Loading...
item_1.addendum._cip_study_sessionPREPARED BY: Nicolle Burnham Parks and Public Works Director Reviewed by: Town Manager 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 11/19/2024 ITEM NO: 1 ADDENDUM DATE: November 18, 2024 TO: Mayor and Town Council FROM: Chris Constantin, Town Manager SUBJECT: Receive an Introductory Report on the Capital Infrastructure Needs of the Town of Los Gatos REMARKS: Attachment 5 contains the staff presentation. Attachments Previously Received with the Staff Report: 1.History of Capital Funding 2.Current Projects 3.Facilities Needs 4.Roads, Parks and Other Projects Attachments Received with this Addendum: 5.Staff Presentation This Page Intentionally Left Blank Capital Improvement Program Study Session Town Council November 19, 2024 Item 1 ATTACHMENT 5 PURPOSE AND INTENT •Initial discussion regarding capital infrastructure needs of the Town. •Overall goal is to develop a look ahead of required annual costs to maintain existing infrastructure: roads, buildings, parks, etc. •Current information identifies a 10-year look forward CAPITAL BUDGETING •Refer to Staff Report Attachment 1 •10-year source and use of funds support capital projects: gas tax, utility undergrounding, traffic mitigation, storm drain funds, grants and general fund appropriated reserve (GFAR) •Trends and observations Ending fund balances remain high in many funds Grant sources increased dramatically in 2021/22 Storm drain and utility undergrounding sources have increased with little use of funds GFAR is the only source that includes unrestricted capital funds CURRENT PROJECT DELIVERY •Refer to Staff Report Attachment 2 •Spending lags projections at end of Q1 due to: Spending on certain projects was not expected until later in FY 2024/25 (e.g., Shannon Road Repair, Townwide Vegetation Management) Billing and processing lags performance of work (e.g., Shannon Road Ped and Bikeway Project, Annual Curb Gutter Sidewalk, Annual Street Repair and Resurfacing, Parking Program Implementation) Some project schedules have shifted due to staffing constraints (e.g., Roadside Fire Fuel Reduction, Pinehurst Community Garden, Lynn Avenue Walkway) FACILITIES NEED PROJECTION 25/26 TO 35/36 •Refer to Staff Memorandum Attachment 2 •Based on 2022 facility condition assessments and American with Disabilities Act Assessment of all Town assets •Preliminary projection of required annual spending to maintain existing building assets FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 FY 32/33 FY 33/34 FY 34/35 FY 35/36 Annual Total 2022 Dollars 3,153,045 3,030,045 1,750,045 1,806,545 1,498,045 1,618,045 1,266,045 1,343,545 606,545 2,249,045 428,045 Annual Total Escalated to 2024 Dollars at 4%3,410,333 3,277,297 1,892,849 1,953,959 1,620,285 1,750,077 1,369,354 1,453,178 656,039 2,432,567 462,973 STREETS AND PARKS •Refer to Staff Report Attachment 4 •Summary of currently known needs •From field conditions and staff knowledge •Bicycle and Pedestrian Master Plan •General Plan 2024 (various adopted elements) SUMMARY OF NEED Items / Need Current Opinion of Potential Costs (2024$) Town Owned Buildings - Maintenance $ 20,278,913 Town Owned Buildings – Capital Needs $ 1,490,000 Parks $ 28,189,000 Storm Drainage $ 23,126,500 Streets and Roads $ 166,037,000 IT Needs $ 310,000 POTENTIAL FUTURE MAJOR NEEDS •Police Operations Consolidation •Civic Center Upgrades •Projects in 2040 General Plan NEXT STEPS •Refine project lists in Staff Report Attachments 3 and 4 to reflect required spending year over year •This may require additional studies (e,g., playground condition assessments, facility assessment of Civic Center, etc.) •Return to Council with refined projections and assessment of fiscal impacts •Align annual CIP budget efforts to what can be funded and completed with a focus on sustaining capital assets that are currently in use. •Work towards establishing annual contribution necessary for current capital and determining funding available to reserve for future capital