16 Attachment 1 - Final Nexus Study DRAFTTRANSPORTATION IMPACT FEE NEXUS REPORT
NOVEMBER 2023
DRAFT
PREPARED FOR:
TOWN OF LOS GATOS
ATTACHMENT 1
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 2
PREPARED FOR TOWN OF LOS GATOS
PREPARED BY DKS ASSOCIATES
IN COORDINATION WITH URBAN ECONOMICS AND RINCON
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 3
TABLE OF CONTENTS
INTRODUCTION AND BACKGROUND .................................................................................................................... 5
SUMMARY OF FINDINGS ......................................................................................... 5
EXISTING AND FORECASTED LAND USE .............................................................................................................. 6
TRANSPORTATION DEMAND FACTORS ................................................................................................................. 6
TRANSPORTATION IMPROVEMENTS .................................................................................................................. 10
TOWN-WIDE MULTIMODAL TRANSPORTATION INFRASTRUCTURE .................................................................... 12
INVENTORY OF TOWN WIDE TRANSPORTATION INFRASTRUCTURE .............................. 12
EXISTING LEVEL OF INVESTMENT AND MAXIMUM JUSTIFIABLE FEE FOR THE
TRANSPORTATION IMPACT FEE .............................................................................. 12
TRANSPORTATION IMPROVEMENTS AND COST PER DUE ............................................. 15
FEE SCHEDULE ................................................................................................................................................... 16
RECOMMENDED FEE SCHEDULE .............................................................................. 16
Residential Fees per Square Foot ...................................................................................................................... 17
Fees for Specialized Land Uses ......................................................................................................................... 18
COMPARABLE FEE RATES ...................................................................................... 18
PROJECTS SUBJECT TO THE FEE PROGRAM ............................................................... 20
REVENUE PROJECTIONS AND USE ........................................................................... 20
APPENDIX ......................................................................................................................................................... 22
SECTION 1. PROJECT LIST .................................................................................... 24
SECTION 2. UNIT COST DETAIL ............................................................................. 26
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 4
LIST OF FIGURES
FIGURE 1: MAP OF TOWN-WIDE INFRASTRUCTURE ....................................................... 14
FIGURE 2: TIF PROJECTS ...................................................................................... 25
LIST OF TABLES
TABLE 1: EXISTING AND FORECASTED DEVELOPMENT ..................................................... 7
TABLE 2: DWELLING UNIT EQUIVALENT (DUE) RATES ..................................................... 8
TABLE 3: TRANSPORTATION DEMAND BY DWELLING UNIT EQUIVALENTS (DUES) .................... 9
TABLE 4: TRANSPORTATION IMPROVEMENT PROJECTS ................................................... 11
TABLE 5: TRANSPORTATION INFRASTRUCTURE UNIT COSTS (2022 $) ................................ 13
TABLE 6: EXISTING FACILITY STANDARD & LEVEL OF INVESTMENT .................................. 15
TABLE 7: TRANSPORTATION IMPROVEMENT COST PER DWELLING UNIT EQUIVALENT ............. 16
TABLE 8: RECOMMENDED FEE SCHEDULE ................................................................... 17
TABLE 9: CALCULATION OF RESIDENTIAL FEES PER SQUARE FOOT ................................... 17
TABLE 10: TRANSPORTATION IMPACT FEES IN COMPARABLE JURISDICTIONS ...................... 19
TABLE 11: MAXIMUM REVENUE PROJECTION ............................................................... 21
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 5
INTRODUCTION AND BACKGROUND
This report documents the update of the Transportation Impact Fee (TIF) for the Town of Los
Gatos. The updated fee program will fund all eligible transportation improvements based on a
reasonable relationship to transportation demand impacts from new development. The TIF will fund
expansion of the Town-wide multimodal transportation infrastructure. This report presents the
results of the fee calculations along with supporting documentation for the nexus study prepared
by DKS Associates with the assistance of Urban Economics and Rincon Associates.
SUMMARY OF FINDINGS
California local agencies may adopt impact fees under authority granted by the Mitigation Fee Act
(the Act), contained in Sections 66000 to 66025 of the California Government Code. This report
presents the key findings required by the act for adopting or increasing a development fee with
respect to the following reasonable relationships1:
Project effects– There must be a reasonable relationship established between new development
and the need for public facilities.
• This finding is based on the need to supply adequate transportation network improvements to offset transportation demand associated with new development.
Benefit – There must be a reasonable relationship between new development and the use of fee
revenue for public facilities to accommodate that development.
• This finding is based on the use of fee revenue for expansions to the Town-wide multimodal
transportation network.
Proportionality – There must be a reasonable relationship between the amount of the fee and the
portion of public facilities cost associated with new development.
• This finding is based on the cost of planned improvements to Town-wide multimodal transportation infrastructure per unit of new development and ensuring that this cost per unit is
not greater than the level of investment in existing infrastructure for existing development.
In addition to the above findings, the Act also requires findings regarding the purpose of the fee
and a description of the public facilities to be funded by the fee:
• The purpose of the fee is to expand the Town-wide multimodal transportation network to
accommodate increased demand from new development. The multimodal improvements to
be funded by the fee are described under “Transportation Improvements”.
1 California Government Code, section 66001(a)(3), 66001(a)(4), and 66001(b)
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 6
The proposed TIF also meets newer statutory requirements brought about by Assembly Bill 602,
including preparation of a nexus study and calculation of fees for residential developments
proportionate to square footage. The following additional findings are made:
a) The existing level of service is the historical level of investment made per unit of
development to fund the Town’s multimodal transportation network. This level of
investment will not be exceeded by the proposed fee.
b) The purpose of the fee to expand the Town-wide multimodal transportation network to
accommodate increased demand from new development.
c) The funds collected by the proposed fee will be used to deliver the projects described under
“Transportation Improvements”.
d) The reasonable relationship between the fee’s use and the type of development project is
derived from the relative levels of transportation demand associated with each land use
category.
e) The need for public facilities to be funded by the proposed fee has been documented by the
adopted planning documents that serve as the source for the transportation improvements
list.
EXISTING AND FORECASTED LAND USE
The proposed fee program is based on the demand for transportation infrastructure associated with
new development. This section documents the additional transportation demand from new
development in terms of “dwelling unit equivalents” (DUEs), a measure of transportation demand
across both residential and nonresidential land use categories that is based on key travel
characteristics.
Table 1 summarizes the existing and forecasted growth by type of land use. The forecasted growth
is consistent with that assumed for the Town’s most recent General Plan and Housing Element.
TRANSPORTATION DEMAND FACTORS
Scaling factors based on relative levels of transportation demand are applied to the different types
of land use to create a common land use unit. These common units or Dwelling Unit Equivalents
(DUEs) are equivalent to the transportation demand generated by one single family residential
unit. Once basic fee levels are calculated, the DUE rates are used to appropriately scale the fee
across different land use categories.
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 7
TABLE 1: EXISTING AND FORECASTED DEVELOPMENT
a Residential based on CA Dept. of Finance. Nonresidential based on job estimate in General Plan Background Report multiplied by employment density factors derived from trip generation data published by the Institute for Transportation Engineers (471, 307, and 637 sq. ft. per job for retail/commercial, office, and industrial, respectively). Office land use includes institutional uses.
b Nonresidential includes intensification of development on existing developed parcels and deducts loss of 19,860 square feet of existing nonresidential development (assumed to be retail/commercial) due to redevelopment.
c Existing (2021) based on detached and attached single family. Growth (2022-2040) based on low and medium density
residential land use categories.
d Existing (2021) includes all multi-family dwellings plus mobile homes. Growth (2022-2040) includes high density residential land use and units in mixed use and nonresidential land uses.
e Accessory Dwelling Units (ADUs) of less than 750 square feet are exempt from impact fees. The number of ADUs that
would be subject to the fee is estimated based on 500 ADUs, per the Housing Element, and analysis of permit data from the last 5 years showing that about 44% of ADUs have been 750 square feet or larger.
Sources: State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the
State — January 1, 2021-2022. Sacramento, California, May 2022; Institute for Transportation Engineers (ITE), Trip
Generation Handbook, 11th Edition, Sept. 2021; Town of Los Gatos 2040 General Plan Background Report, March 2019, Table 2.3-14, p. 2-34; Town of Los Gatos 2040 General Plan, June 2022, Table 3-1, p. 3-4; Town of Los Gatos, Resi and ADU SF Final.xlsx (September 2023).
LAND USE EXISTING (2021) a GROWTH (2022-2040) b TOTAL 2040
RESIDENTIAL (DWELLING UNITS)
SINGLE FAMILY c 10,100 113 10,213
MULTI-FAMILY d 3,792 2,072 5,864
TOTAL 13,892 2,185 16,077
ADD ESTIMATED ACCESSORY DWELLING UNITS (ADUs) 750 SF OR LARGER
SINGLE-FAMILY UNITS 113
NON-EXEMPT ADUs e 220
SINGLE-FAMILY FEE-
PAYING UNITS
333
NONRESIDENTIAL (BUILDING SQUARE FEET)
RETAIL/COMMERCIAL 2,633,475 367,860 3,001,335
OFFICE 3,987,091 146,548 4,133,639
INDUSTRIAL 1,061,766 157,440 1,219,206
TOTAL 7,682,332 671,848 8,354,180
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 8
TABLE 2: DWELLING UNIT EQUIVALENT (DUE) RATES
LAND USE ITE LAND USE (CODE) AVG. WEEKDAY
TRIP RATE
PERCENT NEW
TRIPS A
TRIP LENGTH
FACTOR B
DEMAND FACTOR B DWELLING UNIT
EQUIVALENT
SINGLE-FAMILY
(PER DWELLING
UNIT)
Single Family
Homes (210)
9.43 100 7.9 74.50 1.00
MULTI-FAMILY
(PER DWELLING
UNIT)
Multifamily
Mid-rise (221)
6.74 100 7.9 53.25 0.71
RETAIL (PER 1,000
SQUARE FEET)
Shopping
Center (820)
37.01 78 3.6 103.92 1.40
OFFICE (PER 1,000
SQUARE FEET) General Office
(710)
10.84 96 8.8 91.58 1.23
INDUSTRIAL (PER
1,000 SQUARE
FEET)
General Light
Industrial
(110)
4.87 98 9.0 42.95 0.58
a Includes diverted trips.
b Trip length and VMT factors provide a relative measure of transportation demand among land uses, and a reasonable
method for allocating improvement costs across land use categories to calculate the impact fee. Based on factors commonly used in planning studies. Absolute values for Los Gatos may differ.
Sources: Institute for Transportation Engineers (ITE), Trip Generation, 11th Edition; San Diego Association of Governments
(SANDAG), Brief Guide of Vehicular Trip Generation Rates, April 2002.
The DUE rates and travel demand factors are calculated using the daily trip rates from the 11th
Edition of the Trip Generation Manual, published by the Institute of Transportation Engineers (ITE).
The details of this calculation are shown in Table 2. The DUE rates are applied to the quantities of
land use growth shown in Table 1 to arrive at growth in DUEs as shown in Table 3.
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 9
TABLE 3: TRANSPORTATION DEMAND BY DWELLING UNIT EQUIVALENTS (DUEs)
Sources: Table 1 and Table 2.
LAND USE EXISTING DUEs (2021) GROWTH DUEs (2023-2040) TOTAL DUEs (2040)
RESIDENTIAL
SINGLE FAMILY 10,100 333 10,433
MULTI-FAMILY 2,710 1,481 4,191
SUBTOTAL 12,810 1,814 14,624
NONRESIDENTIAL
RETAIL/COMMERCIAL 3,674 513 4,187
OFFICE 4,901 180 5,081
INDUSTRIAL 612 91 703
SUBTOTAL 9,187 784 9,971
TOTAL 21,997 2,598 24,595
SHARE 90% 10% 100%
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 10
TRANSPORTATION IMPROVEMENTS
This section summarizes the projects needed to expand the transportation network to
accommodate growth. A detailed list of projects may be found in the Appendix, Section 1.
Table 4 summarizes the improvements identified to expand the Town-wide circulation network to
maintain the Town’s historical level of investment. Note that project cost estimates have been
escalated where appropriate and historical levels of supplemental funding have been assumed to
derive the costs allocated to the fee calculations. There are seven categories of projects in this list:
1. Bicycle and Pedestrian Plan Priority Projects: These projects are selected from the Bicycle
and Pedestrian Master Plan of the Town of Los Gatos (Connect Los Gatos, 2020).
2. Complete Streets projects carried over from the existing traffic impact fee project list. The
funding of these projects continues to be a high priority for the Town and including these
projects ensures that the impact fees previously collected will be used to deliver projects
from the previously planned list.
3. Lighting and Signage projects will be drawn from needs identified in the Town’s Downtown
Parking Roadmap. The costs are based on delivery of about $50,000 per year in
improvements.
4. Bicyclist and Pedestrian Safety Projects identified in Connect Los Gatos.
5. New bicycle and pedestrian facilities identified in Connect Los Gatos.
6. Safety and Capacity Improvements are largely associated with the Town’s estimated local
match contribution to the State Route 17 (SR-17) Corridor Congestion Relief Project –
Among other objectives, this project will reduce cut-through traffic through the Town of Los
Gatos and features improvements to the ramp intersections as well as the freeway mainline.
While funding for final design and construction has not been finalized, it is expected to
include a combination of Measure B, local funds, and other funds. Also included in this
category is the Shannon Road widening and safety improvements project.
7. Upgrades to the Town’s traffic signal system – This category of projects includes signal
upgrades including but not limited to; signal synchronization; signal interconnects; signal
head replacements and fiber optic lines. In the past, the Town has sought and received
state and federal funding for this type of project and an assumption of continued grant
funding has been made for calculating costs allocated to the TIF program.
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 11
TABLE 4: TRANSPORTATION IMPROVEMENT PROJECTS
CATEGORY UNFUNDED CAPITAL COSTS
($2022)
BPMP PRIORITY PROJECTS $13,201,857
COMPLETE STREETS (CARRYOVER) $3,522,227
LIGHTING AND SIGNAGE $400,000
OTHER BPMP PROJECTS - BICYCLIST AND PEDESTRIAN SAFETY $1,000,000
OTHER BPMP PROJECTS - NEW FACILITIES $2,600,000
SAFETY AND CAPACITY IMPROVEMENTS $13,382,000
TRAFFIC SIGNAL IMPROVEMENTS $8,000,000
SUBTOTAL $42,106,083
CURRENT TIF FUND BALANCE a $405,570
ALLOCATED COST FOR FEE CALCULATION $41,700,514
a Fund balance as of November 1, 2023.
Source: Connect Los Gatos, Town of Los Gatos
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 12
TOWN-WIDE MULTIMODAL TRANSPORTATION INFRASTRUCTURE
This section presents the Town’s standard for multimodal transportation infrastructure based on
the existing level of investment in that infrastructure. This standard is used to calculate the
Transportation Impact Fee (TIF).
INVENTORY OF TOWN WIDE TRANSPORTATION INFRASTRUCTURE
The investment that the Town has made to date in its transportation network depends upon the
multimodal transportation network that connects residential neighborhoods, retail and employment
centers, and other destinations across and outside the Town. Streets and other transportation
infrastructure that only provide access to individual residential properties and do not provide
connectivity between neighborhoods are excluded from this inventory.
The Town-wide multimodal transportation infrastructure was quantified using street centerline
Geographic Information System (GIS) data, the map of streets by classification published in the
Town’s General Plan 2040, and online aerial photographs. The transportation network is defined as
arterials and collectors that provide connectivity among different neighborhoods in Los Gatos and
to regional destinations. This network includes the entire roadway curb-to-curb (vehicle travel
lanes, bicycle lanes, and on street parking), as well as adjacent sidewalks, medians, traffic signals,
and off-street paths. As mentioned above, the network excludes local streets used primarily for
access to individual properties within specific neighborhoods.
Figure 1 shows a map of the Town’s existing citywide transportation network that is eligible for
improvement or expansion projects funded by the proposed Transportation Impact Fee. Note that
in addition to the collector streets shown in the map, there are some additional facilities that
provide access to school sites2. These facilities function as collectors, although not formally
classified as such, and would be eligible for TIF funded improvements.
EXISTING LEVEL OF INVESTMENT AND MAXIMUM JUSTIFIABLE FEE FOR THE
TRANSPORTATION IMPACT FEE
Total unit costs for transportation infrastructure are provided in Table 5. Additional details on the
unit costs may be found in the Appendix, Section 2. Quantities for each component of the inventory
and estimated historical level of investment per DUE are summarized in Table 6.
2 These facilities include Fischer Avenue and Roberts Road.
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 13
TABLE 5: TRANSPORTATION INFRASTRUCTURE UNIT COSTS (2022 $)
a) Construction costs include temporary traffic control where applicable.
b) Percent of total before contingency. Includes 20% for project design, 15% for construction engineering, and 5% for
project management.
c) Construction Cost*(1+Design Management%) * (1+ Contingency%).
d) Cost of street lighting, water pollution prevention, street furniture and drainage not included in unit cost
Source: DKS Associates
INFRASTRUCTURE TYPE UNIT CONSTRUCTION COST a DESIGN & MANAGEMENT
COST b
CONTINGENCY TOTAL UNIT COST c
ROADWAY Square Foot $56 40% 20% $94
SIDEWALK Square Foot $38 40% 20% $64
CURB & GUTTER Linear Foot $127 40% 20% $214
MEDIAN Square Foot $50 40% 20% $85
BICYCLE PATH Square Foot $38 40% 20% $65
BICYCLE LANE Linear Foot $8 40% 20% $14
TRAFFIC SIGNAL Intersection $654,000 40% 20% $1,098,720
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 14
FIGURE 1: MAP OF TOWN-WIDE INFRASTRUCTURE
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 15
TABLE 6: EXISTING FACILITY STANDARD & LEVEL OF INVESTMENT
Note: All dollars in 2022 $.
Source: Table 10.
TRANSPORTATION IMPROVEMENTS AND COST PER DUE
The required projects identified to maintain the existing level of investment to accommodate future
growth are summarized in Table 4. A detailed listing of transportation improvements or projects is
provided in the Appendix, Section 1. Dividing the cost of the transportation improvements by the
expected growth in DUEs results in the cost per DUE or recommended fee level as shown in
Table 7.
INFRA-
STRUCTURE TYPE INVENTORY
EXISTING DWELLING
UNITS EQUIVALENTS DUE
EXISTING FACILITIES
STANDARD UNITS PER DUE
REPLACE- MENT
COSTS PER UNIT
EXISTING LEVEL OF
INVESTMENT ($ PER DUE)
ROADWAY 11,208,202 square feet 21,997 509.5 $94 $47,936
SIDEWALK 1,481,236 square feet 21,997 67.3 $64 $4,299
CURB &
GUTTER
311,245 linear feet 21,997 14.1 $214 $3,024
MEDIAN 88,386 square feet 21,997 4.0 $85 $340
BICYCLE
PATH 244,859 square feet 21,997 11.1 $65 $718
BICYCLE
LANE
65,719 linear feet 21,997 3.0 $14 $42
TRAFFIC
SIGNAL
31 intersections 21,997 0.001 $1,098,720 $1,548
Total $57,907
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 16
TABLE 7: TRANSPORTATION IMPROVEMENT COST PER DWELLING UNIT EQUIVALENT
ALLOCATED TRANSPORTATION IMPROVEMENT
COSTS
$41,700,514
GROWTH (2022-2040) IN DWELLING UNIT
EQUIVALENTS (DUES)
2,598
COST PER DUE (TRANSPORTATION
IMPROVEMENT FEE PER DUE)
$16,051
Sources: Table 5 and Table 3.
FEE SCHEDULE
This section summarizes the Town’s planned transportation improvements along with associated
costs to demonstrate a reasonable relationship between new development and the use of fee
revenues to accommodate that development.
The Town may adopt any fee level below the maximum justified fees, taking into account economic
development policy, other policy considerations, and fee levels charged by comparable jurisdictions
(see Table 11). The Town may also adopt fees with varying levels of discount by land use category
based on reasonable policy considerations, such as more deeply discounting industrial fees to
encourage industrial development as part of an economic development policy.
The allocated cost of the transportation capital improvements list totals $41,700,514. The full list of
projects and estimated costs is provided in the Appendix, Section 1.
The estimated cost to build out the capital improvement program is summarized in Table 4. Only
capital projects eligible for funding through the TIF program are listed. The estimated costs account
for known funding from other sources, such as the countywide Measure B program. The included
projects would improve, enhance, and/or expand the Town’s existing transportation system.
The basic fees per DUE described in the preceding sections are scaled according to relative
transportation demand rates to arrive at fee schedules by type of land use. The factors scaling the
fee by transportation demand (DUE rates) have been calculated using daily trip generation rates,
as explained under the section titled, “Transportation Demand Factors”.
RECOMMENDED FEE SCHEDULE
The recommended fee schedule shown in Table 8 is the cost per DUE to deliver the planned
Transportation Improvement projects and is below the maximum justifiable fee (historical level of
investment).
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 17
TABLE 8: RECOMMENDED FEE SCHEDULE
LAND USE
IMPROVEMENT
COST PER
DWELLING UNIT
EQUIVALENT
DWELLING UNIT
EQUIVALENT PER
UNIT
FEE UNIT
SINGLE-FAMILY
RESIDENTIAL
$16,051 1.00 $16,051 per dwelling unit
MULTI-FAMILY
RESIDENTIAL
$16,051 0.71 $11,472 per dwelling unit
RETAIL $16,051 1.40 $22,391 per 1,000 square
feet
OFFICE $16,051 1.23 $19,731 per 1,000 square
feet
INDUSTRIAL $16,051 0.58 $9,255 per 1,000 square
feet
Sources: Table 3 and Table 7
RESIDENTIAL FEES PER SQUARE FOOT
Per AB 602, residential fees adopted after July 1, 2022, must be charged proportionally to the size
of the dwelling unit. Fees per DUE are divided by the average size of single family and multifamily
units to arrive at a fee per residential square foot. The average size of single family and multi
family dwelling units is derived from the five years of building permit data in Los Gatos. Note that
the square footage is based on the physical coverage of the living quarters of the residential unit
(i.e., does not reflect yard, garage, or other areas of the property). The resulting residential fees
per square foot are summarized in Table 9.
TABLE 9: CALCULATION OF RESIDENTIAL FEES PER SQUARE FOOT
a Includes ADUs of 750 or more square feet.
Source: Town of Los Gatos.
TOTAL TIF
PROGRAM FEES
AVERAGE SIZE
(SQUARE FEET)
TIF PROGRAM FEES
PER SQUARE FOOT
SINGLE FAMILY DWELLING
UNITS a
$16,051 2,632 $6.10
MULTI FAMILY DWELLING
UNITS
$11,472 1,649 $6.96
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 18
FEES FOR SPECIALIZED LAND USES
Fees for development projects that do not correspond to one of the given generic land use
categories may be determined by multiplying the fee per single family dwelling unit by the
appropriate DUE rate and the quantity of specialized land use. The DUE rate is calculated with the
applicable average weekday trip generation rate using the following formula:
DUE Rate = Average weekday trips per unit of specialized land use/ Average weekday trips
per single family dwelling unit /
The transportation impact fees are given by:
Fee per single family dwelling unit * DUE rate * specialized land use quantity
Example: Fees for self-storage project
Average daily trip generation rates:
Single family dwelling unit = 9.43 trips per dwelling unit (DUE)
Mini warehouse or self-storage = 1.45 trips per thousand square feet (KSF)
DUE Rate = 1.45/9.43 = 0.15 DUE/KSF
Fee per KSF of mini warehouse = 0.15 DUE/KSF*$16,282/DUE = $2,407 per KSF
COMPARABLE FEE RATES
When adopting a fee level, one consideration is the level of fees charged by nearby jurisdictions as
well as the current transportation impact fees being collected in Los Gatos. Table 10 shows the fees
charged by several South Bay jurisdictions as well as the current fee level for Los Gatos.
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 19
TABLE 10: TRANSPORTATION IMPACT FEES IN COMPARABLE JURISDICTIONS
a Based on $1,015 per daily trip.
Sources: Menlo Park: Development guidelines City of Menlo Park, rates updated June 2022. San Mateo: San Mateo 2022-2023 Fee Schedule. San Carlos: City of San Carlos Development Impact Fees 2022-2023 rates (cost is assessed as $7.316*PM peak hour trips). Los Altos: City of Los Altos Proposed 2022-2023 Fees. Redwood City: Redwood City Development Fee
Schedule (downtown area discounted fees not shown). Palo Alto: FY22 Impact Fee Information Sheet, $8,572.00 per net new PM peak hour trip, Charleston/Arastradero special zone discounted fees not shown. East Palo Alto: East Palo Alto Master Fee Schedule 2022, pm peak hour vehicle trip rate of $7,868.71 per trip, with internal trips percentage considered.
Mountain View: Mountain View Development Fee Schedule 2022-2023, other low-trip-generating uses are charged at $3,100.00/am and pm peak-hour trip. Cupertino: City of Cupertino Engineering Fee Schedule 2022. Gilroy: City of Gilroy 2022 Impact Fees. Morgan Hill: City of Morgan Hill Fee Schedule, 2021. Santa Clara: Santa Clara Master Fee Schedule (rates shown apply for projects entitled after Oct 22, 2018). Implementation Policy and Revenue Projections
JURISDICTION
(UPDATE YEAR)
SINGLE FAMILY
RESIDENTIAL PER DU
MULTIFAMILY RESIDENTIAL
PER DU
OFFICE
(PER KSF)
RETAIL
(PER KSF)
HOTEL
(PER ROOM)
MENLO PARK $18,845 $6,352 $21,880 $12,760 $11,422
SAN MATEO $6,868 $3,468 $8,367 $27,735 $4,368
SAN CARLOS $7,243 $4,097 $8,413 $27,874 $4,390
LOS ALTOS $6,774 $4,159 $9,994 $12,409
REDWOOD CITY $1,617 $992 $2,380 $940 $945
PALO ALTO Citywide: $9,266 per net new PM peak hour trip
Charleston/Arastradero district: $460/KSF commercial or $1,599 per DUE
EAST PALO ALTO $2,870 $2,025 $8,360 8,360
MOUNTAIN VIEW $5,364 $3,004 $5,720 5,720 $3,317
CUPERTINO $6,797 $4,215 $19,150 10,940 $3,278
GILROY “Low-Density”
$13,012
“High-Density”
$10,548
Low Traffic Commercial: 14,397
High Traffic Commercial:
$29,082
MORGAN HILL $3,585
>1,200SF:
$2222
<1,200: $1399
All remaining uses charged using $3,585/peak
hour trip
CITY OF SANTA CLARA $1,391 $618 $1,610
Retail
elements
>50KSF:
$5,350
$843
CURRENT LOS
GATOS FEES a $9,571 $6,841 $1,015 per daily trip
PROPOSED LOS GATOS FEES
$16,051 $11,472 $19,731 $22,391
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 20
PROJECTS SUBJECT TO THE FEE PROGRAM
The Town’s Transportation Impact Policy provides for the following:
1. Projects that are determined by the Town to generate one or more new net Average Daily
Trips (ADT) are subject to the Policy (and would presumably pay into the TIF program).
2. Accessory Dwelling Units (ADUs) smaller than 750 square feet shall be exempted from the
requirements of Transportation Analysis and the TIF program3.
3. The Town Council may exempt housing developments for extremely low, very-low, low-,
and moderate-income residents (as defined by Town Ordinance, General Plan, or statute)
from all or a portion of the traffic impact mitigation fee upon making a finding that the
development provides a significant community benefit by meeting current needs for
affordable housing. Any such exemptions will reduce the amount of revenue expected to be
collected and require additional supplemental funding sources to fully deliver the project list.
In addition, the Town’s TIF program will be subject to the requirements of California Government
Code Section 66005.1, which requires a discounted fee rate reflecting lower automobile trip
generation rates for qualifying housing developments. To qualify a development must be located
within a half mile of a transit station (as defined in California Government Code Section 65460.1),
include convenience retail uses a half mile of the housing, and limit parking spaces. Although the
Town does not currently have a transit station meeting the statutory requirement, this statute may
become applicable at some point in the future.
REVENUE PROJECTIONS AND USE
The amount of revenue that can be collected under the new TIF program will depend on the fee
levels adopted by the Town as well as the expected growth over the planning horizon. Table 11
shows the estimated revenue to be collected by the updated TIF program assuming adoption of the
recommended Transportation Improvement Fee.
3 Proposed change to current policy which exempts all ADUs.
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 21
TABLE 11: MAXIMUM REVENUE PROJECTION
LAND USE TIF FEES PER UNIT EXPECTED
GROWTH
REVENUE
ESTIMATE
SINGLE FAMILY
RESIDENTIAL
$16,051 per dwelling unit 333 $5,344,918
MULTI-FAMILY
RESIDENTIAL
$11,472 per dwelling unit 2,072 $23,770,305
RETAIL $22,391 per 1,000 square
feet
368 $8,236,767
OFFICE $19,731 per 1,000 square
feet
147 $2,891,486
INDUSTRIAL $9,255 per 1,000 square
feet
157 $1,457,037
Total $41,700,514
Sources: Table 1 and Table 8.
APPENDIX
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 23
CONTENTS
SECTION 1. PROJECT LIST
SECTION 2. UNIT COST DETAIL
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 24
SECTION 1. PROJECT LIST
Town of Los Gatos TIF Project ListIDProject Name Category Source DescriptionFee Program Component Cost Estimate ($2022) Estimated Funding from Other Sources Unfunded Cost Allocated to TIF Calculation1State Route 17 Corridor Congestion Relief Project 1Safety and Capacity ImprovementsSanta Clara VTA Measure B Projects Modify the SR 17/SR 9 interchange’s on- and off-ramps Implement advance transportation technology Install traffic signals control system, traveler information system, and ramp metersTI 110,820,000$ 99,738,000$ 10,482,000$ 2Shannon Rd Widening and Safety Improvements Safety and Capacity ImprovementsTown of Los Gatos Capital Improvement ProgramAdd shoulders and retaining wall between Santa Rosa Drive and Diduca Way.TI 4,371,513$ 1,471,513$ 2,900,000$ 3Union Avenue Widening and Sidewalks Complete Streets (Carryover) Carryover from previous TIF project listAdd sidewalks and bike lanes between Blossom Valley Dr to Lynne AveTI 4,226,672$ 3,170,004$ 1,056,668$ 4Traffic Signal Modernization Program Traffic SignalTown of Los Gatos Capital Improvement ProgramSmart Signals Project will modernize and upgrade the Town’s traffic signals/communications equipment to provide real‐time data for the advanced traffic management and adaptive traffic control systemsTI 20,452,114$ 12,452,114$ 8,000,000$ 5Highway 17 Bicycle & Pedestrian Overcrossing BPMP Priority Projects Bicycle and Pedestrian Master Plan Overcrossing of SR‐17 south of Blossom Hill RoadVMT 25,288,625$ 18,966,469$ 6,322,156$ 6Kennedy Sidewalk & Bike Lanes BPMP Priority Projects Kennedy RoadAdd sidewalks and Class II bicycle lanes from Los Gatos Bld to Englewood AveVMT 1,402,065$ 138,740$ $1,263,3257Sidewalk Gap Filling Projects Other BPMP Projects ‐ New Facilities Bicycle and Pedestrian Master PlanFill gaps in sidewalks, multiple locations on Town‐wide circulation networkVMT 600,000$ 600,000$ 8New and Expanded Bicycle and Pedestrian Facilities (Non Priority Projects) Other BPMP Projects ‐ New Facilities Bicycle and Pedestrian Master Plan Construct new bicycle lanes, cycle tracks and multiuse pathsVMT 2,000,000$ 2,000,000$ 9Los Gatos Almaden Road Complete Streets Improvements Complete Streets (Carryover) Carryover from previous TIF project listFill gaps in sidewalks between Peach Blossom Lane and Camino del CerroTI 4,226,672$ 3,170,004$ 1,056,668$ 10Los Gatos Boulevard Multimodal Widening Complete Streets (Carryover) Carryover from previous TIF project listAdd sidewalks and bicycle lanes between Samaritan Drive and Camino Del SolTI 5,635,562$ 4,226,672$ 1,408,891$ 11Parking Program Implementation Lighting and Signage Downtown Parking Roadmap Add lighting, signage, and other project elementsTI 400,000$ 400,000$ 12Bicyle and Pedestrian Improvements Program ‐Safety ImprovementsOther BPMP Projects ‐ Bicyclist and Pedestrian SafetyBicycle and Pedestrian Master Plan; Local Road Safety PlanHigh visibility crosswalks, midblock crossings, pedestrian beacons, and other project elements on Town‐wide circulation networkTI 1,000,000$ 1,000,000$ 13Priority Projects from Bicycle and Pedestrian Master Plan BPMP Priority Projects Bicycle and Pedestrian Master PlanWork towards implement priority projects from BPMP as feasibleVMT 11,232,751$ 5,616,375$ 5,616,375$ Notes:Total: 42,106,083$ 1) Unfunded cost for this project reduced by 2023 transfer of traffic impact fee funding to project account.11/14/2023
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 25
FIGURE 2: TIF PROJECTS
TOWN OF LOS GATOS TRANSPORTATION IMPACT FEE • NEXUS STUDY • NOVEMBER 2023 26
SECTION 2. UNIT COST DETAIL
# Infrastructure Type Unit Total Unit
Cost1 Total Quantity Total Cost
1 Roadway Square Foot 94$ 11,208,202 1,054,467,624$
2 Sidewalk Square Foot 64$ 1,481,236 94,562,121$
3 Curb & Gutter Linear Foot 214$ 311,245 66,511,907$
4 Median Square Foot 85$ 88,386 7,483,786$
5 Bicycle Path Square Foot 65$ 244,859 15,796,361$
6 Bicycle Lane* Linear Foot 14$ 65,719 927,422$
7 Traffic Signal** Intersection 1,098,720$ 31 34,060,320$
Sum 1,273,809,540$
1 See Unit Cost Table for detailed information
Town of Los Gatos Impact Fee
Transportation Infrastructure Costs (2022)
P:\P\22\22046‐000 Los Gatos TIF Update\05 Analysis\03 Inventory\Los Gatos Transportation Impact Fee Unit Costs 11‐21‐2022
# Infrastructure Type Unit
Construction
Cost ($)
Design &
Management
Cost1
Contingency Total Unit
Cost2
1 Roadway3 Square Foot 56$ 40% 20% 94$
2 Sidewalk Square Foot 38$ 40% 20% 64$
3 Curb & Gutter Linear Foot 127$ 40% 20% 214$
4 Median Square Foot 50$ 40% 20% 85$
5 Bicycle Path Square Foot 38$ 40% 20% 65$
6 Bicycle Lane Linear Foot 8$ 40% 20% 14$
7 Traffic Signal Intersection 654,000$ 40% 20% 1,098,720$
1
2 Construction Cost*(1+Design Management%)*(1+ Contingency%)
3 Cost of street lighting, water pollution prevention, street furniture and drainage not included in unit cost
Transportation Infrastructure Unit Costs (2022)
Town of Los Gatos Impact Fee
Percent of total before contingency. Includes 20% for project design, 15% for construction engineering, and 5% for
project management
Appendix, Section 2 ‐ 2
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrastructure Type:Roadway
Date of Estimate:Jul. 9, 2022 Revision No.Revision Date
Prepared by:Tommy Cho Revised by
No. Description Quantity Units Unit Cost Total
1 Clearing and Grubbing 1.00 SF $3.48 3.48$
2 Remove Existing Pavement (Obliteration)1.00 SF $6.50 6.50$
3Roadway Excavation (2' depth)0.07 CY $190.00 14.07$
4 Finish Grading within Right of Way 1.00 SF $0.38 0.38$
5 Class 2 Aggregate Base (18") 0.06 CY $196.00 11.76$
6
Asphalt Concrete (6")(Type A, assume 150
lbs/CF)0.04 Ton $280.00 10.50$ 7 Temporary Traffic Control 1.00 LS $4.70 4.70$ 8 Mobilization 1 LS 4.70$ 4.70$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL (TO NEAREST 1,000) 47.00$
Total Contract Items 56.00$
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is a bridge
Appendix, Section 2 ‐ 3
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrastructure Type:Sidewalk
Date of Estimate:Jul. 9, 2022 Revision No.
Revision Date
Prepared by:Tommy Cho Revised by
No. Description Quantity Units Unit Cost Total
1 Clearing and Grubbing 1.00 SF $0.63 0.63$
2 Finish Grading within Right of Way 1.00 SF $0.38 0.38$ 3 Concrete Sidewalk 1.00 SF $28.63 28.63$ 5 Curb Ramp 0.0002 EA $5,000.00 1.00$ 6 Temporary Traffic Control 1 LS 3.10$ 3.10$ 7 Mobilization 1 LS 3.10$ 3.10$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL (TO NEAREST 1,000) 31
Total Contract Items 38$
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is a bridge
Appendix, Section 2 ‐ 4
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrastructure Type:Curb and Gutter
Date of Estimate:Jul. 9, 2022 Revision No.
Revision Date
Prepared by:Tommy Cho Revised by
No. Description Quantity Units Unit Cost Total
1 Curb and Gutter 1 LF $106.40 106$
2 Sawcut Gutter 1 LF -$ 3Temporary Traffic Control 1 LS $10.60 11$ 4 Mobilization 1 LS $10.60 11$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL (TO NEAREST 1,000) 106$
Total Contract Items 127$
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is a bridge
Appendix, Section 2 ‐ 5
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrastructure Type:Median
Date of Estimate:Jul. 9, 2022 Revision No.
Revision Date
Prepared by:Tommy Cho Revised by
No. Description Quantity Units Unit Cost Total
1 Median (Island) Paving 1.00 SF $17.00 17$
2 Class 2 Aggregate Base (6”)1.00 SF $4.00 4$ 3 Curb 0.20 LF $106.40 21$ 4Temporary Traffic Control 1 LS $4.20 4$ 5 Mobilization 1 LS 4.20$ 4$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL (TO NEAREST 1,000) 42$
Total Contract Items 50$
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is a bridge
Appendix, Section 2 ‐ 6
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrastructure Type:Bicycle Path (Shared Use Path)
Date of Estimate:Jul. 9, 2022 Revision No.
Revision Date
Prepared by:Tommy Cho Revised by
No. Description Quantity Units Unit Cost Total
1 Clearing and Grubbing 1.00 SF $3.48 3.48$
2 Remove Existing Pavement (Obliteration)1.00 SF $6.50 6.50$ 3Roadway Excavation (1.5')0.06 CY $190.00 11.40$ 3 Finish Grading within Right of Way 1.00 SF $0.38 0.38$ 4 Class 2 Aggregate Base (4") 0.02 CY $196.00 2.94$
5
Hot Mix Asphalt (Type A) (4")(assume 150
lbs./CF)0.03 Ton $280.00 7.00$
6Temporary Traffic Control 1 LS $3.20 3.20$
7 Mobilization 1 LS 3.20$ 3.20$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL (TO NEAREST 1,000) 32$
Total Contract Items 38$
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is a bridge
Appendix, Section 2 ‐ 7
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrastructure Type:Bicycle Lane (Class II)
Date of Estimate:Jul. 9, 2022 Revision No.
Revision Date
Prepared by:Tommy Cho Revised by
No. Description Quantity Units Unit Cost Total
1 Remove existing striping 1.00 LF $2.30 2.30$
2 Striping 1.00 LF $4.51 4.51$ 3 Signage 0.0008 EA $500.00 0.38$ 4Temporary Traffic Control 1 LS $0.70 0.70$ 5 Mobilization 1 LS 0.70$ 0.70$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL (TO NEAREST 1,000) 7$
Controtal Contract Items 8$
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is a bridge
Appendix, Section 2 ‐ 8
DKS Associates Planning Cost Estimate
1970 Broadway Ste 740, Oakland CA 94612 Project Number
Infrast Traffic Signal for One Intersection
Date oJul. 9, 2022 Revision No.Revision Date
PreparTommy Cho Revised by
No. Description Quantity Units Unit Cost* Total
1 Furnish & Install Cabinet and Controller on New Foundation 1 EA $45,000.00 45,000$
2 Furnish and Install Fiber Switch In Controller Cabinet. 1EA $2,500.00 2,500$
3 Terminate fiber optic cable in cabinet 1EA $2,500.00 2,500$
4 Splice 12 Strand SMFO Cable to trunk cable in vault 1EA $1,000.00 1,000$
5 Furnish & Install Opticom EVP system in signal cabinet 1EA $7,500.00 7,500$
6 Furnish & Install Opticom Card Rack 1 EA $1,000.00 1,000$
7 Furnish & Install Opticom Detector 4 EA $1,200.00 4,800$
8 Furnish & Install VIVDS System, incl. cameras, comms
manager, and SDLC hub (per intersection)1 EA $25,000.00 25,000$
9 Furnish & Install CCTV Camera 1EA $5,000.00 5,000$ 10 Furnish & Install Detector Handhole 4 EA $500.00 2,000$
11 Furnish & Install Detector Loops (6'x6')8EA $2,000.00 16,000$
12 Furnish & Install LED Countdown Pedestrian Signal Head 8EA $800.00 6,400$
13 Furnish & Install Polara Navigator Pedestrian Pushbutton 8EA $1,200.00 9,600$
14 Furnish & Install Polara CCU in Cabinet 1 EA $4,500.00 4,500$
15 Furnish & Install SNS on Mast Arm 4 EA $2,000.00 8,000$
16 Furnish & Install LED Luminaire 4 EA $1,500.00 6,000$
17 Furnish & Install Photoelectric Control Unit (PEU)1EA $500.00 500$
18 Furnish & Install Pull Box #5 4 EA $900.00 3,600$
19 Furnish & Install Pull Box #6 2 EA $1,000.00 2,000$ 20 Furnish & Install Fiber Optic Splice Vault 1 EA $1,250.00 1,250$ 21 Furnish and install 2" conduit with backfill and trenching 100 LF $120.00 12,000$ 22 Furnish and install 3" conduit with backfill and trenching 1000 LF $125.00 125,000$ 23 Furnish and install 4" conduit with backfill and trenching 100 LF $130.00 13,000$
24 Furnish & Install Type 1-B 4' Pole and Foundation 4EA $3,500.00 14,000$
25 Furnish & Install Type 1-B 10' Pole and Foundation 4EA $6,500.00 26,000$
26 Furnish & Install Type 28-5-100 Pole and Foundation 4EA $26,000.00 104,000$
27 Furnish & Install Signal Head Mount Type SV-1-T 4EA $700.00 2,800$
28 Furnish & Install Pedestrian Signal Head Mount SP-2-T 4EA $1,000.00 4,000$
29 Furnish & Install #14 Conductors 7000 LF $1.50 10,500$
30 Furnish & Install #10 Conductors 1500 LF $2.00 3,000$
31 Furnish & Install #8 Conductors 600 LF $2.50 1,500$
32 Furnish & Install #6 Conductors 50 LF $3.00 150$ 33 Furnish & Install #2 Conductors 1000 LF $4.00 4,000$ 34 Furnish & Install Detector Lead-in Cables 250 LF $3.00 750$ 35 Furnish & Install EVP Cable (Opticom Model 138)500 LF $3.00 1,500$
36 Furnish & Install CCTV Cable (CAT6)100 LF $3.00 300$
37 Furnish & Install VIVDS Cable (3-wire)500 LF $3.00 1,500$
38 Furnish & Install 12-strand Fiber Optic Cable 300 LF $5.00 1,500$
39 Furnish & Install Trace Cable (#10)300 LF $2.00 600$
40 Temporary Traffic Control 1 LS $54,500.00 54,500$
41 Mobilization 1 LS 54,500.00$ 54,500$
*2020 unit costs
545,000$
Total Contract Items 654,000$
CONTRACT ITEMS LESS MOBILIZATION AND TEMP TRAFFIC CONTROL, ESC TO 2022 AT 3% (TO
NEAREST 1,000)
Click here if this project is a surface treatment or overlay project.
Click here if the project schedule for this project is to be 50 days or more; also click here if this is
Appendix, Section 2 ‐ 9