Project Contractor Cost Completed
1 Boiler replacement Air Systems Inc. $17,000 2020
2 Chiller replacement Foothill Heat and AC $55,600 2020
3 Water heater replacement OC McDonald $4,934 2021
4
ADA restroom architect
plans & specifica�ons The KPA Group $35,000 2021
5 Move out/in for flooring Ind Facility Resource $11,600 2022
6
Flooring - en�re building
(Replaced subfloor and
window trim as needed)
Shaw Flooring Inc. $140 ,000 2022
7
Door trimming for flooring
(12) PPW-Facili�es $1,570.90 2022
8
HVAC units (18) /interior
paint (Cleaned/replaced
drywall behind units)
Foothill Heat and AC $195,000 2023
9
ADA parking lot and
building entrance – plans,
specifica�ons, and survey
The KPA Group $30,000 2023
10 ADA restroom Tucker Const. Inc. $276,000 Est. 6/30/24
11
FY 23-24 Community
Grant: new kitchen
appliances
N/A $12,000 2024
TOTAL $778,705
An�cipated and Unfunded
Needs Contractor Es�mated Cost Recommended
12
ADA compliant parking lot
and building entrance $400,000 ASAP
13
Window replacements -
Water intrusion repair,
wall patch, and paint.
$200,000 2024/25
14
Roof tune-up (adds 5 years
of life to roof) Facili�es/Cal Roofing $5,000 2024
15 Exterior paint $40,000 2027
16 Roof replacement $100,000 2027
17
Deck seal, drain
replacement, water
intrusion repair
$100,000 2024
TOTAL $845,000