05 Notice of Completion for Traffic Signal Modernization ITEM NO. 5. IMEETTOWN OF LOS GATOS ING DATE: 11/19/2024 exii COUNCIL AGENDA REPORT ITEM NO: 5 • DATE: November 14, 2024 TO: Mayor and Town Council FROM: Chris Constantin,Town Manager SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Smart Signals Field Improvements Project (Traffic Signal Modernization) CIP No. 813-0227 Completed by St. Francis Electric, Inc., and Authorize the Town Clerk to File for Recordation RECOMMENDATION: Authorize the Town Manager to execute a certificate of acceptance and notice of completion for the Smart Signals Field Improvements Project (Traffic Signal Modernization Project) CIP No. 813-0227 completed by St. Francis Electric, Inc., and authorize the Town Clerk to file for recordation (Attachment 1). BACKGROUND: Town staff began the Traffic Signal Modernization Project in 2018,also referred to as the Smart Signals Project,to upgrade the Town-owned and operated traffic signals (31 in total) and enhance the signal systems with state-of-the-art adaptive technologies. The project was funded by a combination of Town funds and grants from the Santa Clara Valley Transportation Authority (VTA) and the Metropolitan Transportation Commission (MTC), including the Innovative Deployments to Enhance Arterials (IDEA) grant for a total project budget of approximately$2.6 million. The goals of the Smart Signals Project were to improve multimodal safety and traffic operations; improve travel time for vehicles, bicycles, and pedestrians; improve the ability to plan for and respond to variable traffic volumes and patterns; test new technologies for bicycle detection and prioritization; and to help address traffic congestion issues on Los Gatos Boulevard. PREPARED BY: Mike Vroman Senior Traffic Engineer Reviewed by: Town Manager,Assistant Town Manager,Town Attorney, Finance Director,and Parks and Public Works Director 110 E. Main Street Los Gatos,CA 95030• (408)354-6832 Page 54 www.losgatosca.gov PAGE 2 OF 4 1TEM NO. 5. SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Smart Signals Field Improvements Project (Traffic Signal Modernization) CIP No. 813-0227 and Authorize the Town Clerk to File for Recordation DATE: November 14, 2024 This was a large-scale project with both local and Federal project funding elements. At its April 3, 2018, meeting, the Town Council approved an Agreement for Consultant Services with W- Trans for project management services for this project. In that report, staff noted that additional project delivery service needs and costs would likely be required during project implementation and that these would be addressed through separate Council action(s) as necessary. At the December 17, 2019, meeting,the Town Council was advised of a four-step procurement process for the project implementation, with a total contract value of approximately $1.8M, and the Council authorized the Town Manager to issue procurement documents for the following services: 1. Central System - Adaptive Traffic Control System and Advanced Traffic Management System (ATCS-ATMS). Econolite was awarded this work on June 2, 2020, and it is now complete. 2. Signal Controller Upgrades. Econolite provided new controllers and St. Francis completed the installation. 3. Automated Traffic Signal Performance Measures & Virtual Bike Detection (ATSPM & VBD). Econolite was awarded this work on February 16, 2021, and it is now complete. 4. Design of Field Elements. Iteris was awarded this work on May 19, 2020, and it is now complete. In addition, a construction agreement for the Field Elements was executed with St. Francis Electric on March 11, 2021, and the improvements are now complete. The current action will result in acceptance of the in-field work completed by St. Francis. The work completed for this project provides adaptive systems technology that allows staff to better coordinate signals along the arterials, reduce signalized intersection delays, and achieve higher overall performance. DISCUSSION: A construction agreement for the Smart Signal Field Improvements was executed with St. Francis Electric, Inc. on March 11, 2021. St. Francis has now satisfactorily completed all contracted work items within budget. A warranty with St. Francis will be in effect for two years from the date of the requested Town Council action. The execution and recordation of the Certificate of Acceptance is required to finalize the Town's acceptance of the project and to release the retention funds withheld from the contractor. Page 55 PAGE 3 OF 4 1TEM NO. 5. SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Smart Signals Field Improvements Project (Traffic Signal Modernization) CIP No. 813-0227 and Authorize the Town Clerk to File for Recordation DATE: November 14, 2024 CONCLUSION: This Council action would close the active contract with St. Francis Electric, Inc. and begin the warranty period for their work. The execution of this Certificate of Acceptance and Notice of Completion is the final component of the Smart Signals Field Improvements Project(Traffic Signal Modernization) CIP No. 813-0227 and will allow the project to be considered complete, closed out, and removed from the Capital Improvement Program. FISCAL IMPACT: There were sufficient funds available in the CIP Budget for the Traffic Signal Modernization Project, also referred to as the Smart Signals Project, including the Smart Signals Field Improvements (CIP No. 813-0227 Traffic Signal Modernization) Project as displayed in the fiscal table. The remaining balance of the Traffic Mitigation Funds will be transferred back to the fund as this project is now considered complete and will be removed from the Capital Improvement Program. Traffic Signal Modernization CIP No. 813-0227 Budget Costs GFAR $ 14,308 Grants $ 1,520,062 Traffic Mitigation $ 1,103,289 Total Budget $ 2,637,659 Costs Project Expenditures $ 2,598,924 Total Expenditures $ 2,598,924 Available Balance $ 38,735 Page 56 PAGE 4 OF 4 1TEM NO. 5. SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Smart Signals Field Improvements Project (Traffic Signal Modernization) CIP No. 813-0227 and Authorize the Town Clerk to File for Recordation DATE: November 14, 2024 ENVIRONMENTAL ASSESSMENT: The Smart Signals project is a project as defined under the California Environmental Quality Act (CEQA) and is Categorically Exempt under Section 15301: Existing Facilities. A Notice of Exemption was filed. Attachment: 1. Certificate of Acceptance and Notice of Completion Page 57 /TEM NO. 5. Recording Requested by: TOWN OF LOS GATOS WHEN RECORDED MAIL TO: TOWN CLERK TOWN OF LOS GATOS 110 E MAIN ST LOS GATOS, CA 95030 (SPACE ABOVE BAR FOR RECORDER'S USE) (RECORD WITHOUT FEE UNDER GOVERNMENT CODE SECTIONS 27383 AND 6103) TYPE OF RECORDING CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION PPW JOB NO.20-813-0227 Smart Signals Field Improvements TO WHOM IT MAY CONCERN: I do hereby certify that St. Francis Electric, Inc. completed the work called for in the agreement with the Town of Los Gatos dated March 11, 2021. The work is outlined in the Town's bid process prepared by the Town of Los Gatos and generally consisted of furnishing all labor, materials, tools, equipment, and services required for completion of the PPW Job No. 20-813-0227 located in the TOWN OF LOS GATOS, County of Santa Clara, State of California and was completed, approved and accepted August 6, 2024. Bond No.: ES00008160 Date: March 25, 2021 TOWN OF LOS GATOS By: Chris Constantin, Town Manager Acknowledgment Required Page 58 ATTACHMENT 1