Loading...
Attachment 1 - Bid Summary 04-06-231 05005A Construction Staking LS 1 $ 60,000.00 $ 60,000.00 $ 50,000.00 $ 50,000.00 $ 31,240.00 $ 31,240.00 $ 30,000.00 $ 30,000.00 $ 36,000.00 $ 36,000.00 2 146002 Contractor Supplied Biologist and Natural Resources Protection Plan LS 1 $ 50,000.00 $ 50,000.00 $ 30,000.00 $ 30,000.00 $ 52,200.00 $ 52,200.00 $ 25,000.00 $ 25,000.00 $ 34,000.00 $ 34,000.00 3 070030 Lead Compliance Plan LS 1 $ 8,000.00 $ 8,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 $ 10,000.00 $ 10,000.00 $ 8,125.00 $ 8,125.00 4 080050 Progress Schedule (Critical Path Method)LS 1 $ 20,000.00 $ 20,000.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,000.00 $ 2,000.00 $ 26,000.00 $ 26,000.00 5 120090 Construction Area Signs LS 1 $ 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 $ 5,000.00 $ 5,000.00 $ 7,000.00 $ 7,000.00 $ 2,000.00 $ 2,000.00 6 120100 Traffic Control System LS 1 $ 100,000.00 $ 100,000.00 $ 295,000.00 $ 295,000.00 $ 370,000.00 $ 370,000.00 $ 230,000.00 $ 230,000.00 $ 650,000.00 $ 650,000.00 7 128652 Portable Changeable Message Sign (LS)EA 5 $ 10,000.00 $ 50,000.00 $ 5,000.00 $ 25,000.00 $ 12,000.00 $ 60,000.00 $ 12,000.00 $ 60,000.00 $ 6,000.00 $ 30,000.00 8 130100 Job Site Management LS 1 $ 15,000.00 $ 15,000.00 $ 100,000.00 $ 100,000.00 $ 18,800.00 $ 18,800.00 $ 125,000.00 $ 125,000.00 $ 635,000.00 $ 635,000.00 9 130200 Prepare Water Pollution Control Program LS 1 $ 20,000.00 $ 20,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 $ 1,000.00 $ 1,000.00 10 130620 Temporary Drainage Inlet Protection EA 3 $ 400.00 $ 1,200.00 $ 300.00 $ 900.00 $ 700.00 $ 2,100.00 $ 100.00 $ 300.00 $ 425.00 $ 1,275.00 11 130640 Temporary Fiber Roll LF 509 $ 4.00 $ 2,036.00 $ 8.00 $ 4,072.00 $ 18.00 $ 9,162.00 $ 4.00 $ 2,036.00 $ 9.00 $ 4,581.00 12 130680 Temporary Silt Fence LF 488 $ 6.00 $ 2,928.00 $ 7.00 $ 3,416.00 $ 20.00 $ 9,760.00 $ 4.00 $ 1,952.00 $ 8.00 $ 3,904.00 13 130710 Temporary Construction Entrance EA 1 $ 8,000.00 $ 8,000.00 $ 6,000.00 $ 6,000.00 $ 5,000.00 $ 5,000.00 $ 1,000.00 $ 1,000.00 $ 15,000.00 $ 15,000.00 14 130900 Temporary Concrete Washout LS 1 $ 6,000.00 $ 6,000.00 $ 10,000.00 $ 10,000.00 $ 4,400.00 $ 4,400.00 $ 1,000.00 $ 1,000.00 $ 4,700.00 $ 4,700.00 15 141103 Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste)LF 230 $ 100.00 $ 23,000.00 $ 15.00 $ 3,450.00 $ 15.00 $ 3,450.00 $ 15.00 $ 3,450.00 $ 16.25 $ 3,737.50 16 160110 Temporary High-Visibility Fence LF 1147 $ 5.00 $ 5,735.00 $ 9.00 $ 10,323.00 $ 30.00 $ 34,410.00 $ 4.00 $ 4,588.00 $ 3.50 $ 4,014.50 17 170103 Clearing and Grubbing (LS)LS 1 $ 62,000.00 $ 62,000.00 $ 100,000.00 $ 100,000.00 $ 58,800.00 $ 58,800.00 $ 100,000.00 $ 100,000.00 $ 16,000.00 $ 16,000.00 18 190101 Roadway Excavation CY 18 $ 195.00 $ 3,510.00 $ 300.00 $ 5,400.00 $ 3,800.00 $ 68,400.00 $ 1,000.00 $ 18,000.00 $ 87.00 $ 1,566.00 19 190106 Roadway Excavation (Type Z-3) (Aerially Deposited Lead)CY 12 $ 500.00 $ 6,000.00 $ 970.00 $ 11,640.00 $ 1,340.00 $ 16,080.00 $ 400.00 $ 4,800.00 $ 150.00 $ 1,800.00 20 190163 Roadway Excavation (Type R-1) (Aerially Deposited Lead)CY 2 $ 180.00 $ 360.00 $ 300.00 $ 600.00 $ 1,340.00 $ 2,680.00 $ 400.00 $ 800.00 $ 400.00 $ 800.00 21F 192003 Structure Excavation (Bridge)CY 97 $ 165.00 $ 16,005.00 $ 225.00 $ 21,825.00 $ 350.00 $ 33,950.00 $ 200.00 $ 19,400.00 $ 440.00 $ 42,680.00 22 192011 Structure Excavation (Type R-1) (Aerially Deposited Lead)CY 358 $ 70.00 $ 25,060.00 $ 300.00 $ 107,400.00 $ 225.00 $ 80,550.00 $ 85.00 $ 30,430.00 $ 111.00 $ 39,738.00 23F 192037 Structure Excavation (Retaining Wall)CY 1700 $ 120.00 $ 204,000.00 $ 225.00 $ 382,500.00 $ 275.00 $ 467,500.00 $ 360.00 $ 612,000.00 $ 87.00 $ 147,900.00 24 192054 Structure Excavation (Type Z-3) (Aerially Deposited Lead)CY 49 $ 350.00 $ 17,150.00 $ 970.00 $ 47,530.00 $ 1,000.00 $ 49,000.00 $ 400.00 $ 19,600.00 $ 400.00 $ 19,600.00 25F 193003 Structure Backfill (Bridge)CY 73 $ 350.00 $ 25,550.00 $ 290.00 $ 21,170.00 $ 350.00 $ 25,550.00 $ 100.00 $ 7,300.00 $ 82.00 $ 5,986.00 26F 193013 Structure Backfill (Retaining Wall)CY 2316 $ 151.00 $ 349,716.00 $ 220.00 $ 509,520.00 $ 200.00 $ 463,200.00 $ 150.00 $ 347,400.00 $ 85.00 $ 196,860.00 27F 193031 Pervious Backfill Material (Retaining Wall)CY 177 $ 190.00 $ 33,630.00 $ 190.00 $ 33,630.00 $ 148.00 $ 26,196.00 $ 200.00 $ 35,400.00 $ 145.00 $ 25,665.00 28 210300 Hydromulch SF 9939 $ 0.40 $ 3,975.60 $ 0.14 $ 1,391.46 $ 0.30 $ 2,981.70 $ 0.20 $ 1,987.80 $ 0.40 $ 3,975.60 29 210430 Hydroseed SF 9939 $ 0.60 $ 5,963.40 $ 0.88 $ 8,746.32 $ 0.40 $ 3,975.60 $ 1.00 $ 9,939.00 $ 0.70 $ 6,957.30 Item Code Item No.Unit Price Robert A. Bothman Construction Extension Gordon N. Ball, Inc. Los Gatos Creek Trail to Highway 9 Trailhead Connector Project BID SUMMARY Unit Unit PriceEstimated Quantity Extension Unit Price Extension Unit Price Extension Unit Price ExtensionItem Description A & B Construction Granite Construction Company Ghilotti Construction Company, Inc. ATTACHMENT 1 Item Code Item No.Unit Price Robert A. Bothman Construction Extension Gordon N. Ball, Inc. Los Gatos Creek Trail to Highway 9 Trailhead Connector Project BID SUMMARY Unit Unit PriceEstimated Quantity Extension Unit Price Extension Unit Price Extension Unit Price ExtensionItem Description A & B Construction Granite Construction Company Ghilotti Construction Company, Inc. 30 210610 Compost (CY)CY 17 $ 300.00 $ 5,100.00 $ 491.00 $ 8,347.00 $ 220.00 $ 3,740.00 $ 550.00 $ 9,350.00 $ 270.00 $ 4,590.00 31 260203 Class 2 Aggregate Base (CY)CY 243 $ 280.00 $ 68,040.00 $ 240.00 $ 58,320.00 $ 380.00 $ 92,340.00 $ 250.00 $ 60,750.00 $ 54.00 $ 13,122.00 32 390132 Hot Mix Asphalt (Type A)TON 50 $ 600.00 $ 30,000.00 $ 400.00 $ 20,000.00 $ 625.00 $ 31,250.00 $ 500.00 $ 25,000.00 $ 551.00 $ 27,550.00 33 394073 Place Hot Mix Asphalt Dike (Type A)LF 5 $ 40.00 $ 200.00 $ 150.00 $ 750.00 $ 680.00 $ 3,400.00 $ 10.00 $ 50.00 $ 1,015.00 $ 5,075.00 34F 510053 Structural Concrete, Bridge CY 27 $ 1,600.00 $ 43,200.00 $ 1,800.00 $ 48,600.00 $ 6,000.00 $ 162,000.00 $ 3,000.00 $ 81,000.00 $ 2,400.00 $ 64,800.00 35F 510054 Structural Concrete, Bridge (Polymer Fiber)CY 17 $ 1,500.00 $ 25,500.00 $ 1,075.00 $ 18,275.00 $ 1,800.00 $ 30,600.00 $ 2,000.00 $ 34,000.00 $ 1,165.00 $ 19,805.00 36F 510060 Structural Concrete, Retaining Wall CY 1136 $ 850.00 $ 965,600.00 $ 1,440.00 $ 1,635,840.00 $ 1,400.00 $ 1,590,400.00 $ 1,575.00 $ 1,789,200.00 $ 1,190.00 $ 1,351,840.00 37F 510094 Structural Concrete, Drainage Inlet CY 2 $ 4,000.00 $ 8,000.00 $ 1,500.00 $ 3,000.00 $ 8,000.00 $ 16,000.00 $ 4,000.00 $ 8,000.00 $ 666.00 $ 1,332.00 38F 510502 Minor Concrete (Minor Structure)CY 8 $ 800.00 $ 6,400.00 $ 4,500.00 $ 36,000.00 $ 5,200.00 $ 41,600.00 $ 5,000.00 $ 40,000.00 $ 4,250.00 $ 34,000.00 39F 511055 Concrete Surface Texture SF 4554 $ 25.00 $ 113,850.00 $ 22.00 $ 100,188.00 $ 65.00 $ 296,010.00 $ 22.00 $ 100,188.00 $ 15.15 $ 68,993.10 40F 520102 Bar Reinforcing Steel (Bridge) LB 5689 $ 1.75 $ 9,955.75 $ 5.50 $ 31,289.50 $ 5.22 $ 29,696.58 $ 7.00 $ 39,823.00 $ 5.75 $ 32,711.75 41F 520103 Bar Reinforcing Steel (Retaining Wall)LB 92337 $ 1.75 $ 161,589.75 $ 2.00 $ 184,674.00 $ 1.71 $ 157,896.27 $ 2.00 $ 184,674.00 $ 1.85 $ 170,823.45 42 550203A Furnish Prefabricated Bridge LS 1 $ 442,000.00 $ 442,000.00 $ 200,000.00 $ 200,000.00 $ 272,000.00 $ 272,000.00 $ 225,000.00 $ 225,000.00 $ 835,000.00 $ 835,000.00 43 550204A Install Prefabricated Bridge LS 1 $ 46,000.00 $ 46,000.00 $ 50,000.00 $ 50,000.00 $ 144,000.00 $ 144,000.00 $ 80,000.00 $ 80,000.00 $ 65,000.00 $ 65,000.00 44 600029 Remove Asphalt Concrete Surfacing SF 30 $ 40.00 $ 1,200.00 $ 45.00 $ 1,350.00 $ 240.00 $ 7,200.00 $ 30.00 $ 900.00 $ 7.00 $ 210.00 45 600093A Remove Tree EA 36 $ - $ - $ 1,750.00 $ 63,000.00 $ 615.00 $ 22,140.00 $ 2,500.00 $ 90,000.00 $ 817.00 $ 29,412.00 46 610108 18" Alternative Pipe Culvert LF 89 $ 800.00 $ 71,200.00 $ 225.00 $ 20,025.00 $ 150.00 $ 13,350.00 $ 300.00 $ 26,700.00 $ 420.00 $ 37,380.00 47 665007 10" Corrugated Metal Pipe LF 3 $ 3,259.62 $ 9,778.86 $ 300.00 $ 900.00 $ 2,500.00 $ 7,500.00 $ 600.00 $ 1,800.00 $ 2,200.00 $ 6,600.00 48 680287 3" Slotted Plastic Pipe Underdrain LF 240 $ 110.00 $ 26,400.00 $ 30.00 $ 7,200.00 $ 65.00 $ 15,600.00 $ 50.00 $ 12,000.00 $ 55.00 $ 13,200.00 49 680405 8" Perforated Steel Pipe Underdrain (.064" Thick)LF 322 $ 330.00 $ 106,260.00 $ 70.00 $ 22,540.00 $ 75.00 $ 24,150.00 $ 60.00 $ 19,320.00 $ 115.00 $ 37,030.00 50 680604 8" Non-Perforated Steel Pipe Underdrain LF 27 $ 460.00 $ 12,420.00 $ 35.00 $ 945.00 $ 75.00 $ 2,025.00 $ 100.00 $ 2,700.00 $ 210.00 $ 5,670.00 51 681132 Geocomposite Drain SQFT 1099 $ 8.00 $ 8,792.00 $ 5.00 $ 5,495.00 $ 8.00 $ 8,792.00 $ 1.00 $ 1,099.00 $ 5.50 $ 6,044.50 52 705311 18" Alternative Flared End Section EA 2 $ 3,600.00 $ 7,200.00 $ 3,000.00 $ 6,000.00 $ 400.00 $ 800.00 $ 1,000.00 $ 2,000.00 $ 2,600.00 $ 5,200.00 53 709522 Drainage Inlet Depression EA 1 $ 600.00 $ 600.00 $ 3,000.00 $ 3,000.00 $ 2,150.00 $ 2,150.00 $ 1,000.00 $ 1,000.00 $ 6,500.00 $ 6,500.00 54 710136 Remove 12" CMP Drainage Pipe (LF)LF 44 $ 45.68 $ 2,009.92 $ 60.00 $ 2,640.00 $ 70.00 $ 3,080.00 $ 25.00 $ 1,100.00 $ 150.00 $ 6,600.00 55 710152 Remove Headwall EA 2 $ 700.00 $ 1,400.00 $ 1,000.00 $ 2,000.00 $ 3,000.00 $ 6,000.00 $ 2,000.00 $ 4,000.00 $ 2,000.00 $ 4,000.00 56 710196 Adjust Drainage Inlet EA 1 $ 2,200.00 $ 2,200.00 $ 6,000.00 $ 6,000.00 $ 2,500.00 $ 2,500.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 57 723080 Rock Slope Protection (60 lb, Class II, Method B) (CY) CY 6 $ 550.00 $ 3,300.00 $ 400.00 $ 2,400.00 $ 1,200.00 $ 7,200.00 $ 500.00 $ 3,000.00 $ 550.00 $ 3,300.00 58 729011 Rock Slope Protection Fabric (Class 8) SQYD 8 $ 225.00 $ 1,800.00 $ 25.00 $ 200.00 $ 15.00 $ 120.00 $ 2.00 $ 16.00 $ 100.00 $ 800.00 59 730020 Minor Concrete (Curb)(CY)CY 11 $ 2,100.00 $ 23,100.00 $ 750.00 $ 8,250.00 $ 1,000.00 $ 11,000.00 $ 5,000.00 $ 55,000.00 $ 2,050.00 $ 22,550.00 Item Code Item No.Unit Price Robert A. Bothman Construction Extension Gordon N. Ball, Inc. Los Gatos Creek Trail to Highway 9 Trailhead Connector Project BID SUMMARY Unit Unit PriceEstimated Quantity Extension Unit Price Extension Unit Price Extension Unit Price ExtensionItem Description A & B Construction Granite Construction Company Ghilotti Construction Company, Inc. 60 731511A Minor Concrete (Cobblestone Paving)CY 3 $ 4,400.00 $ 13,200.00 $ 4,500.00 $ 13,500.00 $ 5,500.00 $ 16,500.00 $ 5,000.00 $ 15,000.00 $ 6,400.00 $ 19,200.00 61 731516A Minor Concrete (Bike Ramp)CY 2 $ 3,000.00 $ 6,000.00 $ 750.00 $ 1,500.00 $ 7,500.00 $ 15,000.00 $ 1,500.00 $ 3,000.00 $ 15,000.00 $ 30,000.00 62 731521 Minor Concrete (Sidewalk) CY 31 $ 1,500.00 $ 46,500.00 $ 1,000.00 $ 31,000.00 $ 1,000.00 $ 31,000.00 $ 900.00 $ 27,900.00 $ 1,600.00 $ 49,600.00 63 731521A Minor Concrete (Pathway)CY 140 $ 1,000.00 $ 140,000.00 $ 1,400.00 $ 196,000.00 $ 1,000.00 $ 140,000.00 $ 1,500.00 $ 210,000.00 $ 520.00 $ 72,800.00 64 731780 Remove Concrete Sidewalk (SQYD)SY 94 $ 110.00 $ 10,340.00 $ 100.00 $ 9,400.00 $ 95.00 $ 8,930.00 $ 40.00 $ 3,760.00 $ 60.00 $ 5,640.00 65F 750001 Miscellaneous Iron and Steel LB 326 $ 30.00 $ 9,780.00 $ 5.00 $ 1,630.00 $ 10.00 $ 3,260.00 $ 2.00 $ 652.00 $ 6.00 $ 1,956.00 66F 750501 Miscellaneous Metal (Bridge)LB 442 $ 12.00 $ 5,304.00 $ 22.00 $ 9,724.00 $ 5.00 $ 2,210.00 $ 20.00 $ 8,840.00 $ 6.00 $ 2,652.00 67 780440 Prepare and Stain Concrete SQFT 5407 $ 50.00 $ 270,350.00 $ 31.50 $ 170,320.50 $ 35.00 $ 189,245.00 $ 30.00 $ 162,210.00 $ 40.00 $ 216,280.00 68F 780460 Anti-Graffiti Coating SQFT 4964 $ 14.00 $ 69,496.00 $ 17.00 $ 84,388.00 $ 5.20 $ 25,812.80 $ 7.00 $ 34,748.00 $ 3.00 $ 14,892.00 69 800320A Chain Link Fence - Black Vinyl Clad (Type CL-4)LF 509 $ 108.00 $ 54,972.00 $ 90.00 $ 45,810.00 $ 65.00 $ 33,085.00 $ 90.00 $ 45,810.00 $ 100.00 $ 50,900.00 70 800360A Chain Link Fence - Black Vinyl Clad (Type CL-6)LF 172 $ 145.00 $ 24,940.00 $ 109.00 $ 18,748.00 $ 71.25 $ 12,255.00 $ 110.00 $ 18,920.00 $ 120.00 $ 20,640.00 71 800360B Chain Link Fence - Standard (Type CL-6)LF 410 $ 81.00 $ 33,210.00 $ 63.30 $ 25,953.00 $ 60.00 $ 24,600.00 $ 65.00 $ 26,650.00 $ 69.00 $ 28,290.00 72 803020 Remove Fence LF 691 $ 8.00 $ 5,528.00 $ 6.00 $ 4,146.00 $ 30.00 $ 20,730.00 $ 10.00 $ 6,910.00 $ 8.00 $ 5,528.00 73 803060A Remove Bollard EA 2 $ 200.00 $ 400.00 $ 200.00 $ 400.00 $ 650.00 $ 1,300.00 $ 500.00 $ 1,000.00 $ 450.00 $ 900.00 74 800103 Temporary Fence (Type CL-6)LS 1 $ 13,000.00 $ 13,000.00 $ 2,500.00 $ 2,500.00 $ 38,000.00 $ 38,000.00 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 75 800103A Temporary Tree Protection Fence LS 1 $ 15,000.00 $ 15,000.00 $ 7,700.00 $ 7,700.00 $ 22,000.00 $ 22,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 76 820250 Remove Roadside Sign EA 1 $ 520.00 $ 520.00 $ 300.00 $ 300.00 $ 125.00 $ 125.00 $ 500.00 $ 500.00 $ 325.00 $ 325.00 77 820630 Relocate Roadside Sign (Wood Post)EA 1 $ 520.00 $ 520.00 $ 600.00 $ 600.00 $ 275.00 $ 275.00 $ 600.00 $ 600.00 $ 650.00 $ 650.00 78 820840 Roadside Sign - One Post EA 19 $ 1,250.00 $ 23,750.00 $ 650.00 $ 12,350.00 $ 595.00 $ 11,305.00 $ 650.00 $ 12,350.00 $ 705.00 $ 13,395.00 79F 833020 Chain Link Railing (Mod)LF 287 $ 120.00 $ 34,440.00 $ 90.00 $ 25,830.00 $ 75.00 $ 21,525.00 $ 90.00 $ 25,830.00 $ 100.00 $ 28,700.00 80F 833085 Pipe Handrailing LF 570 $ 675.00 $ 384,750.00 $ 521.00 $ 296,970.00 $ 188.00 $ 107,160.00 $ 520.00 $ 296,400.00 $ 515.00 $ 293,550.00 81F 833085A Pipe Handrailing (Chain Link Railing Mounted)LF 135 $ 265.00 $ 35,775.00 $ 207.00 $ 27,945.00 $ 180.00 $ 24,300.00 $ 210.00 $ 28,350.00 $ 205.00 $ 27,675.00 82F 833085B Pipe Handrailing (Side Wall Mounted)LF 199 $ 285.00 $ 56,715.00 $ 221.00 $ 43,979.00 $ 280.00 $ 55,720.00 $ 220.00 $ 43,780.00 $ 225.00 $ 44,775.00 83F 833085C Pipe Handrailing (Top Wall Mounted)LF 132 $ 415.00 $ 54,780.00 $ 321.00 $ 42,372.00 $ 270.00 $ 35,640.00 $ 320.00 $ 42,240.00 $ 320.00 $ 42,240.00 84F 833085D Pipe Handrailing (Pedestrian Guardrail Mounted)LF 414 $ 410.00 $ 169,740.00 $ 319.00 $ 132,066.00 $ 140.00 $ 57,960.00 $ 320.00 $ 132,480.00 $ 325.00 $ 134,550.00 85F 833085E Pipe Handrailing (Curb Mounted)LF 78 $ 420.00 $ 32,760.00 $ 323.00 $ 25,194.00 $ 345.00 $ 26,910.00 $ 325.00 $ 25,350.00 $ 340.00 $ 26,520.00 86F 833088A Pedestrian Guardrail LF 407 $ 760.00 $ 309,320.00 $ 589.00 $ 239,723.00 $ 415.00 $ 168,905.00 $ 580.00 $ 236,060.00 $ 635.00 $ 258,445.00 Item Code Item No.Unit Price Robert A. Bothman Construction Extension Gordon N. Ball, Inc. Los Gatos Creek Trail to Highway 9 Trailhead Connector Project BID SUMMARY Unit Unit PriceEstimated Quantity Extension Unit Price Extension Unit Price Extension Unit Price ExtensionItem Description A & B Construction Granite Construction Company Ghilotti Construction Company, Inc. 87 840501A 4" Thermoplastic Traffic Stripe LF 592 $ 16.00 $ 9,472.00 $ 3.00 $ 1,776.00 $ 3.00 $ 1,776.00 $ 3.00 $ 1,776.00 $ 5.50 $ 3,256.00 88 840505 6" Thermoplastic Traffic Stripe LF 33 $ 160.00 $ 5,280.00 $ 6.00 $ 198.00 $ 6.00 $ 198.00 $ 6.00 $ 198.00 $ 6.50 $ 214.50 89 840515 Thermoplastic Pavement Marking SQFT 395 $ 50.00 $ 19,750.00 $ 13.00 $ 5,135.00 $ 13.00 $ 5,135.00 $ 13.00 $ 5,135.00 $ 23.00 $ 9,085.00 90 840501B 4" Thermoplastic Traffic Stripe (Broken)LF 599 $ 14.00 $ 8,386.00 $ 4.00 $ 2,396.00 $ 4.00 $ 2,396.00 $ 4.00 $ 2,396.00 $ 6.50 $ 3,893.50 91 870200A Relocate Lighting Standard LS 1 $ 42,000.00 $ 42,000.00 $ 29,600.00 $ 29,600.00 $ 29,600.00 $ 29,600.00 $ 28,000.00 $ 28,000.00 $ 33,000.00 $ 33,000.00 92 204035A Allocated Tree Replacement Cost LS 1 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 3,500.00 $ 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 93 999990 Mobilization LS 1 $ 586,888.14 $ 586,888.14 $ 650,500.00 $ 650,500.00 $ 582,000.00 $ 582,000.00 $ 675,000.00 $ 675,000.00 $ 551,000.00 $ 551,000.00 TOTAL BID $ 6,869,055.70 $ 5,829,281.42 $ 6,529,395.78 $ 6,635,782.95 $ 6,760,897.80