Attachment 1 Phase 1 Concept PlanBLOSSOM HILL ROADCAMELLIATERRACE
BLOSSOM HILL ROAD
BLOSSOM
H
I
L
L
R
O
A
D
CONCEPTUAL PLAN
AUGUST 2022
NOT FOR CONSTRUCTION
TOWN OF LOS GATOS DRAWING NO.SCALE
CONTRACT NO.
DESIGNEDDRAWN
DATECHECKED
PREPARED BY:
HEXAGON TRANSPORTATION
CONSULTANTS, INC.
100 Century Center Court, Suite 501San Jose, California 95112Ph: (408) 971-6100 www.hextrans.com
BLOSSOM HILL ROAD SAFETY IMPROVEMENTS
CONCEPTUAL PLAN .
QUICK-BUILD ALTERNATIVECHERRYBLOSSOMLANECHERRYBLOSSOMLANECHERRYSTONEDRIVEHILLBROOKDRIVE MATCH LINE A-A SEE BELOWMATCH LINE B-B SEE BELOWMATCH LINE A-A SEE ABOVEMATCH LINE B-B SEE ABOVEAttachment 1