2023-012 - Continuing Certain Fees, Rates, and Charges, and Amending Certain Fees, Rates, and Charges for FY 2023-2024RESOLUTION 2023-012
RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS
CONTINUING DEPARTMENT FEES, RATES, AND CHARGES, AND
AMENDING CERTAIN FEES, RATES, AND CHARGES FOR FY 2023/24
WHEREAS, The Town of Los Gatos follows best municipal financial practices that require
the Town to establish and maintain all user charges and fees based on the cost of providing
services; and
WHEREAS, the last update of the Town of Los Gatos Comprehensive Fee Schedule was
adopted on December 6, 2022; and
WHEREAS, those fees currently in effect will remain in effect without interruption, certain
of these shall be increased, and certain new services shall have fees.
NOW, THEREFORE, THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES HEREBY
RESOLVE:
1. That Resolution 2022-075, "Resolution of the Town Council of the Town of Los Gatos
Continuing Department Fees, Rates, and Charges, and Amending Certain Fees, Rates,
and Charges for FY 2022/23" is hereby rescinded; and
2. The Town of Los Gatos Comprehensive Fee Schedule, attached hereto as Exhibit A, is
adopted and shall become effective July 1, 2023.
1 of 2
Resolution 2023-012 March 21, 2023
PASSED AND ADOPTED at a regular meeting of the Town Council held on the 21sY day of
March 2023 by the following vote:
COUNCIL MEMBERS:
AYES: Mary Badame, Matthew Eludes, Rob Moore, Rob Rennie, Mayor Maria Ristow
NAYS: None
ABSENT: None
ABSTAIN: None
SIGNED: hi.
Y'F
ATTEST:
TOWN CLERK OF i-HETOWN OF LOS GATOS
LOS GATQS; CALIFORNIA :
DATE: ,+,�j:
2of2
Resolution 2023-012
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: 3-1'9•3
March 21, 2023
TOWN OF LOS GAT 0 S
CALIFORNIA
COMPREHENSIVE FEE
SCHEDULE [REDLINEOJ
FISCAL YEAR 2023/24
COVER PHOTOS: NANCY BARRERRA, IEFF JANOFF, JULIAN, KARLAK, AND HUNTER
TOWN OF LOS GATOS FEE SCHEDULE
The following Fee Schedule is effective July 1, 2023 through June 30, 2024, unless updated by
the Town Council. The Fee Schedule will be adjusted annually by the average Consumer Price
Index (Bureau of Labor Statistics, U.S. Department of Labor for the San Francisco/Oakland/San
Jose Metropolitan Statistical Area) for the calendar year and/or by the percentage increase in
actual operating costs for the current year — whichever is greater. The average increase in the
CPI for 2019, 2020, and 2021, was 3.2%, 1.7%, and 3.4% respectively, for a cumulative cost of
living increase of 8.5% since 2019. For Fiscal Year 2022-2023, fees were adjusted by 5.9% CPI,
which is halfway between the 3.2% and 8.5%. In 2022, the average increase in the CPI was
5.6%, for a cumulative cost of living increase of 14.6% since 2019. For FY 2023-2024, the fees
are adjusted by 8.8% CPI to capture full CPI increases since 2019. This Fee Schedule also
provides for minimum annual adjustments for those fees that are directly related to personnel
costs. Other adjustments may be made to maintain consistency with the surrounding
municipalities within the Town of Los Gatos region but in no case are fees charged in excess of
service delivery costs.
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule
TABLE OF CONTENTS
Administrative Services 1
Attorney Services 4
General Development Fees 5
Development Services
Building Division Fees 7
Building Permit Fees 7
Electrical Permit Fees 10
Mechanical Permit Fees 12
Plumbing Permit Fees 13
Other Fees 14
Planning Division Fees 15
Zoning Approvals 16
Subdivisions 19
Miscellaneous Application Fees 20
Environmental Assessment Fees 20
Other Fees 22
Engineering Division Fees 23
Library Services 28
Parks and Public Works Services
Parks Division Fees 29
Oak Meadow Park Fees 29
Creekside Sports Park Fees 30
Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor Park Fees 30
Town Plaza Use Permit 31
Turf Maintenance Fee 31
Tree Related Fees 32
Equipment Hourly Rates 32
Street Division Fees 33
Police Services 34
Parking Permit Fees 35
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule
ADMINISTRATIVE SERVICES
Civic Center-1v, Facilities Use
Town approved non-profit fundraising activities are allowed in/on Civic Center facilities
with an appropriate permit, or license issued by the Town, or provided in an agreement or
Conditional Use Permit with the Town. Private events are not allowed, including in the Council
Chambers, with the exception of approved events hosted by the tenants of 106 and 108 East
Main Street as stated in tenant lease agreements. Large scale special events may be required to
provide a deposit prior to the event. The available Town facilities at the Civic Center are listed
below:
• Civic Center Lawn, Deck and Stairs
• Civic Center West Patio
• Council Chambers
• Council Chambers Lobby (as a stand-alone facility)
• Civic Facilities Conference and Meeting Rooms
Fee for Town Hall Facilities Use
2 Building Attendant
Copy and Printing Charges
MEI
9
10
11
13
Copy of Town Code
8 1/2 x 11 and 8 1/2 x 14
Oversized or Large Productions
Annual Subscription for Town Code Supplements
Copying of Zoning Ordinance
Annual Subscription for Zoning Ordinance
Supplements
Certification of Town Records
Annual Financial Report
Annual Budget
Capital Improvement Plan
Special Events
15
16
Special Event Application Fee, For -Profit
Special Event Application Fee, Not -For Profit
Special Event Road Closure Review Fee
Non Profit: $0.00 per hour
For Profit: $55.00 • er hour
$20.00 per hour
Actual Cost
$.25 per page
$.35 per page
Actual Cost
Actual Cost
Actual Cost
Actual Cost
$2.00
Actual Cost
Actual Cost
Actual Cost
New Event $910.00
Repeat Event $680.00
New Event $227.00
Repeat Event $170.00
$225.00
Town of Los Gatos FY 2023-2024 Compr,. ensive Fee Schedule 1
ecial Events continued
1111
ADMINISTRATIVE SERVICES
Special Event N. Santa Cruz Avenue Road Closure Fee
Block Party Permit
Temporary Encroachment Permit
Police Officer
Parks and Public Works Maintenance Worker
Special Event Road Clos..re
Anti -Vehicle Barrier,
Temporary No Parkin: Sins
Temporary Alcohol Restricted Si : ns
Temporary Banner Permit
Use of the Civic Center lawn, deck and stairs for
approved special events coordinated by a
o : anization special events
Use of Town Plaza Park for approved
Facility Deposit
Business License
Business License Processing Fee - New
Business License Processing Fee - Renewal
Other Services
20
Compact Disk or Tape of Council and Planning
Commission Meetings (plus actual mailing costs, if
applicable)
Copy - Digital
Initial Returned Check Fee
Subsequent Retum Check Fees [CA Civil Code Section
1719(a) (1)1
Election Filing Fee
Town Credit Card Processing Fee
lThird Party Vendor Business License Electronic
Payment Processing Fees
Third Party Vendor Parking Citations and Permits
Electronic Payment Processing Fee
Actual Cost
$55.00
$173.00
$166.21 per hour
$117.96 per hour
Actual Cost
$1.00
$1O)
$105.00
$55 per hour
$55 per hour
$500
Out of Town $20.00
In Town $40.00
Out of Town and In Town $30.00
$20.00 per DVD for meetings under 2
hours
$30.00 per DVD for meetings over 3
hours
$10 per device
$25.00
$35.00
$25.00
2.40%
Credit and Debit Card Processing
2.9% of transaction amout, minimum
of $2.00
ACH/eCheck $1.25 per transaction
Retumed Payments/NSF $25.00
$3.95
•wn of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 2
Other Services
■
ADMINISTRATIVE SERVICES
Request for Service Not Covered by any Other Fee
Initiative/Referendum Petition Filings Fee
Fully allocated hourly rates for all
personnel
$200.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 3
ATTORNEY SERVICES
Conditions, Covenants & Restrictions (CC&R) Review
and Approval
Simple Covenant/Deed Restriction
Subdivision Improvement Agreements
Encroachment Agreements
Miscellaneous (Legal Agreements, Real Property, etc.)
Fully allocated hourly rates for all
personnel
Fully allocated hourly rates for all
personnel
Fully allocated hourly rates for all
personnel
Fully allocated hourly rates for all
personnel
Fully allocated hourly rates for all
personnel
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 4
General Develo ment Fees
2
5
8
DEVELOPMENT SERVICES
Reproduction (sent out) plus actual mailing costs, as
applicable. Maps, plans, etc. (larger than 11" x 17")
Data Duplication service and fee for partial or full
copies of each digital standard Town data file on one-
time request basis. 8 1/2" x 11" copy, standard
Document Storage Fee - Laserfiche
Duplicate Plans Set
Research Records Charge for Staff Research beyond
30 minutes
Address Processing Fee - per address
Computer Surcharge on all
Building/PI umbi ng/Mecha ni ca I/Electrica I/Grading/En
croachment/Planning Permits/Applications and any
other Permits/ Applications except Park
Permit/Applications
Actual Cost - sent to San Jose
Blueprint
$.25 per page
Actual Cost
$154.00/hr. (1/2 hr. minimum)
Fully allocated hourly rate for all
personnel
$1-69AA0-$184.00
4% of development application fee
Engineering Development Review Service Fee -
Building Permit and Building Plan Check*
Request for Service Not Covered by Any Other Fee
Pre -application Conference Fee
Applications for Work Unlawfully Completed
BMP Document Processing Fee
Public Art In -Lieu Fee
1% of building permit valuation
*These fees are applied to
permits or plan checks that require engineering services.
10
12
Re orts A endas and Minutes
14
16
18
20
22
Development Review Committee Agendas
Planning Commission Agendas
Planning Commission Minutes
Plan Copies - microfiche or other reprints sent to an
outside firm
Plan Copies - blueprint reproduction in house
j Copy of Subdivision Ordinance
General Plan (including maps)
Hillside Specific Plan
Hillside Development Standards and Design
Guidelines
5% of permit or plan check
Actual Cost
Courtesy meeting
Double current application fee
$609Q $663.00
$37.00
$25.00
Actual Cost
$31.00 plus costs
$3.00 per page
$26.00
$26.00
$5.80
$19.45
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 5
DEVELOPMENT SERVICES
Re sorts A:endas and Minutes continued
30
Commercial Design Guidelines
Subdivision Ordinance Black & White
General Plan/Zoning Maps (24" x 36") -
General Plan/Zoning Maps (24" x 36") - Color
Blossom Hill Open Space Study
Commercial Specific Plan Report
Residential Design Guidelines Housing Element Technical Appendix
2015-2023 Housing Element
Los Gatos Boulevard Plan (adopted June 2015)
North Forty Specific Plan
Landsca e
Final occupancy clearance (new construction or remodel)
Park Staff Time Spent for Major Development
Applications
$20.50
$26.00
$9.00
$42.00
$14.00
$12.00
$21.50
$24.75
$39.00
$9.50
$45.25
$543.00*
Basis:
Development Review Committee Meetings —1.5 hrs. (estimate)
Site Visits — 4.0 hrs. (estimate)
Review Plan — 4.0 hrs. (estimate)
*Time *pent over and above the initial application fee will be billed at the current
Note: sP
employee billing rate plus equipment hourly rate.
Annexation Fees
1 Lot
2 Lots
3 Lots
4 Lots
1g8;00_$3,469.00
$ sgq:0*—$1,734.00
$1*—$1,158.00
$80000*- $870.00
$63&1 $691.00
5 Lot or more map) - $1,000.00 to $2,200.00
*Annexation Advertising Deposit (varies as to size of
inin deposit will be refunded to the applicant and amounts exceeding the deposit
Any Tema 9 amount will be paid by applicant
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 6
DEVELOPMENT SERVICES
Seismic Hazards Mapping Program Fee (SMIP)
For residential construction of three stories and Tess (Category 1), the permit fee is $13.00 per
$100,000. For all other construction (Category 2), the permit fee is $28.00 per $100,000. This
fee is required by the State of California to identify and map zones of particular seismic hazards.
Five percent of the fee is retained by the Town to be used solely for earthquake preparedness.
Capital Improvement Tax (Construction)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area
of an existing building.
Underground Utility Tax (Utilities)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area
of existing building.
Park Fund Tax (Parks)
Based on $0.04 for each square foot of building addition or alteration, which increases floor
area of an existing building.
Building Division
Building Permit Fees
40
41
42
Fee for issuing/reinstating a Building Permit
Additional Building Permit Fee
Demolition Permit
$68:00-$63.00
$32.00 $35.00
Residential: c20$306.00
Commercial: '4�0$535.00
Building Permit Fees for New Construction and Addition
The fee for each building permit shall be based upon the 1997 Uniform Building Code as
amended by the 2010 California Building Code.
A building valuation regional modifier of 2.32 shall be used in conjunction with the Building
Valuation Data provided in the publication, Building Valuation Data, published by the
International Code Council — February 2012. Hillside Homes shall use a modifier of 3.246 and
Commercial Office Tenant Improvements shall use a modifier of 1.16. The Building Valuation
Data will be increased yearly by the Engineering News Record (ENR) Annual Building Cost Index
(BC!) for every year thereafter.
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 7
DEVELOPMENT SERVICES
Buildin Permit Fees for New Construction and Addition
43
44
Total Valuation
$1.00 to $500.00
$501.00 to $2,000.00
$2,001.00 to $25,Q00.00
$25,001.00 to $50,000.00
$50,001.00 to $100,000.00
$100,001.00 to $500,000.00
449 $500,001.00 to $1,000,000.00
50
$1,000,001.00 and over
$354;0 $38.00
$ $38.00 for the first $500.00
plus $4 53-$4.93 for each additional
$100.00 or fraction thereof, to and
including $2,000.00
SIggA9-$112.00 for the first
$2,000.00 plus c'�$22.65 for
each additional $1,000.00 or fraction
thereof, to and including $25,000.00
S-582,00. $633.00 for the first
$25,000.00 plus 2-$16.34 for
each additional $1,000.00 or fraction
thereof, to and including $50,000.00
cow $1,041.00 for the first
$50,000.00 plus $40:41-$11.33 for
each additional $1,000.00 or fraction
thereof, to and including $100,000.00
$174749Q-$1,608.00 for the first
$100,000.00 plus $8:32 $9.05 for
each additional $1,000.00 or fraction
thereof, to and including $500,000.00
$408;g9-$5,231.00 for the first
$500,000.00 plus $7:06-$7.68 for
each additional $1,000.00 or fraction
thereof, to and including
$1,000,000.00
}4)-$9,073.00 for the first
$1,000,000.00 plus $468-$5.09 for
each additional $1,000.00 or fraction
thereof
an of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 8
DEVELOPMENT SERVICES
Building Permit Fees for Remodels, Alterations, and Repairs
The Building Official shall establish the valuation of said improvements, and fees will be
assessed as per Valuation Schedule above.
Special Services & Inspections
51
52
53
54
55
56
57
58
59
60
Inspection outside normal business hours (4 hr.
minimum)
Re -inspection fees
Inspections for which no fee is specifically indicated
(2 hr. minimum)
Additional plan review required by changes, additions
or revisions to plans (1 hr. minimum)
For use of outside consultants for plan checking
and/or inspections
Services for which no fee is specifically indicated (1/2
hr. minimum)
Permit/Plan check time extension (per permit)
(applies to permits that have not expired)
Express plan review or initial review (1 hr. minimum)
Application for the Appeals Building Board Review
Temporary Certificate of Occupancy
Plan Review Fee
$20-3:00/hI _$221.00/hr.
$1 rn 00/h $184.00/hr.
T r
$16e.ee/44$184.00/hr.
$1-6-1700/-hr--$175.00/hr.
Actual Cost
$169 ens /J_$18400/hr.
T+v
$8$90.00
Wag ee/w _ $184.00/hr.
$289:AA $314.00
$ 6&00 $1,262.00
A plan review fee shall be charged at the time of filing application. This fee is separate from
and shall be in addition to the building permit fee. This fee is calculated at sixty-five percent
(65%) of the building permit fee as per the valuation schedule starting on page 6.
Other Miscellaneous Factors to Determine Construction Valuation
61
62
63
64
65
66
Convert Garage to habitable space
Convert unfinished basement or attic to habitable
Pools/Spas (gunite)
Siding - aluminum/vinyl/wood
Antennas & Towers
Commercial Awning or Canopy
$121.00 $135.00/sq.ft.
$131.00 $146.00/sq.ft.
$80:00-$87.00/sq.ft.
34 00-$37.00/sq.ft.
Const.Value As Applied under
valuation schedule on page 6
Aluminum $34:00-$37.00/sq.ft.
Canvas $25.00 $27.00/sq.ft.
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 9
DEVELOPMENT SERVICES
Other Miscellaneous Factors to Determine Construction Valuation
67
70
Fence or Freestanding Wall (over 6" high)
Decks/Balcony
Wood Deck
Re -roofs
Retaining Walls
S ecial S stems Fees
Emergency generation, wind power, special HVAC
systems, etc.
Photovoltaic - Roof & Ground Mounted - Residential
Photovoltaic - Roof & Ground Mounted - Commercial
Electrical Permit Fees
78
Fee for issuing/reinstating an Electrical Permit
Additional Electrical Permit Fee
New Residential Construction (new buildings only,
including garages)
Commercial Construction
Plan Review & Re -ins ection Fees
continued
Wood or metal s.00-$57.00/sq.ft.
Masonry-$90: $98•00/sq.ft.
$5g;g0-$54.00/sq.ft.
$2 $23.00/sq.ft.
$,,gig $3.26/sq.ft.
c14$123.00/sq.ft.
Plan Review (1 hr. minimum)
$175.00/hr.
Field Inspection (2 hr. minimum)
$$ 9 $184.00/hr.
Plan Review (1/4 hr. minimum)
46 )0-$175.00/hr.
Field Inspection (1 hr. minimum)
s$}€g. OO$184.00/hr.
Plan Review (1 hr. minimum)
$175.00/hr.
Field Inspection (2 hr. minimum)
$$16g:g9-$184.00/hr.
$,r58=00-$63.00
$$2&00 $28.00
s$44 $.12 sq. ft
$,,.gg $.09 sq. ft
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 10
DEVELOPMENT SERVICES
System Fee Schedule
82
83
84
85
86
Private swimming pools
Public swimming pools
Temporary power poles
Temporary distribution system & temporary lighting
Installation of illuminated signs (each)
09-$73.00
$121.00 $132.00
$83:00-$90.00
$40:00-$44.00
$4 00-$116.00
For alterations to existing pools, use Unit Fee Schedule fees listed on page 10.
Unit Fee Schedule
87
88
89
90
91
92
93
94
95
Receptacle, switch and lights
Residential appliances/new circuits (cook top, oven,
range, disposals, clothes dryers, or other motor
operated appliances not exceeding one horsepower)
Nonresidential appliances/new circuits (medical &
dental devices, food, beverage, drinking fountains,
laundry machines, or other similar equipment) NOTE:
for other types of air conditioners and other motor -
driven appliances having larger electrical ratings, see
Generators/Motors
Photovoltaic system (residential)
Solar systems (including controls)
Power apparatus (generators, transformers, A/C, heat
pumps, baking equipment)
Motors
Transformers
Busways/conduits (per 100 ft)
$2.00 $2.18
$6 00-$7.00
$8:00 $9.00
$90.00
$90.00
Up to 10 KV, each $17.00 $18.00
Over 10 KV not over 50 KV, each
$34.00 $37.00
Over 50 KV and not over 100 IN, each
$67.00-$73.00
Over 100 KV, each $89:00 $97.00
Up to 10 hp $17.00 $18.00
Up to 25 hp $34:00 $37.00
Up to 55 hp $67 oO $73.00
Over 55 hp $;0; $106.00
Up to 5 KVA $17.00 $18.00
Up to 10 KVA $34.00.$37.00
Up to 50 KVA $56:00-$61.00
Over 50 KVA $8200 $89.00
$8:00 $9.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 11
DEVELOPMENT SERVICES
Unit Fee Schedule continued
Other Electrical Fees
Duplicate job card
Permit extension (applies to permits that have not
expired)
Mechanical Permit Fees
Fee for issuing/reinstating a Mechanical Permit
Additional Mechanical Permit Fee
New Residential Construction (new buildings only,
including garages)
Commercial Construction
Plan Review & Re -ins ection Fees
Unit Fee Schedule
107
108
109
110
111
113
114
Installation, of each heating system, A/C, boiler,
compressor or air handler
Each duct repair or alteration
Each fireplace appliance
Installation of separate flue or vents not included
with the installation of an appliance
Installation of each hood with mechanical exhaust
Each new or repair of gas piping system
Each additional gas outlet
Installation of evaporative cooler
$26 00-$28.00
$g$90.00
$5&99-$63.00
$.g0-$28.00
$-.- $.12sq. ft
$ 4 $.09 sq. ft
$40,0D $44.00
$ $13.00
$$34.0G $37.00
$-1-244G $13.00
$ $13.00
Residential $.344:0 $37.00
Commercial $,� $132.00
$, 4.0O-$81.00
$24-0 $26.00
$34.0O $37.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 12
DEVELOPMENT SERVICES
Other Mechanical Fees
Duplicate job card
Permit extension (applies to permits that have not
expired)
Flungnit Fees
119
120
Fee for issuing/reinstatin: a Plumbing Permit
Additional Plumbing Permit Fee
New Residential Construction (new buildings only,
including garages)
Commercial Construction
Plan Review & Re -ins ection Fees
S stem Fee Schedule
127
128
129
Private swimming pools (including heater, water
piping, gas piping)
Public swimming pools (including heater, water
piping, gas piping)
Lawn sprinkler system on one meter
Each new or repair of gas piping system
Each drainage, sewer system
Radiant floor heating system
Unit Fee Schedule
$26:00 $28.00
$83:00 $90.00
$5&00 $63.00
$76,00 $28.00
$.12 sq. ft
$:08 $.09 sq. ft
$97A0 $106.00
$446:00 $159.00
$40:00 $44.00
$74:00 $81.00
$40:00 $44.00
$132.00
134
136
138
Each plumbing fixture or trap or set of fixtures on one
trap
Each sewer cleanout, backflow device
Each septic system abatement
Rainwater systems - per drain (inside building)
Each water heater, water softener
Each grease interceptor (750 gallon capacity)
Each grease trap (1-4 fixtures)
Residential water re -piping
$42,00 $13.00
$13.00
$124700 $132.00
$42700 $13.00
$34:00 $37.00
$83:00 $90.00
$47-700 $51.00
$, 4 00 $132.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 13
Unit Fee Schedule continued
140
141
DEVELOPMENT SERVICES
Each ejector/sump pump
Each vacuum breaker/hose bib replacement
Each water piping system repair or rep
Each additional gas outlet
Other Plumbin Fees
Duplicate job card
Permit extension (applies to permits that have not
ex • ired)
Other Buildin Fees
State of California Title 24 Part 2 Ener
Ins action Fees
Asurcharge shall be added to the building permit fee for the cost to plan review and inspect for
fteen
cmpcompliance with State of California Title 24 Regulations. enever aeis plan reviews assessed percent
p applied w
(15%) of the building permit fee. This fee is
State of California Mandated Buildin Standards Fee SB 1473
permits at the rate of four dollars ($4) per one
A surcharge shall be added to all building hundred thousand dollars ($100,000) in valuation, with appropriate fractions thereof, but not
less than one dollar ($1). These funds will be available to the CaliforniaDevelopment, nd the Office ilding d the
f
Commission, the Department of Housing and Communityrvisions of the State Building
State Fire Marshall for expenditure in carrying out the p
Standards Law and provisions of State Housing Law that relate is to
abuilding for code nda d . Up to ten
t
percent (10%) shall be retained for related administrative
education.
$40:00 $44.00
$1-2OG $13.00
$ $27.00
$2 $27.00
$2 00 $28.00
$Q� $90.00
$8241 $35.00
Duplicate Inspection Card NPDES Inspection Fee (Charged on all building
permits with the potential to generate non -point
source storm water runoff during construction)
and Accessibilit Code and Re:ulation Plan Review and
$74.00 $81.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 14
DEVELOPMENT SERVICES
Planning Division
The fees listed below constitute all fees imposed by the Planning Division. Certain types of
applications must be reviewed / processed by other departments/agencies, which may impose
separate fees. Applicants are advised that the fees for those services are not included in the
Planning Department's fees. Where the term "actual cost" is used here, it shall mean:
materials, supplies (including any costs of noticing or publication), outside consultants,
employee cost will be billed at the top step, plus benefits, plus overhead. The following fee
schedule is established for applications filed pursuant to the Town Code. The fees are collected
by the Community Development Department at the time the application is filed unless
otherwise noted.
• Fees for Additional Processing - In the event additional processing services by the Town
are required due to changes, modifications, additions, errors, omissions, or
discrepancies caused by the applicant or his/her agents or representatives, the applicant
shall pay an additional fee as determined by the Director of Community Development to
cover the actual cost.
• Fees for Lack of Progress - If additional information is required by the Town for an
application and the requested information is not submitted within 180 days, the
applicant will be required to pay a fee of 10 percent of the current application fee at the
time the requested information is submitted. Any re -submittal after one year will be
processed as a new application, subject to new fees.
• Fees for Major Projects - If it is anticipated that the application processing costs of
selected major projects will significantly exceed the following fees, the Director of
Community Development may collect a deposit and charge actual time spent to process
the applications based upon current hourly rates.
• Surcharges - All of the following applications are subject to the surcharge fees as set
forth in General Development Services and in the Zoning Research section of Planning
Division.
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 15
Zonin
DEVELOPMENT SERVICES
A royals - Architecture and Site A
A_Pr�a�
147
150
lications — Develo ment Review Committee
New single family detaehed (HR and RC nt Review Service Fee)
Engineering Developm
New non -custom single afs my detached
shedPlan(HRdand RC
zones) per unit/model, partof a
Development**
Engineerin ' Development Review Service Fee
INew single family or two family units
Engineering Development Review Service Fee
New single family or two family (any other zone) per
unit/model new nonresidential or multiple family per
building as part of a Planned Development**
Engineering Development Review Service Fee
$g508;00 $10,345.00
$4 396 $4,783.00
, 00
$034;0 $7,184.00
,
$4 g0 $4,780.00
$67-552J3G $7,129.00
$4494-Ak $4,781.00
$468200 $5,094.00
,
$4;398=0G $4,785.00
37$2,584.00
ro
Minor projects (a development proposal that does not
significantly change the size, mass, appearance or
neighborhood impact of a structure, propel or
parking lot
Engineering Development Review Service Fee
lications — Plannin : Commission A
Zonin
A. +royals — Architecture and Site A
Supplemental fee DRC applications as determined
with fee *146 or minor residential development
a Planned
applications or applications that are part
Development that require Planning Commission
approval
Engineering Development Review Service Fee
New two family unit
Engineering Development Review Service Fee
New nonresidential (includes conceptual Planned
Development elevations)
Engineering Development Review Service Fee
New multiple family (includes conceptual Planned
Development elevations)
Engineering Development Review Service Fee
DRC
$4,00 $3,671.00
,
royal
$31-35543. $3,650.00
122 $1,333.00
,gg4;00-$10,873.00
$4. g6 00 $4,783.00
$ $12,480.00
$400 $4,783.00
$1074284310 $11,346.00
$4 394:00 $4,781.00
,
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 16
Zonin
n co
DEVELOPMENT SERVICES
A..rovals —Architecture and Site A..Iications — Plannin: Commission A
ued
All other (i.e. exceed FAR, major grading, etc.)
Engineering Development Review Service Fee
*Aside from the fees noted above, no additional Architecture
te application fees will be
$4;396700 $4,783.00
assessed for projects that involve a historic structure or site.
**Any changes proposed to model homes, nonresidential, or multiple
supplemental fee shall be based on a time and materials basis to reviewrthe changes.ngebuildingsa
Conditional Use Permits
royal
160
162
Conditional Use Permit
Engineering Development Review Service Fee
Conditional Use Permit (when consolidated with
another application for new development)
Engineering Development Review Service Fee
Conditional Use Permit for Minor Restaurant (DRC
Approval)
Engineering Development Review Service Fee
Conditional Use Permit for Major Restaurant (PC
Approval) Tier 1
Engineering Development Review Service Fee
Conditional Use Permit for Major Restaurant (PC
Approval) Tier 2 includes alcohol and/or
application)
entertainment (must pay #159 below with this
Engineering Development Review Service Fee
Applications that require Town Council Approval
(these fees supplement the above established fees)
Engineering Development Review Service Fee
Rezonin other than Planned Develo ment
163
Without General Plan or Specific Plan Amendment
With General Plan or Specific Plan Amendment
Transcription fee of Planning Commission minutes
$57816$6,327.00
00-$7,318.00
$47431700 $1,557.00
$17148700 $1,216.00
$82070o $892.00
$"� $4,453.00
tlQ $1,336.00
$6,Z2LT08 $7,318.00
$17838:0(3 $2,000.00
$47449:90 $8,649.00
3AO $1,999.00
$3,471.00
$,, 26 OD $1,334.00
Transcription of Planning Commission
minutes - Actual cost and minimum
$500.00 deposit
Actual Cost ($5,000.00 minimum)
Actual Cost ($7,000.00 minimum)
Actual Cost and minimum $500.00
deposit
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 17
Planned Develo ment
166
170
DEVELOPMENT SERVICES
Actual Cost
Without General Plan or Specific Plan Amendment
Without General Plan or Specific Plan Amendment
(HR or RC Underlying Zone)
With General Plan or Specific Man Amendment
With General Plan or Specific Plan Amendment (HR or
RC Underlying Zone) ment
Town Council Modification to a Planned Develop
Actual Cost ($3,000.00 minimum)
ed Development
Pub
Modification to a lanned development ordinance shall be paid by the applicant
Publication costs for the p
Actual Cost and minimum $500.00
de , osit
Transcription fee of Planning Commission minutes
Plannin: Division Certificates of Use and Occu •anc
Change of use change of proprietor
Change of occupancy (excluding
of a continuing business enterprise)
Use/occupancy clearance if Conditional Use Permit is
required or occupancy of a new accessory dwelling
unit
Si n� Action
180
New permanent sign
Temporary nonresidential sign
Change of face only
Sign program
Administrative Land Use Permit
Minor telecommunications facility (i.e. microcell,
8,021 lb. or equivalent) which do not
Major telecommunications facility
require a Conditional Use Permit
Actual Cost
Actual Cost
Actual Cost
Actual Cost ($5,000.00 minimum)
$244,00 $265.00
No fee
5$32$01 $357.00
$1050) $114.00
$164$178.00
S $2,390.00
$176:00 $1,769.00
g9g$4,241.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 18
Other Zonin A royals Fees
183
186
187
190
192
Variance
Engineering Development Review Service Fee
Minor Residential Development (see #151)
Agricultural Preserve Withdrawal
Hazardous Materials Storage Facility Application
Home Occupation Permit
Acc-essecy-Dweilffig-Unit
SB 330 Prelimina Application
SB 35 Preliminary Application
Two -Unit Housing Development
Urban Lot Split
Mobile Home Park Conversion Permit
General Plan/Town Code Amendments
$4;94-7-:A0 $5,382.00
$143140 $1,557.00
$ $2,584.00
$FAO $4,390.00
Fully allocated rate of all personnel,
plus noticing fees
$64:00-$178.00
,419:00-
Actual Cost ($500 minimum deposit)
Actual Cost ($500 minimum deposit)
40-$1,544.00
$1340:00-$1,544.00
Fully allocated rate of all personnel
with initial deposit of $5,000.00
Fully allocated rate of all personnel
with initial deposit of $5,000.00 plus
additional fees
Subdivisions
193
194
195
196
197
198
200
201
202
Lot Line Adjustment (DRC Approval)
Engineering Development Review Service Fee
4 Lots or Less (DRC Approval)
Engineering Development Review Service Fee
4 Lots or Less (as part of a Planned Development)
(DRC Approval)
Engineering Development Review Service Fee
5 Lots or More
Engineering Development Review Service Fee
5 Lots or More (as part of a Planned Development)
(DRC Approval)
Engineering Development Review Service Fee
Vesting Tentative Map (VTM)
Lot Merger and Reversion to Acreage (DRC Approval)
Engineering Development Review Service Fee
Condominium
Condominium (as part of a Planned Development)
Certificate of Compliance (DRC Approval)
Engineering Development Review Service Fee
$27254.A0 $2,452.00
$3,'�0 $4,115.00
$0.021700 $9,880.00
$4,194.00-$4,563.00
$ 00 $4,080.00
$4;3924 0 $4,785.00
$I-0:230sG $11,130.00
$5i44-7 $5,894.00
$¢397:00 $4,784.00
$574241A0 $5,897.00
Actual Cost plus $500.00 deposit and
additional fees
$1714-7:00 $1,215.00
$3790 $4,114.00
$7,88440 $8,578.00
$377-59:0o-$4,080.00
3,257.
$3,544.00
$2733(100 $2,557.00
023-2024 Comprehensive Fee Schedule 19
DEVELOPMENT SERVICES
Subdivisions continued
VTM applications that require Town Council approval,
Subdivision and/or DRC applications that require
Planning Commission approval. This fee supplements
the above -established fees.
Miscellaneous A lication Fees
Time Extensions to Approved Application
Modification to Approved Application
Conceptual Development Advisory Committee Review
Push Cart Permit
Auto Dealer Events
News rack Permit Fee
Firearms Dealer Permit (Town Ordinance 2217 dated
6/17/2013)
Environmental Assessment Fees
Categorical Exemption
Initial Study Deposit***
$3,254.00
50% of current fee (excluding fees
based on actual cost)
75% of current fee (excluding fees
based on actual cost)
$2,966.00
Special Noticing - Actual Cost
(minimum $500.00 deposit)
$ 4 0 $567.00
Smaller Promotional Events ..r8-�00-
$95.00
Large Promotional Events $n
$462.00
$41-34* $449.00
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
Draft Initial Study Review Fee (or actual cost if part of
a Planned Development, General Plan and/or Town
Code Amendment
Engineering Development Review Service Fee
Environmental Impact Report
No fee
Fully allocated hourly rate of all
personnel with initial $5,000.00
deposit
$27950TOG $3,210.00
$2704-543-$2,225.00
Consultant's fee
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 20
DEVELOPMENT SERVICES
Environmental Assessment Fees (continued)
215
216
Draft EIR Review Fee
Fully allocated hourly rate of all
personnel plus any necessary outside
costs
Fully allocated hourly rate of all
personnel plus any necessary outside
costs
***The ,$S,ODO fee is a dep
osit only. The specific cost of the Initial Study and any required
special studies shall be borne by the applicant. The deposit shall be increased before the Town
will authorize work exceeding the amount on deposit. Any deposit balance will be refunded.
Surcharges
217
218
219
Impact Monitoring Program (AB3180)
General Plan update surcharge
Advanced Planning projects
Administrative Fee
Appeals
220
221
222
223
224
Fee to appeal Planning Commission decision to Town
Council
Fee to remand applications from Town Council to
Planning Commission
Qommi s Fee to appeal Director of Community
Development, Development Review
Committee, Historic Preservation Committee, or Sani
Clara County Fire Department Exception Request
(PRC 4290) decision to Planning Commission
Tree appeals
Appeal transcription fee of Planning Commission
minutes (only applies to appeals from Planning
Commission to Town Council)
.5% of building valuation for new
construction and additions/10% of
zone change and subdivision fee
10% of application fee
10% of development application fees
Per Residential $464:0O $505.0(
Per Commercial, multi -family or
tentative map `17867,Bg $2,031.00
Fully allocated hourly rate for all
personnel plus additional fees
Per Residential c234 ,$255.00
Per Commercial c934 $1,016.00
:5 $103.00
Actual Cost - minimum $500.00
deposit
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 21
Zonin Research
226
DEVELOPMENT SERVICES
Basic Zoning Letter
Legal non -conforming verification
Reconstruction of legal non -conforming structures
(Bumdown Letter)
Other Plannin Division Fees
228
230
Fence Height Exceptions remaining deposit will
Peer/Technical Review - any
be refunded to the applicant and amounts exceeding
the deposit amount will be paid by applicant
236
Fees For Additional Tech Review and/or DRC Review -
DRC beyond three meetings, Planning Commission
hearing beyond two meetings, Town Council hearing
beyond one meeting
Consultation
Research Services Minimum Charge
Building Permit Plan Check Fee
Below Market Price Housing Program In -Lieu Fee
Outdoor Seating Permit
Valet Parking Permit
Parklet Program
Shared Parkin: Permit
$$164:00 $178.00
$ 688:00 $749.00
$'� $318.00
$292.00. $318.00
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
Fully allocated hourly rate of all
personnel involved plus additional
fees
Actual cost on an hourly basis
Fully allocated hourly rate for all
personnel with initial $200.00 deposit
20% of building fee
6% of the building permit valuation
for the entire project
Fully allocated hourly rate for all
personnel with initial $1,000.00
deposit
Fully allocated hourly rate for all
personnel with initial $1,000.00
deposit
Fully allocated hourly rate for all
personnel with initial $1,000.00
deposit
Actual Cost ($1,000 de a •sit)
Pa ment of AP.P.PniFees applications are submitted to the Community
All application fees are to be paid at the time the lication, which requires a hearing
Development Department. If the applicant withdraws an app
prior to processing the application for the hearing, 40% of the
by the Planning Commission, applicant at the discretion of the Director of
paid application fee shall be refunded to the
Community Development. All other fees are non-refundable.
Town of Los Gatos FY 2 2024 Comprehensive Fee Schedule 22
DEVELOPMENT SERVICES
Engineering Division
The following fees constitute a comprehensive listing of the various fees charged by the
Engineering Program. Certain types of application/permits must be reviewed and/or processed
by other Town departments or public agencies, which may charge separate fees. Applicants are
advised that the fees for those services are not included in the Engineering Program's fees.
Where the term "actual cost (s)" is used here it shall mean: materials, supplies (including any
costs of noticing or publication), outside consultants and employee cost, (including salary,
benefits and overhead).
Engineering Plan Check Fee (Public Improvements & Grading
238
239
240
241
242
Application Fee
Under $20,000.00
$2O,0OO.00-$20,001.00 to $80,000.00
Greater than $807000-$80,001.00
Each additional plan check beyond three reviews
Inspection Fee (Public Improvements & Grading Permits
243
244
245
Under $20,000.00
$20,001.00 to $80,000.00
Greater than $80,O00-$80,001.00
Permits) *
$ `�00 $565.00
15.5% of valuation
$3,283.00 $3,572.00 plus 9% of .
valuation
y,vvL��
9OO2 ^^ $9,794.00 plus 8.5%
valuation
Fully allocated hourly rate for all
personnel
7.5% of valuation
$1,589.00 $1,729.00 plus 6.5% of
valuation
$5,719.00 $6,222.00 plus 4.0% of
valuation
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 23
DEVELOPMENT SERVICES
Work In or Use of Public Ri ht-of-Wa
248
250
Encroachment Permit - Residential
Encroachment Permit - Collector/Arterial Streets**
Outside contractor underground utility locating
surcharge (actual cost for outside contractor
inspection fee may change)
Temporary Encroachment Permit
Dumpster Permit
Work up to $4,000.00 -
Each additional $2,000.00 -
Work up to $4,000.00 -
$1,820.00
Each additional $2,000.00 $36540-
-
$397.00
$95.00
$ $173.00
$173.00
$, g.0Q $173.00***
Storage Permit
* Work done at night or on weekends shalcharged
a d artactual
ial streets to � charged the
s of staff
** Singlefamily residences located along collector
residential fees above removal, if abandoned
*** $500.00 refundable Storage Unit Removal Deposit, to cover cost of
NPDES
Inspection Fee - Grading Permits
Inspection Fee - Encroachment Permits and Some
Storage Permits
254
255
Inspection of Storm Water Treatment Measures
Annual Stormwater/Limited Impact Development (LID)
Permit
C-3 Permit Hydrologic Calculation
II
Single Family Residential t' 0-
$g41.J0
Commercial or Multi Family
Residential $-2 0G$1,308.00
Single Family Residential $242
$231.00
Commercial or Multi Family
Residential $344.89 $374.00
Plus O $559.00 per LID facility
$-5304* $577.00 per facility
Per Visit and 1st facility inspection
$ $559.00
Every additional facility inspection
L`1 $184.00
Consultant fee deposit of $3,750.00
plus 25% administrative fee
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 24
1-4 Tots
5 or more lots
En ineerin Subdivision Ma Checkin
257
$023:90-$3,289.00*
Certificate of Correction $1,000.00
plus 25% administrative fee
$472-34,00-*Plus, initial $3,000 surveyor dep�it Additional de$4,603.00*
required for larger projects than 5 or more lots, additional nal map check review(s), ort(s) of actual surveyor s overall
complexity of the map.
Traffic Im act Anal sis or Parkin Stud
260
261
Development Review (staff traffic impact analysis or
Parking Study)
Staff Review Fee
Site Distance Analysis
Traffic Impact Mitigation Fee
Storm Draina a Fees
Development Projects
Building/Grading Permits (Building, Structures, &
impervious areas)
Actual Cost
Consultant Report - Consultant Fee
00 $765.00 plus 10% of the
traffic consultant report cost
,89:00 $206.00 per review not to
exceed two hours. Actual cost for
staff time when analysis exceeds two
hours.
YAA $1,104.00 per new average
daily trip generated
Single family lots Section
24.60.035(b) (3): For subdivision
whose lots exceed one acre, the fee
shall not exceed that of one acre per
lot $4,177.00 $4,871.00/ac.
Multiple family dwelling units - initial
unit $^,,"'g $4,871.00/ac.
Multiple family dwelling units - each
unit after initial (not to exceed
$476227gD $5,029.00/ac.) 00-
$183.00
Commercial, industrial, hospitals,
churches, schools, and others
�59&00-$6,091.00/a c.
New impervious surface area, per sq.
ft. �S0 $2.00/sq. ft.
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 25
DEVELOPMENT SERVICES
Street Im rovement In -Lieu Fee
Sidewalks
Curb and Gutter
Other In -Lieu Fee
Trail Improvements
Haulin Permits
House Moving Fee
Hauling (Overweight Vehicle) Permit
*Plus initial deposit of $S,000for facilities damageHauling Permit. If the State fee changes, the
**The current State mandated fee is $16.00 for
Hauling Permit fee will change to reflect the same.
Construction Activities Miti:ation Fee Ordinance 2189
$20.00/sq.ft.
#-$125.00/If.
$16.00/Per sq. ft. or detemuned by
Director
$3769&00 $4,021.00*
Daily $16.00**
Annual $90.00
Residential (per square foot added)
s,12. 6-$1.43/sq.ft.*
Non-residential (per square foot
added) /sq.ft.*
*These two fees are adjusted based on the Building Cost Index
Other. En ineerin Fees
Engineering Reversion to Acreage
Engineering Lot Merger
Engineering Lot Line Adjustments
Certificate of Compliance
_
Abandon Excess Public Right -of -Way & Public
Easement
$2 ` $2,7259.00 plus initial
deposit of $2,500 for surveyor
$3�85-01$4,009.00 plus surveyor
deposit
$4,009.00 plus surveyor
deposit
$ O $4,009.00 plus surveyor
deposit
$476O1 gD $5,006.00 plus surveyor
and valuation consultant and
planning services
n
26
DEVELOPMENT SERVICES
Other En ineerin Fees continued
Geotechnical Peer Review Fees
Separate Instrument Dedication Fee (for dedication
via grant deeds and not maps)
MEMIZ
279 Flood Review Fee
280
Miscellaneous Review Fee*
Consultant fee deposit of $3,000 plus
25% administrative fee. 1lly_
depesif Larger projects
require an initial deposit of $4,500
(plus 25% administrative fee) to
allow for a site visit by the
geotechnicaI peer review consultant.
*This fee will be implemented for services induding, but not fimited
Actual Cost
to, wet weather
inspections, annual inspections, review of operations and maintenance reports, coordination
with property owner(s) and/or homeowner associations, etc.
$700$829.00 plus initial deposit
of $2,500 for surveyor
50-Per-sgft $3.00/sq. yd.
Consultant Cost plus 25% Admin Fee
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 27
LIBRARY SERVICES
Lost or Dama ed Items
Replacement of Adult book/AV item
Replacement of Teen/Children's book/AV item
Replacement of Adult paperback
Replacement of magazine
Cost of item plus $10.00 processing
fee
Cost of item plus $5.00 processing
fee
Cost of item plus $5.00 processing
fee
Cost of item plus $5.00 processing
fee
In lieu of above,
account holder may replace lost/damage item with new identical copy plus
$2.00 processing fee.
Internet rintin and co ies
Printing per page - Black and White Copies
Printing per page - Color Copies
Histor Pro ect Di ital Ima e
Fair Use Fees (for personal use only)
Commercial Use Fees
$0.15
$0.25
Free — Downloaded via History
Website
$25.00 per high resolution image
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 28
PARKS AND PUBLIC WORKS SERVICES
Parks Division
Oak Meadow Park
Picnic Areas (1 through 9)
1
Facility Fee
Facility fee w/Jump House Permit
Bandstand/Gazebo
Non -Profit Event
Public Event
Deposit (refundable)
Minimum two-hour reservation required.
Special Use Permit — Single Use
6
Permit Fee
Deposit (refundable)
Special Use Permit — Multi -Use
8 Non Profit.
9 Additional Day
10 JDeposit (refundable)
Resident $95.00 per site
Non -Resident $150.00 per site
Resident $190.00 per site
Non -Resident $300.00 per site
Resident $65.00 per hour
Non -Resident $120.00 per hour
Resident $95.00 per hour
Non -Resident $150.00 per hour
Resident $95.00 per day
Non -Resident $150.00 per day
$100.00
Resident $95.00 per day
Non -Resident $150.00 per day
Resident $25.00 per additional day
Non -Resident $40.00 per additional
day
$100.00
Multi -Use Permit for recreational/educational purposes only.
1 rsu.n „f I r., ....--
29
PARKS AND PUBLIC WORKS SERVICES
Other Oak Meadow Park Fees
Bocce Ball Court Fee
Parking Fee
Vehicle Escort Fee
Creekside S orts Park
Special Use Permit —Single Use
Permit Fee
Deposit (refundable)
Special Use Permit — Multi -Use
Non Profit
Additional Day
Deposit (refundable)
Resident $95.00 per day
Non -Resident $150.00 per day
Resident No Charge
Non -Resident $6.00 per vehicle
Resident $75.00
Non -Resident $100.00
Resident $95.00 per day
Non -Resident $150.00 per day
$500.00
Resident $95.00 per day
Non -Resident $150.00 per day
Resident $55.00 per additional day
Non -Resident $75.00 per additional
day
$500.00
Multi -Use Permit for recreational/educational purposes only.
Bel :atos Blossom Hill La Rinconada and Live Oak Manor Grou.s of 25+ and or Jum i House
Single Use Permit
20
Permit Fee
Deposit (refundable)
Resident $95.00 per day
Non -Resident $150.00 per day
$100.00
Li 30
PARKS AND PUBLIC WORKS SERVICES
Multi -Use Permit
21
22
Permit Fee
Additional Day
23
Deposit (refundable)
Resident $95.00 per day
Non -Resident $150.00 per day
Resident $25.00 per additional day
Non -Resident $40.00 per additional
day
Multi -Use Permit for recreational/educational purposes only.
TERMR-Plaz-a-Use-Pewnit
$100.00
Maintenance S• d
renter1a U P it
S u pc r in ecndent.
Turf Maintenance Fee
Additional fee added to any Park Use Special gvc t o rmi_, when a permit's scheduled
activity or event will negatively impact the park turf, (locations including but not limited to Oak
Meadow, Town Plaza, and Civic Center lawn areas). The fee amount is to be based upon best
estimate of turf repair cost, as determined by the Director of Parks and Public Works and/or
Maintenance Superintendent.
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 31
Tree Related Fees
24
PARKS AND PUBLIC WORKS SERVICES
Tree Removal Permit Application*
26
Illegal Tree Removal Administrative Fee
Replacement Trees - Town Forestry Fund Per Tree
Ordinance Section 29.10.0985
One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
$330.00
Tree cost for each 24 ,36 , and/or
48" box size will be the Market Price
plus the installation cost, determined
by the Director
*Fee will be waived if tree removal is done to implement or maintain Defensible Space.
E ui ment Hourl Rates as Follows
29
30
32
34
35
37
37
Pick-up Truck
nal1 Ton Flatbed Truck
Dump Truck (10 Wheel)
Dump Truck (Bobtail)
Paint Truck
Line Remover
Tractor Loader
Ell
40
44
45
47
48
50
51
54
Backhoe
Rubber -tired Loader
Roller
Concrete $3W
Saw
Air Compressor
Arrowboard
Generator
Blower
Paving Box
Rodder
High Pressure Sewer Cleaner
Brush Chipper
Chipper Truck
Aerial Unit
Street Sweeper
Forklift
Message Board
$32.00
$42.00
$57.00
$85.00
$63.00
$85.00
$26.00
$63.00
$85.00
$85.00
$63.00
$37.00
$32.00
$32.00
$32.00
$26.00
$20.00
$10.00
$63.00
$63.00
$117.00
$42.00
$63.00
$92.00
$92.00
$42.00
$42.00
Barricades
$10.81
$0.23
Town of Los Gatos FY 202 2-2024 Comprehen :ive Fee Schedule 32
PARKS AND PUBLIC WORKS SERVICES
E ui ment Hourl Rates as Follows continued
Streets Division
Hazard and/or Debris Removal
158 Staff time spent to conduct hazard and or debris
removal caused by citizen negligence l Fully allocated hourly rate of all
personnel plus any outside costs
Special Events Fees
I59 (Staff and equipment for special event requests + Fully allocated hourly rate of all
i
J
personnel
Electric Vehicle Charging Fee
60 System Connection Fee
61 Hourly Charge -1- 4 hours
62 Hourly Charge - after 4 hours
$1.00
$1.00/hour
$5.00/hour
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 33
POLICE SERVICES
Printin and Co in Char es
8 1/2" x 11 and 8 1/2" x 14
Copy - Digital
Concealed Wea ons
Permit Fee, DOJ Fee, and Admin Fee
Renewal Permit
Amended Permit
Massa a Permit Fees
Massage Establishment Permit (initial and
subsequent renewals) (Ord 14.110.075)
$10.00 . er device
$100.00
$25.00
$10.00
$qa g0-$335.00
Fee covers staff time to process application, review pertinent documents, ovalsafronge�
and obtain all necessary apP
Special Events
13
ABC Application
No Parking Signs/Required Event Signage
Officer Staffing
Bingo Permit
No charge
$0.46/eaeh-$1.00/each
Fully allocated hourly rate of all
personnel
$` 17$50.00
Other Special Police Services — Pursuant to Agreement between Police Chief and Requester.
Town of Los Gatos FY 2023-2024 Comprehensive ree ate+
34
POLICE SERVICES
Motion Picture/Television/Commerical Still Photo
15
16
For -Profit Groups (each)
Non -For -profit Groups (each)
Emergency Response Caused By
17
DUI Emergency Accident Response (Government
Code Section 53155)
18
Second Response due to Disturbances
Alarm Fees
$1,609.00
$579.00
Actual costs incurred up to
$12,000.00
At current billing rate
19
Commercial Alarm Registration Fee
$95.00
20
Second False Alarm*
$170.00
21
Third False Alarm*
$170.00
22
Fourth False Alarm*
$170.00
23
Fifth False Alarm*
No response, no charge, at the
Chief's discretion
ithin a six-month period within a calendar year
Citation issued for failure to display appropriate Permit or placard. Dismissal fee in lieu of full
Bail Amount
24
Handicap CVC22507.8/22500(1)
$37_00
25
Parking Permits
$10.00
Parking Permit Fees
Residential Parking Permit
26
Annual residential parking permit/per vehicle (Limit
4 per residence)
$42.00
27
Visitor guest passes
Two (2) complimentary with the
purchase of the primary permit
28
Special Event Permit -First permit (one day)
$10.00
29
Special Event Permit -Each Additional (one day)
$2.00
30
Replacement permit for vehicle change (within
calendar year)
$10.00
31
Lost permit replacement
$37.00
32
Damaged permit replacement (with retum of permit)
$18.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 35
POLICE SERVICES
Parking Permit Fees (continued)
Business Parking Permit
33 Standard Employee annual
34 Lost permit replacement
35 Damaged permit replacement (with retum of permit)
Construction Parking Permit
36
37
One day parking permit per construction vehicle
Each additional day per vehicle
Other Police Fees
38
$248.00
$37.00
$18.00
$32.00
$5.00
39
Subpoena Duces Tecum
40
41
42
43
44
45
46
Solicitor/Peddler's Permit (need to obtain
fingerprinting
Bicycle L os low)
Taxicabs Permit
Clearance Letter
Horse Drawn Vehicle Permit
Firearms Storage Fee
Vehicle Release
47
48
49
Vehicle Repossession Release Fee (Government
Code Section 41612 2671)
Non -Los Gatos Cite Sign Off
,Feral Cat Feeder/Trap Permit
Per Califomia Evidence Code Section
1563
$55.00 p fngorprinting
$3.00
$185.00 per business
$25.00
$270.00
$245.00 Admin Fee plus $1.00 per
firearm per day for storage
$235.00
$15.00
$27.00
$42.00
Town of Los Gatos FY 2023-2024 Comprehensive Fee Schedule 36