03 - Project 315 - Nicholson Hill Storm Diversion & Wheeler/Yosemite/Harding Storm & Sanitary Sewer Installation Award of ContractDATE: TO: FROM: SUBJECT: Council Agenda Date: 8/5/85 Item No.j? TOWN OF LOS GATOS Counci Agenda Report JULY 30, 1985 MAYOR AND TOWN COUNCIL TOWN MANAGERCW`' PROJECT 315 - NICHOLSAN HILL STORM DIVERSION AND WHEELER/YOSEMITE/HARDING STORM AND SANITARY SEWER INSTALLATION AWAItD OF CONTRACT RECOMMENDATION Award the contract for the work to the low bidder, Wingard & Seerley, General Construction, in the total estimated amount of $46,688.00 (Alternate) and authorize the Mayor to sign the contract on behalf of the Town. BACKGROUND At the June 17, 1985 Council meeting, the Town Council approved plans and specifications, and authorized staff to advertise for bids for subject project. Four bids were received and analyzed: Contractor 1. Wingard & Seerley General Construction 2. Manuel C. Jardim, Incorporated 3. James J. Viso, Incorporated 4. Piazza Construction Company Engineer's Estimate (Continued on page 2) PREPARED BY: RONALD J. ZAPF RJZ:BA:pm (TC 8/5-2/ENG03) Bid Estimate Town Engineer cc: Regular Distribution Gene H. Campbell, Construct on Section Mr. and Mrs. Alfred H. Gerhardt - 141 Wheeler Avenue, Los Gatos CA 95030 Mr. and Mrs. Joseph D. Olivet 136 Harding Avenue, Los Gatos CA 95030 Mr. and Mrs. Kenneth E. Buller - 128 Yosemite Way, Los Gatos CA 95030 $47,543.00 59,880.00 72,651.00 97,180.00 $66,875.00 Alternate $46,688.00 61,248.00 73,335.00 96,838.00 $64,737.50 Revi eweTy : Attachment Attorney TOWN co ON ozREcrE6fa ACTION OF COUNCIL: Cler reasurer COMMENTS: PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT: PROJECT 315 JULY 30, 1985 DISCUSSION (continued) The alternate bird, item 13, substitutes 171 linear feet of 24 inch diameter poly vinyl chloride pipe for 24 inch diameter reinforced concrete pipe on the Wheeler/Yosemite/Harding portion of the project. The purpose of the alternate was to establish the most cost effective method of installing the proposed storm drain line. In order to install sanitary sewer and storm drainage facilities south of Harding Avenue as authorized by Council on March 4, 1985, it is necessary to obtain public utility easement from the Gerhardt, Iwamoto and Olivet properties. To date, Grant of Easements have been obtained from the following property owners: Mr. and Mrs. Alfred H. Gerhardt - 141 Wheeler Avenue. Mr. and Mrs. Joseph D. Olivet - 136 Harding Avenue. A Grant of Easement is forthcoming from Mr. and Mrs. Kichiro K ■ Iwamoto (Harding Avenue) . Staff anticipates receipt of the document before the start of construction. A Right of Entry Permit has been obtained from Mr. and Mrs. Kenneth E. Buller -- 128 Yosemite Way. Expenditures Contractor Bidcontract ......................................... •....., $45,588.00 ConsultantFees... ■ .............. . ................ • ......... 10, 500■ 00 Total Funding $57,188.00 Storm Basin #1...■.■■......■..... •..........•,.■....■■.....• $46,000.00 SanitarySewer Fund■••.a...........■aa.r.......•+.•,........ 21,000.00 Total $67,000.00 An amplified bid summary is attached for your convenience. 4%, imc dbb v`k`' 1.14 U. fbh ,NN \c \\-% 1 sgs TABULATION OF BIDS PROJECT: Nicholson Hill Storm Diversion & Wheeler Yosemite - Nardin Sto& S ' rm � �O.1M a r ataL PROJECT ECT 31 3 I DS OPENED: DATE July 17, 1985 BIDDER ii ngard & Seer1 ey General Const. '.0. Box 7205 "remon t, CA. 94537 cannel C. Jardim, Inc. '.0. Box 677 In i on C i t CA. 94587 ames J. Viso, Inc. .0. Drawer 150 anta Ciara, CA. 95052 i azza Construction Co. .0. Box 23550 an Jose CA. 95153 TIME: 3:00 P.M. BY Rose E. Aldag, Town Clerk NET BID $ 47,543.00 46, 688. 00 Alternate $ 59,880.00 61, 248.00 Alternate $9T2O $97,180.00 96T9981-00 95 ,838; 00A1 ternate NOTE: List in order of lowest to highest net bid. REMARKS: *Piazza Construction Company, error in addition. **Error in extension on #17 & #19. Totals are correct. pies to be prepared as soon as possible after bid opening giveng, and to following; l l owi n • Manager General Svc. Supervisor Department Head