Loading...
14 Staff Report-2024 Annual Concrete_Materials Testing with attachments PREPARED BY: Gary Heap Town Engineer Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 06/04/2024 DATE: May 30, 2024 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: 2024 Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813- 9921): a. Award and Authorize the Town Manager to Execute an Agreement for Consultant Services with Ninyo & Moore for Materials Testing in an Amount Not to Exceed $18,555; and b. Authorize an Expenditure Budget Transfer in an Amount of $18,555 from the Annual Street Repair and Resurfacing Project (CIP No. 811-9901) to the Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813- 9921) RECOMMENDATION: 2024 Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921): a. Award and authorize the Town Manager to execute an agreement for consultant services for materials testing with Ninyo & Moore in an amount not to exceed $18,555; and b. Authorize an expenditure budget transfer in an amount of $18,555 from the Annual Street Repair and Resurfacing Project (CIP No. 811-9901) to the Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921). REMARKS: On May 7, 2024, Council approved award and execution of an agreement with Villalobos and Associates for the 2024 Annual Curb, Gutter, and Sidewalk project (#813-9921). For this project, there is a need for materials testing as the Town does not have its own testing laboratory. PAGE 2 OF 2 SUBJECT: 2024 Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921) DATE: May 30, 2024 REMARKS (continued): On February 20, 2024, Council approved the On-Call Consultants List for Engineering and Design Support Services. Staff requested proposals from the three listed materials testing consultants on the Council approved on-call list, BSK Associates, ISI Inspection Services, and Ninyo and Moore. Three proposals were submitted, evaluated, and Ninyo and Moore was selected (Attachment 2). Services include subgrade testing, concrete sampling and testing, daily field reporting. FISCAL IMPACT: ENVIRONMENTAL ASSESSMENT: This is not a project defined under CEQA, and no further action is required. Attachments: 1. Agreement for Consultant Services 2. Ninyo & Moore Proposed Scope of Services Budget Costs GFAR 410,682$ Budget Adjustment from 411-811-9901 (Approved by Town Council on 5/7/24)185,331$ Budget Adjustment from 411-811-9901 (Requested with this Staff Report)18,555$ Budget 614,568$ 2023 Project Construction Costs (7/1/23-7/3/23 Service)89,535$ Contract with Precision Concrete for Additional Sidewalk Repair Services 44,000$ Misc. Expenses 50$ Construction - Public Works Contract (Approved by Town Council on 5/7/24)409,480$ Construction Contingency - Public Works Contract (10%)40,948$ Temporary/Part-Time Staff 12,000$ Consultant Agreement (Proposed with this Staff Report)18,555$ Costs to Date 614,568$ Available Balance (0)$ 2024 Curb, Gutter, and Sidewalk Maintenance Project CIP No. 813-9921 Page 1 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore AGREEMENT FOR CONSULTANT SERVICES PREAMBLE THIS AGREEMENT is dated for identification on this 4th day of June 2024 by and between TOWN OF LOS GATOS, a California municipal corporation, (“Town”) Ninyo & Moore (“Consultant”), identified as an S Corporation and whose address is 1301 Marina Village Parkway, Suite 110, Alameda, CA 94501. This Agreement is made with reference to the following facts. I. RECITALS 1.1 The Town desires to engage Consultant to provide materials testing for the 2024 Annual Curb, Gutter, and Sidewalk Maintenance Project. 1.2 The Consultant represents and affirms that it is willing to perform the desired work pursuant to this Agreement. 1.3 Consultant warrants it possesses the distinct professional skills, qualifications, experience, and resources necessary to timely perform the services described in this Agreement. Consultant acknowledges Town has relied upon these warranties to retain Consultant. II. AGREEMENTS 2.1 Scope of Services. Consultant shall provide services as described in that certain Proposal sent to the Town on April 17, 2024, which is hereby incorporated by reference and attached as Exhibit A. 2.2 Term and Time of Performance. This contract will remain in effect upon execution to December 31, 2024. Consultant shall perform the services described in this agreement as described in Exhibit A. 2.3 Compliance with Laws. The Consultant shall comply with all applicable laws, codes, ordinances, and regulations of governing federal, state and local laws. Consultant represents and warrants to Town that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession. Consultant shall maintain a Town of Los Gatos business license pursuant to Chapter 14 of the Code of the Town of Los Gatos. 2.4 Sole Responsibility. Consultant shall be responsible for employing or engaging all persons necessary to perform the services under this Agreement. 2.5 Information/Report Handling. All documents furnished to Consultant by the Town and all reports and supportive data prepared by the Consultant under this Agreement are the Town’s property and shall be delivered to the Town upon the completion of Consultant's Page 2 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore services or at the Town's written request. All reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of its services pursuant to this Agreement are confidential until released by the Town to the public, and the Consultant shall not make any of the these documents or information available to any individual or organization not employed by the Consultant or the Town without the written consent of the Town before such release. The Town acknowledges that the reports to be prepared by the Consultant pursuant to this Agreement are for the purpose of evaluating a defined project, and Town's use of the information contained in the reports prepared by the Consultant in connection with other projects shall be solely at Town's risk, unless Consultant expressly consents to such use in writing. Town further agrees that it will not appropriate any methodology or technique of Consultant which is and has been confirmed in writing by Consultant to be a trade secret of Consultant. 2.6 Compensation. Compensation for Consultant's professional services shall not exceed $18,555, inclusive of all costs. Payment shall be based upon Town approval of each task. 2.7 Billing. Billing shall be monthly by invoice within thirty (30) days of the rendering of the service and shall be accompanied by a detailed explanation of the work performed by whom at what rate and on what date. Also, plans, specifications, documents or other pertinent materials shall be submitted for Town review, even if only in partial or draft form. Payment shall be net thirty (30) days. All invoices and statements to the Town shall be addressed as follows: Invoices: Town of Los Gatos Attn: Accounts Payable P.O. Box 655 Los Gatos, CA 95031-0655 Email (preferred): AP@losgatosca.gov 2.8 Availability of Records. Consultant shall maintain the records supporting this billing for not less than three years following completion of the work under this Agreement. Consultant shall make these records available to authorized personnel of the Town at the Consultant's offices during business hours upon written request of the Town. 2.9 Assignability and Subcontracting. The services to be performed under this Agreement are unique and personal to the Consultant. No portion of these services shall be assigned or subcontracted without the written consent of the Town. 2.10 Independent Contractor. It is understood that the Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and not an agent or employee of the Town. As an independent contractor he/she shall not Page 3 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore obtain any rights to retirement benefits or other benefits which accrue to Town employee(s). With prior written consent, the Consultant may perform some obligations under this Agreement by subcontracting but may not delegate ultimate responsibility for performance or assign or transfer interests under this Agreement. Consultant agrees to testify in any litigation brought regarding the subject of the work to be performed under this Agreement. Consultant shall be compensated for its costs and expenses in preparing for, traveling to, and testifying in such matters at its then current hourly rates of compensation, unless such litigation is brought by Consultant or is based on allegations of Consultant's negligent performance or wrongdoing. 2.11 Conflict of Interest. Consultant understands that its professional responsibilities are solely to the Town. The Consultant has and shall not obtain any holding or interest within the Town of Los Gatos. Consultant has no business holdings or agreements with any individual member of the Staff or management of the Town or its representatives nor shall it enter into any such holdings or agreements. In addition, Consultant warrants that it does not presently and shall not acquire any direct or indirect interest adverse to those of the Town in the subject of this Agreement, and it shall immediately disassociate itself from such an interest, should it discover it has done so and shall, at the Town's sole discretion, divest itself of such interest. Consultant shall not knowingly and shall take reasonable steps to ensure that it does not employ a person having such an interest in this performance of this Agreement. If after employment of a person, Consultant discovers it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant shall promptly notify Town of this employment relationship, and shall, at the Town's sole discretion, sever any such employment relationship. 2.12 Equal Employment Opportunity. Consultant warrants that it is an equal opportunity employer and shall comply with applicable regulations governing equal employment opportunity. Neither Consultant nor its subcontractors do and neither shall discriminate against persons employed or seeking employment with them on the basis of age, sex, color, race, marital status, sexual orientation, ancestry, physical or mental disability, national origin, religion, or medical condition, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment & Housing Act. III. INSURANCE AND INDEMNIFICATION 3.1 Minimum Scope of Insurance: i. Consultant agrees to have and maintain, for the duration of the contract, General Liability insurance policies insuring him/her and his/her firm to an amount not less than: two million dollars ($2,000,000) combined single limit per occurrence for bodily injury, personal injury and property damage. ii. Consultant agrees to have and maintain for the duration of the contract, an Automobile Liability insurance policy ensuring him/her and his/her staff to Page 4 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore an amount not less than one million dollars ($1,000,000) combined single limit per accident for bodily injury and property damage. iii. Consultant shall provide to the Town all certificates of insurance, with original endorsements effecting coverage. Consultant agrees that all certificates and endorsements are to be received and approved by the Town before work commences. iv. Consultant agrees to have and maintain, for the duration of the contract, professional liability insurance in amounts not less than $1,000,000 which is sufficient to insure Consultant for professional errors or omissions in the performance of the particular scope of work under this agreement. General Liability: i. The Town, its elected and appointed officials, employees, and, agents are to be covered as insured as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of Consultant, premises owned or used by the Consultant. This requirement does not apply to the professional liability insurance required for professional errors and omissions. ii. The Consultant's insurance coverage shall be primary insurance as respects the Town, its elected and appointed officials, employees, and agents. Any insurance or self-insurances maintained by the Town, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. iii. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Town, its officers, officials, employees or volunteers. iv. The Consultant's insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the limits of the insurer's liability. 3.2 All Coverages. Each insurance policy required in this item shall be endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the Town. Current certification of such insurance shall be kept on file at all times during the term of this agreement with the Town Clerk. 3.3 Workers’ Compensation. In addition to these policies, Consultant shall have and maintain Workers' Compensation insurance as required by California law and shall provide evidence Page 5 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore of such policy to the Town before beginning services under this Agreement. Further, Consultant shall ensure that all subcontractors employed by Consultant provide the required Workers' Compensation insurance for their respective employees. As required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than one million dollars ($1,000,000) per accident for bodily injury or disease. 3.4 Indemnification. The Consultant shall save, keep, hold harmless and indemnify and defend the Town its elected and appointed officials, agents, employees and volunteers from all damages, liabilities, penalties, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property or personal injury received by reason of, or in the course of performing work which may be occasioned by a willful or negligent act or omissions of the Consultant, or any of the Consultant's officers, employees, or agents or any subconsultant. IV. GENERAL TERMS 4.1 Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder, nor does waiver of a breach or default under this Agreement constitute a continuing waiver of a subsequent breach of the same or any other provision of this Agreement. 4.2 Governing Law. This Agreement, regardless of where executed, shall be governed by and construed to the laws of the State of California. Venue for any action regarding this Agreement shall be in the Superior Court of the County of Santa Clara. 4.3 Termination of Agreement. The Town and the Consultant shall have the right to terminate this agreement with or without cause by giving not less than fifteen days (15) written notice of termination. In the event of termination, the Consultant shall deliver to the Town all plans, files, documents, reports, performed to date by the Consultant. In the event of such termination, Town shall pay Consultant an amount that bears the same ratio to the maximum contract price as the work delivered to the Town bears to completed services contemplated under this Agreement, unless such termination is made for cause, in which event, compensation, if any, shall be adjusted in light of the particular facts and circumstances involved in such termination. 4.4 Amendment. No modification, waiver, mutual termination, or amendment of this Agreement is effective unless made in writing and signed by the Town and the Consultant. 4.5 Disputes. In any dispute over any aspect of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, including costs of appeal. 4.6 Notices. Any notice required to be given shall be deemed to be duly and properly given if mailed postage prepaid, and addressed to: Page 6 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore Town of Los Gatos Attn: Town Clerk 110 E. Main Street Los Gatos, CA 95030 Ninyo & Moore Attn: Bradon Wilken 1301 Marina Village Parkway, Suite 110 Alameda, CA 94501 or personally delivered to Consultant to such address or such other address as Consultant designates in writing to Town. 4.7 Order of Precedence. In the event of any conflict, contradiction, or ambiguity between the terms and conditions of this Agreement in respect of the Products or Services and any attachments to this Agreement, then the terms and conditions of this Agreement shall prevail over attachments or other writings. 4.8 Entire Agreement. This Agreement, including all Exhibits, constitutes the complete and exclusive statement of the Agreement between the Town and Consultant. No terms, conditions, understandings or agreements purporting to modify or vary this Agreement, unless hereafter made in writing and signed by the party to be bound, shall be binding on either party. Page 7 of 7 Agreement for Consultant Services ATTACHMENT 1 Ninyo & Moore IN WITNESS WHEREOF, the Town and Consultant have executed this Agreement. Town of Los Gatos by: Laurel Prevetti, Town Manager Recommended by: Nicolle Burnham Director of Parks and Public Works Consultant by: Brandon Wilken, Principal Geologist Approved as to Form: Gabrielle Whelan, Town Attorney Attest: Wendy Wood, CMC, Town Clerk April 17, 2024 Proposal No. 08SJO02-02606 Ms. Janice Chin, Assistant Engineer Town of Los Gatos Parks and Public Works Department 41 Miles Avenue, Los Gatos California 95030 Subject: Proposal for Materials Testing Services for the 2024 Annual Curb, Gutter and Sidewalk Maintenance Project Los Gatos, California Project No.: 813-9921 Dear Ms. Chin: Ninyo & Moore is pleased to submit this proposal to provide materials testing services for the 2024 Annual Curb, Gutter and Sidewalk Maintenance Project in Los Gatos, California. This proposal includes our proposed scope of services and associated cost estimates, which are based on our review of the project plans, specifications, and our previous experience with similar projects of this nature. PROPOSED SCOPE OF SERVICES Based on our review of the project documents, and our experience with similar projects, we propose to provide the following scope of services: Sampling of subgrade and aggregate base from the job site and transportation to our laboratory for testing. Maximum compacted density determinations of soils and aggregates in the laboratory accordance with ASTM D1557 for subgrade and aggregate base. In-place field density testing of soils and aggregates using a nuclear density gauge to determine the relative compaction of compacted subgrade and aggregate base. Concrete sampling and testing including slump and temperature tests of concrete and cast compressive strength test specimens (1 set / 150 cubic yards) on site. Concrete sample pick-up and transportation to our laboratory for curing and testing. Compression testing of concrete cylinders in the laboratory. Prepare daily field reports documenting observations and field test results, and reports of laboratory testing to be submitted to the project team. 2149 O'Toole Avenue, Suite 30 | San Jose, California 95131 | p. 408.435.9000 | www.ninyoandmoore.com EXHIBIT A Ninyo & Moore | 2024 Annual Curb, Gutter and Sidewalk Maintenance, Los Gatos, California | 08SJO02-02606 | April 17, 2024  Prepare a final report at the completion of the project ESTIMATED FEE We propose to perform the scope of services described above, subject to the listed assumptions, on a time-and-materials basis in accordance with the attached Schedule of Fees. Our fee estimate for the scope of services described for the project is $18,555 (Eighteen Thousand Five Hundred Fifty Five Dollars). Our detailed estimate of fee is attached (Table 1). Should the construction schedule require a lesser or greater amount of services than that estimated herein, the cost will vary accordingly. AUTHORIZATION Please provide us with a Purchase Order as written authorization for us to proceed with the proposed services. We sincerely appreciate the opportunity to submit this proposal and look forward to working with you on this project. Respectfully submitted, NINYO & MOORE Rowell Sta Ana Senior Staff Engineer Lothus Hennefer Construction Services Manager RSA/LMH/rk Attachments: Table 1 - Breakdown of Estimated Fee Schedule of Fees Senior Technician Compaction Testing (Subgrade & Aggregate Base) 80 hours @ 110.00$ /hour 8,800.00$ Senior Technician Concrete Sampling & Testing (Slump & Temperature) 20 hours @ 110.00$ /hour 2,200.00$ Lab Compacted Maximum Density (ASTM D1557) For Subgrade & Aggregate Base 5 tests @ 340.00$ /test 1,700.00$ Compression Tests 5 Concrete Cylinders / 150 Cubic Yards (4"x 8" Cylinders) 25 tests @ 35.00$ /test 875.00$ Subtotal 13,575.00$ Field Vehicle Usage 100 hours @ 15.00$ /hour 1,500.00$ Equipment Usage 100 hours @ 12.00$ /hour 1,200.00$ Subtotal 2,700.00$ Geotechnical / Project Assistant Data Compilation & Distribution and Dispatch 4 hours @ 95.00$ /hour 380.00$ Project Manager Meetings, Project Coordination and Progress Report Preparation 8 hours @ 185.00$ /hour 1,480.00$ Principal Engineer Project Oversight & Consultation 2 hours @ 210.00$ /hour 420.00$ Subtotal 2,280.00$ TOTAL ESTIMATED FEE 18,555.00$ Table 1 - Breakdown of Estimated Fee Materials Testing Project Management Reimbursables Ninyo & Moore | 2024 Annual Curb, Gutter and Sidewalk Maintenance, Los Gatos, California | 08SJO02-02606 | April 17, 2024 1 Ninyo & Moore | 2024 Annual Curb, Gutter and Sidewalk Maintenance, Los Gatos, California | April 17, 2024 | April 17, 2024 CA14 Schedule of Fees Hourly Charges for Personnel Professional Staff Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist ............................................... $ 210 Senior Engineer/Geologist/Environmental Scientist ................................................................................................ $ 200 Senior Project Engineer/Geologist/Environmental Scientist ..................................................................................... $ 195 Project Engineer/Geologist/Environmental Scientist ................................................................................................ $ 185 Senior Staff Engineer/Geologist/Environmental Scientist ........................................................................................ $ 170 Staff Engineer/Geologist/Environmental Scientist .................................................................................................... $ 155 GIS Analyst ................................................................................................................................................................ $ 130 Technical Illustrator/CAD Operator ........................................................................................................................... $ 110 Field Staff Certified Asbestos/Lead Technician ......................................................................................................................... $ 195 Field Operations Manager ......................................................................................................................................... $ 130 Nondestructive Examination Technician (UT, MT, LP) ............................................................................................ $ 125 Supervisory Technician ............................................................................................................................................. $ 120 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing) .............................................. $ 115 Senior Technician ...................................................................................................................................................... $ 110 Technician ................................................................................................................................................................ $ 110 Administrative Staff Information Specialist ................................................................................................................................................ $ 90 Geotechnical/Environmental/Laboratory Assistant .................................................................................................... $ 95 Data Processor .......................................................................................................................................................... $ 75 Other Charges Concrete Coring Equipment (includes technician) ................................................................................................ $ 190/hr Anchor Load Test Equipment (includes technician) ................................................................................................ $ 190/hr GPR Equipment ....................................................................................................................................................... $ 180/hr State of California Prevailing Wage Surcharge ....................................................................................................... $ 30/hr Inclinometer .............................................................................................................................................................. $ 100/hr Hand Auger Equipment ........................................................................................................................................... $ 80/hr Rebar Locator (Pachometer) ................................................................................................................................ $ 25/hr Vapor Emission Kit ................................................................................................................................................... $ 65/kit Nuclear Density Gauge ............................................................................................................................................ $ 12/hr X-Ray Fluorescence ................................................................................................................................................ $ 70/hr PID/FID..................................................................................................................................................................... $ 25/hr Air Sampling Pump .................................................................................................................................................. $ 10/hr Field Vehicle ............................................................................................................................................................. $ 15/hr Expert Witness Testimony ....................................................................................................................................... $ 450/hr Direct Expenses .......................................................................................................................................................Cost plus 15 % Special equipment charges will be provided upon request. Notes Our field services, are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding 4 hours. Overtime rates at 1.5 times the regular rates will be charged for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays. Field services that may be subject to prevailing wage in accordance with AB 1768 and Prevailing Wage Determinations, will be subject to a prevailing wage surcharge as shown in our Schedule of Fees. Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the project, as applicable. The terms and conditions are included in Ninyo & Moore’s Work Authorization and Agreement form. Ninyo & Moore | 2024 Laboratory Testing Schedule of Fees for Laboratory Testing SOILS CONCRETE Atterberg Limits, D 4318, CT 204 ............................................................. $ 170 Compression Tests, 6x12 Cylinder, C 39 ................................................... $ 35 California Bearing Ratio (CBR), D 1883 ................................................... $ 550 Concrete Mix Design Review, Job Spec ..................................................... $ 300 Chloride and Sulfate Content, CT 417 & CT 422 .................................... $ 175 Concrete Mix Design, per Trial Batch, 6 cylinder, ACI ............................... $ 850 Consolidation, D 2435, CT 219 ................................................................. $ 300 Concrete Cores, Compression (excludes sampling), C 42 ........................ $ 120 Consolidation, Hydro-Collapse only, D 2435 ........................................... $ 150 Drying Shrinkage, C 157 .............................................................................. $ 400 Consolidation – Time Rate, D 2435, CT 219 ........................................... $ 200 Flexural Test, C 78 ....................................................................................... $ 85 Direct Shear – Remolded, D 3080 ............................................................ $ 350 Flexural Test, C 293 ..................................................................................... $ 85 Direct Shear – Undisturbed, D 3080 ......................................................... $ 300 Flexural Test, CT 523 ................................................................................... $ 95 Durability Index, CT 229 ............................................................................ $ 175 Gunite/Shotcrete, Panels, 3 cut cores per panel and test, ACI ................ $ 275 Expansion Index, D 4829, IBC 18-3 ......................................................... $ 190 Lightweight Concrete Fill, Compression, C 495 ......................................... $ 80 Expansion Potential (Method A), D 4546 ................................................. $ 170 Petrographic Analysis, C 856 ....................................................................... $ 2,000 Geofabric Tensile and Elongation Test, D 4632 ...................................... $ 200 Restrained Expansion of Shrinkage Compensation ................................... $ 450 Hydraulic Conductivity, D 5084 ................................................................. $ 350 Splitting Tensile Strength, C 496 ................................................................. $ 100 Hydrometer Analysis, D 6913, CT 203 ..................................................... $ 220 3x6 Grout, (CLSM), C 39.............................................................................. $ 55 Moisture, Ash, & Organic Matter of Peat/Organic Soils .......................... $ 120 2x2x2 Non-Shrink Grout, C 109.................................................................. $ 55 Moisture Only, D 2216, CT 226 ................................................................ $ 35 Moisture and Density, D 2937 ................................................................... $ 45 ASPHALT Permeability, CH, D 2434, CT 220 ........................................................... $ 300 Air Voids, T 269 ............................................................................................ $ 85 pH and Resistivity, CT 643 ........................................................................ $ 175 Asphalt Mix Design, Caltrans (incl. Aggregate Quality) ............................. $ 4,500 Proctor Density D1557, D 698, CT 216, AASHTO T-180 ....................... $ 220 Asphalt Mix Design Review, Job Spec ........................................................ $ 180 Proctor Density with Rock Correction D 1557.......................................... $ 340 Dust Proportioning, CT LP-4 ........................................................................ $ 85 R-value, D 2844, CT 301 ........................................................................... $ 375 Extraction, % Asphalt, including Gradation, D 2172, CT 382 .................... $ 250 Sand Equivalent, D 2419, CT 217 ............................................................ $ 125 Extraction, % Asphalt without Gradation, D 2172, CT 382 ........................ $ 150 Sieve Analysis, D 6913, CT 202 ............................................................... $ 145 Film Stripping, CT 302 .................................................................................. $ 120 Sieve Analysis, 200 Wash, D 1140, CT 202 ............................................ $ 100 Hveem Stability and Unit Weight D 1560, T 246, CT 366 .......................... $ 225 Specific Gravity, D 854 .............................................................................. $ 125 Marshall Stability, Flow and Unit Weight, T 245 ......................................... $ 240 Thermal Resistivity (ASTM 5334, IEEE 442) ........................................... $ 925 Maximum Theoretical Unit Weight, D 2041, CT 309 .................................. $ 150 Triaxial Shear, C.D, D 4767, T 297 ........................................................... $ 550 Moisture Content, CT 370 ............................................................................ $ 95 Triaxial Shear, C.U., w/pore pressure, D 4767, T 2297 per pt ................ $ 450 Moisture Susceptibility and Tensile Stress Ratio, T 238, CT 371 ............. $ 1,000 Triaxial Shear, C.U., w/o pore pressure, D 4767, T 2297 per pt ........................ $ 350 Slurry Wet Track Abrasion, D 3910 ............................................................. $ 150 Triaxial Shear, U.U., D 2850 ..................................................................... $ 250 Superpave, Asphalt Mix Verification (incl. Aggregate Quality) .................. $ 4,900 Unconfined Compression, D 2166, T 208 ................................................ $ 180 Superpave, Gyratory Unit Wt., T 312 .......................................................... $ 100 Superpave, Hamburg Wheel, 20,000 passes, T 324 ................................. $ 1,000 MASONRY Unit Weight sample or core, D 2726, CT 308 ............................................. $ 100 Brick Absorption, 24-hour submersion, 5-hr boiling, 7-day, C 67 ........... $ 70 Voids in Mineral Aggregate, (VMA) CT LP-2 .............................................. $ 90 Brick Compression Test, C 67 .................................................................. $ 55 Voids filled with Asphalt, (VFA) CT LP-3 ..................................................... $ 90 Brick Efflorescence, C 67 .......................................................................... $ 55 Wax Density, D 1188 ................................................................................... $ 140 Brick Modulus of Rupture, C 67 ................................................................ $ 50 Brick Moisture as received, C 67 .............................................................. $ 45 AGGREGATES Brick Saturation Coefficient, C 67 ............................................................. $ 60 Clay Lumps and Friable Particles, C 142 .................................................... $ 180 Concrete Block Compression Test, 8x8x16, C 140 ................................. $ 70 Cleanness Value, CT 227 ............................................................................ $ 180 Concrete Block Conformance Package, C 90 ......................................... $ 500 Crushed Particles, CT 205 ........................................................................... $ 175 Concrete Block Linear Shrinkage, C 426 ................................................. $ 200 Durability, Coarse or Fine, CT 229 .............................................................. $ 205 Concrete Block Unit Weight and Absorption, C 140 ................................ $ 70 Fine Aggregate Angularity, ASTM C 1252, T 304, CT 234 ....................... $ 180 Cores, Compression or Shear Bond, CA Code ....................................... $ 70 Flat and Elongated Particle, D 4791 ............................................................ $ 220 Masonry Grout, 3x3x6 prism compression, C 39 .................................... $ 45 Lightweight Particles, C 123 ......................................................................... $ 180 Masonry Mortar, 2x2 cube compression, C 109 ...................................... $ 35 Los Angeles Abrasion, C 131 or C 535 ....................................................... $ 200 Masonry Prism, half size, compression, C 1019...................................... $ 120 Material Finer than No. 200 Sieve by Washing, C 117 .............................. $ 90 Masonry Prism, Full size, compression, C 1019...................................... $ 200 Organic Impurities, C 40 ............................................................................... $ 90 Potential Alkali Reactivity, Mortar Bar Method, Coarse, C 1260 ............... $ 1,250 REINFORCING AND STRUCTURAL STEEL Potential Alkali Reactivity, Mortar Bar Method, Fine, C 1260 .................... $ 950 Chemical Analysis, A 36, A 615 ................................................................ $ 135 Potential Reactivity of Aggregate (Chemical Method), C 289 ................... $ 475 Fireproofing Density Test, UBC 7-6 .......................................................... $ 90 Sand Equivalent, T 176, CT 217.................................................................. $ 125 Hardness Test, Rockwell, A 370 ............................................................... $ 80 Sieve Analysis, Coarse Aggregate, T 27, C 136 ........................................ $ 120 High Strength Bolt, Nut & Washer Conformance, Sieve Analysis, Fine Aggregate (including wash), T 27, C 136 ................. $ 145 per assembly, A 325 ............................................................................. $ 150 Sodium Sulfate Soundness, C 88 ................................................................ $ 450 Mechanically Spliced Reinforcing Tensile Test, ACI ............................... $ 175 Specific Gravity and Absorption, Coarse, C 127, CT 206 .......................... $ 115 Pre-Stress Strand (7 wire), A 416 ............................................................. $ 170 Specific Gravity and Absorption, Fine, C 128, CT 207............................... $ 175 Reinforcing Tensile or Bend up to No. 11, A 615 & A 706 ..................... $ 75 Structural Steel Tensile Test: Up to 200,000 lbs., A 370......................... $ 90 ROOFING Welded Reinforcing Tensile Test: Up to No. 11 bars, ACI ...................... $ 80 Roofing Tile Absorption, (set of 5), C 67 ..................................................... $ 250 Roofing Tile Strength Test, (set of 5), C 67................................................. $ 250 Special preparation of standard test specimens will be charged at the technician’s hourly rate. Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.