Loading...
15 Fee Schedule with Attachments PREPARED BY: Gitta Ungvari Finance Director Reviewed by: Town Manager, Assistant Town Manager, and Town Attorney, Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 02/18/2025 ITEM NO: 15 DATE: February 13, 2025 TO: Mayor and Town Council FROM: Chris Constantin, Town Manager SUBJECT: Adopt a Resolution Modifying the Comprehensive Fee Schedule for Fiscal Year (FY) 2024-25 Amending Certain Fees, Rates, and Charges for FY 2024-25. RECOMMENDATION: Adopt a resolution modifying the Comprehensive Fee Schedule for FY 2024-25 amending certain fees, rates, and charges for FY 2024-25. BACKGROUND: The Town’s financial policies require that certain fees, rates, and charges for services be maintained to allow for cost recovery based on the actual cost to provide Town services. “Fee” activities are services and functions provided by the Town to individuals who receive some direct material benefit above and beyond services offered to residents at general taxpayer expense. Staff periodically reviews the cost of providing such services and recommends appropriate adjustments in fees when supported by actual cost data. The current fee schedule became effective on July 1, 2024. The fee schedule was developed based on a comprehensive evaluation of Town fees completed in 2019. The fees established in the 2019 study are increased each year based on the Consumer Price Index. The current fee schedule calls for Parks and Public Works to charge $4,948 for new multi-family residential applications. On December 3, 2024, the Town Council adopted amendments to Town Code Section 14 regarding sidewalk and park vending. The updated code eliminates reference to pushcart permits. The current fee schedule (line 207) references an application fee for a pushcart permit that no longer exists as of January 3, 2025. PAGE 2 OF 3 SUBJECT: Fee Schedule for Fiscal Year 2024-25 DATE: February 13, 2025 DISCUSSION: The proposed FY 2024/25 Comprehensive Fee Schedule accounts for modifications to fees as explained below: 1. Sidewalk Vending Permit (Line 207 page 21) – Effective January 3, 2025, the pushcart ordinance was repealed and replaced with a sidewalk vending ordinance. This modification updates the name of the permit fee to reflect the new permit program. 2. Encroachment Permit - Consultant Plan Review and Inspection Services for serial applications (10+ per year) or specialty applications (page 26) – Provides clarity with regard to use of Parks and Public Works use of consultant services to review encroachment permit applications and inspect work performed in the right of way. Parks and Public Works (PPW) receives, reviews, and issues approximately 700 encroachment permits every calendar year. Each of these permits receives field inspection to ensure the permittee is complying with the permit requirements. Throughout 2024, PPW has been seeing a dramatic increase in high-volume encroachment permit applications from telecom, digital, electric service, and other utility providers. With only one staff member in the encroachment permit program, the use of a third-party consultant to review applications and perform field observations of work associated with these high-volume applicants (e.g., Comcast, PG&E) is required. This change in the fee schedule provides PPW the authority to use third-party consultants to support the review of these applications. 3. Entitlement Application - Consultant Plan Review – 10+ Units (page 30) – Provides the authority for staff to require applicants of large land use entitlement projects to pay for consulting costs associated with review of the application at the time the application is made. This change is proposed because the current fee schedule allows for Parks and Public Works to charge approximately $4,950 for entitlement applications. That fee is not adequate to cover staff costs associated with the review of the larger mult-family applications the Town has been receiving in recent years. With only two engineers in the PPW land use review team, the volume and size of applications through 2024 is not something staff can complete with their own resources; a fact that is exacerbated when paid leaves occur. The proposed change will keep the application fee and add a requirement for applicants to pay for third-party consultant review fees. The application fee will pay for staff time associated with processing the application; processing consultant agreements; coordinating comments between the consultant, the Community Development Department, and the applicant; and meeting with the applicant. At an average staff billing rate of $176.15 per hour, the PAGE 3 OF 3 SUBJECT: Fee Schedule for Fiscal Year 2024-25 DATE: February 13, 2025 $4,950 fee covers 28 hours of staff time, which is the minimum amount of staff time spent reviewing large planning applications. 4. Building Permit Application - Consultant Plan Review and Inspection Services - 10+ units (page 30) – Provides the authority for staff to require applicants of large building permit projects to pay for consulting costs associated with review of the application at the time the application is made. At present PPW does not charge a fee for the review of building permit applications. This change will allow PPW to use third-party consultants to review larger multi-family building permit applications. In the future, following a more detailed study, PPW may seek the charge staff time associated with this review. CONCLUSION: For the reasons stated in this report, staff recommends that the Town Council adopt a resolution amending the Comprehensive Fee Schedule for Fiscal Year 2024-25 amending certain fees, rates, and charges for Fiscal Year 2024-25. FISCAL IMPACT: The proposed Encroachment Permit, Entitlement Application, and Building Permit fees have no fiscal impact on this action, as costs for the Engineering consulting services for Pass-Through Accounts (program 5999) are paid by applicants of development proposals. The proposed Sidewalk Vendor Permit application fee will provide for cost recovery of administrative costs. ENVIRONMENTAL ASSESSMENT: This is not a project defined under CEQA, and no further action is required. Attachment: 1. Resolution approving Comprehensive Fee Schedule FY 2024-25, including Exhibit A Proposed FY 2024-25 Comprehensive Fee Schedule – (Redline) 1 of 2 Draft Resolution Date DRAFT RESOLUTION RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS CONTINUING DEPARTMENT FEES, RATES, AND CHARGES, AND AMENDING CERTAIN FEES FOR SERVICE FOR FY 2024-25 WHEREAS, The Town of Los Gatos follows best municipal financial practices that require the Town to establish and maintain all user charges and fees based on the cost of providing services; and WHEREAS, the last update of the Town of Los Gatos Comprehensive Fee Schedule was adopted on April 2, 2024; and WHEREAS, those fees currently in effect will remain in effect without interruption, certain of these shall be increased, and certain new services shall have fees; and WHEREAS, in accordance with Government Code Section 66018, information regarding the proposed changes to the fees for service and facilities fees was made available to the public in the Office of the Town Clerk; and WHEREAS, these fee changes to provide for cost recovery are not a project subject to CEQA. NOW, THEREFORE, THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES HEREBY RESOLVE: 1. That Resolution 2024-013, “Resolution of the Town Council of the Town of Los Gatos Continuing Department Fees, Rates, and Charges, and Amending Certain Fees, Rates, and Charges for FY 2024/25” is hereby rescinded; and 2. The Town of Los Gatos Comprehensive Fee Schedule, attached hereto as Exhibit A, is adopted and shall become effective February 18, 2025. ATTACHMENT 1 2 of 2 Draft Resolution Date PASSED AND ADOPTED at a regular meeting of the Town Council held on the _____ day of _______, 2025 by the following vote: COUNCIL MEMBERS: AYES: NAYS: ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: TOWN CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA T O W N O F L O S G A T O S C A L I F O R N I A COMPREHENSIVE FEE SCHEDULE (REDLINED) FISCAL YEAR 2024-25 Cover Photos: Ken Benjamin, Scott Anderson, and Evie Julian Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule TOWN OF LOS GATOS FEE SCHEDULE The following Fee Schedule is effective July 1, 2024 through June 30, 2025, unless updated by the Town Council. The Fee Schedule will be adjusted annually by the average Consumer Price Index (Bureau of Labor Statistics, U.S. Department of Labor for the San Francisco/Oakland/San Jose Metropolitan Statistical Area) for the calendar year and/or by the percentage increase in actual operating costs for the current year – whichever is greater. For FY 2024-2025, the fees are adjusted by 3.5% CPI. This Fee Schedule also provides for minimum annual adjustments for those fees that are directly related to personnel costs. Other adjustments may be made to maintain consistency with the surrounding municipalities within the Town of Los Gatos region but in no case are fees charged in excess of service delivery costs. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule TABLE OF CONTENTS Administrative Services ......................................................................................................... 1 Attorney Services .................................................................................................................. 4 Development Services General Development Fees ............................................................................................................ 5 Building Division Fees ..................................................................................................................... 7 Building Permit Fees ....................................................................................................................... 7 Electrical Permit Fees .................................................................................................................... 10 Mechanical Permit Fees ................................................................................................................ 12 Plumbing Permit Fees ................................................................................................................... 13 Other Fees ..................................................................................................................................... 14 Planning Division Fees...................................................................................................... ……………16 Zoning Approvals .......................................................................................................................... 17 Subdivisions .................................................................................................................................. 20 Miscellaneous Application Fees .................................................................................................... 21 Environmental Assessment Fees .................................................................................................. 21 Other Fees ..................................................................................................................................... 23 Engineering Division Fees ............................................................................................................. 25 Library Services ................................................................................................................... 31 Parks and Public Works Services Parks Division Fees ........................................................................................................................ 32 Oak Meadow Park Fees ................................................................................................................ 32 Creekside Sports Park Fees ........................................................................................................... 33 Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor Park Fees ......................................... 34 Turf Maintenance Fee ................................................................................................................... 34 Tree Related Fees .......................................................................................................................... 34 Equipment Hourly Rates ............................................................................................................... 35 Street Division Fees ....................................................................................................................... 35 Police Services ..................................................................................................................... 37 Parking Permit Fees ...................................................................................................................... 38 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 1 ADMINISTRATIVE SERVICES Civic Center Facilities Use Town approved non-profit fundraising activities are allowed in/on Civic Center facilities with an appropriate permit, or license issued by the Town, or provided in an agreement or Conditional Use Permit with the Town. Private events are not allowed, including in the Council Chambers, with the exception of approved events hosted by the tenants of 106 and 108 East Main Street as stated in tenant lease agreements. Large scale special events may be required to provide a deposit prior to the event. The available Town facilities at the Civic Center are listed below: • Civic Center Lawn, Deck and Stairs • Civic Center West Patio • Council Chambers • Council Chambers Lobby (as a stand-alone facility) Copy and Printing Charges Special Events 1 Fee for Town Hall Facilities Use Non Profit: $0.00 per hour For Profit: $55.00 per hour 2 Building Attendant $20.00 per hour 3 Copy of Town Code Actual Cost 4 8 1/2 x 11 and 8 1/2 x 14 $.25 per page 5 11 x 17 $.35 per page 6 Oversized or Large Productions Actual Cost 7 Annual Subscription for Town Code Supplements Actual Cost 8 Copying of Zoning Ordinance Actual Cost 9 Annual Subscription for Zoning Ordinance Supplements Actual Cost 10 Certification of Town Records $2.00 11 Annual Financial Report Actual Cost 12 Annual Budget Actual Cost 13 Capital Improvement Plan Actual Cost 14 Special Event Application Fee, For-Profit New Event $910.00 Repeat Event $680.00 15 Special Event Application Fee, Not-For Profit New Event $227.00 Repeat Event $170.00 16 Special Event Road Closure Review Fee $225.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 2 ADMINISTRATIVE SERVICES Special Events (continued) Business License Other Services 17 Special Event N. Santa Cruz Avenue Road Closure Fee Actual Cost 18 Block Party Permit $55.00 19 Temporary Encroachment Permit $173.00 20 Police Officer $251.55 per hour 21 Lead Parks and Public Works Maintenance Worker $130.17 per hour 22 Parks and Public Works Maintenance Worker $108.55 per hour 23 Anti-Vehicle Barrier, Special Event Road Closure Actual Cost 24 Temporary No Parking Signs $1.00 25 Temporary Alcohol Restricted Signs $1.00 26 Temporary Banner Permit $105.00 27 Use of the Civic Center lawn, deck and stairs for approved special events coordinated by a for-profit organization $55 per hour 28 Use of Town Plaza Park for approved special events $55 per hour 29 Facility Deposit $500 30 Street Pole Banner Program $220 per banner (includes install and removal) 31 Business License Processing Fee - New Out of Town $20.00 In Town $40.00 32 Business License Processing Fee - Renewal Out of Town and In Town $30.00 33 Compact Disk or Tape of Council and Planning Commission Meetings (plus actual mailing costs, if applicable) $20.00 per DVD for meetings under 2 hours $30.00 per DVD for meetings over 3 hours 34 Copy - Digital $10 per device 35 Initial Returned Check Fee $25.00 36 Subsequent Return Check Fees [CA Civil Code Section 1719(a) (1)]$35.00 37 Election Filing Fee $25.00 38 Town Credit Card Processing Fee 2.40% Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 3 ADMINISTRATIVE SERVICES Other Services Credit and Debit Card Processing 2.9% of transaction amout, minimum of $2.00 ACH/eCheck $1.25 per transaction Returned Payments/NSF $25.00 40 Third Party Vendor Parking Citations and Permits Electronic Payment Processing Fee $3.95 41 Request for Service Not Covered by any Other Fee Fully allocated hourly rates for all personnel 42 Initiative/Referendum Petition Filings Fee $200.00 39 Third Party Vendor Business License Electronic Payment Processing Fees Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 4 ATTORNEY SERVICES 1 Conditions, Covenants & Restrictions (CC&R) Review and Approval Fully allocated hourly rates for all personnel 2 Simple Covenant/Deed Restriction Fully allocated hourly rates for all personnel 3 Subdivision Improvement Agreements Fully allocated hourly rates for all personnel 4 Encroachment Agreements Fully allocated hourly rates for all personnel 5 Miscellaneous (Legal Agreements, Real Property, etc.)Fully allocated hourly rates for all personnel Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 5 DEVELOPMENT SERVICES General Development Fees Reports, Agendas, and Minutes 1 Reproduction (sent out) plus actual mailing costs, as applicable. Maps, plans, etc. (larger than 11" x 17") Actual Cost - sent to San Jose Blueprint 2 Data Duplication service and fee for partial or full copies of each digital standard Town data file on one- time request basis. 8 1/2" x 11" copy, standard i $.25 per page 3 Document Storage Fee - Laserfiche Actual Cost 4 Duplicate Plans Set $154.00/hr. (1/2 hr. minimum) 5 Research Records Charge for Staff Research beyond 30 minutes Fully allocated hourly rate for all personnel 6 Address Processing Fee - per address $190.00 7 Computer Surcharge on all Building/Plumbing/Mechanical/Electrical/Grading/En croachment/Planning Permits/Applications and any other Permits/ Applications except Park Permit/Applications 4% of development application fee 8 Engineering Development Review Service Fee - Building Permit and Building Plan Check* 5% of permit or plan check 9 Request for Service Not Covered by Any Other Fee Actual Cost 10 Pre-application Conference Fee Courtesy meeting 11 Applications for Work Unlawfully Completed Double current application fee 12 BMP Document Processing Fee $686.00 13 Public Art In-Lieu Fee 1% of building permit valuation *These fees are applied to permits or plan checks that require engineering services. 14 Development Review Committee Agendas $37.00 15 Planning Commission Agendas $25.00 16 Planning Commission Minutes Actual Cost 17 Plan Copies - microfiche or other reprints sent to an outside firm $31.00 plus costs 18 Plan Copies - blueprint reproduction in house $3.00 per page 19 Copy of Subdivision Ordinance $26.00 20 General Plan (including maps)$26.00 21 Hillside Specific Plan $5.80 22 Hillside Development Standards and Design Guidelines $19.45 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 6 DEVELOPMENT SERVICES Reports, Agendas, and Minutes (continued) Landscape Final occupancy clearance (new construction or remodel) Basis: Development Review Committee Meetings – 1.5 hrs. (estimate) Site Visits – 4.0 hrs. (estimate) Review Plan – 4.0 hrs. (estimate) *Note: Time spent over and above the initial application fee will be billed at the current employee billing rate plus equipment hourly rate. Annexation Fees Any remaining deposit will be refunded to the applicant and amounts exceeding the deposit amount will be paid by applicant. 23 Commercial Design Guidelines $20.50 24 Subdivision Ordinance $26.00 25 General Plan/Zoning Maps (24" x 36") - Black & White $9.00 26 General Plan/Zoning Maps (24" x 36") - Color $42.00 27 Blossom Hill Open Space Study $14.00 28 Commercial Specific Plan Report $12.00 29 Residential Design Guidelines $21.50 30 Housing Element Technical Appendix $24.75 31 2015-2023 Housing Element $39.00 32 Los Gatos Boulevard Plan $9.50 33 North Forty Specific Plan (adopted June 2015)$45.25 34 Park Staff Time Spent for Major Development Applications $543.00* 35 1 Lot $3,590.00 36 2 Lots $1,795.00 37 3 Lots $1,199.00 38 4 Lots $900.00 39 5 Lot or more $715.00 *Annexation Advertising Deposit (varies as to size of map) - $1,000.00 to $2,200.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 7 DEVELOPMENT SERVICES Seismic Hazards Mapping Program Fee (SMIP) For residential construction of three stories and less (Category 1), the permit fee is $13.00 per $100,000. For all other construction (Category 2), the permit fee is $28.00 per $100,000. This fee is required by the State of California to identify and map zones of particular seismic hazards. Five percent of the fee is retained by the Town to be used solely for earthquake preparedness. Capital Improvement Tax (Construction) Based on $0.18 for each square foot of building addition or alteration, which increases floor area of an existing building. Underground Utility Tax (Utilities) Based on $0.18 for each square foot of building addition or alteration, which increases floor area of existing building. Park Fund Tax (Parks) Based on $0.04 for each square foot of building addition or alteration, which increases floor area of an existing building. Building Division Building Permit Fees Building Permit Fees for New Construction and Addition The fee for each building permit shall be based upon the 1997 Uniform Building Code as amended by the 2010 California Building Code. A building valuation regional modifier of 2.32 shall be used in conjunction with the Building Valuation Data provided in the publication, Building Valuation Data, published by the International Code Council – February 2012. Hillside Homes shall use a modifier of 3.246 and Commercial Office Tenant Improvements shall use a modifier of 1.16. The Building Valuation Data will be increased yearly by the Engineering News Record (ENR) Annual Building Cost Index (BCI) for every year thereafter. 40 Fee for issuing/reinstating a Building Permit $65.00 41 Additional Building Permit Fee $36.00 42 Demolition Permit Residential: $317.00 Commercial: $554.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 8 DEVELOPMENT SERVICES Building Permit Fees for New Construction and Addition Total Valuation Fee 43 $1.00 to $500.00 $39.00 44 $501.00 to $2,000.00 $39.00 for the first $500.00 plus $5.10 for each additional $100.00 or fraction thereof, to and including $2,000.00 45 $2,001.00 to $25,000.00 $116.00 for the first $2,000.00 plus $23.44 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 46 $25,001.00 to $50,000.00 $655.00 for the first $25,000.00 plus $16.91 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 47 $50,001.00 to $100,000.00 $1,077.00 for the first $50,000.00 plus $11.73 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 48 $100,001.00 to $500,000.00 $1,664.00 for the first $100,000.00 plus $9.37 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 49 $500,001.00 to $1,000,000.00 $5,414.00 for the first $500,000.00 plus $7.95 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 50 $1,000,001.00 and over $9,391.00 for the first $1,000,000.00 plus $5.27 for each additional $1,000.00 or fraction thereof Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 9 DEVELOPMENT SERVICES Building Permit Fees for Remodels, Alterations, and Repairs The Building Official shall establish the valuation of said improvements, and fees will be assessed as per Valuation Schedule above. Special Services & Inspections Plan Review Fee A plan review fee shall be charged at the time of filing application. This fee is separate from and shall be in addition to the building permit fee. This fee is calculated at sixty-five percent (65%) of the building permit fee as per the valuation schedule starting on page 6. Other Miscellaneous Factors to Determine Construction Valuation 51 Inspection outside normal business hours (4 hr. minimum) $229.00/hr. 52 Re-inspection fees $190.00/hr. 53 Inspections for which no fee is specifically indicated (2 hr. minimum) $190.00/hr. 54 Additional plan review required by changes, additions or revisions to plans (1 hr. minimum) $181.00/hr. 55 For use of outside consultants for plan checking and/or inspections Actual Cost 56 Services for which no fee is specifically indicated (1/2 hr. minimum) $190.00/hr. 57 Permit/Plan check time extension (per permit) (applies to permits that have not expired) $93.00 58 Express plan review or initial review (1 hr. minimum)$190.00/hr. 59 Application for the Appeals Building Board Review $325.00 60 Temporary Certificate of Occupancy $1,306.00 61 Convert Garage to habitable space $140.00/sq.ft. 62 Convert unfinished basement or attic to habitable $151.00/sq.ft. 63 Pools/Spas (gunite)$90.00/sq.ft. 64 Siding - aluminum/vinyl/wood $38.00/sq.ft. 65 Antennas & Towers Const.Value As Applied under valuation schedule on page 6 66 Commercial Awning or Canopy Aluminum $38.00/sq.ft. Canvas $28.00/sq.ft. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 10 DEVELOPMENT SERVICES Other Miscellaneous Factors to Determine Construction Valuation (continued) Special Systems Fees Electrical Permit Fees Plan Review & Re-inspection Fees 67 Fence or Freestanding Wall (over 6" high)Wood or metal $59.00/sq.ft. Masonry $101.00/sq.ft. 68 Decks/Balcony $56.00/sq.ft. 69 Wood Deck $24.00/sq.ft. 70 Re-roofs $3.37/sq.ft. 71 Retaining Walls $127.00/sq.ft. 72 Emergency generation, wind power, special HVAC systems, etc. Plan Review (1 hr. minimum) $181.00/hr. Field Inspection (2 hr. minimum) $190.00/hr. 73 Photovoltaic - Roof & Ground Mounted - Residential Plan Review (1/4 hr. minimum) $181.00/hr. Field Inspection (1 hr. minimum) $190.00/hr. 74 Photovoltaic - Roof & Ground Mounted - Commercial Plan Review (1 hr. minimum) $181.00/hr. Field Inspection (2 hr. minimum) $190.00/hr. 75 Fee for issuing/reinstating an Electrical Permit $65.00 76 Additional Electrical Permit Fee $29.00 77 New Residential Construction (new buildings only, including garages) $.12 sq. ft 78 Commercial Construction $.09 sq. ft 79 Plan review fee 25% of Electrical Permit Fee 80 Additional plan review $181.00/hr. 81 Re-inspection fee $190.00/hr. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 11 DEVELOPMENT SERVICES System Fee Schedule For alterations to existing pools, use Unit Fee Schedule fees listed on page 10. Unit Fee Schedule 82 Private swimming pools $76.00 83 Public swimming pools $137.00 84 Temporary power poles $93.00 85 Temporary distribution system & temporary lighting $46.00 86 Installation of illuminated signs (each)$120.00 87 Receptacle, switch and lights $2.26 88 Residential appliances/new circuits (cook top, oven, range, disposals, clothes dryers, or other motor operated appliances not exceeding one horsepower) $7.25 89 Nonresidential appliances/new circuits (medical & dental devices, food, beverage, drinking fountains, laundry machines, or other similar equipment) NOTE: for other types of air conditioners and other motor- driven appliances having larger electrical ratings, see Generators/Motors $9.32 90 Photovoltaic system (residential)$90.00 91 Solar systems (including controls)$90.00 92 Power apparatus (generators, transformers, A/C, heat pumps, baking equipment) Up to 10 KV, each $19.00 Over 10 KV not over 50 KV, each $38.00 Over 50 KV and not over 100 KV, each $76.00 Over 100 KV, each $100.00 93 Motors Up to 10 hp $19.00 Up to 25 hp $38.00 Up to 55 hp $76.00 Over 55 hp $110.00 94 Transformers Up to 5 KVA $19.00 Up to 10 KVA $38.00 Up to 50 KVA $63.00 Over 50 KVA $92.00 95 Busways/conduits (per 100 ft)$9.32 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 12 DEVELOPMENT SERVICES Unit Fee Schedule (continued) Other Electrical Fees Mechanical Permit Fees Plan Review & Re-inspection Fees Unit Fee Schedule 96 Service equipment 200 amps or less $93.00 201 to 999 amps $128.00 Sub-panels $46.00 97 Installation of spas or saunas $46.00 98 Duplicate job card $29.00 99 Permit extension (applies to permits that have not expired) $93.00 100 Fee for issuing/reinstating a Mechanical Permit $65.00 101 Additional Mechanical Permit Fee $29.00 102 New Residential Construction (new buildings only, including garages) $.12 sq. ft 103 Commercial Construction $.09 sq. ft 104 Plan review fee 25% of Mechanical Permit Fee 105 Additional plan review $181.00/hr. 106 Re-inspection fee $190.00/hr. 107 Installation, of each heating system, A/C, boiler, compressor or air handler $46.00 108 Each duct repair or alteration $13.46 109 Each fireplace appliance $38.00 110 Each ventilating fan $13.46 111 Installation of separate flue or vents not included with the installation of an appliance $13.46 112 Installation of each hood with mechanical exhaust Residential $38.00 Commercial $137.00 113 Each new or repair of gas piping system $84.00 114 Each additional gas outlet $27.00 115 Installation of evaporative cooler $38.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 13 DEVELOPMENT SERVICES Other Mechanical Fees Plumbing Permit Fees Plan Review & Re-inspection Fees System Fee Schedule Unit Fee Schedule 116 Duplicate job card $29.00 117 Permit extension (applies to permits that have not expired) $93.00 118 Fee for issuing/reinstating a Plumbing Permit $65.00 119 Additional Plumbing Permit Fee $29.00 120 New Residential Construction (new buildings only, including garages) $.12 sq. ft 121 Commercial Construction $.09 sq. ft 122 Plan review fee 25% of Plumbing Permit Fee 123 Additional plan review $181.00/hr. 124 Re-inspection fee $190.00/hr. 125 Private swimming pools (including heater, water piping, gas piping) $110.00 126 Public swimming pools (including heater, water piping, gas piping) $165.00 127 Lawn sprinkler system on one meter $46.00 128 Each new or repair of gas piping system $84.00 129 Each drainage, sewer system $46.00 130 Radiant floor heating system $137.00 131 Each plumbing fixture or trap or set of fixtures on one trap $13.46 132 Each sewer cleanout, backflow device $13.46 133 Each septic system abatement $137.00 134 Rainwater systems - per drain (inside building)$13.46 135 Each water heater, water softener $38.00 136 Each grease interceptor (750 gallon capacity)$93.00 137 Each grease trap (1-4 fixtures)$53.00 138 Residential water re-piping $137.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 14 DEVELOPMENT SERVICES Unit Fee Schedule (continued) Other Plumbing Fees Other Building Fees Building Fee Refunds Request must be received within 1 year of original payment date. Subject to approval by the Chief Building Official. • Building Permit - 80% provided no work or inspections have been completed; 0% if any work or inspections have been completed. • Subtrade Permit - 80% provided no work or inspections have been completed; 0% if any work or inspections have been completed. • PV Permits - 80% provided no work or inspections have been completed; 0% if any work or inspections have been completed. • Building Plan Check - 80% if cancelled or withdrawn before any plan check review has begun. • Microfilm/Laserfiche - 80% of actual cost minus refund request page. • Planning Plan Check - 0% • Computer services (4%) - 0% • Issuance Fee - 0% • Credit Card processing fee - 0% • Title 24 Fee - 0% • Capital Improvement Tax - 100% • Utility Tax - 100% 139 Each ejector/sump pump $46.00 140 Each vacuum breaker/hose bib $13.46 141 Each water piping system repair or replacement $28.00 142 Each additional gas outlet $28.00 143 Duplicate job card $29.00 144 Permit extension (applies to permits that have not expired) $93.00 145 Duplicate Inspection Card $36.00 146 NPDES Inspection Fee (Charged on all building permits with the potential to generate non-point source storm water runoff during construction) $84.00 147 SB 1186 Accessibility Fee $4.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 15 DEVELOPMENT SERVICES Building Fee Refunds (continued) • Park Tax - 100% • Storm Drain (ENG) - 100% • Road Impact Basin - 100% • Seismic Tax (SMIP) 5% - 100% • Seismic Tax (SMIP) 95% - 100% • General Plan Update - 100% • NPDES - 80% provided no work or inspections have been completed; 0% if any work or inspections have been completed. • Building Standards - 0% • Itemized items - 100% • Online permits such as water heaters, furnace, and electrical permits - 100% State of California Title 24 Part 2 Energy and Accessibility Code and Regulation Plan Review and Inspection Fees A surcharge shall be added to the building permit fee for the cost to plan review and inspect for compliance with State of California Title 24 Regulations. This fee is calculated at fifteen percent (15%) of the building permit fee. This fee is applied whenever a plan review is assessed. State of California Mandated Building Standards Fee – SB 1473 A surcharge shall be added to all building permits at the rate of four dollars ($4) per one hundred thousand dollars ($100,000) in valuation, with appropriate fractions thereof, but not less than one dollar ($1). These funds will be available to the California Building Standards Commission, the Department of Housing and Community Development, and the Office of the State Fire Marshall for expenditure in carrying out the provisions of the State Building Standards Law and provisions of State Housing Law that relate to building standards. Up to ten percent (10%) shall be retained for related administrative costs and for code enforcement education. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 16 DEVELOPMENT SERVICES Planning Division The fees listed below constitute all fees imposed by the Planning Division. Certain types of applications must be reviewed / processed by other departments/agencies, which may impose separate fees. Applicants are advised that the fees for those services are not included in the Planning Department's fees. Where the term "actual cost" is used here, it shall mean: materials, supplies (including any costs of noticing or publication), outside consultants, employee cost will be billed at the top step, plus benefits, plus overhead. The following fee schedule is established for applications filed pursuant to the Town Code. The fees are collected by the Community Development Department at the time the application is filed unless otherwise noted. • Fees for Additional Processing - In the event additional processing services by the Town are required due to changes, modifications, additions, errors, omissions, or discrepancies caused by the applicant or his/her agents or representatives, the applicant shall pay an additional fee as determined by the Director of Community Development to cover the actual cost. • Fees for Lack of Progress - If additional information is required by the Town for an application and the requested information is not submitted within 180 days, the applicant will be required to pay a fee of 10 percent of the current application fee at the time the requested information is submitted. Any re-submittal after one year will be processed as a new application, subject to new fees. • Fees for Major Projects - If it is anticipated that the application processing costs of selected major projects will significantly exceed the following fees, the Director of Community Development may collect a deposit and charge actual time spent to process the applications based upon current hourly rates. • Surcharges - All of the following applications are subject to the surcharge fees as set forth in General Development Services and in the Zoning Research section of Planning Division. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 17 DEVELOPMENT SERVICES Zoning Approvals - Architecture and Site Applications – Development Review Committee (DRC) Approval Zoning Approvals – Architecture and Site Applications – Planning Commission Approval 148 New single family detached (HR and RC zones)$10,707.00 Engineering Development Review Service Fee $4,950.00 149 New non-custom single family detached (HR and RC zones) per unit/model, as part of a Planned Development** $7,435.00 Engineering Development Review Service Fee $4,947.00 150 New single family or two family units $7,379.00 Engineering Development Review Service Fee $4,948.00 151 New single family or two family (any other zone) per unit/model new nonresidential or multiple family per building as part of a Planned Development** $5,272.00 Engineering Development Review Service Fee $4,952.00 152 Minor projects (a development proposal that does not significantly change the size, mass, appearance or neighborhood impact of a structure, property or parking lot i.e. minor grading permit) $2,674.00 Engineering Development Review Service Fee $3,799.00 153 Supplemental fee DRC applications as determined with fee #146 or minor residential development applications or applications that are part of a Planned Development that require Planning Commission approval $3,778.00 Engineering Development Review Service Fee $1,380.00 154 New two family unit $11,254.00 Engineering Development Review Service Fee $4,950.00 155 New nonresidential (includes conceptual Planned Development elevations and mixed use that includes two or fewer buildings) $12,917.00 Engineering Development Review Service Fee $4,950.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 18 DEVELOPMENT SERVICES Zoning Approvals – Architecture and Site Applications – Planning Commission Approval (continued) Conditional Use Permits Rezoning (other than Planned Development) 156 New multiple family (includes conceptual Planned Development elevations that include two or fewer buildings) $11,743.00 Engineering Development Review Service Fee $4,948.00 157 New multiple family, mixed use, or non residential project with more than two buildings Actual Cost and minimum $20,000 deposit *Aside from the fees noted above, no additional Architecture and Site application fees will be assessed for projects that involve a historic structure or site. **Any changes proposed to model homes, nonresidential, or multiple family buildings, a supplemental fee shall be based on a time and materials basis to review the changes. 158 Conditional Use Permit (PC Approval)$7,574.00 Engineering Development Review Service Fee $1,611.00 159 Conditional Use Permit (when consolidated with another application for new development) $1,259.00 Engineering Development Review Service Fee $923.00 160 Conditional Use Permit (DRC Approval)$4,609.00 Engineering Development Review Service Fee $1,383.00 161 Applications that require Town Council Approval (these fees supplement the above established fees) $3,592.00 Engineering Development Review Service Fee $1,381.00 Transcription of Planning Commission minutes - Actual cost and minimum $500.00 deposit 162 Without General Plan or Specific Plan Amendment Actual Cost ($5,000.00 minimum) 163 With General Plan or Specific Plan Amendment Actual Cost ($7,000.00 minimum) 164 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00 deposit Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 19 DEVELOPMENT SERVICES Planned Development Planning Division Certificates of Use and Occupancy Sign Application Administrative Land Use Permit 165 Without General Plan or Specific Plan Amendment Actual Cost 166 Without General Plan or Specific Plan Amendment (HR or RC Underlying Zone) Actual Cost 167 With General Plan or Specific Plan Amendment Actual Cost 168 With General Plan or Specific Plan Amendment (HR or RC Underlying Zone) Actual Cost 169 Town Council Modification to a Planned Development Actual Cost ($5,000.00 minimum) 170 DRC Modification to a Planned Development Actual Cost ($3,000.00 minimum) 171 172 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00 deposit Publication costs for the planned development ordinance shall be paid by the applicant 173 Change of use $274.00 174 Change of occupancy (excluding change of proprietor of a continuing business enterprise) $184.00 175 Use/occupancy clearance if Conditional Use Permit is required or occupancy of a new accessory dwelling unit No fee 176 New permanent sign $369.00 177 Temporary nonresidential sign $118.00 178 Change of face only $184.00 179 Sign program $2,474.00 180 Minor telecommunications facility (i.e. microcell, 8,021 lb. or equivalent) $1,831.00 181 Major telecommunications facility which do not require a Conditional Use Permit $4,389.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 20 DEVELOPMENT SERVICES Other Zoning Approvals Fees Subdivisions 182 Variance $5,570.00 Engineering Development Review Service Fee $1,611.00 183 Minor Residential Development (see #151)$2,674.00 184 Agricultural Preserve Withdrawal $4,544.00 185 Hazardous Materials Storage Facility Application Fully allocated rate of all personnel, plus noticing fees 186 Home Occupation Permit $184.00 187 SB 330 Preliminary Application Actual Cost ($500 minimum deposit) 188 SB 35 Preliminary Application Actual Cost ($500 minimum deposit) 189 Two-Unit Housing Development $1,598.00 190 Urban Lot Split $1,598.00 191 Mobile Home Park Conversion Permit Fully allocated rate of all personnel with initial deposit of $5,000.00 192 General Plan/Town Code Amendments Fully allocated rate of all personnel with initial deposit of $5,000.00 plus additional fees 193 Lot Line Adjustment (DRC Approval)$2,538.00 Engineering Development Review Service Fee $4,259.00 194 4 Lots or Less (DRC Approval)$10,226.00 Engineering Development Review Service Fee $4,723.00 195 4 Lots or Less (as part of a Planned Development) (DRC Approval) $4,223.00 Engineering Development Review Service Fee $4,952.00 196 5 Lots or More $11,520.00 Engineering Development Review Service Fee $6,100.00 197 5 Lots or More (as part of a Planned Development) (DRC Approval) $4,951.00 Engineering Development Review Service Fee $6,103.00 198 Vesting Tentative Map (VTM)Actual Cost plus $500.00 deposit and additional fees Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 21 DEVELOPMENT SERVICES Subdivisions (continued) Miscellaneous Application Fees Environmental Assessment Fees 199 Lot Merger and Reversion to Acreage (DRC Approval)$1,258.00 Engineering Development Review Service Fee $4,258.00 200 Condominium $8,878.00 201 Condominium (as part of a Planned Development)$4,223.00 202 Certificate of Compliance (DRC Approval)$3,668.00 Engineering Development Review Service Fee $2,646.00 203 VTM applications that require Town Council approval, Subdivision and/or DRC applications that require Planning Commission approval. This fee supplements the above-established fees. $3,368.00 204 Time Extensions to Approved Application 50% of current fee (excluding fees based on actual cost) 205 Modification to Approved Application 75% of current fee (excluding fees based on actual cost) 206 Conceptual Development Advisory Committee Review $2,966.00 Special Noticing - Actual Cost (minimum $500.00 deposit) 207 Push Cart Permit Sidewalk Vending Permit $587.00 208 Auto Dealer Events Smaller Promotional Events $98.00 Large Promotional Events $478.00 209 News rack Permit Fee $465.00 210 Firearms Dealer Permit (Town Ordinance 2217 dated 6/17/2013) Fully allocated hourly rate of all personnel plus any necessary outside costs and initial $2,000.00 deposit 211 Categorical Exemption No fee 212 Initial Study Deposit***Fully allocated hourly rate of all personnel with initial $5,000.00 deposit Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 22 DEVELOPMENT SERVICES Environmental Assessment Fees (continued) Surcharges Appeals 213 Draft Initial Study Review Fee (or actual cost if part of a Planned Development, General Plan and/or Town Code Amendment $3,322.00 Engineering Development Review Service Fee $2,303.00 214 Environmental Impact Report Consultant's fee 215 Draft EIR Review Fee Fully allocated hourly rate of all personnel plus any necessary outside costs 216 Impact Monitoring Program (AB3180)Fully allocated hourly rate of all personnel plus any necessary outside costs ***The $5,000 fee is a deposit only. The specific cost of the Initial Study and any required special studies shall be borne by the applicant. The deposit shall be increased before the Town will authorize work exceeding the amount on deposit. Any deposit balance will be refunded. 217 General Plan update surcharge .5% of building valuation for new construction and additions/10% of zone change and subdivision fee 218 Advanced Planning projects 10% of application fee 219 Administrative Fee 10% of development application fees 220 Fee to appeal Planning Commission decision to Town Council Per Residential $523.00 Per Commercial, multi-family or tentative map $2,102.00 221 Fee to remand applications from Town Council to Planning Commission Fully allocated hourly rate for all personnel plus additional fees Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 23 DEVELOPMENT SERVICES Appeals (continued) Zoning Research Other Planning Division Fees 222 Fee to appeal Director of Community Development, Development Review Committee, Historic Preservation Committee, or Santa Clara County Fire Department Exception Request (PRC 4290) decision to Planning Commission Per Residential $264.00 Per Commercial $1,052.00 223 Tree appeals $107.00 224 Appeal transcription fee of Planning Commission minutes (only applies to appeals from Planning Commission to Town Council) Actual Cost - minimum $500.00 deposit 225 Basic Zoning Letter $184.00 226 Legal non-conforming verification $775.00 227 Reconstruction of legal non-conforming structures (Burndown Letter) $329.00 228 Fence Height Exceptions $329.00 229 Peer/Technical Review - any remaining deposit will be refunded to the applicant and amounts exceeding the deposit amount will be paid by applicant Fully allocated hourly rate of all personnel plus any necessary outside costs and initial $2,000.00 deposit 230 Fees For Additional Tech Review and/or DRC Review - DRC beyond three meetings, Planning Commission hearing beyond two meetings, Town Council hearing beyond one meeting Fully allocated hourly rate of all personnel involved plus additional fees 231 Consultation Actual cost on an hourly basis 232 Research Services Minimum Charge Fully allocated hourly rate for all personnel with initial $200.00 deposit 233 Building Permit Plan Check Fee 20% of building fee 234 Below Market Price Housing Program In-Lieu Fee 6% of the building permit valuation for the entire project Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 24 DEVELOPMENT SERVICES Other Planning Division Fees (continued) Payment of Application Fees All application fees are to be paid at the time the applications are submitted to the Community Development Department. If the applicant withdraws an application, which requires a hearing by the Planning Commission, prior to processing the application for the hearing, 40% of the paid application fee shall be refunded to the applicant at the discretion of the Director of Community Development. All other fees are non-refundable. 235 Outdoor Seating Permit Fully allocated hourly rate for all personnel with initial $1,000.00 deposit 236 Valet Parking Permit Fully allocated hourly rate for all personnel with initial $1,000.00 deposit 237 Parklet Program Fully allocated hourly rate for all personnel with initial $1,000.00 deposit 238 Shared Parking Permit Actual Cost ($1,000 deposit) Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 25 DEVELOPMENT SERVICES Engineering Division The following fees constitute a comprehensive listing of the various fees charged by the Engineering Program. Certain types of application/permits must be reviewed and/or processed by other Town departments or public agencies, which may charge separate fees. Applicants are advised that the fees for those services are not included in the Engineering Program's fees. Where the term "actual cost (s)" is used here it shall mean: materials, supplies (including any costs of noticing or publication), outside consultants and employee cost, (including salary, benefits and overhead). Engineering Plan Check Fee (Public Improvements & Grading Permits) * Inspection Fee (Public Improvements & Grading Permits) 239 Application Fee $585.00 240 Under $20,000.00 15.5% of valuation 241 $20,001.00 to $80,000.00 $3,697.00 plus 9% of valuation 242 Greater than $80,001.00 $10,137.00 plus 8.5% valuation 243 Each additional plan check beyond three reviews Fully allocated hourly rate for all personnel * Work done at night or on weekends shall be charged the actual costs of staff 244 Under $20,000.00 7.5% of valuation 245 $20,001.00 to $80,000.00 $1,790.00 plus 6.5% of valuation 246 Greater than $80,001.00 $6,440.00 plus 4.0% of valuation Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 26 DEVELOPMENT SERVICES Work In or Use of Public Right-of-Way * NPDES 247 Encroachment Permit - Residential Work up to $4,000.00 - $363.00 Each additional $2,000.00 - $190.00 248 Encroachment Permit - Collector/Arterial Streets**Work up to $4,000.00 - $1,884.00 Each additional $2,000.00 - $411.00 Encroachment Permit - Consultant Plan Review and Inspection Services for serial applications (10+ per year) or specialty applications Consultant fee based on scope, plus the base encroachment fee in the Engineering Division Fees 247 and 248, depending on street type. 249 Outside contractor underground utility locating surcharge (actual cost for outside contractor inspection fee may change) $95.00 250 Temporary Encroachment Permit $179.00 251 Dumpster Permit $179.00 252 Storage Permit $179.00*** *Work done at night or on weekends shall be charged the actual costs of staff ** Single-family residences located along collector and arterial streets to be charged the residential fees above *** $500.00 refundable Storage Unit Removal Deposit, to cover cost of removal, if abandoned 253 Inspection Fee - Grading Permits Single Family Residential $870.00 Commercial or Multi Family Residential $1,354.00 254 Inspection Fee - Encroachment Permits and Some Storage Permits Single Family Residential $239.00 Commercial or Multi Family Residential $387.00 Plus $579.00 per LID facility 255 Inspection of Storm Water Treatment Measures $597.00 per facility 256 Annual Stormwater/Limited Impact Development (LID) Permit Per Visit and 1st facility inspection $579.00 Every additional facility inspection $190.00 257 C-3 Permit Hydrologic Calculation Consultant fee deposit of $3,750.00 plus 25% administrative fee Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 27 DEVELOPMENT SERVICES Engineering Subdivision Map Checking Traffic Impact Analysis or Parking Study $3,404.00* Certificate of Correction $1,000.00 plus 25% administrative fee $4,764.00* Certificate of Correction $1,000.00 plus 25% administrative fee *Plus, initial $3,000 surveyor deposit. Additional deposit(s) of actual surveyor costs may be required for larger projects than 5 or more lots, additional map check review(s), or overall complexity of the map. 1-4 lots258 5 or more lots259 260 Development Review (staff traffic impact analysis or Parking Study) Actual Cost Consultant Report - Consultant Fee 261 Staff Review Fee $792.00 plus 10% of the traffic consultant report cost 262 Site Distance Analysis $213.00 per review not to exceed two hours. Actual cost for staff time when analysis exceeds two hours. 263 Traffic Impact Mitigation Fee $1,104.00 per new average daily trip generated Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 28 DEVELOPMENT SERVICES Storm Drainage Fees Street Improvement In-Lieu Fee Other In-Lieu Fee Hauling Permits 264 Development Projects Single family lots Section 24.60.035(b) (3): For subdivisions with lots that exceed one acre, the fee shall not exceed that of one acre per lot $5,041.00/ac. Multiple family dwelling units - initial unit $5,041.00/ac. Multiple family dwelling units - each unit after initial (not to exceed $5,205.00/ac.) $189.00 Commercial, industrial, hospitals, churches, schools, and others $6,304.00/ac. 265 Building/Grading Permits (Building, Structures, & impervious areas) New impervious surface area, per sq. ft. $2.00/sq. ft. 266 Sidewalks $20.00/sq.ft. 267 Curb and Gutter $125.00/lf. 268 Trail Improvements $16.00/per sq. ft. or determined by Director 269 House Moving Fee $4,162.00* 270 Hauling (Overweight Vehicle) Permit Daily $16.00** Annual $90.00 *Plus initial deposit of $5,000 for facilities damage **The current State mandated fee is $16.00 for Hauling Permit. If the State fee changes, the Hauling Permit fee will change to reflect the same. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 29 DEVELOPMENT SERVICES Construction Activities Mitigation Fee (Ordinance 2189) 271 New Buildings and Additions Residential (per square foot added) $1.48/sq.ft.* Non-residential (per square foot added) $1.48/sq.ft.* *These two fees are adjusted based on the Building Cost Index Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 30 DEVELOPMENT SERVICES Other Engineering Fees Other Engineering Fees 272 Engineering Reversion to Acreage $2,856.00 plus initial deposit of $2,500 for surveyor 273 Engineering Lot Merger $4,149.00 plus surveyor deposit 274 Engineering Lot Line Adjustments $4,149.00 plus surveyor deposit 275 Certificate of Compliance $4,149.00 plus surveyor deposit 276 Abandon Excess Public Right-of-Way or Public Easement $5,181.00 plus surveyor and valuation consultant and planning services 277 Geotechnical Peer Review Fees Consultant fee deposit of $3,000 plus 25% administrative fee. Larger projects require an initial deposit of $4,500 (plus 25% administrative fee) to allow for a site visit by the geotechnical peer review consultant. 278 Separate Instrument Dedication Fee (for dedication via grant deeds and not maps) $858.00 plus initial deposit of $2,500 for surveyor 279 Slurry Seal Fee $3.00/sq. yd. 280 Flood Review Fee Consultant Cost plus 25% Admin Fee 281 Miscellaneous Review Fee*Actual Cost (including staff and consultant time) Entitlement Application - Consultant Plan Review – 10+ Units Engineering Development Review Service fees listed in the Planning Division Fees (Fees 148-238), plus all outside consultant costs, with $10,000 initial deposit paid at time of application. Building Permit Application - Consultant Plan Review and Inspection Services - 10+ units All outside consultant costs, with $10,000 initial deposit paid at time of application. *This fee will be implemented for services including, but not limited to, wet weather inspections, annual inspections, review of operations and maintenance reports, coordination with property owner(s) and/or homeowner associations, etc. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 31 LIBRARY SERVICES Lost or Damaged Items In lieu of above, account holder may replace lost/damage item with new identical copy plus $2.00 processing fee. Internet printing and copies History Project Digital Image 1 Replacement of Adult book/AV item Cost of item plus $10.00 processing fee 2 Replacement of Teen/Children’s book/AV item Cost of item plus $5.00 processing fee 3 Replacement of Adult paperback Cost of item plus $5.00 processing fee 4 Replacement of magazine Cost of item plus $5.00 processing fee 5 Printing per page - Black and White Copies $0.15 6 Printing per page - Color Copies $0.25 7 Fair Use Fees (for personal use only)Free – Downloaded via History Website 8 Commercial Use Fees $25.00 per high resolution image Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 32 PARKS AND PUBLIC WORKS SERVICES Parks Division Oak Meadow Park – Picnic Areas (1 through 9 ) Other Oak Meadow Park Fees Oak Meadow Park – Bandstand/Gazebo – Special Use Permit – Minimum two-hour reservation required Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor Resident $125.00 per site Non-Resident $175.00 per site Resident $250.00 per site Non-Resident $350.00 per site 3 Park Reservation Cancellation Fee $25 per park reservation 2 Picnic Area Reservation Fee w/Jump House 1 Picnic Area Reservation Fee Resident $125.00 per day Non-Resident $175.00 per day Resident $6.00 per vehicle Non-Resident $6.00 per vehicle 6 Annual Parking Pass $95.00 per vehicle 7 Senior Annual Parking Pass $48.00 per vehicle (60 years or older) Resident $100.00 Non-Resident $125.00 8 Vehicle Escort Fee 4 Bocce Ball Court Fee 5 Parking Fee 9 Special Use Permit Application Administrative Fee $25 per application Resident $75.00 per hour Non-Resident $130.00 per hour Resident $125.00 per hour Non-Resident $175.00 per hour 12 Deposit (refundable)$600.00 Resident $75.00 per hour Non-Resident $130.00 per hour 10 Non-Profit Event 11 Public Event Bandstand/Gazebo Lawn Fee Non-Profit/Public13 Resident $125.00 per site Non-Resident $175.00 per site Resident $250.00 per site Non-Resident $350.00 per site 16 Park Reservation Cancellation Fee $25 per park reservation 15 Picnic Area Reservation Fee w/Jump House 14 Picnic Area Reservation Fee Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 33 PARKS AND PUBLIC WORKS SERVICES Oak Meadow Park – Special Use Permit – Single Use Oak Meadow Park – Special Use Permit – Multi- Use Permit – Recreational/educational purposes only Creekside Sports Park – Special Use Permit – Single Use Creekside Sports Park – Special Use Permit – Multi-Use – Recreational/educational purposes only 17 Special Use Permit Application Administrative Fee $25 per application Resident $35.00 per hour Non-Resident $45.00 per hour $200.00 attendees of 150-300 $500.00 attendees over 300 18 Permit Fee 19 Damage Deposit (refundable) 20 Special Use Permit Application Administrative Fee $25 per application Resident $25.00 per hour Non-Resident $35.00 per hour Resident $25.00 per hour Non-Resident $35.00 per hour $200.00 attendees of 150-300 $500.00 attendees over 300 Damage Deposit (refundable)23 21 Non Profit 22 Additional Day 24 Special Use Permit Application Administrative Fee $25 per application Resident $45.00 per hour Non-Resident $55.00 per hour 26 Damage Deposit (refundable)$600.00 25 Permit Fee 27 Special Use Permit Application Administrative Fee $25 per application Resident $35.00 per hour Non-Resident $45.00 per hour Resident $35.00 per hour Non-Resident $45.00 per hour 30 Damage Deposit (refundable)$600.00 28 Non Profit 29 Additional Day Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 34 PARKS AND PUBLIC WORKS SERVICES Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor (Groups of 25+ and/or Jump House) Special Use Permit – Single Use Permit Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor (Groups of 25+ and/or Jump House) Special Use Permit – Multi-Use Permit – Recreational/educational purposes only Turf Maintenance Fee Additional fee added to any Park Use, when a permit's scheduled activity or event will negatively impact the park turf, (locations including but not limited to Oak Meadow, Town Plaza, and Civic Center lawn areas). The fee amount is to be based upon best estimate of turf repair cost, as determined by the Director of Parks and Public Works and/or Maintenance Superintendent. Tree Related Fees 31 Special Use Permit Application Administrative Fee $25 per application Resident $35.00 per hour Non-Resident $45.00 per hour $200.00 attendees of 150-300 $500.00 attendees over 300 33 Damage Deposit (refundable) 32 Permit Fee 34 Special Use Permit Application Administrative Fee $25 per application Resident $25.00 per hour Non-Resident $35.00 per hour Resident $25.00 per hour Non-Resident $35.00 per hour $200.00 attendees of 150-300 $500.00 attendees over 300 37 Damage Deposit (refundable) 35 Non Profit 36 Additional Day 24 Tree Removal Permit Application*One Tree $250.00 Additional Tree $125.00/each If application is denied 50% refund 25 Illegal Tree Removal Administrative Fee $330.00 26 Replacement Trees - Town Forestry Fund Per Tree Ordinance Section 29.10.0985 Tree cost for each 24”,36", and/or 48" box size will be the Market Price plus the installation cost, determined by the Director *Fee will be waived if tree removal is done to implement or maintain Defensible Space. Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 35 PARKS AND PUBLIC WORKS SERVICES Equipment Hourly Rates as Follows Streets Division Hazard and/or Debris Removal 27 Pick-up Truck $32.00 28 1 Ton Flatbed Truck $42.00 29 Utility Truck $57.00 30 Dump Truck (10 Wheel)$85.00 31 Dump Truck (Bobtail)$63.00 32 Paint Truck $85.00 33 Line Remover $26.00 34 Tractor Loader $63.00 35 Backhoe $85.00 36 Rubber-tired Loader $85.00 37 Roller $63.00 38 Van $37.00 39 Concrete Saw $32.00 40 Air Compressor $32.00 41 Arrowboard $32.00 42 Generator $26.00 43 Chainsaw $20.00 44 Blower $10.00 45 Paving Box $63.00 46 Rodder $63.00 47 High Pressure Sewer Cleaner $117.00 48 Brush Chipper $42.00 49 Chipper Truck $63.00 50 Aerial Unit $92.00 51 Street Sweeper $92.00 52 Forklift $42.00 53 Trailer $42.00 54 Message Board $10.81 55 Barricades $0.23 56 Cones $0.15 57 Portable Generators $28.04 58 Staff time spent to conduct hazard and or debris removal caused by citizen negligence Fully allocated hourly rate of all personnel plus any outside costs Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 36 PARKS AND PUBLIC WORKS SERVICES Special Events Fees Electric Vehicle Charging Fee 59 Staff and equipment for special event requests Fully allocated hourly rate of all personnel 60 System Connection Fee $1.00 61 Hourly Charge - 1- 4 hours $1.00/hour 62 Hourly Charge - after 4 hours $5.00/hour Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 37 POLICE SERVICES Printing and Copying Charges Photographs Concealed Weapons Tow Trucks Massage Permit Fees Fee covers staff time to process application, review pertinent documents and obtain all necessary approvals. Special Events Other Special Police Services – Pursuant to Agreement between Police Chief and Requestor. 1 8 1/2" x 11 and 8 1/2" x 14 $.25 per page 2 Copy - Digital $10.00 per device 3 For the first 3 $42.00 4 Each Additional $13.00 5 Permit Fee, DOJ Fee, and Admin Fee $100.00 6 Renewal Permit $25.00 7 Amended Permit $10.00 8 Tow Permit $95.00 9 Driver Permit $290.00 10 Massage Establishment Permit (initial and subsequent renewals) (Ord 14.110.075) $335.00 11 ABC Application No charge 12 No Parking Signs/Required Event Signage $1.00/each 13 Officer Staffing Fully allocated hourly rate of all personnel 14 Bingo Permit $50.00 Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 38 POLICE SERVICES Motion Picture/Television/Commerical Still Photo Emergency Response Caused By Alarm Fees Citation issued for failure to display appropriate Permit or placard. Dismissal fee in lieu of full Bail Amount Parking Permit Fees Residential Parking Permit 15 For-Profit Groups (each)$1,609.00 16 Non-For-profit Groups (each)$579.00 17 DUI Emergency Accident Response (Government Code Section 53155) Actual costs incurred up to $12,000.00 18 Second Response due to Disturbances At current billing rate 19 Commercial Alarm Registration Fee $95.00 20 Second False Alarm*$170.00 21 Third False Alarm*$170.00 22 Fourth False Alarm*$170.00 23 Fifth False Alarm*No response, no charge, at the Chief’s discretion *Within a six-month period within a calendar year 24 Handicap CVC22507.8/22500(1)$37.00 Vehicle 1: $52.00 Vehicle 2: $72.00 Vehicle 3: $92.00 Vehicle 4: $112.00 26 Visitor guest passes Two (2) complimentary with the purchase of the primary permit 27 Special Event Permit -First permit (one day)$10.00 28 Special Event Permit -Each Additional (one day)$2.00 29 Lost permit replacement $37.00 30 Damaged permit or vehicle change (within calendar year) $18.00 25 Annual residential parking permit (Limit 4 per residence) Town of Los Gatos FY 2024-2025 Comprehensive Fee Schedule 39 POLICE SERVICES Parking Permit Fees (continued) Business Parking Permit Construction Parking Permit Other Police Fees 31 Standard Employee annual $0.00 32 Lost permit replacement $37.00 33 Damaged permit replacement (with return of permit) $18.00 34 One day parking permit per construction vehicle $32.00 35 Each additional day per vehicle $5.00 36 Subpoena Duces Tecum Per California Evidence Code Section 1563 37 Solicitor/Peddler's Permit (need to obtain fingerprinting $55.00 38 Taxicabs Permit $185.00 per business 39 Clearance Letter $25.00 40 Horse Drawn Vehicle Permit $270.00 41 Firearms Storage Fee $245.00 Admin Fee plus $1.00 per firearm per day for storage 42 Vehicle Release $235.00 43 Vehicle Repossession Release Fee (Government Code Section 26751) $15.00 44 Non-Los Gatos Cite Sign Off $27.00 45 Feral Cat Feeder/Trap Permit $42.00