Loading...
15 Attachment 2 - Updates to Adult Recreation Center Improvements and Repairs Since 2020 Table ATTACHMENT 2 Adult Recrea�on Center- Improvements and Repairs Since 2020 Project Contractor Cost Completed 1 Boiler replacement Air Systems Inc. $17,000 2020 2 Chiller replacement Foothill Heat and AC $55,600 2020 3 Water heater replacement OC McDonald $4,934 2021 4 ADA restroom architect plans & specifica�ons The KPA Group $35,000 2021 5 Move out/in for flooring Ind Facility Resource $11,600 2022 6 Flooring - en�re building (Replaced subfloor and window trim as needed) Shaw Flooring Inc. $140 ,000 2022 7 Door trimming for flooring (12) PPW-Facili�es $1,570.90 2022 8 HVAC units (18) /interior paint (Cleaned/replaced drywall behind units) Foothill Heat and AC $195,000 2023 9 ADA parking lot and building entrance – plans, specifica�ons, and survey The KPA Group $30,000 2023 10 ADA restroom Tucker Const. Inc. $276,000 Est. 6/30/24 11 FY 23-24 Community Grant: new kitchen appliances N/A $12,000 2024 TOTAL $778,705 An�cipated and Unfunded Needs Contractor Es�mated Cost Recommended 12 ADA compliant parking lot and building entrance $400,000 ASAP 13 Window replacements - Water intrusion repair, wall patch, and paint. $200,000 2024/25 14 Roof tune-up (adds 5 years of life to roof) Facili�es/Cal Roofing $5,000 2024 15 Exterior paint $40,000 2027 16 Roof replacement $100,000 2027 17 Deck seal, drain replacement, water intrusion repair $100,000 2024 TOTAL $845,000