14 Downtown Restroom Feasibility PresentationTown Council Meeting May 7, 2024 Downtown Restroom Feasibility Study CIP No . 821-20 11 Project Overview 1 Project Scope: Identify a preferred site for an American with Dis abilitie s Ac t (ADA) c ompliant public re s troom in Downtown Los Gatos. Staff recommendations: •Two fixture fac ilitie s •Single occupancy •Gender-neutral Graphic by William Duff Architects Project Overview 2 Factors for Site Selection: •Proximity and value to the downtown area •Financ ial e ffic ie nc y •Utility adjac e nc y •Ac c e s s ibility •Safety •Fle xibility Site Evaluations •Site 1: Northwest corner of Town Plaza Park •Site 2: Southeast corner of Parking Lot #6 (West Main Street & Victory Lane) •Site 3: North edge of Parking Lot #5 (Elm Street) •Site 4: South edge of Parking Lot #5 (West Main Street) 3 Site Evaluations 4 Site 1: Northwest Corner of Town Plaza Park (Recommended) Option 1: Remove the raised planter bed and replace with the restroom facility Option 2: Install restroom facility adjacent or attached to the bus stop shelter Option 3: Demolish the bus stop shelter and replace with the restroom facility Option 1: Demolish sidewalk planter bed and replace with the restroom facility Option 2: Demolish one accessible and one standard parking space and replace with a ne w re s troom fac ility Site Evaluations 5 Site 2: Southeast corner of Parking Lot #6 Optio n 1: Remove and adjust one accessible parking space and one standard parking space on the western parking aisle Option 2: Remove or adjust several standard parking spaces on the eastern parking aisle Site Evaluations 6 Site 3: North edge or Parking Lot # 5 Option 1: Remove and adjust two standard parking spaces to be replaced with a new restroom facility. Potentially would need to adjust adjacent accessible parking space and connection to sidewalk Option 2: Close the Parking Lot #5 entrance on West Main Street fully and utilize the end of the lot Site Evaluations 7 Site 4: South edge or Parking Lot #5 Conclusion Staff Recommendation: Install a single occupancy, two fixture , gender neutral restroom facility adjacent or attached to the bus stop shelter at the northwest corner of Town Plaza Park (Site 1, Option 2) 8 Future funding needed for design, permitting, and construction is estimated at $550,000 to $650,000. Questions/Comments? Town of Los Gatos Parks & Public Works ppw@losgatosca.gov (408) 399-5770