12 Staff Report.Downtown Restroom Feasibility Report Update
PREPARED BY: Marina Chislett
Environmental Programs Specialist
Reviewed by: Interim Town Manager, Town Attorney, Finance Director, and Director of Parks and Public
Works
110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832
www.losgatosca.gov
TOWN OF LOS GATOS
COUNCIL AGENDA REPORT
MEETING DATE: 09/17/2024 ITEM NO: 12
DATE: September 12, 2024
TO: Mayor and Town Council
FROM: Katy Nomura, Interim Town Manager
SUBJECT: Receive an Update on the Downtown Restroom Feasibility Study (CIP No.
821-2011) and Provide Direction to Town Staff
RECOMMENDATION:
Receive an Update on the Downtown Restroom Feasibility Study (CIP No. 821-2011) and
Provide Direction to Town Staff.
BACKGROUND:
Per the direction of Town Council, funding for the Downtown Restroom Feasibility Study (CIP
No. 821-2011) was provided in the Fiscal Year (FY) 2023/2024 Capital Budget. The purpose of
this project is to analyze locations for a public restroom facility in the Downtown.
On May 7, 2024, Town staff presented the Downtown Restroom Feasibility Study to Town
Council1 (Item 14). This study evaluated potential sites for consideration for a new downtown
restroom facility. The primary factors for site selection included: proximity and value to the
downtown area, financial efficiency, utility adjacency, accessibility, safety, and flexibility. From
these criteria, the consultant assessed four potential sites (some with various options for
placement) for consideration for the new restroom facility:
• Site 1: Northwest corner of Town Plaza Park
• Site 2: Southeast corner of Parking Lot #6 (West Main Street & Victory Lane)
• Site 3: North edge of Parking Lot #5 (Elm Street)
• Site 4: South edge of Parking Lot #5 (West Main Street)
1 Restroom Report May 2024:
https://meetings.municode.com/adaHtmlDocument/index?cc=LOSGATOS&me=7f5087ff8d7a4bffa21c7f33e58fa2d
e&ip=True
PAGE 2 OF 4 SUBJECT: Receive an Update on the Downtown Restroom Feasibility Study (CIP No. 821-2011) and Provide Direction to Town Staff DATE: September 12, 2024
After consideration of the four sites, Town Council identified Site 1 (Options 1 and 2) and Site 4
(Option 1) as being the most optimal locations for a new downtown restroom facility. Site 1,
Option 1 is in Plaza Park at the location of a raised planter bed along South Santa Cruz Avenue
near Main Street. Site 1, Option 2 is in Plaza Park adjacent to the existing bus shelter. Site 4,
Option 1 is at the south end of Parking Lot 5, across the street from Plaza Park. Town staff was
directed to continue to review the options, review safety concerns with the Police Department
and consider whether Site 4 is visible enough.
Figure 1. Site 1: Northwest corner of Plaza Park
Figure 2. Site 4: South edge of Parking Lot #5
PAGE 3 OF 4 SUBJECT: Receive an Update on the Downtown Restroom Feasibility Study (CIP No. 821-2011) and Provide Direction to Town Staff DATE: September 12, 2024
DISCUSSION:
Town staff met with the Police Department in the field to evaluate both locations on June 10,
2024. After a thorough evaluation of both sites, the Police Department recommends a new
restroom facility at Site 1 Option 1 or Option 2. Site 4 was not recommended for the following
reasons:
• The addition of a new restroom facility will block a major thoroughfare through a highly
trafficked area resulting in bottlenecking at the southside of Parking Lot #5.
• There are concerns about crime being tucked away in a parking lot and not in the
immediate line of site.
• Potential odors, vandalism, or nefarious behavior, should that occur, could negatively
impact the surrounding businesses that would be within close proximity of the new
restroom facility.
Site 1, Option 2 is the current location for the temporary downtown restroom facility. The
single-occupancy porta potty was installed on August 31, 2023. Due to heavy usage, servicing of
this facility was increased from two times per week to three times per week in February 2024.
Additional temporary facilities or servicing are required to accommodate events at Plaza Park.
Aside from special events, the temporary facility continues to require monitoring and follow-up
to ensure proper servicing. Town staff recommends a two single-occupant restroom facility that
is serviced daily on the same schedule as other Town restroom facilities to ensure it is providing
the most civic value to the community.
CONCLUSION:
After evaluation with the Police Department of the locations identified by Town Council, and
feedback from staff regarding current usage and maintenance of the temporary restroom
facility, staff recommends a two single-occupant restroom facility at Plaza Park at the location
of the existing porta potty (Site 1, Option 2) . This would provide the most civic value to the
community with consideration to space and size limitations as well as usage and maintenance
needs.
If the Town Council wishes to move forward, it should direct staff to include the project for
consideration in the upcoming Capital Improvement Program.
FISCAL IMPACT:
This feasibility study was allocated $25,000 (CIP No. 821-2011) and the funding has been
expended. There is no current funding allocation for the design of a permanent restroom. Staff
PAGE 4 OF 4 SUBJECT: Receive an Update on the Downtown Restroom Feasibility Study (CIP No. 821-2011) and Provide Direction to Town Staff DATE: September 12, 2024
expects design and permitting costs of approximately $100,000. Construction may range from
$450,000 to $550,000.
Following construction of this new building, there will be an operating budget impact to Parks
and Public Works to manage and maintain the structure. The Facilities Team would manage the
building and day to day cleaning would require additional contract services for the janitorial
vendor.
ENVIRONMENTAL ASSESSMENT:
This is not a project defined under CEQA.