Loading...
10 Staff Report.Corporation Yard Building Replacement project closeout with attachment PREPARED BY: Dan Keller Facilities & Environmental Services Manager Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 04/16/24 DATE: April 1, 2024 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for Construction of the Corporation Yard Building Replacement Completed by S&H Construction, Inc., and Authorize the Town Clerk to File for Recordation RECOMMENDATION: Authorize the Town Manager to execute a certificate of acceptance and notice of completion for construction of the Corporation Yard Building Replacement completed by S&H Construction, Inc., and authorize the Town Clerk to file for recordation (Attachment 1). BACKGROUND: This phased project began in the summer of 2020 with phase one for the design and construction for the remodel of the engineering building and adjacent warehouse spaces at 41 Miles Avenue to accommodate engineering and maintenance staff. The project was completed in May 2021. Phase two began in 2022 for the design and construction of a replacement building at 41 Miles Avenue to be utilized for storage for Parks and Public Works equipment and Police evidence. At the August 2, 2022 Town Council meeting, Council authorized the Town Manager to execute a Construction Agreement with S&H Construction Inc. for the construction of the storage building for a total agreement amount not to exceed $999,180 including 30% for unanticipated services. PAGE 2 OF 3 SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Corporation Yard Building Replacement and Authorize the Town Clerk to File for Recordation DATE: April 1, 2024 DISCUSSION: S&H Construction, Inc. began work in fall 2022 and has satisfactorily completed all contracted work items, for a final construction cost of $817,468. Five percent of the faithful performance bond will remain in effect for a period of two years as a guarantee for any needed repair or replacement caused by defective materials and/or workmanship for the project. The execution and recordation of the Certificate of Acceptance is now required to finalize the Town’s acceptance of the project and to release the retention funds withheld from the contractor. CONCLUSION: This Council action would close the active contract period with S&H Construction, Inc. and begin the warranty period for their work. FISCAL IMPACT: There were sufficient funds available in the CIP Budget for the Corporation Yard Building Replacement Project as displayed in the fiscal table. Budget Costs GFAR 2,651,781$ Total Budget 2,651,781$ Costs Construction & Consultant Expenses 1,576,281$ Construction Agreement with S&H Construction, Inc. (Requested with this Staff Report)817,468$ Total Costs 2,393,749$ Available Balance 258,032$ Corporation Yard Building Replacement Project CIP No. 821-2302 PAGE 3 OF 3 SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Corporation Yard Building Replacement and Authorize the Town Clerk to File for Recordation DATE: April 1, 2024 ENVIRONMENTAL ASSESSMENT: This is not a project defined under CEQA, and not further action was required. Attachment: 1. Certificate of Acceptance and Notice of Completion This Page Intentionally Left Blank Recording Requested by: TOWN OF LOS GATOS WHEN RECORDED MAIL TO: TOWN CLERK TOWN OF LOS GATOS 110 E MAIN ST LOS GATOS, CA 95030 ______________________________________________________________________________ (SPACE ABOVE BAR FOR RECORDER’S USE) (RECORD WITHOUT FEE UNDER GOVERNMENT CODE SECTIONS 27383 AND 6103) TYPE OF RECORDING CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION PPW JOB NO. 18-821-2302 Corporation Yard Building Replacement TO WHOM IT MAY CONCERN: I do hereby certify that S&H Construction, Inc. completed the work called for in the agreement with the Town of Los Gatos dated August 9, 2022. The work is outlined in the Town’s bid process prepared by the Town of Los Gatos and generally consisted of furnishing all labor, materials, tools, equipment, and services required for completion of the PPW Job No. 18-821-2302 located in the TOWN OF LOS GATOS, County of Santa Clara, State of California and was completed, approved and accepted April 1, 2024. Bond No.: 602-133948-9 Date: August 10, 2022 TOWN OF LOS GATOS By: __________________________________ Laurel Prevetti, Town Manager Acknowledgment Required ATTACHMENT 1