Loading...
Exhibit B - ActiveWayz 2nd Amendment ScopeACTIVEWAYZ ENGINEERING Shannon Road Pedestrian and Bikeway Improvement Project, Los Gatos, CA WORK SCOPE 03/08/2023 TASK 1: Bid Support ActiveWayz Engineering will perform the following tasks: •Provide clarifications and assistance during the bidding phase to satisfactorily answer any questions from prospective bidders, if requested by Town. Town to reproduce and distribute Contract Documents, maintain a plan holder’s list and log of bidder’s questions and responses. •Attend Pre-Bid Meeting and Council meeting for construction award. Attend up to three (3) additional coordination meetings. •Prepare up to two Addenda to Construction Documents, if needed. Town to reproduce and distribute all addenda. •If addenda are issued, prepare a conformed set of documents that incorporated addenda into the documents. •Assist Town in evaluating bids. Deliverables: 1.Written clarifications and response to questions from prospective bidders, if needed 2.Addenda to the Bid Documents, if needed. 3.Conformed construction documents, if needed. TASK 2: Construction Support The Town’s construction management team will have primary responsibility for construction management and inspection. Upon request by Town, ActiveWayz will perform the following tasks: •Attend Pre-Construction Meeting and respond to pre- construction meeting questions. •Review and approve shop drawings and submittals. •Review Contractor’s request for information (RFI’s) and furnish additional drawings and/or specifications for supplementing, clarifying, and/or correcting purposes. •Attend up to three (3) meetings and site visits when necessary as determined and requested by Town. •Attend punch-list walk through meeting. •Assist Town with the review of construction, and other activities, as requested. •Prepare, review, and recommend approval of up to two (2) design related change orders, as requested. EXHIBIT B, Page 1 of 3 Deliverables: 1.Shop drawing and submittal comments. 2.RFI responses. 3.Site visit memoranda, as required. 4.Drawings and specifications for supplementing, clarifying, and/or correcting the contract documents and for design related change orders. 5.Change orders, as required. TASK 3: Record Drawings ActiveWayz will perform the following tasks: •At Final Completion of the Project, provide Town with one set of reproducible Record Drawing that reflects the changes to the work during construction based upon marked up prints, drawings, and other data furnished by the Contractor, Town, and Consultants. •Provide a complete set of the Record Drawings and all X-ref files “bound,” including other associated fonts, plot style files on AutoCAD, including electronic copies in PDF format. Deliverables: 1.Record Drawings using AutoCAD, and one set electronic copy in PDF format. Page 2 of 3 ActiveWayz Engineering Fee Estimate 3/8/2023 Project ManagerDesign EngineerEngineering TechnicianTotalProject ManagerDesign EngineerEngineering Technician$220 $136 $109 Tasks $220 $136 $109 1. Bid Support 21 6 14 41 $4,620 $816 $1,526 $6,962 Sub-Task Pre-bid Meeting 2 ——2 $440 ——$440 Council Meeting 3 ——3 $660 ——$660 Coordination Meetings (3 tot)6 ——6 $1,320 ——$1,320 Prepare Addenda (2 tot)2 4 8 14 $440 $544 $872 $1,856 Prepare Conformed Set 2 2 6 10 $440 $272 $654 $1,366 Evaluate Bids 6 ——6 $1,320 ——$1,320 2. Construction Support 38 36 12 86 $8,360 $4,896 $1,308 $14,564 Sub-Task Pre-Construction Meeting 2 ——2 $440 ——$440 Coordination Meetings (3 tot)6 ——6 $1,320 ——$1,320 Review Shop Drawings and Submittals 16 16 —32 $3,520 $2,176 —$5,696 Respond to RFIs 4 8 —12 $880 $1,088 —$1,968 Prepare Change Order (2 tot)6 12 12 30 $1,320 $1,632 $1,308 $4,260 Punch-list Walkthrough 4 ——4 $880 ——$880 3. Record Drawings 4 8 16 28 $880 $1,088 $1,744 $3,712 Sub-Task Prepare Record Drawings 4 8 16 28 $880 $1,088 $1,744 $3,712 Total 63 50 42 155 $13,860 $6,800 $4,578 $25,238 ActiveWayz Engineering Hours SubtotalFeePage 3 of 3 ActiveWayz_Fee - Shannon Road Construction Support.xlsx