Item 3 - Staff Report with Exhibits 1 through 9.123 Wilder PREPARED BY: Sean Mullin, AICP Senior Planner Reviewed by: Planning Manager and Community Development Director 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6874 www.losgatosca.gov TOWN OF LOS GATOS PLANNING COMMISSION REPORT MEETING DATE: 06/26/2024 ITEM NO: 3 DATE: June 21, 2024 TO: Planning Commission FROM: Joel Paulson, Community Development Director SUBJECT: Requesting Approval for Technical Demolition of a Contributing Single-Family Residence and Construction of a New Single-Family Residence to Exceed the Floor Area Ratio (FAR) Standards and Requiring a Variance to Side Yard Setback Requirements Located in the Almond Grove Historic District on Property Zoned R-1D:LHP. Located at 123 Wilder Avenue. APN 510-18-008. Architecture and Site Application S-23-039 and Variance Application V-24-001. Categorically Exempt Pursuant to CEQA Guidelines Section 15301: Existing Facilities. Property Owner: Boguslaw Marcinkowski and Brygida Sas-Marcinkowski. Applicant: Jose De La O. Project Planner: Sean Mullin. RECOMMENDATION: Consider approval of a request for technical demolition of a contributing single-family residence and construction of a new single-family residence to exceed the floor area ratio (FAR) standards and requiring a Variance to side yard setback requirements located in the Almond Grove Historic District on property zoned R-1D:LHP, located at 123 Wilder Avenue. PROJECT DATA: General Plan Designation: Medium Density Residential Zoning Designation: R-1D:LHP Applicable Plans & Standards: General Plan; Residential Design Guidelines Parcel Size: 6,226 square feet Surrounding Area: Existing Land Use General Plan Zoning North Residential Medium Density Residential R-1D:LHP South Residential Medium Density Residential R-1D:LHP East Residential Medium Density Residential R-1D:LHP West Residential Medium Density Residential R-1D:LHP Page 17 PAGE 2 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp CEQA: The project is Categorically Exempt pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act (CEQA), Section 15301: Existing Facilities. FINDINGS:  The project is Categorically Exempt pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act (CEQA), Section 15301: Existing Facilities.  As required by Section 29.10.09030(e) of the Town Code fo r the demolition of an existing residence.  The project meets the objective standards of Chapter 29 of the Town Code (Zoning Regulations) except the requests to exceed the FAR standards and reduce the required side setback.  As required by Section 29.40.075(c) of the Town Code for granting approval of an exception to the FAR standards.  As required by Section 29.20.170 of the Town Code for granting a Variance application.  The project complies with the Residential Design Guidelines. CONSIDERATIONS:  As required by Section 29.20.150 of the Town Code for granting approval of an Architecture and Site application. ACTION: The decision of the Planning Commission is final unless appealed within ten days. BACKGROUND: The subject property is located on the west side of Wilder Avenue approximately 310 feet north of the intersection with Bean Avenue in the Almond Grove Historic District (Exhibit 1). The property is approximately 6,226 square feet and is developed with an existing 2,225-square foot, two-story residence with a 470-square foot detached garage (Exhibit 4). The immediate neighborhood is comprised of one- and two-story residences. In September 2023, it was brought to the Town’s attention that work had occurred on the residence without the required permits. Staff was able to observe that siding had been removed and replaced on the sides and rear of the residence (Exhibit 5). Additionally, some removal of the siding had occurred on the front of the residence. Section 29.10.020 defines Page 18 PAGE 3 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp BACKGROUND (continued): demolition (historic structure) as removal or enclosure of the exterior wall covering on more than 25 percent of the walls facing a public street or 50 percent of all exterior walls. When a project on a historic resource exceeds these limitations, the result is a technical demolition. The extent of siding removal on the subject residence constitutes a technical demolition since it was observed that the existing siding had been completely removed from the rear and side elevations and portions of the front elevation. New cementitious horizontal siding had been installed on portions of the side and rear elevations. On September 26, 2023, a Stop Work Notice was issued by the Town for unlawful technical demolition related to removal of the siding on the residence. On October 5, 2023, the applicant was informed of the unlawful demolition. On October 22, 2023, the applicant filed an Architecture and Site application for the project. During technical review of the application, staff identified that the project would also require approval of an exception to the FAR standards since the existing residence exceeds the allowable FAR for the property and a Variance to the required side setbacks since the residence is located three feet, six inches from the side property line where five feet is required. The pending Architecture and Site and Variance applications and future Building Permits are remed ies for these circumstances. On December 20, 2023, the Historic Preservation Committee (HPC) considered the request and forwarded a recommendation of approval to the Planning Commission with the following conditions (Exhibit 6):  Replace the installed horizontal cementitious lap siding with wood shingle siding to match what was removed;  The existing ornate shingle pattern in the front gable end shall be replicated in the north facing gable end; and  The new windows shall match the windows they are replacing. Full details of the new wood windows shall be provided to the Town to ensure in-kind replacement. The project is being considered by the Planning Commission due to the request to exceed the maximum allowable FAR and the request for a Variance to the required side setback for a single-family dwelling in the Almond Grove Historic District. PROJECT DESCRIPTION: A. Location and Surrounding Neighborhood The subject property is located on the west side of Wilder Avenue approximately 310 feet north of the intersection with Bean Avenue in the Almond Grove Historic District (Exhibit 1). Page 19 PAGE 4 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp PROJECT DESCRIPTION (continued): The property is approximately 6,226 square feet and is developed with an existing 2,225- square foot, two-story residence that is noted as a contributor to the historic district and a 470-square foot detached garage (Exhibit 4). The immediate neighborhood is comprised of one- and two-story residences. B. Project Summary The application includes technical demolition of the existing single-family residence through removal and replacement of the existing shingle siding (Exhibit 9). The project also requires approval of an exception to the FAR standards and a Variance to the required side setback. The residence exceeds the allowable FAR by 108 square feet. In addition, the residence includes a side setback of approximately three feet, six inches, where five feet is required. The existing structure would remain and no additional square footage is proposed. C. Zoning Compliance The subject property is approximately 6,226 square feet, where a minimum lot size of 5,000 square feet is required for a parcel in the R-1D zone. A single-family residence is permitted in the R-1D zone. The proposed residence complies with the zoning regulations for height. The applicant requests approval to exceed the allowable FAR for the residence and a Variance to the Town Code for the required side setback. DISCUSSION: A. Architecture and Site Analysis The applicant proposes technical demolition of the existing single-family residence through removal and replacement of the existing shingle siding (Exhibit 9). As noted above, much of the existing shingle siding has already been removed without the benefit of permits. Prior to its removal, shingle siding covered all elevations of the residence (Exhibit 4). The removal of siding on the side and rear elevations constitutes a technical demolition under the Town Code. As a result of the technical demolition of the contributing residence, the Town Code requires approval of an Architecture and Site application for a new single-family residence. The applicant proposes removal of the remaining existing shingle siding on portions of the front elevation, as well as the installed cementitious horizontal siding on the side and rear elevations (Exhibits 7 and 9). Shingle siding on the front elevation would be either stripped and repainted or replaced in-kind. New shingle siding would be installed on all elevations to match the residence prior to the unpermitted work. The ornate pattern of the shingles in Page 20 PAGE 5 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp DISCUSSION (continued): the front-facing gable end would be replicated in both the front- and north-facing gable ends. Additionally, ten existing single-hung wood windows would be replaced in-kind with single-hung, dual pane wood windows at the front of the house, located on the front and side elevations (Exhibit 9, Sheet A-2). Lastly, the existing board and batten siding on the detached garage would be replaced in-kind. The applicant provided photos showing termite damage and rot in the existing wood shingle siding and windows on the residence, and the board and batten siding on the garage (Attachment 8). The project also requires approval of an exception to the FAR standards , discussed in Section B below, and a Variance to the required side setbacks, discussed in Section D below. The residence exceeds the allowable FAR by 108 square feet. In addition, the residence includes a side setback of approximately three feet, six inches, where five feet is required. The existing structure would remain, and no additional square footage is proposed. The applicant provided a Letter of Justification summarizing the project (Exhibit 7). B. Neighborhood Compatibility Pursuant to Section 29.40.075 of the Town Code, the maximum FAR for the subject property is 0.34 (2,117 square feet). The existing residence to be restored has an FAR of 0.36 (2,225 square feet), exceeding the maximum allowable floor area by 108 square feet. The table below reflects the current conditions of the residences in the immediate area and the proposed project. Immediate Neighborhood Comparison Address Zoning House SF Garage SF Total SF Site SF Building FAR Exceed FAR? 127 Wilder Ave. R-1D:LHP 1,215 0 1,215 6,134 0.20 No 131 Wilder Ave. R-1D:LHP 1,563 382 1,945 6,118 0.26 No 122 Wilder Ave. R-1D:LHP 1,912 559 2,471 5,597 0.34 No 124 Wilder Ave. R-1D:LHP 1,108 408 1,516 5,611 0.20 No 134 Wilder Ave. R-1D:LHP 2,270 0 2,270 6,650 0.37 Yes, by 9 sf 128 Wilder Ave. R-1D:LHP 1,975 484 2,459 6,134 0.32 No 115 Wilder Ave. R-1D:LHP 968 0 968 6,872 0.14 No 121 Wilder Ave. R-1D:LHP 1,692 220 1,912 6,103 0.28 No 114 Wilder Ave. R-1D:LHP 2,340 513 2,853 5,366 0.44 Yes, by 478 sf 123 Wilder Ave. (E & P) R-1D:LHP 2,225 470 2,695 6,226 0.36 Yes, by 108 sf Page 21 PAGE 6 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp DISCUSSION (continued): Based on Town and County records, the residences in the immediate neighborhood range in size from 1,108 square feet to 2,340 square feet and building FARs range from 0.14 to 0.44. The applicant is proposing a 2,225-square foot residence and a 470-square foot detached garage on a 6,226-square foot parcel. The proposed residence would be the third largest in terms of square footage and FAR in the immediate neighborhood. Section 29.40.075(c) of the Town Code states that the deciding body may allow a FAR in excess of the maximum allowed FAR if the following findings can be made: 1. The design theme, sense of scale, exterior materials, and details of the proposed project are consistent with the provisions of the landmark and historic preservation overlay zone and the adopted residential development standards; and 2. The lot coverage, setbacks, and FAR of the proposed project is compatible with the development on surrounding lots. Exhibit 7 contains the applicant’s Letter of Justification indicating that the residence is existing, and the project does not include additional proposed floor area. While being considered a new residence under the Architecture and Site application, the proposed project would restore the existing residence to its appearance before the unpermitted work took place. No additional massing or floor area is proposed. On December 20, 2023, the HPC considered the project for compatibility with the Almond Grove historic District and for consistency with the Residential Design Guidelines. The HPC forwarded a recommendation of approval to the Planning Commission with conditions. As provided above, the proposed residence would not be the only residence in the immediate neighborhood to exceed allowable FAR. The residence would not be the largest in the immediate neighborhood in terms of floor area or FAR. Since the residence is existing and is being considered under this Architecture and Site application due to the removal of existing siding resulting in a technical demolition, the existing massing, setbacks, and lot coverage would continue to be compatible with the development on surrounding properties. C. Building Design The applicant proposes to replace the siding on the residence in-kind, installing new wood shingle siding on all elevations. The ornate shingle pattern present in the front -facing gable end would be restored and repeated in the north-facing side gable end. Ten existing windows would be replaced in-kind, with no change in appearance. Lastly, the existing board and batten siding on the detached garage would be replaced in-kind. All work would maintain the existing appearance of the residence. Page 22 PAGE 7 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp DISCUSSION (continued): On December 20, 2023, the HPC considered the req uest and forwarded a recommendation of approval to the Planning Commission with the following conditions (Exhibit 6):  Replace the installed horizontal cementitious lap siding with wood shingle siding to match what was removed;  The existing ornate shingle pattern in the front gable end shall be replicated in the north-facing gable end;  The new windows shall match the windows they are replacing. Full details of the new wood windows shall be provided to the Town to ensure in -kind replacement. The current project plans respond to all the recommendations from the HPC. D. Variance – Setbacks The applicant is requesting a Variance from Section 29.40.740 of the Town Code for the required side setback in the R-1D zone. Pursuant to Town Code, the required side setback in the R-1D zone is five feet. The existing residence is sited square to the front property line and street and the majority of the residence complies with all setback requirements. Due to the angled side property lines, several corners along the left side of the residence project into the required setback as the residence steps into the property. These portions project approximately one -foot, six inches into the require left side setback resulting in a setback of three feet, six inches from the property line. As required by Section 29.20.170 of the Town Code, the Planning Commission, on the basis of the evidence submitted at the hearing, may grant a Variance if it finds that: 1. Because of special circumstances applicable to the property, including size, shape, topography, location or surroundings, the strict application of this ordinance deprives such property of privileges enjoyed by other properties in the vicinity and under identical zone; and 2. The granting of a variance would not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity and zone which such property is situated. Regarding the first finding, the subject property includes parallel front and rear property lines connected by angled side property lines. When siting a residence square to the front property line, the angular nature of the side property lines causes the side setback area to continually traverse toward the residence as it moves into the property. The subject Page 23 PAGE 8 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp DISCUSSION (continued): residence attempts to address this constraint by stepping the footprint of the structure toward the centerline of the property along the left side property line. The result is not completely successful in meeting the required left side setback as three corners of the residence project into the required setback area, producing a left side setback of three feet, six inches where five feet is required. While other properties in the immediate neighborhood have similar configurations, several are developed with residences with reduced side setbacks. With regards to the second finding, a review of Town permit records shows that at least three of the nine other properties in the immediate neighborhood include a residence with side setbacks that do not meet the requirement of the zone. Granting the Variance would not constitute a grant of special privilege to the subject property and would be consistent with the limitations of other properties in the immediate neighborhood . As indicated in the applicant’s Letter of Justification, the project would not add floor area or change the existing setbacks (Exhibit 7). The project is considered a new residence under this application since the unpermitted removal of the existing siding resulted in a technical demolition. The proposed project would restore the existing residence to its former appearance and the existing setbacks would not change and would remain compatible with the immediate neighborhood where it has been located since the early 1900s. E. CEQA Determination The project is Categorically Exempt pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act, Sections 1530 1: Existing Facilities. While the proposed removal of siding qualifies as a technical demolition, it is not considered a new structure for the purposes of CEQA. PUBLIC COMMENTS: Project signage was installed on the site by June 3, 2024, in anticipation of the June 26, 2024, Planning Commission hearing. Written notice was sent to property owners and tenants within 300 feet of the subject property. At the time of this report’s preparation, the Town has not received any public comment. Page 24 PAGE 9 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp CONCLUSION: A. Summary The applicant proposes approval of an Architecture and Site application for technical demolition of a contributing single-family residence and construction of a new single-family residence to exceed the floor area ratio (FAR) standards and requiring a Variance to side yard setback requirements located in the Almond Grove Historic District. The applicant has responded to all recommendations of the HPC, who forwarded a recommendation of approval for the project. The proposed FAR exceedance and the Variance to the side setback are consistent with the immediate neighborhood. B. Recommendation Based on the analysis above, staff recommends approval of the Architecture and Site application and Variance application subject to the recommended conditions of approval (Exhibit 3). If the Planning Commission finds merit with the proposed project, it should: 1. Make the finding that the proposed project is Categorically Exempt, pursuant to the adopted Guidelines for the implementation of the California Environmental Quality Act, Section 15301: Existing Facilities (Exhibit 2); 2. Make the finding as required by Section 29.10.09030(e) of the Town Code for the demolition of an existing structure (Exhibit 2); 3. Make the finding that the project complies with the objective standards of Chapter 29 of the Town Code (Zoning Regulations) except the request to exceed the FAR standards and the required side setback (Exhibit 2); 4. Make the findings as required by Section 29.40.075(c) of the Town Code for granting approval of an exception to the FAR standards (Exhibit 2); 5. Make the required findings as required by Section 29.20.170 of the Town Code for granting a Variance (Exhibit 2); 6. Make the finding required by the Town’s Residential Design Guidelines that the project complies with the Residential Design Guidelines (Exhibit 2); 7. Make the considerations as required by Section 29.20.150 of the Town Code for granting approval of an Architecture and Site application (Exhibit 2); and 8. Approve Architecture and Site Application S-23-039 and Variance Application V-24-001 with the conditions contained in Exhibit 3 and the Development Plans in Exhibit 9. C. Alternatives Alternatively, the Commission can: 1. Continue the matter to a date certain with specific direction; or Page 25 PAGE 10 OF 10 SUBJECT: 123 Wilder Avenue/S-23-039 and V-24-001 DATE: June 21, 2024 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmpA16B.tmp CONCLUSION (continued): 2. Approve the applications with additional and/or modified conditions; or 3. Deny the applications. EXHIBITS: 1. Location Map 2. Required Findings and Considerations 3. Recommended Conditions of Approval 4. Photos of Residence Prior to Unpermitted Work 5. Photos of Current State of the Residence 6. Historic Preservation Committee Action Letter, December 20, 2023 7. Letter of Justification 8. Applicant’s Photos of Damage 9. Development Plans Page 26 TAIT AVBEA N A V VICTORY LNWILDER AVN SANTA CRUZ AVNICH O L S O N A V MASSOL AVBAYVIEW AVGRAY S L N ROYC E S T 123 Wilder Avenue 0 0.250.125 Miles ° Update Notes:- Updated 12/20/17 to link to tlg-sql12 server data (sm)- Updated 11/22/19 adding centerpoint guides, Buildings layer, and Project Site leader with label- Updated 10/8/20 to add street centerlines which can be useful in the hillside area- Updated 02-19-21 to link to TLG-SQL17 database (sm)- Updated 08-23-23 to link to "Town Assessor Data" (sm) EXHIBIT 1Page 27 This Page Intentionally Left Blank Page 28 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmp6B8.tmp PLANNING COMMISSION – June 26, 2024 REQUIRED FINDINGS AND CONSIDERATIONS FOR: 123 Wilder Avenue Architecture and Site Application S-23-039 Variance Application V-24-001 Requesting Approval for Technical Demolition of a Contributing Single-Family Residence and Construction of a New Single-Family Residence to Exceed the Floor Area Ratio (FAR) Standards and Requiring a Variance to Side Yard Setback Requirements Located in the Almond Grove Historic District on Property Zoned R- 1D:LHP. APN 510-18-008. Categorically Exempt Pursuant to CEQA Guidelines Section 15301: Existing Facilities. Property Owner: Boguslaw Marcinkowski and Brygida Sas-Marcinkowski. Applicant: Jose De La O. Project Planner: Sean Mullin. FINDINGS Required finding for CEQA: ■ The project is Categorically Exempt pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act, Section 15301: Existing Facilities. Required finding for the technical demolition of existing structures: ■ As required by Section 29.10.09030(e) of the Town Code for the demolition of existing structures: 1. The Town's housing stock will be maintained as the single-family residence will be replaced. 2. The existing structure has no architectural or historical significance. 3. The property owner does not desire to maintain the structure as it exists; and 4. The economic utility of the structures was considered. The extent of the unpermitted removal of siding constitutes an unlawful technical demolition. On December 20, 2023, the Historic Preservation Committee reviewed the project and forwarded a recommendation of approval with conditions requiring restoration o f the residence through in-kind replacement of the removed shingle siding. The residence remains on the Historic Resources Inventory as a contributor to the Almond Grove Historic District since the project replaces the removed siding with in-kind shingle siding, retaining the historical significance. EXHIBIT 2 Page 29 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmp6B8.tmp Required compliance with the Zoning Regulations: ■ The project meets the objective standards of Chapter 29 of the Town Code (Zoning Regulations) except the requests to exceed the FAR standards and reduce the required side setback. Required finding to exceed floor area ratio (FAR) standards: ■ As required by Section 29.40.075(c) of the Town Code for allowing a FAR in excess of the FAR standards in the Town Code: 1. The design theme, sense of scale, exterior materials, and details of the proposed project are consistent with the provisions of the Landmark and historic Preservation Overlay Zone and the adopted residential development standards; and 2. The lot coverage, setbacks, and FAR of the proposed project are compatible with the development on surrounding lots. Required findings for granting a Variance application: ■ As required by Section 29.20.170 of the Town Code for granting a Variance application: 1. Because of special circumstances applicable to the property, including size, shape, topography, location or surroundings, the strict application of this ordinance deprives such property of privileges enjoyed by other properties in the vicinity and under identical zone; and 2. The granting of a variance does not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity and zone which such property is situated. Required compliance with the Residential Design Guidelines: ■ The project is in compliance with the Residential Design Guidelines for single -family residences not in hillside areas. The project was reviewed by the Historic Preservation Committee and recommendations were provided to address the consistency of the project with the surrounding neighborhood, Almond Grove Historic District, and the Residential Design Guidelines. Page 30 C:\Users\MeetingsOfficeUser7\AppData\Local\Temp\tmp6B8.tmp CONSIDERATIONS Required considerations in review of Architecture and Site applications: ■ As required by Section 29.20.150 of the Town Code, the considerations in review of an Architecture and Site application were all made in reviewing this project. Page 31 This Page Intentionally Left Blank Page 32 PLANNING COMMISSION – June 26, 2024 CONDITIONS OF APPROVAL 123 Wilder Avenue Architecture and Site Application S-23-039 Variance Application V-24-001 Requesting Approval for Technical Demolition of a Contributing Single-Family Residence and Construction of a New Single-Family Residence to Exceed the Floor Area Ratio (FAR) Standards and Requiring a Variance to Side Yard Setback Requirements Located in the Almond Grove Historic District on Property Zoned R- 1D:LHP. APN 510-18-008. Categorically Exempt Pursuant to CEQA Guidelines Section 15301: Existing Facilities. Property Owner: Boguslaw Marcinkowski and Brygida Sas-Marcinkowski. Applicant: Jose De La O. Project Planner: Sean Mullin. TO THE SATISFACTION OF THE DIRECTOR OF COMMUNITY DEVELOPMENT: Planning Division 1. APPROVAL: This application shall be completed in accordance with all of the conditions of approval and in substantial compliance with the approved plans. Any changes or modifications to the approved plans and/or business operation shall be approved by the Community Development Director, DRC or the Planning Commission dependin g on the scope of the changes. 2. EXPIRATION: The approval will expire two years from the approval date pursuant to Section 29.20.320 of the Town Code, unless the approval has been vested. 3. OUTDOOR LIGHTING: Exterior lighting shall be kept to a minimum, and shall be down directed fixtures that will not reflect or encroach onto adjacent properties. No flood lights shall be used unless it can be demonstrated that they are needed for safety or security. 4. DEMOLITION AFFIDAVIT: Prior to issuance of a building permit, a demolition affidavit must be submitted and signed by the property owner, project architect, project engineer and contractor. 5. STORY POLES/PROJECT IDENTIFICATION SIGNAGE: Story poles and/or project identification signage on the project site shall be removed within 30 days of approval of the Architecture & Site application. 6. TREE REMOVAL PERMIT: A Tree Removal Permit shall be obtained for any trees to be removed, prior to the issuance of a building or grading permit. 7. EXISTING TREES: All existing trees shown on the plan and trees required to remain or to be planted are specific subjects of approval of this plan, and must remain on the site. 8. TREE FENCING: Protective tree fencing and other protection measures shall be placed at the drip line of existing trees prior to issuance of demolition and building permits and EXHIBIT 3 Page 33 shall remain through all phases of construction. Include a tree protection plan with the construction plans. 9. TREE STAKING: All newly planted trees shall be double-staked using rubber tree ties. 10. FRONT YARD LANDSCAPE: Prior to issuance of a Certificate of Occupancy the front yard must be landscaped. 11. TOWN INDEMNITY: Applicants are notified that Town Code Section 1.10.115 requires that any applicant who receives a permit or entitlement (“the Project”) from the Town shall defend (with counsel approved by Town), indemnify, and hold harmless the Town, its agents, officers, and employees from and against any claim, action, or proceeding (including without limitation any appeal or petition for review thereof) against the Town or its agents, officers, or employees related to an approval of the Project, including without limitation any related application, permit, certification, condition, environmental determination, other approval, compliance or failure to comply with applicable laws and regulations, and/or processing methods (“Challenge”). Town may (but is not obligated to) defend such Challenge as Town, in its sole discretion, determines appropriate, all at applicant’s sole cost and expense. Applicant shall bear any and all losses, damages, injuries, liabilities, costs , and expenses (including, without limitation, staff time and in -house attorney’s fees on a fully-loaded basis, attorney’s fees for outside legal counsel, expert witness fees, court costs, and other litigation expenses) arising out of or related to any Challenge (“Costs”), whether incurred by Applicant, Town, or awarded to any third party, and shall pay to the Town upon demand any Costs incurred by the Town. No mo dification of the Project, any application, permit certification, condition, environmental determination, other approval, change in applicable laws and regulations, or change in such Challenge as Town, in its sole discretion, determines appropriate, all at the applicant’s sole cost and expense. No modification of the Project, any application, permit certification, condition, environmental determination, other approval, change in applicable laws and regulations, or change in processing methods shall alter the applicant’s indemnity obligation. 12. COMPLIANCE MEMORANDUM: A memorandum shall be prepared and submitted with the building plans detailing how the Conditions of Approval will be addressed. Building Division 13. PERMITS REQUIRED: A Building Permit is required for the renovation of the existing structure consisting of exterior siding and window replacement. 14. APPLICABLE CODES: The current codes, as amended and adopted by the Town of Los Gatos as of January 1, 2023, are the 2022 California Building Standards Code, California Code of Regulations Title 24, Parts 1-12, including locally adopted Reach Codes. 15. CONDITIONS OF APPROVAL: The Conditions of Approval must be blue lined in full on the cover sheet of the construction plans. A Compliance Memorandum shall be prepared and submitted with the building permit application detailing how the Conditions of Approval will be addressed. 16. SIZE OF PLANS: Minimum size 24” x 36”, maximum size 30” x 42”. Page 34 17. TITLE 24 ENERGY COMPLIANCE: All required California Title 24 Energy Compli ance Forms must be blue-lined (sticky-backed), i.e., directly printed, onto a plan sheet. 18. HAZARDOUS FIRE ZONE: All projects in the Town of Los Gatos require Class A roof assemblies. 19. SPECIAL INSPECTIONS: When a special inspection is required by CBC Section 1704, the Architect or Engineer of Record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the Building Permit. The Town Special Inspection form must be completely filled-out and signed by all requested parties prior to permit issuance. Special Inspection forms are available online at www.losgatosca.gov/building. 20. BLUEPRINT FOR A CLEAN BAY SHEET: The Town standard Santa Clara Valley Nonpoint Source Pollution Control Program Sheet (page size same as submitted drawings) shall be part of the plan submittal as the second page. The specification sheet is available online at www.losgatosca.gov/building. 21. APPROVALS REQUIRED: The project requires the following departments and agencies approval before issuing a building permit: a. Community Development – Planning Division: (408) 354-6874 b. Engineering/Parks & Public Works Department: (408) 399-5771 c. Santa Clara County Fire Department: (408) 378-4010 d. West Valley Sanitation District: (408) 378-2407 e. Local School District: The Town will forward the paperwork to the appropriate school district(s) for processing. A copy of the paid receipt is required prior to permit issuance. TO THE SATISFACTION OF THE DIRECTOR OF PARKS & PUBLIC WORKS: Engineering Division 22. GENERAL: All public improvements shall be made according to the latest adopted Town Standard Plans, Standard Specifications and Engineering Design Standards. All work shall conform to the applicable Town ordinances. The adjacent public right -of-way shall be kept clear of all job-related mud, silt, concrete, dirt and other construction debris at the end of the day. Dirt and debris shall not be washed into storm drainage facilities. The storing of goods and materials on the sidewalk and/or the st reet will not be allowed unless an encroachment permit is issued by the Engineering Division of the Parks and Public Works Department. The Owner’s representative in charge shall be at the job site during all working hours. Failure to maintain the public right-of-way according to this condition may result in the issuance of correction notices, citations, or stop work orders and the Town performing the required maintenance at the Owner’s expense. 23. PAYMENT OPTIONS: a. All payments regarding fees and deposits can be mailed to: Town of Los Gatos PPW – Attn: Engineering Dept 41 Miles Avenue Los Gatos, CA 95030 Page 35 Or hand deliver/drop off payment in engineering lock box Checks made out to “Town of Los Gatos” and should mention address and application number on memo/note line. 24. APPROVAL: This application shall be completed in accordance with all the conditions of approval listed below and in substantial compliance with the latest reviewed and approved development plans. Any changes or modifications to the approved plans or conditions of approvals shall be approved by the Town Engineer. 25. CONSTRUCTION PLAN REQUIREMENTS: Construction drawings shall comply with Section 1 (Construction Plan Requirements) of the Town’s Engineering Design Standards, which are available for download from the Town’s website. 26. CHANGE OF OCCUPANCY: Prior to initial occupancy and any subsequent change in use or occupancy of any non-residential condominium space, the buyer or the new or existing occupant shall apply to the Community Development Department and obtain approval for use determination and building permit and obtain inspection approval for any necessary work to establish the use and/or occupancy consistent with th at intended. 27. GENERAL LIABILITY INSURANCE: The property owner shall provide proof of insurance to the Town on a yearly basis. In addition to general coverage, the policy must cover all elements encroaching into the Town’s right-of-way. 28. PUBLIC WORKS INSPECTIONS: The Owner, Applicant and/or Developer or their representative shall notify the Engineering Inspector at least twenty -four (24) hours before starting any work pertaining to on -site drainage facilities, grading or paving, and all work in the Town's right-of-way. Failure to do so will result in penalties and rejection of any work that occurred without inspection. 29. RESTORATION OF PUBLIC IMPROVEMENTS: The Owner, Applicant and/or Developer or their representative shall repair or replace all existing improvements not designated for removal that are damaged or removed because of the Owner, Applicant and/or Developer or their representative's operations. Improvements such as, but not limited to: curbs, gutters, sidewalks, driveways, signs, pavements, raised pavement markers, thermoplastic pavement markings, etc., shall be repaired and replaced to a condition equal to or better than the original condition. Any new concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor’s sole expense and no additional compensation shall be allowed therefore. Existing improvement to be repaired or replaced shall be at the direction of the Engineering Constructio n Inspector and shall comply with all Title 24 Disabled Access provisions. The restoration of all improvements identified by the Engineering Construction Inspector shall be completed before the issuance of a certificate of occupancy. The Owner, Applicant and/or Developer or their representative shall request a walk-through with the Engineering Construction Inspector before the start of construction to verify existing conditions. 30. PLAN CHECK FEES: Plan check fees associated with the Grading Permit shall be deposited with the Engineering Division of the Parks and Public Works Department prior Page 36 to the commencement of plan check review. 31. SITE SUPERVISION: The General Contractor shall provide qualified supervision on the job site at all times during construction. 32. INSPECTION FEES: Inspection fees shall be deposited with the Town prior to the issuance of permits or recordation of maps. 33. DESIGN CHANGES: Any proposed changes to the approved plans shall be subject to the approval of the Town prior to the commencement of any and all altered work. The Owner’s project engineer shall notify, in writing, the Town Engineer at least seventy-two (72) hours in advance of all the proposed changes. Any approved changes shall be incorporated into the final “as-built” plans. 34. PLANS AND STUDIES: All required plans and studies shall be prepared by a Registered Professional Engineer in the State of California and submitted to the Town Engineer for review and approval. Additionally, any post-project traffic or parking counts, or other studies imposed by the Planning Commission or Town Council shall be funded by the Owner, Applicant and/or Developer. 35. GRADING PERMIT DETERMINATION DURING CONSTRUCTION DRAWINGS: All grading work taking place with this application and related applications/projects within a two year time period are considered eligible for the grading permit process and will be counted toward the quantities used in determining grading permit requirements. In the event that, during the production of construction drawings and/o r during construction of the plans approved with this application by the Town of Los Gatos, it is determined that a grading permit would be required as described in Chapter 12, Article II (Grading Permit) of the Town Code of the Town of Los Gatos, an Architecture and Site Application would need to be submitted by the Owner for review and approval by the Development Review Committee prior to applying for a grading permit. 36. GRADING: Any grading work, cut/fill, earthwork or combination thereof (completed or proposed on submitted plans) on the parcel over the upcoming two-year period are combined with regards to grading permit thresholds. This also applies to adjacent parcels with identical owners, applicants and or developers. 37. ILLEGAL GRADING: Per the Town’s Comprehensive Fee Schedule, applications for work unlawfully completed shall be charged double the current fee. As a result, the required grading permit fees associated with an application for grading will be charged accordingly. 38. DUST CONTROL: Blowing dust shall be reduced by timing construction activities so that paving and building construction begin as soon as possible after completion of grading, and by landscaping disturbed soils as soon as possible. Further, water trucks shall be present and in use at the construction site. All portions of the site subject to blowing dust shall be watered as often as deemed necessary by the Town, or a minimum of three (3) times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites in order to insure proper control of blowing dust for the duration of the project. Watering on public streets shall not occur. Streets shall be cleaned by street sweepers or by hand as often as deemed necessary by the Town Engineer, or at least once a day. Watering associated with on -site construction activity shall take place between the hours of 8 a.m. and 5 p.m. and shall Page 37 include at least one (1) late-afternoon watering to minimize the effects of blowing dust. All public streets soiled or littered due to this construction activity shall be cleaned and swept on a daily basis during the workweek to the satisfaction of the Town. Demolition or earthwork activities shall be halted when wind speeds (instantaneous gust s) exceed twenty (20) miles per hour (MPH). All trucks hauling soil, sand, or other loose debris shall be covered. For sites greater than four (4) acres in area: a. Enclose, cover, water twice daily or apply (non-toxic) soil binders to exposed stockpiles (dirt, sand, etc.). b. Limit traffic speeds on unpaved roads to fifteen (15) miles per hour. c. Install sandbags or other erosion control measures to prevent silt runoff to public roadways. d. Replant vegetation in disturbed areas as quickly as possible. e. Hydroseed or apply (non-toxic) soil stabilizers to inactive construction areas (previously graded areas inactive for ten days or more). 39. CONSTRUCTION ACTIVITIES: All construction shall conform to the latest requirements of the CASQA Stormwater Best Management Practices Handbooks for Construction Activities and New Development and Redevelopment, the Town's grading and erosion control ordinance, and other generally accepted engineering practices for erosion control as required by the Town Engineer when undertaking construction activities. 40. SILT AND MUD IN PUBLIC RIGHT-OF-WAY: It is the responsibility of Contractor and homeowner to make sure that all dirt tracked into the public right-of-way is cleaned up on a daily basis. Mud, silt, concrete and other construction debris SHALL NOT be washed into the Town’s storm drains. 41. COVERED TRUCKS: All trucks transporting materials to and from the site shall be covered. 42. GOOD HOUSEKEEPING: Good housekeeping practices shall be observed at all times during the course of construction. All construction shall be diligently supervised by a person or persons authorized to do so at all times during working hours. The Owner’s representative in charge shall be at the job site during all working hours. Failure to maintain the public right-of-way according to this condition may result in penalties and/or the Town performing the required maintenance at the Owner’s expense 43. SITE DESIGN MEASURES: All projects shall incorporate at least one of the following measures: a. Protect sensitive areas and minimize changes to the natural topography. b. Minimize impervious surface areas. c. Direct roof downspouts to vegetated areas. d. Use porous or pervious pavement surfaces on the driveway, at a minimum. e. Use landscaping to treat stormwater. 44. CONSTRUCTION HOURS: All subdivision improvements and site improvements construction activities, including the delivery of construction materials, labors, heavy equipment, supplies, etc., shall be limited to the hours of 8:00 a.m. to 6:00 p.m., weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. The Town may authorize, on a case-by- Page 38 case basis, alternate construction hours. The Owner, Applicant and/or Developer shall provide written notice twenty-four (24) hours in advance of modified construction hours. Approval of this request is at discretion of the Town. 45. CONSTRUCTION NOISE: Between the hours of 8:00 a.m. to 6:00 p.m., weekdays and 9:00 a.m. to 4:00 p.m. Saturdays, construction, alteration or repair activities shall be allowed. No individual piece of equipment shall produce a noise level exceeding eighty- five (85) dBA at twenty-five (25) feet from the source. If the device is located within a structure on the property, the measurement shall be made at distances as close to twenty-five (25) feet from the device as possible. The noise level at any point outside of the property plane shall not exceed eighty-five (85) dBA. 46. WATER METER: Water meters shall be relocated within the property in question, directly behind the public right-of-way line. The Owner, Applicant and/or Developer shall repair and replace to existing Town standards any portion of concrete flatwork within said right-of-way that is damaged during this activity prior to issuance of a certificate of occupancy. 47. SANITARY SEWER CLEANOUT: Sanitary sewer cleanouts shall be relocated within the property in question, within one (1) foot of the property line per West Valley Sanitation District Standard Drawing 3, or at a location specified by the Town. The Owner, Applicant and/or Developer shall repair and replace to existing To wn standards any portion of concrete flatwork within said right-of-way that is damaged during this activity prior to issuance of a certificate of occupancy. 48. PRECONSTRUCTION MEETING: Prior to issuance of any grading or building permits or the commencement of any site work, the general contractor shall: a. Along with the Owner, Applicant and/or Developer, setup a pre-construction meeting with Eric Christianson, Senior Public Works Inspector echristianson@losgatosca.gov (408) 354-6824 to discuss the project conditions of approval, working hours, site maintenance and other construction matters; b. Acknowledge in writing that they have read and understand the project conditions of approval and will make certain that all project sub-contractors have read and understand them as well prior to commencing any work, and that a copy of the project conditions of approval will be posted on-site at all times during construction. 49. CONSTRUCTION VEHICLE PARKING: Construction vehicle parking within the public right- of-way will only be allowed if it does not cause access or safety problems as determined by the Town. 50. STREET/SIDEWALK CLOSURE: Any proposed blockage or partial closure of the street and/or sidewalk requires an encroachment permit. Special provisions such as limitations on works hours, protective enclosures, or other means to facilitate public access in a safe manner may be required. 51. DRIVEWAY: The driveway conform to existing pavement on Wilder shall be constructed in a manner such that the existing drainage patterns will not be obstructed. 52. DRIVEWAY APPROACH: The Owner, Applicant and/or Developer shall install a Town standard residential driveway approach. The new driveway approach shall be constructed per Town Standard Plans and must be completed and accepted by the Page 39 Town before a Certificate of Occupancy for any new building can be issued. New concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor’s sole expense and no additional compensation shall be allowed therefore. 53. JOINT TRENCH PLANS: Joint trench plans shall be reviewed and approved by the Town prior to recordation of a map. The joint trench plans sha ll include street and/or site lighting and associated photometrics. A letter shall be provided by PG&E stating that public street light billing will by Rule LS2A, and that private lights shall be metered with billing to the homeowners’ association. Pole numbers, assigned by PG&E, shall be clearly delineated on the plans. 54. CERTIFICATE OF OCCUPANCY: The Engineering Division of the Parks and Public Works Department will not sign off on a Temporary Certificate of Occupancy or a Final Certificate of Occupancy until all required improvements within the Town’s right-of-way have been completed and approved by the Town. 55. UTILITIES: The Owner, Applicant and/or Developer shall install all new, relocated, or temporarily removed utility services, including telephone, electric power and all other communications lines underground, as required by Town Code Section 27.50.015(b). All new utility services shall be placed underground. Underground conduit shall be provided for cable television service. The Owner, Applicant and/or Developer is required to obtain approval of all proposed utility alignments from any and all utility service providers before a Certificate of Occupancy for any new building can be issued. The Town of Los Gatos does not approve or imply approval for f inal alignment or design of these facilities. 56. TRENCHING MORATORIUM: Trenching within a newly paved street will be allowed subject to the following requirements: a. The Town standard “T” trench detail shall be used. b. A Town-approved colored controlled density backfill shall be used. c. All necessary utility trenches and related pavement cuts shall be consolidated to minimize the impacted area of the roadway. d. The total asphalt thickness shall be a minimum of three (3) inches, meet Town standards, or shall match the existing thickness, whichever is greater. The final lift shall be 1.5-inches of one-half (½) inch medium asphalt. The initial lift(s) shall be of three-quarter (¾) inch medium asphalt. e. The Contractor shall schedule a pre-paving meeting with the Town Engineering Construction Inspector the day the paving is to take place. f. A slurry seal topping may be required by the construction inspector depending their assessment of the quality of the trench paving. If required, the slurry seal shall extend the full width of the street and shall extend five (5) feet beyond the longitudinal limits of trenching. Slurry seal materials shall be approved by the Town Engineering Construction Inspector prior to placement. Black sand may be required in the slurry mix. All existing striping and pavement markings shall be replaced upon completion of slurry seal operations. All pavement restorations shall be completed and approved by the Inspector before occupancy. Page 40 57. SIDEWALK REPAIR: The Owner, Applicant and/or Developer shall repair and replace to existing Town standards any sidewalk damaged now or during construction of this project. All new and existing adjacent infrastructure must meet current ADA standards. Sidewalk repair shall match existing color, texture and design, and shall be constructed per Town Standard Details. New concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor’s sole expense and no additional compensation shall be allowed therefore. The limits of sidewalk repair will be determined by the Engineering Construction Inspector during the construction phase of the project. The improvements must be completed and accepted by the Town before a Certif icate of Occupancy for any new building can be issued. 58. CURB AND GUTTER REPAIR: The Owner, Applicant and/or Developer shall repair and replace to existing Town standards any curb and gutter damaged now or during construction of this project. All new and existing adjacent infrastructure must meet Town standards. New curb and gutter shall be constructed per Town Standard Details. New concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor’s sole expense and no additional compensation shall be allowed therefore. The limits of curb and gutter repair will be determined by the Engineering Construction Inspector during the construction phase of the project. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 59. VALLEY GUTTER REPAIR: The Owner/Applicant shall repair and replace to existing Town standards any valley gutter damaged now or during construction of this project. All new and existing adjacent infrastructure must meet Town standards. New valley gutter shall be constructed per Town Standard Details. New concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor’s sole expense and no additional compensation shall be allowed therefore. The limits of valley gutter repair will be determined by the Engineering Construction Inspector during the construction phase of the project. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 60. FENCING: Any fencing proposed within two hundred (200) feet of an intersection shall comply with Town Code Section §23.10.080. 61. FENCES: Fences between all adjacent parcels will need to be located on the property lines/boundary lines. Any existing fences that encroach into the neighbor’s property will need to be removed and replaced to the correct location of the boundary lines before a Certificate of Occupancy for any new building can be issued. Waiver of this condition will require signed and notarized letters from all affected neighbors. 62. HAULING OF SOIL: Hauling of soil on- or off-site shall not occur during the morning or evening peak periods (between 7:00 a.m. and 9:00 a.m. and between 4:00 p.m. and 6:00 p.m.), and at other times as specified by the Director of Parks and Public Works. Prior to the issuance of a grading or building permit, the Owner and/or Applicant or their representative shall work with the Town Building Department and Engineering Division Page 41 Inspectors to devise a traffic control plan to ensure safe and efficient traffic flow under periods when soil is hauled on or off the project site. This may include, but is not limited to provisions for the Owner and/or Applicant to place construction notification signs noting the dates and time of construction and hauling activities, or providing addition al traffic control. Coordination with other significant projects in the area may also be required. Cover all trucks hauling soil, sand and other loose debris. 63. BEST MANAGEMENT PRACTICES (BMPs): The Owner, Applicant and/or Developer is responsible for ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Best Management Practices (BMPs) shall be maintained and be placed for all areas that have been graded or disturbed and for all material, equipment and/or operations that need protection. Removal of BMPs (temporary removal during construction activities) shall be replaced at the end of each working day. Failure to comply with the construction BMP will result in the issuance of correction notices, citations, or stop work orders. 64. NPDES STORMWATER COMPLIANCE: In the event that, during the production of construction drawings for the plans approved with this application by the Town of Los Gatos, it is determined that the project will create and/or replace more than 2,500 square feet of impervious area, completion of the NPDES Stormwater Compliance Small Projects Worksheet and implementation of at least one of the six low impact development site design measures it specifies shall be completed and submitted to the Engineering Division before issuance of a grading/building permit. 65. IMPAIRED WATER BODIES: Projects that discharge directly to CWA section 303(d) listed water bodies shall implement appropriate source control, site design and treatment measures for the listed pollutants of concern. 66. UNLAWFUL DISCHARGES: It is unlawful to discharge any wastewater, or cause hazardous domestic waste materials to be deposited in such a manner or location as to constitute a threatened discharge, into storm drains, gutt ers, creeks or the San Francisco Bay. Unlawful discharges to storm drains include, but are not limited to: discharges from toilets, sinks, industrial processes, cooling systems, boilers, fabric cleaning, equipment cleaning or vehicle cleaning. 67. EROSION CONTROL: Interim and final erosion control plans shall be prepared and submitted to the Engineering Division of the Parks and Public Works Department. A maximum of two (2) weeks is allowed between clearing of an area and stabilizing/building on an area if grading is allowed during the rainy season. Interim erosion control measures, to be carried out during construction and before installation of the final landscaping, shall be included. Interim erosion control method shall include, but are not limited to: silt fences, fiber rolls (with locations and details), erosion control blankets, Town standard seeding specification, filter berms, check dams, retention basins, etc. Provide erosion control measures as needed to protect downstream water quality during winter months. The Town of Los Gatos Engineering Division of the Parks and Public Works Department and the Building Department will conduct periodic NPDES inspections of the site throughout the recognized storm season to verify compliance with the Construction General Permit and Stormwater ordinances and regulations. 68. AIR QUALITY: To limit the project’s construction-related dust and criteria pollutant Page 42 emissions, the following the Bay Area Air Quality Management District (BAAQMD)- recommended basic construction measures shall be included in the project’s grading plan, building plans, and contract specifications: a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day, or otherwise kept dust- free. b. All haul trucks designated for removal of excavated soil and demolition debris from site shall be staged off-site until materials are ready for immediate loading and removal from site. c. All haul trucks transporting soil, sand, debris, or other loose material off-site shall be covered. d. As practicable, all haul trucks and other large construction equipment shall be staged in areas away from the adjacent residential homes. e. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day, or as deemed appropriate by Town Engineer. The use of dry power sweeping is prohibited. An on-site track- out control device is also recommended to minimize mud and dirt-track-out onto adjacent public roads. f. All vehicle speeds on unpaved surfaces shall be limited to fifteen (15) miles per hour. g. All driveways and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. h. Post a publicly visible sign with the telephone number and person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within forty-eight (48) hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. Please provide the BAAQMD’s complaint number on the sign: 24-hour toll-free hotline at 1-800-334- ODOR (6367). i. All excavation, grading, and/or demolition activities shall be suspended when average wind speeds exceed twenty (20) miles per hour. j. Vegetative ground cover (e.g., fast-germinating native grass seed) shall be planted in disturbed areas as soon as possible and watered appropriately until vegetation is established. 69. SITE DRAINAGE: Rainwater leaders shall be discharged to splash blocks. No through curb drains will be allowed. Page 43 This Page Intentionally Left Blank Page 44 y,//dϰPage 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 This PageIntentionally Left BlankPage 52 y,///dϱPage 53 Page 54 Page 55 Page 56 Page 57 Page 58 TOWN OF LOS GATOS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION (408)354-6872 Fax (408) 354-7593 December 21, 2023 Jose De La O 1126 Allerton Street Redwood City, CA 94063 Via email RE: 123 Wilder Avenue Architecture and Site Application S-23-039 Requesting Approval for Technical Demolition of a Contributing Single-Family Residence and Construction of a New Single-Family Residence to Exceed the Floor Area Ratio (FAR) Standards and Requiring a Variance to Side Yard Setback Requirements Located in the Almond Grove Historic District on Property Zoned R-1D:LHP. APN 510-18-008. Categorically Exempt Pursuant to CEQA Guidelines Section 15301: Existing Facilities. Property Owners: Bogusla Marcinkowski and Brygida Sas-Marcinkowski Applicant: Jose De La O Project Planner: Sean Mullin On December 20, 2023, the Los Gatos Historic Preservation Committee recommended approval of the above request with the following conditions: •Replace the installed horizontal cementitious lap siding with wood shingle siding to match what was removed; •The existing ornate shingle pattern in the front gable end shall be replicated in the north facing gable end; •The new windows shall match the windows they are replacing. Full details of the new wood windows shall be provided to the Town to ensure in-kind replacement. If you have any questions, I can be contacted by phone at (408) 354-6802 or by email at SMullin@losgatosca.gov. Sincerely, Sean Mullin, AICP Senior Planner N:\DEV\HISTORIC PRESERVATION\HPC Action Letters\2023\Wilder Avenue, 123 - 12-20-23 Action Letter - HPC.docx CIVIC CENTER 110 E. MAIN STREET LOS GATOS, CA 95030 EXHIBIT 6 Page 59 This Page Intentionally Left Blank Page 60 Justification Letter for work done at: 123 Wilder Ave. Los Gatos CA The 10 windows that were replaced were in poor condition and needed to be replaced. The replaced windows match the type and style of the rest of the windows in the house. We have not changed the floor area ratio. (FAR) All that it was done is as disclosed on the scope of work at sheet A-1 As for the setbacks, the existing setback did not change. Most cities that have similar guidelines allow for repairs to be done without having to apply for any special permits. And last, as we already stated on the scope of work, the contractor will remove the installed hardy board siding and install wood shingle siding matching the original siding. EXHIBIT 7 Page 61 This Page Intentionally Left Blank Page 62 EXHIBIT 8Page 63 I{a t; J{7.> t $r \-t ). I t l I I' J 't I l.i,.i D.l.r !.lJ v i: I t g i I I 1 x a t. I c' a I A \r|\ .':.11 i;- iil ).! ,l II1. lt I, t .t I; tl t it t. t1 ( :r ii , :\t I '{Page 64 v. .{,I :, ] ,r.r - 'i P .,, I \.1 t \ .-:.;r--' -'ira :.:-..7 v);t :' lr? l\ a h "9,J,I l.:\ l l I I t 4I T ,fJt'-\- Page 65 .r'l l\ \f.\ il t\ ItL -\ trli.; " \';.t '<, ,|\ \I \\ l'l6l ir i ''\ I \ \ I \ \ it, 1 'i \ I \ I I I ! I I \ t I i i I t .$ ,l rlii Irlr -( Page 66 : 4 Qi i :rr. SY It_a" -_. ..ir:r ._ ;.f-)?.v.-t1rdli ;d |rFr tGa. l'i {! Y" t' :{ -a l tr .i? ,a .ii*' ":iii9t- ,l l.F ,i ':'t'. i €;':L.: f. .?. I I tt.'/ 'lr !t _l .:--!A I .t I ,t,tt '4/ ( --*f .l.-.\-, )i ;r:'i'.'*1. a.!'.t a J lt t ftt 4 I Jo tt i n l:i,'l ,l, I t. f, a i {Page 67 t.I1tT-lMti jrl ) :?ri!' ,t ;..!7, ' '.$: , : f,. .t a ,t -,,/ I 4 i{,t' '< t '.: v8.,. o'l4. ;/.t :F17 !tt i 1l ;1 L --.'I t-- : rt aiI j f; J h I rat tr t Qr. i I I ta Page 68 ., "t ? iff T)'tt- ti c, 16, ) .'1 ,r ,/.1 .' . ...it, I tli ii! e t'I .l'+t.t tt I li-L:-,' ;t -.') _ I 1f a' t tl: t.)!t t. !, ) \ Page 69 I t. i -'t-3 t a , I iJ, 1.{4- Page 70 Page 71 Page 72 Page 73 -:gi1f;.. c;'.' r.-.1i.. .-' -r't*r,q6t;/\\B c ; l_' *5J *q o @ c) o, ot-O €l O-r 6Oi> =3to.o o o a--I .t I mo- Z @ -1 I g6 3' 4' \q \*;i.sr' -l? r t ! -^.-i".*.af,,+.+.*. - :ea t tt. l.':: i ;,Page 74 I5o) !5otaio a---.l E oooo 0o o D QJ DPage 75 This Page Intentionally Left Blank Page 76 N3'-6" 3'-6" 3'-6"15'-11"17'-0"10'-10"47'-9"35'-5"Existing Landscaped Ar ea Existing Gas Meter Existing Two Car Garage (470 sq. ft.) Existing Electric Meter Existing Wood Deck Existing Concrete Driveway Existing Front Porch Existing House Existing 4" ABS C lean Out Li ne of second f loor Site Pla n Scale 1/8"=1'-0" Pr operty Line 46.50 Feet Existing 200amp. Main Electrical Panel Existing 4 " ABS S ewer Cleanouts Existing Landscaped Area Existing Landsc aped Area Existing Pavers Pati o Existing Pavers WalkwayExisting Water Fountain Existing Wood Deck Pr operty Line 46.50 Feet Property Line 133.5 FeetProperty Line 153 FeetExisting Landscaped Area Sidewalk WILDER AVENUE Existing Water Meter Existing C ity Rain Gutter (E) A/C (E) W/H (E) Wood Fence Property Line 133.5 FeetExisting 3/4 " Copper Water Line Existing 4 " ABS sewer pipe Existing 4" ABS sewer pipe Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-1 1.Replace (10) wood framed windows at living room with dual glazed double hung wood framed windows. 2.Remodel existing bathroom by stairway that include replac e existing tub with a shower. 3.Replaced wood shingle siding finish to be restored by removing the hardy board s iding and replace with wood shingle siding to match the areas that remained at the front of the hous e. 4.Existing Wood Board & Batten siding at garage to be replaced with same type new siding. Occupancy group: R3/U , Type(s) of construction: VB, 2022 CALIFORNIA RESIDENTIAL C ODE WIND LOAD = 110 M .P.H., ROOF LIVE LOAD = 20 psf, FLOO R LIVE LOAD = 40 psf. 2022 CALIFORNIA ELECTRICAL CODE, 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA MECHANICAL CODE, 2022 CALIFORNIA ENERGY C ODE 2022 CALIFORNIA FIRE CODE. Code editions under which this project is to be approved AND ALL OTH ER STATE, MUNICIPAL, AND LOCAL ORDINANCES, CODES, RULES AND R EGULATIONS. 1.CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND CONDITIONS OF THE SITE AND EXISTING CONDITIONS PRIOR TO COMMENCING CONSTRUCTION. IF THERE ARE ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY IN W RITING. IN NO CASE SHALL DIMENSIONS BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THE DRAWINGS OR CALCULATIONS. 2.ALL OMISSIONS AND CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS AND OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OR THE DESIGNER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. 3.THE CONTRACTOR SHALL LOCATE AND PROTECT ALL EXISTING UTILITY LINES AND CONNECTIONS INCLUDING SEWER, WATER, GAS, AND ELECTRIC SERVICES BEFORE AND DURING HIS WORK. 4.WHERE A CONSTRUCTION DETAIL IS NOT SHOWN OR NOTED, THE DETAIL SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. 5.NO PIPES, DUCTS, SLEEVES, CHASES, ETC., SHALL BE PLACED IN SLABS, FOOTING, BEAMS, OR WALLS UNLESS SPECIFICALLY SHOWN OR NOTED, NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR PIPES, DUCTS, ETC., UNLESS OTHERWISE NOTED. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FOR INSTALLATION OF ANY ADDITIONAL PIPES, DUCTS, ETC. 6.CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXPECTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 7.CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTY IS PROTECTED DURING THIS OPERATION. ANY DAMAGES OR CHANGED CONDITIONS SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. 8.THE DESIGN, ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC., IS THE RESPONSIBILITY OF THE CONTRACTOR, AND HAS NOT BEEN CONSIDERED BY THE DESIGN ENGINEER, THE DESIGNER, THE CONTRACTOR I S RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE PRIOR TO THE APPLICATION OF ALL SHEAR WALLS, GEN ERAL SPEC IFICATION S Sheet Index VICINITY M AP NOT TO SCALE Scope of Work 11 PROP OSED HOUS E REMODEL AT:123 WILDER AVENUE LOS GATOS, CA 95030 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comA-1 Site Plan A-2 Existing Floor Plan. A-3 Elevations. A-4 Proposed Floor Plan. BCB Blueprint for a clean bay. BMPs Construction best management practices. Santa Clara Valley urban runoff pollution prevention program. T24.1 Title 24 energy calculations . T24.2 Single family residential mandatory requirements summary.PHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206De ferred Submittals Fire sprinklers will be required for this project. Fire sprinkled plants to be submitted at a later date as a deferred submittal. Note: All construction sites must comply with applicable provisions of the CFC Chapter 33 and the Santa Clara County Fire Department Standard Detail and Specification S1-7 PR OPO SED HOUS E RE MODEL AT:123 W ILDER AVENUE LOS GATOS , CA 95030 Parcel Siz e: 6226 sq. ft. Existing hous e living s pace: 2225 sq. ft . Existing garag e/W or k shop: 470 sq. ft. APN: 510-18-008 Zone: R-1D:LHP Required Setbacks: Fron t: 15 ft Side: 5 f t Rear: 20 ft Pr oposed/Existing Setb acks: Fron t: 15'-11" Righ t Sid e: 10'-10" Left Side: 3'-6" Rear: 47'-9" PLANN IN G D ATA DES IG N DATA 11 11 Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 11 22 11 22 March 29, 2024 Response to latest plan review comments 22 22 BACKWAT ER VAL VE: Th e scope o f this proje ct may req uire the insta llation of a s anitary sewe r backwater valve per T own Ordinance 6.40.020. The Town of L os Gatos Ordina nc e and We st V alle y Sa nitation District (WVSD) require s backwater va lve s on drainage pip ing serving fi xture s that have flood level rims less than 1 2 inches above the e levation of th e next ups tre am manhole. At the mom ent it is not expected that a backwater valve will be nee de d but if during constructi on it is found tha t it is ne eded, contractor to the nec essary actions to install it. 22 SPECIAL INSP ECTIONS: When a spe cial inspec tion is required by CBC Section 1 704, the Arch ite ct or Enginee r of Record shall prepare a n inspec tion program that shall be submitte d to the Building Officia l for app roval pri or to issuance of the Buildi ng Pe rmit. The T own Special Inspection fo rm must be com plete ly fille d-out and si gne d by all requested p arties p rior to permit iss uance. 22 Allo wa ble FAR/Floor Area: 2,11 7 SF Garage 604 SF 22 22 22 22 22 22 22 22 N o structural framing be ing replaced. N o foundation be ing replace d. Therefor, this pro ject would not fall into the definition of a new structure for the building de pt. 22 22 EXHIBIT 9Page 77 REF.WH(E) 2266SH(E) 2464SH(E) 2464SH(E) 5068(E) 2640SH(E) 2640SH(E) 2640SH (E) 2644SH(E) 2644SH(E) 3250SH(E) 3250SH(E) 5068 (E) 2644SH (E) 2644SH(E) 2468(E) 2668 (E) 2668(E) 2020SC(E) 2020SC(E) 2868(E) 2034SH(E) 2034SH(E) 2034SH(E) 2656SH(E) 2620FX(E) 2656SH(E) 2620FX(E) 3068 (E) 2036PT(E) 2036PT(E) 2036PT(E) 2868(E) 2468(E) 61068(E) 32410SH(E) 2630SH(E) 2652(E) 2656SH(E) 2656SH(E) 2868 (E) 2656SH(E) 2656SH(E) 2656SH(E) 2656SH(E) 2656SH (E) 2668(E) 2468 UP UP UP UP 6'-10 " x 7'-2" 12'-11" x 10'-10" 3'-7" x 3'-5" 5'-0" x 7'-3" 8'-2" x 8'-6" 20'-2 " x 16'-1" 3'-9" x 3'-6" 11'-10" x 12'-0" 5'-0" x 7'-1"20'-6" x 8'-7"3'-2" x 7'-1" 13 '-8" x 11 '-6" 9'-1" x 3'-2 " 11'-3" x 12'-0" 2'-5" x 3'-2" 11'-3" x 10'-11" 15 '-4" x 10 '-0" 6'-8" x 11 '-4" 8'-6" x 2 7'-3" 17'-5" x 6'-10" 18'-2" x 10 '-6" (E) Skylight (E) Skylight (E) Skylight (E) Master Bathroom (E) Dressing Room (E) Shower (E) Walk i n Closet (E) Master Bedroom (E) Hal lway (E) Nook (E) Kitchen (E) Laundry Room(E) Bathroom (E) Bedroom 2 (E) Closet (E) Closet (E) Dining Room (E) Livi ng Room (E) Media Room (E) Study (E) Deck (E) Porch (E) Porch (E) Deck EXISTING LOWER FLOOR PLAN Scale 1/4" = 1' - 0" Existing b athtub to be replaced with a shower Replace (10) wood framed windows with dual glazed double h ung wood fr amed window s.(E) 2868(E) 4068(E) 2640DC (E) 2650SH2612(E) 2650SH(E) 2650SH 2612 (E) 2650SH (E) 2020SC(E) 20510(E) 2020SC20 '-2" x 16'-1" 4'-6" x 8'-6" 3'-3" x 3'-4" 3'-0" x 5'-0 " (E) Closet (E) Bedroom 3 (E) Closet EXISTING UPPER FLOOR PLAN Scale 1/4" = 1' - 0" (E) Stairs (2) 3-1/8 in. Star Driv e Bugle Head M ulti-Purpose Framing Screws @ 24" o.c. 2x4 studs @ 16" o.c. Ripped 2x4 2x8 reinforcement(2) 3-1/8 in. Star Driv e Bugle Head M ulti-Purpose Framing Screws @ 24" o.c. 2x4 studs @ 16" o.c. Ripped 2x4 2x8 reinforcement Aging-in-Place Reinforc ement Installation Detail at Tub/Shower Reinforcement to be installed 32"to 39.25" abov e the finished floor Contractor to install a 2x8 reinf or cem ent for future installation of grab bars per CR C R327 Bath tub and combi n ation bath tub and shower rei nforcement sha ll b e c o ntinuous on over al l s urrounding tub. I n a d diti on a sec o nd b ack wa ll o f reinfo rcement for a lo w e r grout b ar shall be pr ovide d with t he bo tt om edge locat ed n o mor e than six inches abo ve the bat h tub rim. Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-2 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 22 March 29, 2024 Response to latest plan review comments 11 22 Detail for install ed dou ble hu ng windows Note: Installed windows are same typ e and style as existing windo ws 22 Page 78 REF.WH(N) 2266SH2 (N) 2666SH(E) 50682 (E) 2640SH(E) 2640SH (E) 2644SH(E) 2644SH2 (E) 3250SH(E) 5068 (E) 2644SH (E) 2644SH(E) 2468(E) 2668 (E) 2668(E) 2020SC(E) 2020SC(E) 28682 (E) 2034SH2 (E) 2656SH2 (E) 2620FX(E) 3068 (N) 2036PT(N) 2036PT(N) 2036PT(E) 2868(E) 2468(E) 61 068(E) 32410SH(E) 2630SH(E) 26522 (N) 2656SH(E) 2868 2 (N) 2656SH3 (N) 2656SH (E) 2468 (E) 2668UP UP UP UP 4'-9"2'-6"9'-0"2'-2"5'-8"3'-11"2'-6"1'-4"3'-8"3'-2"5'-6"1'-11"2'-6"0'-4"2'-6"0'-3"2'-6"1'-11"1'-11"2'-8"2'-7"2'-6"0'-5"2'-6"1'-5" 11'-11"14'-0" 25'-11" 0'-6"5'-0"1'-9" 7'-3" 1'-3"3'-0"0'-10" 5'-1" 1'-8"2'-6"1'-4"2'-6"2'-3"5'-0"1'-0"4'-3"2'-6"0'-5" 16'-3 "7'-2"3'-10"2'-1" 29'-4" 0'-3"2'-4"0'-6" 3'-1"0'-10" 5'-0"1'-5"2'-6"0'-10"2'-6"4'-3"2'-7"2'-6"0'-4"2'-6"2'-5"4'-1"2'-0"0'-2"2'-0"0'-1"2'-0"0'-8"1'-5"3'-2"3'-1"1'-1"1'-4"2'-6"8'-9"2'-6"1'-8"11'-6"10'-4"11'-0"8'-9"16'-9"65'-10"5'-6"1'-1"2'-6"2'-6"1'-5"7'-6"0'-11"2'-0"1'-10"2'-0"1'-2"4'-1"3'-5"7'-11"6'-3"2'-3"7'-9"12'-4"3'-3"24'-1"71'-4"6'-10" x 7'-2 " 12 '-11" x 10'-10" 3'-7" x 3'-5" 5'-0" x 7'-3" 8'-2 " x 8'-6" 20 '-2" x 16'-1" 3'-9" x 3'-6" 11'-10" x 12'-0" 5'-0" x 7'-1"20'-6" x 8'-7"3'-2" x 7'-1" 9'-1" x 3'-2" 13'-8" x 11 '-6" 2'-5" x 3'-2 " 11'-3" x 10'-11" 15'-4" x 10'-0" 6'-10" x 11'-6" 11'-3" x 12'-0" 8'-6" x 27'-3" 17'-5 " x 6'-10 " 18'-2 " x 10'-6" (E) Skylight (E) Skylight (E) Skylight (E) Master Bathroom (E) Dressing Room (E) Shower (E) Walk in Closet (E) Master Bedroom (E) Hallway (E) Nook (E) Kitchen (E) Laundry Room Remodeled Bathroom (E) Bedroom 2 (E) Closet (E) Closet (E) Dining Room (E) Deck (E) Porch (E) Porch (E) Deck PROPOSE D LOWER FLOOR PLAN Scale 1/4" = 1' - 0" (E) Livi ng Room (E) Media Room (E) Study(E) 2868(E) 4068(E) 2640DC 2 (E) 2650SH2 (E) 2650SH (E) 205102 (E) 2020SC2'-4"2'-6"16'-0" 4'-11"3'-7"20'-10" 29'-4"2'-2"5'-5"9'-2"16'-9"3'-5"1'-6"1'-3"1'-3"1'-3"1'-3"10'-3"16'-9"3'-5"14'-7"1'-3"1'-3"1'-3"1'-3"1'-3" 20'-10"3'-4"0'-3"4'-11" 29'-4" 20'-2 " x 16'-1" 4'-6" x 8'-6" 3'-3" x 3'-4" 3'-0" x 5'-0" (E) Closet (E) Bedroom 3 (E) Closet PROPOSED UPPER FLOOR PLAN Scale 1/4" = 1' - 0" (E) Stairs (E) 3021PT(E) 2668(E) 32210DC (E) 3028DC(E) 3028PT(E) 32210PT (E) 3968(E) 2868(E) 131070 (E) 3021DC2'-6"2'-6"5'-1"0'-1"3'-2"0'-3" 8'-0"4'-7"3'-6"6'-10"3'-1" 26'-0"6'-0"3'-0"0'-2"6'-0"3'-2"2'-9"10'-1"22'-0"0'-9"3'-0"2'-10"0'-7"2'-11"6'-7"11'-11"22'-0"1'-10"13'-10"0'-7" 16'-3 "9'-9" 26'-0" 15'-2" x 10'-6" 13'-8" x 9 '-5" 9'-0" x 1 0'-6" 6'-5" x 2'-9" (E) Skylight (E) Skylight(E) Two Car Garage (E) Shop Area (E) Closet (E) Wi ne Storage EXISTING GARAGE FLOOR PLAN Scale 1/4" = 1' - 0" (E) 131 070 FRONT FINISH ELEVATI ON SCALE 1/4"=1'-0 " (E) 131 070 (E) 32210DC REAR FI NISH ELEVATION SCALE 1/4"=1'-0" (E) 32210DC (E) 3028DC LEFT SIDE FINISH ELEVATION SCALE 1/4"=1'-0 " (E) 3028DC (E) 3021PT (E) 2668 (E) 3021DC RIGHT SI DE FINISH ELEVATION SCALE 1/4"=1'-0 " (E) 3021PT (E) 2668 (E) 3021DC Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-3 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Garage Elevation Notes Roof: Existing: Comp shingle roof to remain. Exterior Finish: Existing: Wood Board & Batten siding to be replaced with same type new siding. Windows: Existing: Existing windows to remain. Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 11 11 11 11 22 March 29, 2024 Response to latest plan review comments 1 A-2 1 A-2 22 Page 79 (E) 5068 (E) 3068 2 (N) 2656SH (E) 2868 3 (N) 2656SH (REVISED) FRONT FINI SH ELEVATION SCALE 1/4"=1'-0 " Note: A door buzzer, bell or ch ime shall be hard wired at primary entrance. (E) 5068 (E) 3068 2 (N) 2656SH (E) 2868 3 (N) 2656SH (E) 5068 (E) 2640SH(E) 2644SH(E) 2644SH (E) 2468 2 (E) 2650SH (REVISED) REAR FINISH ELEVATI ON SCALE 1/4"=1'-0 " (E) 5068 (E) 2640SH(E) 2644SH(E) 2644SH (E) 2468 2 (E) 2650SH 2 (E) 2640SH(E) 2644SH 2 (E) 3250SH 2 (E) 2034SH (E) 2644SH 2 (E) 2656SH 2 (E) 2620FX 2 (N) 2656SH 2 (E) 2650SH (REVISED) RIGHT SIDE FINISH ELEVATION SCALE 1/4"=1'-0 " 2 (E) 2640SH(E) 2644SH 2 (E) 3250SH 2 (E) 2034SH (E) 2644SH 2 (E) 2656SH 2 (E) 2620FX 2 (N) 2656SH 2 (E) 2650SH (N) 2266SH2 (N) 2666SH (E) 2020SC (E) 3241 0SH (E) 2020SC (E) 2630SH 2 (E) 2020SC (R EVISED) LEFT SIDE FINISH ELE VATION SCALE 1/4"=1'-0 " (N) 2266SH2 (N) 2666SH (E) 2020SC (E) 3241 0SH (E) 2020SC (E) 2630SH 2 (E) 2020SC Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-4 SEC TION R703 EX TER IOR C OVER IN G SEC TION R905 R EQU IR EMENTS FOR R OOF C OVER IN GS 2022 CRC R905.2.2 Slope. Asphalt shingles shall be used only on roof slopes of twounits vertical in 12 units horizontal (17percent slope) or greater. For roof slopes from twounits vertical in 12 units horizontal (17-percent slope) up to four units vertical in 12 units horizontal (33-percent slope), double underlayment application is required in accordancewith Section R905.1.1. R905.1.1 Underlayment. Underlayment for asphalt shingles, clay and concrete tile, metal roof shingles, mineral-surfaced roll roofing, slate and slate-type shingles, wood shingles,wood shakes, metal roof panels and photovoltaic shingles shall conform to the applicablestandards listed in this chapter. Underlayment materials required to comply with ASTM D226, D1970, D4869 and D6757shall bear a label indicating compliance to the standarddesignation and, if applicable, type classification indicated in Table R905.1.1(1).Underlayment shall be applied in accordance with Table R905.1.1(2). Underlayment shall be attached in accordance with Table R905.1.1(3). R905.2.4.1 Wind resistance of asphalt shingles. Asphalt shingles shall be tested in accordance with ASTM D7158. Asphalt shingles shall meet the classification requirementsof Table R905.2.4.1 for the appropriate ultimate design wind speed. Asphalt shinglepackaging shall bear a label to indicate compliance with ASTM D7158 and the required classification in Table R905.2.4.1. R905.2.5 Fasteners. Fasteners for asphalt shingles shall be galvanized steel, stainless steel, aluminum or copper roofing nails, minimum 12-gage [0.105 inch (3 mm)] shank with a minimum 3/8-inch-diameter (9.5 mm) head, complying with ASTM FI667, of a length topenetrate through the roofing materials and not less than ¾ inch (19.1 mm) into the roofsheathing. Where the roof sheathing is less than ¾ inch (19.1 mm) thick, the fasteners shall penetrate through the sheathing. R905.2.6 Attachment. Asphalt shingles shall have the minimum number of fasteners required by the manufacturer’s approved installation instructions, but not less than fourfasteners per strip shingle or two fasteners per individual shingle. Where the roof slopeexceeds 21 units vertical in 12 units horizontal (21:12, 175-pcrcent slope), shingles shall be installed in accordance with the manufacturer’s approved installation instructions. From TABLE R905.1.1(2) for Asphalt shingles Section R905.2 Underlayment application. For roof slopes from two units vertical in 12 units horizontal (2:12), up to fourunits vertical in 12 units horizontal (4:12), underlayment shall be two layers applied in thefollowing manner: apply a 19-inch strip of underlayment felt parallel to and starting at the eaves. Starting at the eave, apply 36-inchwide sheets of underlayment, overlapping successive sheets 19 inches. Distortions in the underlayment shall not interfere with theability of the shingles to seal. End laps shall be 4 inches and shall be offset by 6 feet. Forroof slopes of four units vertical in 12 units horizontal (4:12) or greater, underlayment shall be one layer applied in the following manner: underlayment shall be applied shingle fashion,parallel to and starting from the eave and lapped 2 inches, Distortions in the underlaymentshall not interfere with the ability of the shingles to seal. End laps shall be 4 inches and shall be offset by 6 feet. R905.2.8.2 Valleys. Valley linings shall be installed in accordance with the manufacturer’s instructions before applying shingles. Valley linings of the following types shall be permitted:1. For open valleys (valley lining exposed) lined with metal, the valley lining shall benot less than 24 inches (610 mm) wide and of any of the corrosion-resistant metals in Table R905.2.8.2.2. For open valleys, valley lining of two plies of mineral-surfaced roll roofing,complying with ASTM D3909 or ASTM D6380 Class M, shall be permitted. The bottom layer shall be 18 inches (457 mm) and the top layer not less than 36 inches (914 mm) wide. 3. For closed valleys (valley covered with shingles), valley lining of one ply of smoothroll roofing complying with ASTM D6380 and not less than 36 inches wide (914 mm) orvalley lining as described in Item 1 or 2 shall be permitted. Self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 shall be permitted in lieu of the liningmaterial. 2022 CRC SECTION R703 EXTERIOR COVERING R703.1 General. Exterior walls shall provide the building with a weather-resistant exterior wall envelope. The exterior wall envelope shall include flashing as described in Section R703.4. R703.1.1 Water resistance. The exterior wall envelope shall be designed and constructed in a manner that prevents theaccumulation of water within the wall assembly by providing a water-resistant barrier behind the exterior cladding as required by Section R703.2 and a means of draining to the exterior water that penetrates the exterior cladding. Exceptions: 1. A weather-resistant exterior wall envelope shall not be required over concrete or masonry walls designed in accordance withChapter 6 and flashed according to Section R703.4 or R703.8. R703.1.2 Wind resistance. Wall coverings, backing materials and their attachments shall be capable of resisting wind loads in accordance with Tables R301.2(2) and R301.2(3). Wind-pressure resistance of the siding, soffit and backing materials shall bedetermined by ASTM E330 or other applicable standard test methods. Where wind-pressure resistance is determined by designanalysis, data from approved design standards and analysis conforming to generally accepted engineering practice shall be used to evaluate the siding, soffit and backing material and its fastening. R703.2 Water-resistive barrier. Not fewer than one layer of water-resistive barrier shall be applied over studs or sheathing of all exterior walls with flashing as indicated in Section R703.4, in such a manner as to provide a continuous water-resistive barrier behindthe exterior wall veneer. The water-resistive barrier material shall be continuous to the top of walls and terminated at penetrations andbuilding appendages in a manner to meet the requirements of the exterior wall envelope as described in Section R703.1. Water-resistive barrier materials shall comply with one of the following: 1. No. 15 felt complying with ASTM D226, Type 1.2. ASTM E2556, Type 1 or 2.3. ASTM E331 in accordance with Section R703.1.1. 4. Other approved materials in accordance with the manufacturer's installation instructions.No. 15 asphalt felt and water-resistive barriers complying with ASTM E2556 shall be applied horizontally, with the upper layerlapped over the lower layer not less than 2 inches (51 mm), and where joints occur, shall be lapped not less than 6 inches (152 mm). R703.3.3 Fasteners. Exterior wall coverings and roof overhang soffits shall be securely fastened with aluminum, galvanized,stainless steel or rust-preventative coated nails or staples in accordance with Table R703.3(1) or with other approved corrosion-resistant fasteners in accordance with the wall covering manufacturer’s installation instructions. Nails and staples shall comply with ASTM FI667. Nails shall be T-head, modified round head, or round head with smooth or deformed shanks. Staples shall have aminimum crown width of 7/16 inch (11.1 mm) outside diameter and be manufactured of minimum 16-gage wire. Where fiberboard,gypsum, or foam plastic sheathing backing is used, nails or staples shall be driven into the studs. Where wood or wood structural panel sheathing is used, fasteners shall be driven into studs unless otherwise permitted to be driven into sheathing in accordance witheither the siding manufacturer’s installation instructions or Table R703.3.3. R703.3.4 Minimum fastener length and penetration. Fasteners shall have the greater of the minimum length specified in Table R703.3(1) or as required to provide a minimum penetration into framing as follows: 1. Fasteners for horizontal aluminum siding, steel siding, particleboard panel siding, wood structural panel siding in accordancewith ANSI/APA-PRP 210, fiber-cement panel siding and fiber-cement lap siding installed over foam plastic sheathing shall penetrate not less than 1½ inches (38mm) into framing or shall be in accordance with the manufacturer’s installation instructions.2. Fasteners for hardboard panel and lap siding shall penetrate not less than 1½ inches (38 mm) into framing.3. Fasteners for vinyl siding and insulated vinyl siding installed overwood or wood structural panel sheathing shall penetrate not less than 1¼ inches (32 mm) into sheathing and framing combined. Vinyl siding and insulated vinyl siding shall be permitted to beinstalled with fasteners penetrating into or through wood or wood structural sheathing of minimum thickness as specified by themanufacturer’s instructions or test report, with or without penetration into the framing. Where the fastener penetrates fully through thesheathing, the end of the fastener shall extend not less than ¼ inch (6.4mm) beyond the opposite face of the sheathing. Fasteners for vinyl siding and insulated vinyl siding installed over foam plastic sheathing shall be in accordance with Section R703.11.2. Fastenersfor vinyl siding and insulated vinyl siding installed over fiberboard or gypsum sheathing shall penetrate not less than 1¼ inches (32mm) into framing. 4. Fasteners for vertical or horizontal wood siding shall penetrate not less than 1½ inches (38mm) into studs, studs and woodsheathing combined, or blocking.5. Fasteners for siding material installed over foam plastic sheathing shall have sufficient length to accommodate foam plastic sheathing thickness and to penetrate framing or sheathing and framing combined, as specified in Items 1 through 4. 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030Elevation Notes Roof: Existing: Comp shingle roof to remain. Proposed: Comp shingle roof to match existing. Exterior Finish: Replaced wood shingle siding finish to be restored by removing the hardy board siding and replace with wood shingle siding to match the areas that remained at the front of the house. Windows: Existing: Existing windows to remain. Proposed: New windows to match existing.Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 11 11 11 11 11 N ote to con tractor : T he Historic Prese rvatio n Comm ittee approv al included a condition th at the existing or nate shingle pat tern in t he fr ont gable en d shall be re plicated 22 March 29, 2024 Response to latest plan review comments 22 Ad dre ss iden tification : Ne w and existing bu ilding s sh all have approv ed address numbe rs, build ing numb ers or approved b uil din g i dentification place d in a positi on th at is plainly le gib le and visib le from th e street o r ro ad fronting th e p rop erty. T hese nu mbe rs sha ll con trast with th eir backgrou nd. Where require d b y the fire code offi cia l, a ddress numbers shal l be provid ed in ad ditional app ro ved loca ti ons to facilitate emergen cy respo nse. Address numbe rs shal l be Arabic numbers or a lphabetica l letters. Numb ers sh all b e a min imum o f 6 inch es (101.6 mm) high with a min imum stroke width o f 0.5 inch (12.7 mm). Whe re acce ss i s by me ans of a priva te road and the bui ld ing cannot be viewe d from the pub lic way, a monu me nt, pole o r other s ign or mea ns shall be used to id entify the structu re. Add re ss n umb ers sh all b e maintain ed. C FC Sec. 50 5.1 . R703.4 Flashing. Approved corrosion-resistant flashing shall be applied shingle-fashion in amanner to prevent entry of water into the wall cavity or penetration of water to the buildingstructural framing components. Self-adhered membranes used as Hashing shall comply with AAMA 711. Fluid-applied membranes used as flashing in exterior walls shall comply with AAMA714. The flashing shall extend to the surface of the exterior wall finish. Approved corrosion-resistant flashings shall be installed at the following locations: 1. Exterior window and door openings. Flashing at exterior window and door openings shallbe installed in accordance with Section R703.4.1.2. At the intersection of chimneys or other masonry construction with frame or stucco walls, with projecting lips on both sides under stucco copings.3. Under and at the ends of masonry, wood or metal copings and sills.4. Continuously above all projecting wood trim.5. Where exterior porches, decks or stairs attach to a wall or floor assembly or wood-frame construction.6. At wall and roof intersections.7. At built-in gutters. R703.5.3 Horizontal wood siding. Horizontal lap siding shall be installed in accordance with themanufacturer’s recommendations. Where there are no recommendations the siding shall be lappednot less than 1 inch (25 mm), or ½ inch (12.7 mm) if rabbeted, and shall have the ends caulked, covered with a batten or sealed and installed over a strip of flashing. 123 22 Page 80 Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-5 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 22 March 29, 2024 Response to latest plan review comments BC B Sheet 1 of 1 Page 81 Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-6 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 22 March 29, 2024 Response to latest plan review comments BM P s Sheet 1 of 1 Page 82 Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-7 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030T24.1 Sheet 1 of 2Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 22 March 29, 2024 Response to latest plan review comments Page 83 Oct. 24, 2023 Of________ REVISIONS DATE: S heet________ 4 A-8 11 PROPOSED HOUSE REMODEL AT:123 WILDER AVENUELOS GATOS, CA 95030T24.2 Sh eet 2 of 2Owner Info:Name: Peter PomianekPhone Number: 650-245-7985Email: pomiansf@yahoo.comPHONE # (650) 793-1491EMAIL jose@jmdesigners.com______________________________________Designed by: Jose Jimenez1005 West Eighth StreetStockton California 95206Feb. 6, 2024 Respons e to comments from Planning Department letter dated December 13, 2023 22 March 29, 2024 Response to latest plan review comments Page 84