14 Desk Item.Downtown Restroom Feasibility Report with attachment
PREPARED BY: Marina Chislett
Environmental Programs Specialist
Reviewed by: Town Manager, Town Attorney, Finance Director, and Director of Parks and Public Works
110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832
www.losgatosca.gov
TOWN OF LOS GATOS
COUNCIL AGENDA REPORT
MEETING DATE: 05/07/2024 ITEM NO: 14 DESK ITEM
DATE: May 1, 2024
TO: Mayor and Town Council
FROM: Laurel Prevetti, Town Manager
SUBJECT: Receive an Update on the Downtown Restroom Feasibility Study (CIP No.
821-2011) and Provide Direction to Town Staff
REMARKS:
Attachment 2 contains a presentation prepared by staff.
Attachment previously received with the Staff Report:
1. Downtown Restroom Feasibility Study (CIP No. 821-2011)
Attachment received with this Desk Item:
2. Staff Presentation
This Page Intentionally Left Blank
Town Council Meeting
May 7, 2024
Downtown Restroom
Feasibility Study
CIP No . 821-20 11
ATTACHMNET 2
Project Overview
1
Project Scope: Identify a preferred site for an American with
Dis abilitie s Ac t (ADA) c ompliant public re s troom in Downtown Los
Gatos.
Staff recommendations:
•Two fixture fac ilitie s
•Single occupancy
•Gender-neutral
Graphic by William Duff Architects
Project Overview
2
Factors for Site Selection:
•Proximity and value to the downtown area
•Financ ial e ffic ie nc y
•Utility adjac e nc y
•Ac c e s s ibility
•Safety
•Fle xibility
Site Evaluations
•Site 1: Northwest corner of
Town Plaza Park
•Site 2: Southeast corner of
Parking Lot #6 (West Main
Street & Victory Lane)
•Site 3: North edge of Parking
Lot #5 (Elm Street)
•Site 4: South edge of Parking
Lot #5 (West Main Street)
3
Site Evaluations
4
Site 1: Northwest Corner of Town Plaza Park (Recommended)
Option 1: Remove the raised
planter bed and replace with
the restroom facility
Option 2: Install restroom
facility adjacent or attached
to the bus stop shelter
Option 3: Demolish the bus
stop shelter and replace
with the restroom facility
Option 1: Demolish sidewalk
planter bed and replace with
the restroom facility
Option 2: Demolish one
accessible and one standard
parking space and replace
with a ne w re s troom fac ility
Site Evaluations
5
Site 2: Southeast corner of Parking Lot #6
Optio n 1: Remove and adjust one
accessible parking space and
one standard parking space on
the western parking aisle
Option 2: Remove or adjust
several standard parking spaces
on the eastern parking aisle
Site Evaluations
6
Site 3: North edge or Parking Lot # 5
Option 1: Remove and adjust two
standard parking spaces to be
replaced with a new restroom
facility. Potentially would need to
adjust adjacent accessible parking
space and connection to sidewalk
Option 2: Close the Parking Lot #5
entrance on West Main Street
fully and utilize the end of the lot
Site Evaluations
7
Site 4: South edge or Parking Lot #5
Conclusion
Staff Recommendation: Install a single occupancy, two fixture ,
gender neutral restroom facility adjacent or attached to the bus
stop shelter at the northwest corner of Town Plaza Park (Site 1,
Option 2)
8
Future funding needed for
design, permitting, and
construction is estimated at
$550,000 to $650,000.