Loading...
17 Desk Item.Shannon Road Cost of Options PREPARED BY: Nicolle Burnham Director of Parks and Public Works 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 11/21/2023 ITEM NO: 17 DESK ITEM DATE: November 21, 2023 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Receive a Report on Traffic Management at the Shannon Road Repair (CIP Project No 811-0008) Location (Between Diduca Way and Santa Rosa Drive) and Provide Feedback REMARKS This Desk Item provides preliminary estimates of cost associated with the three strategies outlined in the staff report. It also provides the current engineer’s estimate for implementation of completed design for the full repair. Strategy 1 – Maintain Existing One-Way Traffic Control This option would retain the existing one-way traffic control, provide additional enhanced signage, and provide outreach to drivers and residents about how the lights function. The associated costs are as follows: Fixed Costs Initial implementation of one-way road closure: $33,800 (Prior Spending) Additional safety signage: $1,000 (New Spending) Additional outreach: $250 (New Spending) Total Fixed Cost: $35,300 Monthly Costs for the Duration of the Closure Monthly signal rental: $7,300 Monthly fuel cost for generators: $1,400 Total Monthly Cost (per Month): $8,700 PAGE 2 OF 3 SUBJECT: Shannon Road Pedestrian and Bikeway Improvements Project (CIP No. 813-0218) DATE: November 21, 2023 REMARKS (continued): Strategy 2 – Temporary Road Repairs This option would construct temporary pavement repairs in the northern lane of Shannon Road, which is the area that generated the need for the one-way closure. This would allow Shannon Road to be reopened to two-way traffic until construction of the Shannon Road Repair Project. The temporary road repair would not provide any benefit towards the ultimate road repair project improvements and it would require the full closure of Shannon Road during the period of construction. Estimated Cost to Repair Shannon Road Pavement: $150,000 - $200,000 Outreach: $250 Implementation of Traffic Control Plan: $12,500 Total Cost: $162,750 – $212,750 Strategy 3 – Full Closure of Shannon Road This option would close Shannon Road between Santa Rosa Drive and Diduca Way from December 2023 through construction of the repair. Outreach: $750 Implementation of Traffic Control Plan: $40,000 Total Cost: $40,270 FISCAL IMPACT: Each strategy will require expenditure of capital funds. The staff report reported an incorrect current balance in the project budget as $3,748,617. The current budget balance is $4,184,770 as demonstrated in the fiscal table below. The $224,270 balance would be available to implement the traffic control strategies outlined above. If construction bids exceed the engineer’s estimate then additional funding may be needed for the permanent repair and this would be addressed at award of the construction bid. PAGE 3 OF 3 SUBJECT: Shannon Road Pedestrian and Bikeway Improvements Project (CIP No. 813-0218) DATE: November 21, 2023 FISCAL IMPACT (continued): Budget Costs GFAR 4,879,064$ Total Budget 4,879,064$ Costs Consultant Agreement & Construction Services (Includes Expenses and Encumbrance)694,294$ Total Costs 694,294$ Current Available Balance 4,184,770$ Additional Expenditures: Expenditure Budget Transfer (Requested in 11/21/23 Staff Report)3,000$ Engineer's Construction Estimate 3,597,700$ 10% Contingency 359,800$ Subtotal 3,960,500$ Total Costs 4,654,794$ Available Balance 224,270$ CIP No. 811-0008