Loading...
Item 2 - Staff Report and Attachments 1 to 8 PREPARED BY: SEAN MULLIN, AICP Senior Planner Reviewed by: Planning Manager and Community Development Director 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6832 www.losgatosca.gov TOWN OF LOS GATOS CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE REPORT MEETING DATE: 05/11/2022 ITEM NO: 2 DATE: May 6, 2022 TO: Conceptual Development Advisory Committee FROM: Joel Paulson, Community Development Director SUBJECT: Conceptual Development Advisory Committee Application CD-22-003. Project Location: 300 Mountain Laurel Lane. APN: 567-24-023. Property Owner: Bright Smile Dental Office Defined Benefit Plan. Applicant: Kunling Wu, Trustee. Requesting Preliminary Review of a Proposal to Amend the Planned Development Ordinance to Increase the Maximum Residence Size Allowed on Lot 14 on Property Zoned HR-5:PD. ROLE OF THE CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE: The Conceptual Development Advisory Committee (Committee) advises a prospective applicant on the overall consistency of a project with Town policies prior to submitting a formal application and investing in the development review process. The Committee also endeavors to identify the potential issues that will need to be addressed during the development review process should the applicant wish to submit an application. The issues identified by the Committee are not intended to be all-inclusive and other additional issues may be identified during the formal development review process. None of the Committee's comments are binding on the Town and in no way are they intended to indicate whether the project will be received favorably by the various review bodies that are charged with evaluating and deciding the application. As noted in this report, if an application is filed, technical analysis would need to be done during the evaluation of the proposal. In addition, public input is a required and essential component in the development review process. Notice has been sent to residents and property owners within 600 feet of the project site and to all properties within the Shannon Valley Ranch subdivision. In addition to the public comments received at this meeting, all applicants are strongly encouraged to hold neighborhood meetings to receive input as the design of the project evolves should they decide to proceed with the development review process. PAGE 2 OF 6 SUBJECT: 300 Mountain Laurel Lane/CD-22-003 DATE: May 6, 2022 N:\DEV\CDAC\CDAC Reports and Attachments\2022\05-11-22\Mountain Laurel Lane 300\Staff Report.300 Mountain Laurel Lane.docx BACKGROUND: The subject property is approximately 8.14 acres located in the northern portion of the Shannon Valley Ranch subdivision (Attachment 1). A single-family residence was once located on the property, but was destroyed by fire prior to the 2004 subdivision. The property is the last undeveloped residential property in the subdivision. In March 2002, the Town Council considered a project at 17101 Hicks Road and 14045 Shannon Road and approved Ordinance 2097, amending the General Plan land use designation from Agricultural to Hillside Residential and a Planned Development (PD) to change the zoning from HR-5:Prezone to HR-5:PD to allow subdivision of the property into 14 single-family lots and three open space lots (Attachment 3). Architecture and Site applications for new residences on Lots 1 through 13 were approved in 2002 and 2003. The subdivision was completed in November 2004 and subsequent Building Permits were issued in December of 2004. The 13 new residences were completed by 2007. In 2009, the Town Council approved an amendment to the PD to allow accessory structures on all 14 lots, provided they comply with the Hillside Development Standards and Guidelines (HDS&G) (Attachment 4). The original PD application was considered numerous times by the Development Review Committee and the Planning Commission prior to the Council’s action in March 2002. During the final Planning Commission meeting on January 23, 2002, two members of the public spoke on the project, offering comments specific to the size of the replacement residence on Lot 14 (Attachment 5, highlighted text). Both commenters expressed concern on whether developing Lot 14 was appropriate, with one commenter adding that if Lot 14 is to be developed, it should be rebuilt in the original footprint and not turned into a 4,600 or 4,800 square foot home. The motion to forward a recommendation of approval to the Town Council included an additional performance standard that Lot 14 be developed under the guidelines of a replacement structure, similar in square footage, mass, and scale to the original residence that was destroyed by fire. This additional performance standard was forwarded to the Council and included in Ordinance 2097 and the amended Ordinance 2172 (Attachments 3 and 4, Performance Standard #8). The Town Council approved the project in March 2002 with the additional performance standard as recommended by the Planning Commission. Town records for Lot 14 do not provide much detail on the original residence that was destroyed by fire. An April 20, 2016, letter from Greenbriar Homes Communities (applicant under the original PD application) to Mr. Alan Barbie of the Sereno Group indicates that the original home was one story and approximately 2,400 square feet (Attachment 6). Other anecdotal information indicates that the size of the original residence was closer to 3,000 square feet. Given the incomplete nature of the records for Lot 14, staff has messaged that the lot could be developed with a single-story residence with a maximum size of 3,000 square feet to be located in the general area of the previous residence subject to Architecture and Site approval. PAGE 3 OF 6 SUBJECT: 300 Mountain Laurel Lane/CD-22-003 DATE: May 6, 2022 N:\DEV\CDAC\CDAC Reports and Attachments\2022\05-11-22\Mountain Laurel Lane 300\Staff Report.300 Mountain Laurel Lane.docx BACKGROUND (continued): In addition to Lot 14, Performance Standard #8 limits the sizes of the residences on Lots 1 through 13 to a maximum of 4,850 square feet, with an average size of 4,650 square feet (Attachment 4, Performance Standard 8). Additionally, two-thirds of the 13 residences are limited to a one-story design. The table below provides a summary of the development on Lots 1 through 13. Summary of developed lots. Lot Address Residence Stories Garage Accessory Structure 1 280 Shannon Oaks Ln 4,656 sf 1 768 sf -- 2 282 Shannon Oaks Ln 4,815 sf 2 799 sf -- 3 286 Mountain Laurel Ln 4,655 sf 1 811 sf -- 4 288 Mountain Laurel Ln 4,612 sf 1 781 sf -- 5 290 Mountain Laurel Ln 4,815 sf 2 799 sf -- 6 299 Mountain Laurel Ln 4,327 sf 1 806 sf -- 7 297 Mountain Laurel Ln 4,635 sf 1 811 sf -- 8 293 Mountain Laurel Ln 4,611 sf 1 781 sf -- 9 291 Mountain Laurel Ln 4,655 sf 1 811 sf -- 10 289 Mountain Laurel Ln 4,315 sf 1 806 sf -- 11 287 Mountain Laurel Ln 4,814 sf 2 799 sf 636 sf 12 283 Shannon Oaks Ln 4,605 sf 1 781 sf 960 sf 13 281 Shannon Oaks Ln 4,808 sf 2 799 sf -- AVERAGE RESIDENCE: 4,640 sf 69 percent single story PROJECT DESCRIPTION: The applicant has submitted a Conceptual Development Advisory Committee application (Attachment 2) and a project description letter (Attachment 7) requesting preliminary review of a proposal to amend the PD to allow for the construction of a residence larger than what the PD currently permits on the subject property. The applicant’s letter indicates that they wish to construct a single-story residence of 6,000 square feet. The applicant indicates that a larger residence is needed to accommodate a large family and offers the following as justification for the residence size: • The proposed 6,000 square foot single-story residence would be consistent with the development on neighboring properties; • The current size limitation is not proportional to the size of the property (8.14 acres) or the developable area (75,000 sf); and • The high cost to develop a residence on the site is not proportional to the current size limitation for a residence. PAGE 4 OF 6 SUBJECT: 300 Mountain Laurel Lane/CD-22-003 DATE: May 6, 2022 N:\DEV\CDAC\CDAC Reports and Attachments\2022\05-11-22\Mountain Laurel Lane 300\Staff Report.300 Mountain Laurel Lane.docx PROJECT DESCRIPTION (continued): The applicant has provided a Site Plan showing a developable area of approximately 75,000 square feet (1.72 acres) served by a proposed 1,483-foot paved driveway with an average slope of 17.1 percent (Attachment 7). The proposed driveway would follow the path of the existing dirt driveway, taking access from the eastern end of Mountain Laurel Lane, rising approximately 250 feet along the western property line to the developable area identified by the applicant. The slope of the proposed driveway would require an exception to the HDS&G, which limits driveway slopes to a maximum of 15 percent and a maximum length of 300 feet. Future development of the site as proposed would require an amendment to the PD Ordinance and an Architecture and Site application, which would be subject to the Residential Design Guidelines, HDS&G, and the Hillside Specific Plan. EXISTING GENERAL PLAN, ZONING, AND PLANNING AREA: 1. General Plan land use designation: Hillside Residential, which provides for very low density (0-1 dwelling units per net acre; up to 3.5 persons per acre), rural, large lot or cluster, single-family residential development. This designation allows for development that is compatible with the unique mountainous terrain and vegetation of parts of the Town. 2. Zoning designation: HR-5:PD, Hillside Residential (five to 40 acres for each dwelling unit) with a Planned Development overlay. The intent and purpose of the HR zone is to provide for an orderly, harmonious development of the foothills and mountains resulting in the minimum amount of disturbance of the natural terrain through existing residential density to the natural slope to encourage and provide incentive for excellence in design principles and engineering techniques, and to provide for a variety of dwelling types where land assembly and a unified development scheme are more appropriate. Slope-density regulations will be utilized to assist in relating the intensity of development to the steepness of terrain in order to minimize grading, removal of vegetation, runoff, erosion, geologic hazards, fire hazards, and to help ensure utilization of land in balance with its natural capabilities to support development. 3. Surrounding zoning designations: HR-1 to the north and east, HR-5 to the west and south. EXISTING CONDITIONS: The subject property has a gross lot area of 354,458 square feet (8.14 acres) with an average lot slope of 28 percent. When adjusted for slope per the HDS&G, the net lot area is 163,051 square feet (3.74 acres); which would allow for 6,000 square feet of development without the limitations imposed by the existing PD Ordinance. The subject property takes access from the east end of Mountain Laurel Lane via a dirt driveway along the western property line accessing the northeastern portion of the property, where the original residence once stood. This portion of the property is relatively flat encompassing approximately 75,000 square feet (1.72 acres). PAGE 5 OF 6 SUBJECT: 300 Mountain Laurel Lane/CD-22-003 DATE: May 6, 2022 N:\DEV\CDAC\CDAC Reports and Attachments\2022\05-11-22\Mountain Laurel Lane 300\Staff Report.300 Mountain Laurel Lane.docx EXISTING CONDITIONS (continued): The majority of the remaining portions of the property are steeply sloped and are held in a scenic conservation easement. POTENTIAL CONSIDERATIONS AND ISSUES: The following is a brief list of issues and topics for consideration by the Committee. Staff has not reached conclusions on these topics. Staff is identifying them here to help frame the discussion and to solicit input. The main question for the Committee is whether or not the applicant’s concept for the project creates a high-quality plan appropriate for Los Gatos in this location. If an application is filed, staff would evaluate the technical issues. 1. General Plan a. Policy LU-1.3 encourages preservation of existing trees, natural vegetation, natural topography, riparian corridors and wildlife habitats, and promote high quality, well- designed, environmentally sensitive, and diverse landscaping in new and existing developments. b. Policy LU-1.4 states, infill projects shall be designed in context with the neighborhood and surrounding zoning with respect to existing scale and character of surrounding structures, and should blend rather than compete with the established character of the area. c. Policy LU-6.8 states, new construction, remodels, and additions shall be compatible and blend with the existing neighborhood. d. Policy LU-7.3 states, infill projects shall contribute to the further development of the surrounding neighborhood (e.g. improve circulation, contribute to or provide neighborhood unity, eliminate a blighted area) and shall not detract from the existing quality of life. e. Policy LU-7.4 states, infill projects shall be designed in context with the neighborhood and surrounding zoning with respect to the existing scale and character of surrounding structures, and should blend rather than compete with the established character of the area. 2. Zoning a. Is the proposed residence size consistent with the PD zoning of the Shannon Valley Ranch subdivision and the development on surrounding properties? 3. Circulation a. Adequate access, that meets Town roadway and/or driveway requirements. b. Driveway slopes would exceed the 15 percent limit in the HDS&G. c. Driveway length would exceed the 300-foot limit in the HDS&G. d. The Hillside Specific Plan prohibits access roads that result in excessive grading. Would access and driveways require excessive grading? e. Is a second means of emergency access/egress available? PAGE 6 OF 6 SUBJECT: 300 Mountain Laurel Lane/CD-22-003 DATE: May 6, 2022 N:\DEV\CDAC\CDAC Reports and Attachments\2022\05-11-22\Mountain Laurel Lane 300\Staff Report.300 Mountain Laurel Lane.docx POTENTIAL CONSIDERATIONS AND ISSUES (continued): 4. Visibility a. The potential visibility of the future single-family residences from the Town’s established viewing areas will need to be analyzed pursuant to the HDS&G. The applicant proposes a single-story residence, which may be more compatible with the limitations for a visible residence. 5. Potential Tree Impacts a. An arborist report will be required during the development review process to evaluate the potential impacts to trees. b. Will the proposed driveway be located to avoid tree impacts? c. Do underground electrical and telephone utility lines impact trees? d. Do the water and sanitary sewer lines impact trees? 6. Other a. The project would be evaluated for utilities, stormwater management, and other engineering considerations. b. Would the proposed residence be located within the Least Restrictive Development Area (LRDA) as required by the HDS&G? PUBLIC COMMENTS: Public comments received by 11:00 a.m., Friday, May 6, 2022, are included as Attachment 8. ATTACHMENTS: 1. Location Map 2. CDAC Application 3. Ordinance 2097 4. Ordinance 2172 5. Planning Commission Minutes of January 23, 2002 6. Letter from Greenbriar Homes Communities, dated April 20, 2016 7. Project Description Letter with exhibits 8. Public comments received by 11:00 a.m., Friday, May 6, 2022 HICKS RDSANTA R O S A D R SH A N N O N R D GUADALUPE MINES RDSYCAMORE CREEK STCOLORADO CTS H A N N O N O A K S L N BURKE R D MAPLE CREEK300 Mountain Laurel Lane 0 0.250.125 Miles ° Update Notes: - Updated 12/20/17 to link to tlg-sql12 server data (sm) - Updated 11/22/19 adding centerpoint guides, Buildings layer, and Project Site leader with label - Updated 10/8/20 to add street centerlines which can be useful in the hillside area - Updated 02-19-21 to link to TLG-SQL17 database (sm) ATTACHMENT 1 This Page Intentionally Left Blank ATTACHMENT 2 This Page Intentionally Left Blank ORDINANCE 2097 ORDINANCE OF THE TOWN OF LOS GATOS AMENDING THE TOWN CODE EFFECTING A ZONE CHANGE FROM RC AND HR -5 PREZONE TO HR -5:PD FOR PROPERTY LOCATED AT 17101 HICKS ROAD AND 14045 SHANNON ROAD THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES ORDAIN AS FOLLOWS: SECTION I The Town Code of the Town of Los Gatos is hereby amended to change the zoning on property at 17101 Hicks Road and 14045 Shannon Road (Santa Clara County Assessor Parcel Numbers 537 -18 -001, 567 -24 -008 and 567 -23 -041) as shown on the map attached hereto as Exhibit A, and is part of this Ordinance, from RC (Resource Conservation) and HR -5 (Hillside Residential, 5 Acres per Dwelling Unit) to HR -5:PD (Hillside Residential, 5 Acres per Dwelling Unit, Planned Development). SECTION II The PD (Planned Development Overlay) zone established by this Ordinance authorizes the following construction and use of improvements: 1. Demolition of two existing pre -1941 and two post -1941 single family residences and one pre -1941 barn. 2. Construction of 13 new single - family dwelling units and reconstruction of one single - family dwelling that was destroyed by fire. 3. Landscaping, streets, trails, and other improvements shown and required on the Official Development Plan. 4. Dedication of 45.4 acres of hillside and riparian open space as shown on the Official Development Plans. 5. Dedication of trail easements to the Town of Los Gatos as shown on the Official Development Plans. 6. Uses permitted are those specified in the HR (Hillside Residential) zone by Sections 29.40.235 (Permitted Uses) and 29.20.185 (Conditional Uses) of the Zoning Ordinance, as those sections exist at the time of the adoption of this Ordinance, or as they may be amended in the future. However, no use listed in Section 29.20.185 is Page 1 of 17 ATTACHMENT 3 allowed unless specifically authorized by this Ordinance, or by a Conditional Use Permit. SECTION III COMPLIANCE WITH OTHER DEVELOPMENT STANDARDS All provisions of the Town Code apply, except when the Official Development Plan specifically shows otherwise. SECTION IV Architecture and Site Approval and Subdivision Approval is required before construction work for the dwelling units is performed, whether or not a permit is required for the work and before any permit for construction is issued. Construction permits shall only be in a manner complying with Section 29.80.130 of the Town Code. SECTION V The attached Exhibit A (Map), and Exhibit B (Official Development Plans), are part of the Official Development Plan. The following conditions must be complied with before issuance of any grading, or construction permits: TO THE SATISFACTION OF THE DIRECTOR OF COMMUNITY DEVELOPMENT: Planning Division 1. EXPIRATION/USE OF APPROVAL. The approval for the requested zone change from RC Resource Conservation) and HR -5 prezone (Hillside Residential, 5 Acres per Dwelling Unit) to HR -5:PD (Hillside Residential, 5 Acres per Dwelling Unit, Planned Development) shall expire two years from the date of approval unless the application has been vested pursuant to Town Code Section 29.20.320. 2. ARCHITECTURE AND SITE APPROVAL REQUIRED. A separate Architecture and Site application and approval is required for the residential units proposed. 3. OFFICIAL DEVELOPMENT PLANS. The Official Development Plans provided is conceptual in nature. Final footprints and building designs shall be determined during the architecture and site approval process. 4. HOUSE SITING. The siting of the homes shall be determined during the Architecture & Site approval process. Page 2 of 17 5. RECYCLING. All wood, metal, glass and aluminum materials generated from the demolished structures shall be deposited to a company which will recycle the materials. Receipts from the company(s) accepting these materials, noting type and weight of material, shall be submitted to the Town prior to the Town's demolition inspection and the issuance of any building permits. 6. TREE REMOVAL PERMIT. A Tree Removal Permit shall be obtained for the removal of any ordinance sized tree prior to the issuance of a Building, Grading or Encroachment Permit. 7. FENCING. Fence locations shall be reviewed and approved during the Architecture & Site review(s), including privacy and yard fencing. Developer will include in the CC &R's for the project a restriction limiting the home owners from replacing the fence type as installed by the Developer and as shown on the Official Development Plans, or as otherwise approved during the Architecture & Site review(s). Any replacement or addition of other fence types shall be restricted to open fence types including wood with wire mesh and wood or concrete split -rail fencing. Solid fencing will be permitted only where installed by the Developer and as shown on the approved development plans. CC &R's shall require fences to be set back a minimum of 10 feet for from property lines. 8. BUILDING SQUARE FOOTAGE. All proj ect homes will be limited to a maximum size of 4,850 square feet with an average of 4,650 square feet, and at least 2/3 of the homes shall be limited to a one story design. Final building design and size will be determined during Architecture and Site review. No further expansion of the homes will be allowed unless this Ordinance is amended by the Town Council. Lot 14 shall be developed under guidelines of a replacement structure and shall be similar is size, mass and scale to the original home that was destroyed by fire. 9. SETBACKS. The minimum setbacks are those specified by the HR -5 zoning district. 10. HEIGHT. The maximum height for single -story homes shall be 25 feet and the maximum height for two -story homes shall be 30 feet. 11. EXTERIOR LIGHTING. All exterior lighting shall be reviewed and approved as part of the Architecture & Site review(s). Lighting shall be down directed, and no street lighting shall be included in the development. If it is determined that lighting is needed for safety reasons at the intersection of Hicks Road and the new road into the development, a street light may be required, but only if there is not alternative safety devices that can adequately delineate the intersection. If it is determined that a new light must be installed, it shall be designed to only illuminate the minimum area necessary for safety. 12. "BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -3a. During the design phase, the property owner /developer shall implement the following measures: a. Any plan affecting trees shall be reviewed by the Consulting Arborist to ensure that improvement plans, utility and drainage plans, grading plans, landscape and irrigation plans, and demolition plans will not adversely affect the tree to be retained. b. The horizontal and vertical elevations of trees to be preserved within development areas shall be established and included on all plans. C. The Consulting Arborist shall identify a Tree Protection Zone for trees to be preserved in which no soil disturbance is permitted. For design purposes, the Tree Protection Zone shall be defined by the dripline. Where development must encroach Page 3 of 17 within the dripline, the Consulting Arborist shall identify an appropriate Tree Protection Zone. d. No underground services including utilities, sub - drains, water or sewer shall be placed in the Tree Protection Zone. e. Tree Preservation Notes shall be included on all plans. f. Any herbicides placed under paving materials must be safe for use around trees and labeled for that use. g. Irrigation systems must be designed so that no trenching will occur within the Tree Protection Zone. 13. "BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -3b. During the pre - construction phase, the property owner /developer shall take the following measures: a. A fence shall be constructed around all trees to be retained and it shall completely enclose the Tree Protection Zone prior to demolition, grubbing, or grading. Fencing shall be 6 -foot chain link or equivalent. Fencing shall be placed at the dripline or as otherwise directed by the Consulting Arborist. Fences are to remain until all grading and construction is completed. b. All trees to be retained shall be pruned within and adjacent to development areas shall be reviewed by a certified arborist to determine which trees should be pruned to clean the crown, reduce end weight and /or provide clearance. Tree #201 will require pruning to reduce weight throughout the crown. Clearance shall be provided by selectively thinning low - hanging lateral branches. C. All pruning shall be performed by a Certified Arborist or Tree Worker in accordance with the Tree Pruning Guidelines of the International Society of Arboriculture. d. Prior to the start of any demolition and clearing, the Consulting Arborist will meet with the demolition, grading and other relevant contractors to review limits of construction activity, identify areas requiring fencing, identify trees to be removed and review work procedures. 14. "BIOLOGICAL RESOURCES MITIGATION MEASURE 6-3C. Prior to the construction phase of the project, the applicant shall take the following measures: a. Any grading, construction demolition, or other work within the Tree Protection Zone shall be monitored by the Consulting Arborist. b. Any root pruning required for construction purposes shall receive the prior approval of, and be supervised by, the Consulting Arborist. C. If any injury to a tree should occur during construction, it should be evaluated as soon as possible by the Consulting Arborist so that appropriate treatments can be made. d. Root- injured trees have a limited capacity to absorb water. Therefore, it is important to ensure adequate soil moisture in the area of active roots. One to several irrigations may be needed for trees that are at risk of impacts. Irrigations shall be specified by the Consulting Arborist. e. No excess soil, chemical, debris, equipment or other materials shall be dumped or stored within the Tree Protection Zone. f. Any additional pruning required to provide clearance during construction shall be performed by a Certified Arborist and not construction personnel. 15. "BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -3d. Following construction, Page 4 of 17 r a comprehensive management plan for the trees shall be developed that considers the broad objectives of development as well as the needs of the specific species. This management plan shall specify pruning, fertilization, mulch, pest management, replanting and irrigation requirements. In addition, provisions for monitoring both tree health and structural stability following construction must be made a priority. As trees age, the likelihood of failure of branches or entire trees increases. Therefore, the management plan must include an annual inspection for hazard potential. 16. * *BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -4. To minimize impacts on nesting raptors, the applicant shall complete necessary pre- construction surveys and monitoring. If it is not possible to schedule construction between August and February, then pre- construction surveys for nesting raptors will be conducted by a qualified ornithologist in order to ensure that no raptor nests will be disturbed during project construction. This survey will be conducted no more than 15 days prior to the initiation of construction activities during the early part of the breeding season (February through April) and no more than 30 days prior to the initiation of these activities during the late part of the breeding season (May through August). During this survey, the biologist will inspect all trees in and immediately adjacent to the impact areas for raptor nests. If an active raptor nest is found close enough to the construction area to be disturbed by these activities, the ornithologist, in consultation with CDFG, will determine the extent of a construction -free buffer zone to be established around the nest. 17. * *BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -5a. To minimize impacts on yellow warblers, the property owner /developer shall retain sycamore riparian habitat along Shannon Creek and shall maintain setbacks of at least 50 feet between proposed development and sycamore riparian habitat. If a small amount of development encroaches into this 50- foot setback, then this encroachment (indirect impact) shall be mitigated by planting riparian habitat at a 1:1 ratio. 18. * *BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -5b. The property owner /developer shall implement the following measures to minimize potential impacts on any roosting bats: a. Surveys shall be conducted up to one year in advance of building demolition and tree removal, if possible, to determine if active roosts are present. These surveys shall not substitute for pre - construction/pre - disturbance surveys for nesting raptors, as bats could move on or adjacent to the site between survey periods. If roosting bats are found during these surveys, either avoidance of the maternity roost season, establishment of buffer zones or exclusion of bats shall be implemented as appropriate. b. Avoidance: Construction activities involving potential roost sites shall be conducted outside the maternity roost season if the project commences after young are volant by July 31 and finished before the formation of maternity roosts begins (as early as March 1). C. Pre - demolition Surveys and Buffer Zones: If the project schedule does not allow for early detection surveys to occur, a pre - demolition survey for roosting bats shall be conducted by a qualified bat biologist 14 days prior to construction as determined by a Memorandum of Understanding with the California Department of Fish & Game Page 5 of 17 CDFG) prior to any removal of buildings, particularly those with closed areas such as an attic space, or trees 12 inches in diameter. No activities that would result in disturbance to active roosts shall proceed prior to the completed surveys. If no active roosts are found, then no further action is warranted. If a maternity roost were present, a qualified bat biologist shall determine the extent of construction -free zones around active nurseries located during surveys. CDFG shall also be notified of any active nurseries within the construction zone. d. Surveys: Initial surveys can be conducted any time prior to the pre - demolition surveys to establish if a particular location has supported, or supports, roosting bats. A survey for indications of nursery roosts shall be conducted prior to March 1. If indications of a maternity roost are present, the structure can be removed or modified before a maternity roost becomes reestablished. e. Exclude Bats Prior to Construction Near Roost: Bats can be excluded after July 31 and before March 1 to prevent the formation of maternity colonies. Such non- breeding bats can be safely evicted, under the direction of a qualified bat biologist, by sealing crevices and providing them one -way exclusion doors. Such a device should be employed in all expansion joints during dark hours as a temporary device to prevent the formation of a maternity colony. In order not to exclude all potential maternity roost habitat at once, only one -half of the expansion j oints should be sealed at any one given time during the maternity colony- nesting season. This should allow bats to leave during dark hours, thus increasing their chance of finding new roosts with a minimum of potential predation during daylight. After construction, all exclusion devices shall be removed to allow bats to re- establish habitat for colonies. 19. "BIOLOGICAL RESOURCES MITIGATION MEASURE 6 -6. The property owner /developer shall implement the following protection measures to mitigate impacts to the red - legged frog (see Addendum to the project EIR for additional details): a. Avoidance to the extent possible. b. Minimization. The project shall be designed, built and operated in the following ways that will minimize both direct and indirect impacts to these species. Any construction near or adjacent to the Shannon Creek drainage will be preceded by a pre- construction survey. The existing culvert over the Shannon Creek drainage will not be widened and will only be used as an EVA road. The primary egress and ingress for the project will be off of Hicks Road. In addition, impacts relating to the construction of the outfalls for the project are likely to be covered by the Programmatic Section 7 for the red - legged frog. If formal consultation (via Section 7) for the red - legged frog is required, then the project applicant shall implement all of the Minimization measures outlined in the Programmatic Section 7 Biological Opinion. C. Compensation by Wetland Creation. Any impacts from the project (i.e., outfalls) shall be mitigated by creating habitat on -site at a minimum of 1:1 ratio. d. Compensation by Riparian Restoration. A riparian restoration plan for mitigation shall be developed by a qualified biologist. The mitigation area(s) should be designed to expand existing riparian vegetation and re- create high quality riparian habitat along the Shannon Creek drainage and northern drainage. The mitigation Page 6 of 17 f °l goal is to create and enhance riparian habitat with habitat functions and values equal to, or greater than those existing along the Shannon Creek drainage and northern drainage. The final species selection and configuration shall be determined during final mitigation design. The trees and shrubs to be installed should be of local origin, preferably contract grown from seed or cuttings from within five miles of the site. e. A detailed monitoring plan including specific success criteria shall be developed and submitted to The Town of Los Gatos for approval. The mitigation area will be monitored in accordance with the plan approved by the Town. The basic components of the monitoring plan are final success criteria, performance criteria, monitoring methods, data analysis, as -built plans, monitoring schedule, contingency /remedial measures and reporting requirements. f. Specific success criteria and characteristics shall be developed during preparation of the mitigation and monitoring plan. At a minimum, the final success criteria shall include absolute percent cover by native trees and shrubs of 60% and 40 %, respectively. The performance criteria should include tree and shrub survival at three years of 80% of the original planting. If the final encroachment estimates exceed 1.0 acre, monitoring of the mitigation site shall be conducted for 10 years. Annual monitoring reports shall be sent to the appropriate agencies. If the required mitigation planting is less than 1.0 acres, monitoring shall be conducted annually for five years. g. During the development of the riparian restoration plan, an appropriate area (or areas) shall be identified to replace encroachment impacts at a 1:1 basis. h. Maintain Water Quality ofthe Watershed. The project shall be designed, constructed and built in such a way as to maintain the water quality in the adjacent drainage channels and ponds. Appropriate best management practices (BMPs) shall be developed for the project. 20. SOLAR WATER SYSTEM. Each residence shall be pre - plumbed for a solar water heater system prior to issuance of a certificate of occupancy. 21. COLOR REFLECTIVITY DEED RESTRICTION. Prior to the issuance of a building permit, a deed restriction shall be recorded by the applicant with the Santa Clara County Recorder's Office that requires all exterior paint colors to be maintained in conformance with the Town's Hillside Development Standards. 22. SUBDIVISION REQUIRED. A separate tentative map application submittal and approval is required for the proposed project prior to the issuance of building permits. 23. BELOW MARKET PRICE (BMP) IN -LIEU FEE: A Below Market Price (BMP) in -lieu fee shall be paid by the property owner /developer pursuant to Town Code Section 29.10.3025 and any applicable Town Resolutions. The fee amount shall be based upon the Town Council fee resolution in effect at the time a final or vesting tentative map is approved. 24. FINAL CC &R's. Final CC &R's shall be approved by the Town Attorney prior to the recording of the Final Map. The CC &R's shall include provisions for traffic circulation, vehicle parking enforcement procedures, and landscaping, exterior lighting and fencing restrictions. The approved CC &R's shall become conditions of this Ordinance. Building Division Page 7 of 17 25. PERMITS REQUIRED. A building permit application shall be required for each proposed structure. Separate Electrical /Mechanical /Plumbing permit shall be required as necessary. 26. CONSTRUCTION PLANS. The Conditions of Approval shall be stated in full on the cover sheet of the construction plan submitted for building permit. 27. SIZE OF PLANS. The maximum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 28. PLANS. The construction plans for this project shall be prepared under direct supervision of a licensed architect or engineer (Business and Professionals Code Section 5538). 29. DEMOLITION REQUIREMENTS. Contact the Bay Area Air Quality Management District at (495) 771 -6000 and complete their process as necessary before obtaining a demolition permit from the Town Building Department. No demolition work shall be done without first obtaining a demolition permit from the Town. 30. SOILS REPORT. Two copies of a soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations, shall be submitted with the building permit application. This report shall be prepared by a licensed civil engineer specializing in soils mechanics. 31. FOUNDATION INSPECTIONS. A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project building inspector upon foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and the building pad elevation and on -site retaining wall locations and elevations are prepared according to approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. Pad elevation b. Finish floor elevation C. Foundation corner locations 32. RESIDENTIAL TOWN ACCESSIBILITY STANDARDS. The residences shall be designed with adaptability features for single - family residences per Town Resolution 1994 -61. a. Wooden backing (no smaller than 2- inches by eight- inches) shall be provided in all bathroom walls at water closets, showers and bathtub, located at 34- inches from the floor to the center of the backing, suitable for installation of grab bars. b. All passage doors shall have a 36 -inch wide door including a five foot by five foot level landing no more than one -inch out of plane with the immediate interior floor level, with an 18 -inch clearance at interior strike edge. C. Door buzzer, bell or chime shall be hard wired. 33. SOLAR HOT WATER HEATING. The residences shall be pre- plumbed for solar hot water heating. The plans shall show the location of a stub and valve located in the attics for solar heating use. 34. TITLE 24 ENERGY COMPLIANCE. California Title 24 Energy Compliance forms CR- IR and MF -IR shall be printed on the construction plans. 35. HAZARDOUS FIRE ZONE. This project requires Class A roofing assembly. 36. TOWN FIREPLACE STANDARDS. New fireplaces shall be EPA Phase II approved appliances per Town Ordinance 1905. Tree limbs within 10 feet of chimneys shall be cut. 37. SPECIAL INSPECTIONS. When a special inspection is required by UBC Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted Page 8 of 17 0 to the Building Official for approval prior to issuance of any building permits, in accordance with UBC Section 106.3.5. Please obtain Town Special Inspection form from the Building Division Service Counter. The Town Special Inspection schedule shall be printed on the construction plans. 38. NON -POINT SOURCE POLLUTION STANDARDS. The Town standard Santa Clara Valley Non -point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet is available at the Building Division service counter. 39. ADDITIONAL AGENCY APPROVALS REQUIRED. The project requires the following agencies approval before issuance of a building permit: a. West Valley Sanitation District 378 -2407 b. Santa Clara County Fire Department: 378 -4010 C. Lots 1 -13: Los Gatos School District: 335 -2000 d. Lot 14: Union School District: 377 -8010 Note: Obtain the school district forms from the Town Building Department, after the Building Department has approved the building plans. TO THE SATISFACTION OF THE DIRECTOR OF PARKS & PUBLIC WORKS: Engineering Division 40. GRADING. Grading shall be kept to a minimum to construct the roads within the project. Any future grading will be considered at the time of Architecture & Site review(s). 41. GRADING PERMIT. A grading permit is required for all on -site grading, erosion control and improvements (roadway, storm drainage, utilities, lighting, etc.). A separate application for a grading permit (with grading plans) shall be made to the Engineering Division of the Parks & Public Works Department. The grading plans shall include final grading, drainage, retaining wall location, driveway, utilities and interim erosion control. Unless specifically allowed by the Director of Parks & Public Works, the grading permit will be issued concurrently with the building permit. 42. SOILS REPORT. One copy of the soils and geologic report shall be submitted with the grading permit application. The soils report shall include specific criteria and standards governing site grading, drainage, pavement design, retaining wall design, and erosion control. The report shall be signed and "wet stamped" by the engineer or geologist, in conformance with Section 6735 of the California Business and Professions Code. 43. FINAL MAP. A final map shall be recorded. Two copies of the final map shall be submitted to the Engineering Division of the Parks & Public Works Department for review and approval. The submittal shall include closure calculations, title report and appropriate fees. The map shall be recorded prior to issuance of any building permits for the project. 44. DEDICATIONS. The following shall be dedicated prior to issuance of any permits: a. Hicks Road. A 40 -foot half street right -of -way with the chord of a 20 -foot radius at the intersection with the new street. b. Shannon Road. A 20 -foot half street right -of -way. C. New interior streets. A 40 -foot street right -of -way with the chord of a 20 -foot radius at all intersections and a standard 42 -foot radius cul -de -sac. d. Public Service Easement (PSE). Ten (10) feet wide, next to the new street right -of- Page 9 of 17 i ways. e. Ingress- egress, storm drainage and sanitary sewer easements, as required. f. Trail Easement. Ten (10) to twenty (20) feet wide, as shown on the Official Development Plan. g. Emergency Access Easement. Twenty (20) feet wide, from the new public road to Shannon Road, as shown on the Official Development Plans. 45. PUBLIC IMPROVEMENTS. The following improvements shall be installed by the developer. Plans for those improvements shall be prepared by a California registered civil engineer, reviewed and approved by the Town, and guaranteed by contract, Faithful Performance Security and Labor & Materials Security before the issuance of a building permit or the recordation of a map. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. a. New Streets. Curb, gutter, new street paving, signing, striping, storm drainage and sanitary sewers, as required. Curbs shall be rolled concrete to the satisfaction of the Director of Parks and Public Works. 46. INSURANCE. One million dollars ($1,000,000) of liability insurance holding the Town harmless shall be provided in a format acceptable to the Town Attorney before recordation of the map. 47. TRAFFIC IMPACT MITIGATION FEE (RESIDENTIAL). The developer shall pay a proportional the project's share of transportation improvements needed to serve cumulative development within the Town of Los Gatos. The fee amount will be based upon the Town Council resolution in effect at the time the request of Certificate of Occupancy is made. The fee shall be paid before issuance of the Certificate of Occupancy. The traffic impact mitigation fee for each new house in this project using the current fee schedule is $5,730. The final fee shall be calculated from the final plans using the rate schedule in effect at the time of the request for a Certificate of Occupancy. Credit shall be given for the house on Lot 14, where a house was previous located, and for the three residences to be demolished. 48. GENERAL. All public improvements shall be made according to the latest adopted Town Standard Drawings and the Town Standard Specifications or as otherwise approved by the Director of Parks and Public Works. All work shall conform to the applicable Town ordinances. The adjacent public right -of -way shall be kept clear of all job related dirt and debris at the end of the day. Dirt and debris shall not be washed into storm drainage facilities. The storing of goods and materials on the sidewalk and /or the street will not be allowed unless a special permit is issued. The developer's representative in charge shall be at the job site during all working hours. Failure to maintain the public right -of -way according to this condition may result in the Town performing the required maintenance at the developer's expense. 49. ENCROACHMENT PERMIT. All work in the public right -of -way will require a Construction Encroachment Permit. All work over $5,000 will require construction security. 50. PUBLIC WORKS INSPECTIONS. The developer or his representative shall notify the Engineering Inspector at least twenty -four (24) hours before starting an work pertaining to on -site drainage facilities, grading or paving, and all work in the Town's right -of -way. Failure to do so will result in rejection ow work that went on without inspection. 51. GRADING MORATORIUM. No grading or earth- disturbing activities shall be initiated in Page 10 of 17 1 hillside areas between October 1 and April 15 of each year. For grading operations commenced before October 1, all grading or earth - disturbing activities shall cease October 15 and will not be allowed to restart until April 15. Grading permits will not be issued between September 15 and April 15. These limitations include, but are not limited to these items: driveways, building pads, foundation trenches and drilled piers, retaining walls, swimming pools, tennis courts, outbuildings and utility trenches. Install interim erosion control measures, shown on the approved interim erosion control plan, by October 1, if final landscaping is not in place. Maintain the interim erosion control measures throughout the October 1 to April 15 period. 52. GRADING INSPECTIONS. The soils engineer or her /his qualified representative shall continuously inspect all grading operations. The soils engineer shall submit a final grading report before occupancy /Certificate of Completion. 53. SURVEYING CONTROLS. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer qualified to practice land surveying, for the following items: a. Retaining wall - -top of wall elevations and locations. b. Toe and top of cut and fill slopes. C. Top of future curb along one side of the new street. 54. EROSION CONTROL. Interim and final erosion control plans shall be prepared and submitted to the Engineering Development Division of the Parks & Public Works Department. A Notice of Intent (NOI) shall be submitted to the San Francisco Bay Regional Water Quality Control Board. A Storm Water Pollution Prevention Plan (SWPPP) shall be submitted to the Town Engineering Division concurrently with the grading permit application. Grading activities shall be limited to the period of least rainfall (April 15 to October 1). A maximum of two weeks is allowed between clearing of an area/building on an area if grading is allowed during the rainy season. In addition, straw bales and plastic sheeting shall be stored on -site for emergency control, if needed. Install fiber berms, check dams, retention basins, silt fences, erosion control blankets and fiber rolls as needed on the project site, to protect down stream water quality during winter months. 55. SILT AND MUD IN PUBLIC RIGHT -OF -WAY. It is the responsibility of contractor and home owner to make sure that all dirt tracked into the public right -of -way is cleaned up on a daily basis. Mud, silt, concrete and other construction debris SHALL NOT be washed into the Town's storm drains or creeks. 56. NPDES REQUIREMENTS. All work within the project shall be in conformance with the National Pollution Discharge Elimination System permit issued to local agencies within Santa Clara County by the San Francisco Bay Regional Water Quality Control Board on October 17, 2001. 57. FISH & GAME REQUIREMENTS. A "1603" permit shall be obtained for the California Department of Fish & Game for proposed improvements in or near riparian areas within that agency's jurisdiction. A copy of the permit shall be provided to the Parks & Public Works Department before any permits are issued /final map is recorded. 58. UTILITIES. The developer shall install all utility services, including telephone, electric power and all other communications lines underground, as required by Town Code 27.50.015(b). Cable television capability shall be provided to all new lots. Page 11 of 17 59. RESTORATION OF PUBLIC IMPROVEMENTS. The developer shall repair or replace all existing improvements not designated for removal that are damaged or removed because of developer's operations. Improvements such as, but not limited to: curbs, gutters, sidewalks, driveways, signs, pavements, raised pavement markers, thermoplastic pavement markings, etc. shall be repaired and replaced to a condition equal to or better than the original condition. Existing improvement to be repaired or replaced shall be at the direction of the Engineering Construction Inspector, and shall comply with all Title 24 Disabled Access provisions. Developer shall request a walk - through with the Engineering Construction Inspector before the start of construction to verify existing conditions. 60. DRIVEWAY APPROACH. The developer shall install a minimum of one (1) Town standard residential driveway approach for each lot. The new driveway approaches shall be constructed per Town Standard Detail. 61. LOT 14 DRIVEWAY. The driveway to Lot 14 shall be the minimum width required to provide fire access. The intent is to minimize the visibility of the driveway. 62. AS -BUILT PLANS. After completion of the construction of all work in the public right -of- way or public easements, the original plans shall have all changes (change orders and field changes) clearly marked. The "as- built" plans shall again be signed and "wet- stamped" by the civil engineer who prepared the plans, attesting to the changes. The original "as- built" plans shall be review and approved the Engineering Construction Inspector. A Mylar of the approved "as- built" plans shall be provided to the Town before the Faithful Performance Security is released. 63. SANITARY SEWER LATERAL. Sanitary sewer laterals are televised by West Valley Sanitation District and approved by the Town of Los Gatos before they are used or reused. Install a sanitary sewer lateral clean -out at the property line of each new lot. 64. SIDEWALK REPAIR. The developer shall repair and replace to existing Town standards any sidewalk damaged now or during construction of this project. Sidewalk repair shall match existing color, texture and design, and shall be constructed per Town Standard Detail. The limits of sidewalk repair will be determined by the Engineering Construction Inspector during the construction phase of the project. 65. CURB AND GUTTER. The developer shall repair and replace to existing Town standards any curb and gutter damaged now or during construction of this project. New curb and gutter shall be constructed per Town Standard Detail. The limits of curb and gutter repair will be determined by the Engineering Construction Inspector during the construction phase of the proj ect. 66. CURB RAMPS. The developer shall construct curb ramp according to State Standard Drawings at all intersections. The actual "Case" as shown on the standard to be used will be decided by the Engineering Construction Inspector during the construction phase of the proj ect. 67. "HYDROLOGY AND WATER QUALITY MITIGATION MEASURE 7 -3. Energy dissipaters should be provided at the outfalls of proposed storm drains to minimize the increased potential for erosion hazards due to project development. 68. "HYDROLOGY AND WATER QUALITY MITIGATION MEASURE 7 -4. A Storm Water Pollution Prevention Plan (SWPPP) shall be prepared prior to start of construction. The SWPPP and project plans shall be reviewed by the Town Engineering staff. The Page 12 of 17 C. SWPPP shall be in conformance with the Santa Clara County NPDES Permit as amended by the San Francisco Bay Regional Water Quality Control Board ( RWQCB) on October 17, 2001. The SWPPP shall be approved concurrently with the grading, drainage and erosion control plans. Reference the Addendum to the EIR for additional details. 69. * *HYDROLOGY AND WATER QUALITY MITIGATION MEASURE The proj ect design shall incorporate water quality mitigation measures in accordance with current NPDES requirements. Water quality measures should include use of biofilters, drainage swales, and detention facilities to mitigate non -point source impacts. In addition, the SCVWD and RWQCB recommend the incorporation of site planning design measures to help reduce potential contributions of urban pollutants from the project. See the Addendum to the EIR for additional details. 70. * *TRANSPORTATION AND TRAFFIC MITIGATION MEASURE 8 -2. In order to minimize potential traffic safety impacts the property owner /developer shall take the following measures: a. Adequate sight distance shall be provided for the project access road /Hicks Road intersection through removal of vegetation and grading of the embankment. b. A stop sign shall be installed to control traffic on the project access road to Hicks Road. The stop sign for the proposed driveway shall be located along and parallel to the north edge of pavement on Hicks Road. C. Warning signs shall be installed indicating a "T" intersection along Hicks Road approaching the new driveway. These signs shall be located approximately 300 feet east and west of the project entrance /Hicks Road intersection. d. Traffic reflectors shall be installed on the south side of Hicks Road at the intersection with the entrance road to the project. 71. * *TRANSPORTATION AND TRAFFIC MITIGATION MEASURE 8 -3. A separate pedestrian trail shall be installed along the north side of Hicks Road. 72. "TRANSPORTATION AND TRAFFIC MITIGATION MEASURE 8 -4. Use of trails by bicyclists, particularly the trail parallel to Hicks Road, shall be considered during Architecture and Site review. In addition, design issues such as the appropriateness of trail widths, pavement versus compacted earth, and trailhead facilities shall be considered during Architecture and Site Review. 73. GEOTECHNICAL REVIEW OF SUBDIVISION IMPROVEMENT PLANS. The project geotechnical consultant shall review and approve all geotechnical aspects of the subdivision improvement plans to ensure that their recommendations have been properly incorporated. The results of the plan review shall be summarized by the geotechnical consultant in a letter and submitted to the Town Engineer for review, prior to issuance of permits for construction of subdivision level improvements. 74. GEOTECHNICAL PLAN REVIEW (LOTS 1 THROUGH 13). The project geotechnical consultant shall review and approve all geotechnical aspects of the project building and grading plans for individual residences on Lots 1 through 13. To ensure that their recommendations have been properly incorporated. The consultant shall verify that recommended measures to address potential debris flows on Lot 6, and potential co- seismic ground deformation on Lots 1 and 13 have been incorporated. 75. GEOTECHNICAL INVESTIGATION (LOT 14). The project geotechnical consultant shall Page 13 of 17 0 complete a site specific soil and foundation investigation as a basis for preparing recommended geotechnical design parameters for Lot 14 residential improvements. The results of this investigation shall be submitted to the Town for review by the Town Engineer and Town Geotecbnical Consultant prior to approval of a site specific development plan. 76. GEOTECHNICAL FIELD INVESTIGATION. The project geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of the project construction. The results of these inspections and the as -built conditions of the project shall be described by the project geotechnical consultant in a letter and submitted to the Town Engineer for review prior to final inspection. For further detail on conditions 71 through 74, see the letter from Cotton, Shires & Associates dated February 12, 2002. Parks Division 77. AERATION TUBES. All impervious surface encroaching under the dripline of existing trees shall have aeration tubes installed and these tube locations shown on the plans. 78. IRRIGATION. All newly planted landscaping shall be irrigated by an in- ground irrigation system. Special care shall be taken to avoid irrigation which will endanger existing native trees and vegetation. 79. BUILDING FOUNDATIONS: Any buildings under the dripline of existing trees shall have a foundation built from pier and grade beam to minimize impaction on existing trees. 80. TREE STAKING: All newly planted trees are required to be double staked to Town standards. 81. GENERAL. All existing and newly planted trees shown on the plan are specific subjects of approval of this plan and must remain on site. 82. IRRIGATION SYSTEM. Water efficient irrigation systems shall be utilized to conserve water in all project irrigation of publicly landscaped areas. 83. VEGETATIVE SCREENING. Vegetative screening shall be used along the development edges, where appropriate, to soften views of peripheral buildings and to integrate landscaping and native vegetation. 84. WATER EFFICIENT ORDINANCE. This project is subject to the Town's Water Efficient Ordinance. A fee of $472 is required when the landscape, irrigation plans, and water calculations are submitted for review. 85. TREE PROTECTION. Tree protection fencing shall be placed at the dripline of existing trees to be saved in the area of construction. Fencing shall be four feet high chain link attached to steel poles driven two feet into the ground when at the dripline of the tree. If the fence has to be within eight feet of the trunk of the tree a fence base may be used, as in a typical chain link fence that is rented. The fencing must be inspected and approved by the Parks Superintendent and must be installed prior to issuance of a grading and /or building permit. 86. ORNAMENTAL LANDSCAPING. All formal landscaping shall be within 30 feet of the perimeter of the houses. Any planting beyond the 30 -foot perimeter shall be native vegetation that is drought and fire resistant, and planted in natural clusters. 87. LANDSCAPE GUIDELINES. The adopted landscape guidelines and native plant lists shall include the recommendations of the Town consulting arborist, except that lawn areas shall Page 14 of 17 not exceed 5,000 square feet. The landscape guidelines are attached as Exhibit C. Page 15 of 17 Cs TO THE SATISFACTION OF THE SANTA CLARA COUNTY FIRE DEPARTMENT: 88. WATER SUPPLY. Two water tanks with a capacity of 10,000 Gallons and one wharf style hydrant shall be provided unless the proposed public water system can be extended to provide appropriate lot protection, or other acceptable means of fire protection can provided as authorized by the Fire Department. Installations shall conform with Fire Department Standard Details and Specifications W -1. 89. FIRE APPARATUS(ENGINE) ACCESS. Provide access roadways with apaved all weather surface and a minimum unobstructed width of 20 feet, vertical clearance of 13 feet 6 inches, minimum circulating turning radius of 36 feet outside and 23 feet inside, and a maximum slope of 15 %. Installations shall conform with Fire Department Standard Details and Specifications A -1. 90. FIRE APPARATUS (ENGINE) TURN - AROUND REQUIRED. Provide an approved fire department engine roadway turnaround with a minimum radius of 3 6 feet outside and 23 feet inside. Installations shall conform with Fire Department Standard Details and Specifications A -1. Cul -De -Sac Diameters shall be no less than 64 feet. 91. FIRE APPARATUS (HYDRANT). Where buildings exceed 150 feet travel distance from the street either an on -.site (private) hydrant or an approved residential fire sprinkler system shall be provided. 92. PUBLIC FIRE HYDRANT(S) REQUIRED. Provide public fire hydrant(s) at location(s) to be determined jointly by the Fire Department and the San Jose Water Company. Maximum hydrant spacing shall be 500 feet, with a minimum single hydrant flow of 1,750 GPM at 20 psi, residual. Consult with San Jose Water Company relative to main sizing requirements and hydrant spacing. Prior to applying for building permit, provide civil drawings reflecting all fire hydrants proximal to the site. To prevent building permit delays, the developer shall pay all required fees to the water company as soon as possible. 93. TIMING OF REQUIRED WATER SUPPLY INSTALLATIONS. Installations of required fire service(s) and fire hydrants(s) shall be tested and accepted by the Fire Department, prior to the start of framing or delivery of bulk combustible materials. Building permit issuance may be delayed until required installations are completed, tested, and accepted. 94. TIMING OF REQUIRED ROADWAY INSTALLATIONS. Required driveways and /or access roads up through first lift of asphalt shall be inspected and accepted by the Fire Department prior to the start of construction. Bulk combustible materials shall not be delivered to the site until installations are completed as stated above. Building permit issuance may be delayed until installations are completed. 95. FIRE APPARATUS (HYDRANT). Prior to project inspection, the general contractor shall ensure theat a "Blue" dot has been placed in the roadway as directed by the Fire Department. 96. HOUSE NUMBERS. Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. SECTION VI This Ordinance was introduced at a regular meeting of the Town Council of the Town of Los Page 16 of 17 Gatos on March 4, 2002, and adopted by the following vote as an ordinance of the Town of Los Gatos at a meeting of the Town Council of the Town of Los Gatos on March 18, 2002 and takes effect 30 days after it is adopted. COUNCIL MEMBERS: AYES: Steven Blanton, Sandy Decker, Steve Glickman, Joe Pirzynski, Mayor Randy Attaway. NAYS: None ABSENT: None ABSTAIN: None SIGNED: MAYOR OF E TOWN OF OS GATOS LOS GATOS, CALIFORNIA ATTEST: 1-7 CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA Page 17 of 17 f 'a yr HR-5 Prezone HR-2 1/2 HR-6 Prezone RC HR-20 Prezone Prezone1 GENERAL DEVELOPMENT PLAN LANDS OF THE DAGNEY GROUP. LLC TOWN OF LOS GATOS, CALIFORNIA SHANNON VALLEY RANCH BY GREENBRIAR HOMES COMMUNITIES, INC. TABLE OF CONTENTS SHEET NO. DESCRIPTION 1. COVER SHEET 2• CONCEPTUAL LAND USE PLAN 3. CONCEPTUAL SITE PLAN / CIRCULATION PLAN 4• LEAST RESTRICTIVE DEVELOPMENT AREA 5• CONCEPTUAL GRADING PLAN 6. UTILITY PLAN 7. SITE SECTIONS S. TREE NOTES 9. SCHEMATIC LANDSCAPE PLAN RECEVED JAN - 3 2002 TOWN OF LOS GATOS PLANNING DEPARTMENT flEV: PEV: M", MATCH LINE A 575 -02 -013 umwx w. R0"0 Q SEE BELOW ` \\ LANDS OF t Cltt OF SAN JOSE D) a GuH ° " EUPIE... ce E- N ' r °i,.•,'\\ ° 20S a3 i M F, y cIII SITE II Y II N ° II 557- 23 -040 LANDS OF CHRISTIAN CHURCH OF LOS GATOS 8.632 Ac. VICINITY MAP 567-2 3-a25: / `. O Az _. . i `I iii 1- o° U. w] lo ssuE LEGEN LANDS OF BUftx: Ege \\ i u gc+'JJ' 8.441 J F. \ \4 1, 1 \ II. p9QO PROPOSED TOWN ZONING L, in ; . 1 11 N ;, f 1 H 1 H q 0 M QI An CURRENT COUNtt ZONING II II 11 W ® Y p v - _ _ i `\ I 11 1 ZONING _ W CURRENT TOWN ZONING N ` 1 1 1 A TOWN PREZONINC UCM°..E CBEEN HR-5 P BE BE9b1E9 1. EX.l G. 0 PEx vvsaEE, svx[ +xo O) SCG4C LM iMN1 EM1S[YEMI y5Pd / \\ \ Y r .' :. J J,f _ ^` \- f _ _ \ R 5\\ g \I O xLL9gE PESI]FMULti AA 1 1 LM }\ \ \\ ApJAVX AESIMfi]IM .xG PARCEL 47557 -M a] AREAS OF USES: 11.91E STREET. (WITH. NM ECrf 3.1 4 Fow U56] -23 -045 mFN S. FAZIO IHCN9 r j i ___ i \ \\ mrz II I c QW.AY, zszzu1\ 2.0971 11' *wa .._I .. \\\ \\\ TxRU qa l1Nlx•]EY •:xesu wlu 9Twx Lms x s a fY \ f SUAEIi - - L 1 ' \ \ AREA KBNG GVI fWPE S lm B (PUSICt •Y .t 1 1 1 \ \ \ \`• %/ \ \ \ ] mu OGFN Ear Plow n mxu u) as.B> u roru cRss .R fl \ _ - .vdID6^ Jt.T ..'.... .... =.;a i4 :S •v AfW'CNCG' jF JG ANT vI L N 1.872 A LOT AREAS 1 _ _ \\ - R -O -S 6U AM -7 EBr J 1 - ^' _ I Wr 2 zsfi AcnJ RVICE EASEMEMZ_ LI\ 527 -56 -011 aii 1 o s xuisOFLEUPPUR11s u.n r UB n zes 4m d"V ®2®s d mi a iii i.n: O \\ 527 -56 -0101 I\ " Z a ,Iti sett K:.. vVA p26, 3.012 Ac. A/ I / e ° w Im Es.: Jrn1s LANDS OF JAHPN NOTES. WUQiGE \ \` 537 -17 -011 1. IIU. OiTIMG OF HGME41O NM ISLIS WGG K\ 527-56-009 ti L, .. i s. OiSilsec BRITB zwx vnnm I.T . ro BE AEMOEB 2.492 Ac. LA3 DSFACEEPLANDSOFCHITREC v v 0 PROJECT INFO sJSwo:' m1. E, 1. 1 v \\ ` ,_ - i IALCWr GNQNBAWI MEM COYMINI25. MC. M'ItOPER: 9MN f/JSTAVZO. J:. 1'{ I NO STFNS CNEEN BLW.. 11 \\ i 1. - ASET E. / (p1J0515E - Id a5119 527 -56 -008 1 HR-5 1.672 Ac. 11` I 1 [` l. l sE ENOIXFFR S9Mµ5 iXFJgeGESIZN1LANDSOFCHANGi \ 1 IN slu -afio E E wsnxc use NEEE E .9.wmxm AESIOExcEs 11 11 \ \ tPEE 1 1 A-209 C \ ; - PROF69Ep IR: x — (AW, / 014N SP/CE 1 1 1 J \\ \ 1 P l I.. MAY S/i xi951T 1 I 1:1. BEST VMIEY sNNT.M1x ms]nCT 1 j O PoNFA M 1 SYPPLT. TO / SE M, COUPMry fy 1 1 _ p GBIE iEi£190N: .31. JBI.°]B] -H -PoB k stiJ -L -Oa: I527-56-006 ix, \ t HR -5 pd li o cxoss Pl6A w.sua I\ 111 `LANDS 1 OHOLBERi yf LANDS OF SEPA SOUR 537- 17-012 p A- i 1 ------------------ 952 M- 2 y Dabs - c. 527-56-00+ F'' ik ] iys level 1v . 1-022 Pc IS \ m4 J;' Ervr CONCEPTUAL LAND USE PLAN E + LANDSbFSTERANHAs J / 111 /f\ / o ® o y 7sC UE:I'.eo. LANDS OF THE DAGNEY GROUP. L.L.C. z c pBNMZ .. . / MATCH LINE A ^, ` I8 y _ I __ .._ Jam/ Las uros cnJECRw.'i 5ll -1 -003 5 }] 18 -002 `y 1LAND25. 53± OF SWEI. LANDS OF MCBETH KSi ° SEEABOVE - 25. 532 Ac. I [' 5. 032 Ac. pA a lmB xIVm & ENe. 3 11 VII 0 S 4I 20a d H 1 i yi . A ° 2®s SHEET 2 OF 9 sw 1us Brave. 1 Iva r it _ I \i' x DEVELOPMENT AREA LANDS OF THE UAGNEY GROUP, L.L.C. A TCH LINE a _ .__ _ r t - us tyros SEE asovE _ • CJ- IYu y - SHEET 4 OF 9 w msc um o, xoe, ,xv w NNI s,mF 10 6 "'N"A DM In I. Pc PNNNR xl3ilw_'- _ R4N -" i MROMMATE ENrt MWORK QUANTITIES -^'> \ \ \ ... _ -. - %ossw, INt AOa a s zsxv CUT FlLL \ I.., T LOTS TOTAL 23627 23827 i \ \ ` 575-02-013 TYPICAL DRIVEWAY SECTION STREET 3071 2305 ' l LANDS xls) TRAIL 1970 1394 \\\ M_OF -SAR. So NOISE— IN Kuss vs.., TOTAL 28868 Is Is Nm MWUEa Mu BNIM'CE oN sn , 2s / S A, D SITErc "IFNUL zsx_ iROoAIL —L EMERGENCY VEHICLE ACCESS ROAD 56- g3 -040 LAND$ OF CHRISTIAN CHURCH OF L68 GATOF{ :' 1 - 1 \I\ " \\ \ i VICINITY MAP 0,'!y\ NtlN EM D itl iWL ITM@ Y , r• _ ' I p. ° 1 \1' s \, - } p aT, N.KWP ? 8 K8, xo. iE TME: wemr ro-xx /- r $'• \ Ur Ei Is1MD Rcs.,wD vEC[r .' c 8' e !, 1 7 po o TREE LEGEND v \ \: \ ! ., e . _ .I ,! _ aq ; IB 1 (( dv I iwMr"inzE` R "E — '..1 r:41 i v c 1q 111.S IIIE TO uuNn F '0 Y T1EE ID BE REIpuEO A + t ; as+EGATO r $,A &S rmociss .\ '. _ E / _,. \ ` \'. \: } EASEMENTExFA [xGENx)4M KGE. 3J't' l3 ryI 1 8\ }.P , } , } X , '. 1' Y\ .,. yp •'..' r .` ljLRl \:\\ 1 LLS.ESE WED Sa ESCENK C0.v5CRVn110Np y F I 1 "1 I li 1C sl''. dq 5p4'. DpxM1EVP Cry aCi I ( q.~ . \S "'/ \ ' S.E. SWaF w . 1 "rte \ \ 4l. IR151w0 0.M 1 ' w PGR d G[I T nG at[i4 :. ,.'/ \ i S ,• '!1 ;\ % \\ \ ? \ f.E.E N611L r WN6 SEMU IS 14 , p1 ER T1 , I , / \ ('\ Na 1 \ \ _ .{j H , • -' \ $\ \, D.E %tlVI.2 SiMY oRWI FISflIE 1 RD PI InT /u, l I } \\,• . / /. : \ . /, ') " A r J , k v /; LOi r! wu40B'9 m E i \ l `0 - AI \11F3 s mnN EV'E E M ludTivRNA+o xo I rw + , IG \` / Sb; Jd 4t \ \ w nx'4 c"ip¢'EC°'^'"E — - ' 13 vs.F. sE \ . \ ...... k / ( PRChgf $TsNipA O I \ ''AEt wr gE REpr°p6 1 JS _R \ FlREOEPi TURNWi x _ . "• ll 1 /6s \ T D .• 6 \'~ Y". / n I \ 9Db 'DUPN'rICH 5' •WY 1 •\ \ // nI M \ , E 5 Sx p \\ , TRAIL SECTION GG" ffAAAA yMIYp `\\ I _ 567-2 11\ L LANDS a O UN 1 i Ay. R -O -S l vo' ESCmP ox e.,.. m w`ro w •.EI64NM -T M1D4RlF \NP 'i ,21 VI ,_ - 1 n, A i A < •/ f-J I - c. s u 7 1 A / JI S OF FEUph ARE, v AdovosM mow P.w w i PER ry, \ I i fww m.nx /o,. I _ 1 vl l L1 1 ss CI iL',. \ \ 1 \ •. / LANDS OF ARAN \\ , . I : _ X \ D' ya\ z.'! r . NO EE ISnNO NIURNSA TO 6E RMOUSxM. 2. PREPLoT MNOOfRol! S RIELLwNY wDAI - \ y r 537-17-011 "svaFV io cNN16E A v.Nrx. s 1 527-56-009 z i II x `, A j a usnrw vureRrwN vmm mr e PI M RE,S1 } DS OF FEE I. FASFe,EM.LOdlgxS sx6aM PAE uP xMNres9± Pc q 1 V 4 }µ D PAS SURS= r0 .0.VSwEM nl 1XE DYE Arv05 Oa CHITRE !.- 11A P oa w\ \ 3 I} 'd 34 IOt Ac. SSRORI PE.wPREPUUmx. Ys. C rL cRwwc IIORx_uwL AS c°NPI . x 1 1 A II x R EM1F VNOS OF wwG Nn NNYLTwr c ENGCO v1A / I d A ' ` ANN10 r ICNRDNKE MM GEOIEMNMK IXoL° RR110R 2• 6' 1 1 \ p \ \ U $ P GrJRO[ P r 1 WEROAY PEA e, soxc wEUS sxaL AE UsUN. [O .51 NE,xoorvw CATKIN of qo XG TO ORRRRR RE°VUlS -' POw1A5RlEO 6Y VEE GUTTER DETAIL \. I \ t 7 1 n3 ENCINEEIS SPIT. c1AV vPLUr wnlLR °LSwn. c.0 p°m zcs - zeo° i V :3TT, ,' a\ N 9 /91. E.N oN xz ro mNU Ron wsMe:r oesER,.TwN of PE• _ \ Pu wcu . sNmwNExrs. q Y J" [.slil 1 I Zn • L l i. swx xc NUR rRNLS re BE DnwunM nr m of Fl. Is. c/L - 52z j 1 I t I HI - -J'' I o[scx co°Imuww° wrx TRE SAR aF Los tyros PFz —[=E P'S a s. E 1.6 ., AL YktPWRyIµ4 III II1 C ' g e:.' , ry` \ 1 }'Ij }311 II _ G .INE.T aF PMNS AND FaRESrm. xo• 10' la 10. LAN'ui 'J CI 4NN \ LOT A PCR CPp E ,l'1 11 1.b Ip' IRNt lllcnYFM NIO EaulM M POINT ov lF SuNK[ / I I IINIED U E. 1 \ /(gyp ( r I II' A r F O- \ \ 1444'...,1 I - LM plO51M AND °"So. CPYpIIEC /MESIMSXru 1 .REPORT D F 1 pp COLREE EME j}II I'nl - a RNAI. o[ sloil. ho F; 1 I 1 N •'9. CPp SP.V£ KGS fY ^.tPT L°i A s1W1 6E YVMNMO 6Y cuss 2 KO 66E / I I i r/ 1 A _ 1 \II I I 7j ' s O°' i f ' \V I y -. ( mE roYE ox+rtxs ASSOC.nox ixol rx° /°R NDmoua I1( f j 1 1 _ b I ' t f w PMIERS rRNC sX41 AE .R1.[D 6I ENF xD.A ir. r \ A\ I\I/'/ III I I y 4 I I • - S i '\ I II 10, TRA WIMIN LOr C MLL BE MNRS M Bf ME NAA INTERIOR ROADS - ALTERNATE "A 11. TIE siM S el PII. I OF iNE Ex, S. GROSSxc 1 5z7 % -005 _ $ , 11 APiorwE mrtEa RNON[ NOrtN wRw nwL ° Enw Rn (xTSI a. F h 73F2 %pc I \ )(I'll (, l i r 537 -1] -012 6 R T M RI RM lq REN9 WOtOFSEPAHMANSOURRkv. s -W m ' 1 11.952 Ac REV.1 m ' y so ?— szis- ooa1," r , l l E' l CONCEPTUAL GRADING PLAN 1 AU E' ( 3 LANDS OF THE DAGNEY GROUP, L.L. C. S DF r$TERMKA I HVIJ o O L @°2 j; N 1 A \ l ' : p VIII / T I I 1 / / U L/ \ . LM urDS yy GWfORnu J S' s'.. ses[/ F M AMM UM INTERIOR ROADS - ALTERNATE " B" -- - \ 1 1 s r / P I t *. i I ® avlLfw.Nueews. INC. sceASl - eo• Ixrsl - L%iAl0S OFUS fz E /' /. N/ '` \ ! g'I I I ! {AMPS OFBiAIOBEI{ F lA xoM vN IsI& 2531b .AH.':. . \ .:.n' l 5.03E Ar// _.,' / / .. ."SA EET 5 OF 575-02-013 I LANDS 4F CITY 0 —W JOSE z 3 § II.!) cSITE NT\ \r = w 56] 23 040 LANDS OF CHRISTIAN a/ DH oos ? VICINITY MAPcHHfLospnr REW .aUSr ENr m Tee { RE REOUPm W irAi•.wu m /Y' L NpS {>R 6}1{tN SE R l LJ 4n 35FI L I, 1 ^. ".`. _ r I.; \11 \ \1 \2 m r / l / w3me v E r. cusroN o f 3 l EASEMENT ND VEIJEC a ROwxv Ass IFFEE 5 r ' '.`L \ 1 I I, - \ 1'! \ 09.5<.E9 CxG[ONSSEM MNi4t11 ` - 11111 \4' "zo[ wBJEE Co""EiEDwvN - J III FR" E.sE4Ex15 eErwax Lm it .- \ s.E. sLaRE 14 µD E' IDRMMpT0 PUb.K W1RnR,' sENER 3 4 1 I. Lro DR Q'x r ° a eURRE I 'Ri ^ 1\ .c weuc muLs IPR DEb i 2srSsNwMlac s : ^ g1 \ v. 1 / APPRO%IAMTE LOCAMkE OF SHE ^ \ \ q1 \ I AfiCe1 M P , JOINT"TAENCd HAS BEEN 6H0 , 3 R E y[A 11 I A P ft 4 1 _ /.' EXACT OON OF JOINT NCN .'/ / W t 1 7 TO BE 6E E5 HOED BY .L, N \ PROVIDE T 7, 1FIR O§TH2''' •IFIRE`DEPi.-:IiM1OUi .- .. II v \•! l \. 1` 1 E, I Iv l v E Jr — rI F 1 \ \ AaQIwN \ - ...WATER NE HAS BEEn sn0wrv. . 1 ILR y r E rauL iG - __- -__r 567- 24' APPROIIIqATE LOCAl10N OF THE 1' lv 0 1 1 G,ILANDS OF A JOUM( I Q - 1 ' iR.ut jry, pl A : LINE ITO BE0 9kNE0 %By SANAJOS _ II} 1 a/a 1 X/ \'\ \\ WATfR. COMPANY ^ l I R-0-5 641 M 7 i TREET IGNi P LEGEN FOR. oRNx . NxDLE t V'! v — PRavosm smnu cew UBk J Lt 9 d4 >? i`T' — PRaosm N.o owETjCFLEJPt B` - / L J L I ;b., . '(\ F X\ A' y\ Oy, pv2v y d v vv I vv v l 527; 56'0! 0 _ _ III A J II' I // m Uouw RNET 3.01i Ac oaEO..' SE R 4NOS OF JAPAN NOTES oxulucE FF wuE A AND wLDwcs rD BE DEOSXED of 1 i• \ %r III X \ \ "^ spry 3. giEPLmIME Or RRWM IS MWIRN RT µD 527-55-06J / .\ ` \ ` „ lr I!1DSo-OF FEE %s'Oo''cror.I -El — mrwx Lon.Ano BE Irtuwro 1.2 49i 4a \\ 1 \ \ 1 \ V _ o ME SUWM tD MARSIFEW Xr THE ENE R. ENEM LDCUIws I.. µE ANRD%x. T J 1 ' . or RsROrc.IE , w.w PREPeD. nox. 1 \ I 1 \ E% . EULVERT A AA ) t I'r ` 'CROSSING s. cwgND wcRr swu BE m ""FnT6REMAIN !E.rAWwCE mM'cmrzaw uL FlNnMmx a FR. uIO XwuFOW 9x ENDED c.. EVES /IV / 9e. l 1 6- Eb5TX4 NELLS ENRE BE 4NMNNEO OR RMISMDIIICI1'Q \ - /' I I I I -.. rnva9 ro o ROF REgR E ro HRRE aEo er J Ewer, wufl' IrnrFrt D51Rx'f. cru (wel :55 xew ME`5 L rsaeirvo AFRAH E MR oman OONDR llax ar 1 \ 1 1 ` _ % 52]56 -006 I1 I II i I I i _y T ! T. W F RO .0 SRREER s M DE REOal¢IEn E Ly7r REwxsvum rnwn ro ssuwcE or 1 vcam¢ r E9NFHA^ o \ 1' \ V:, I I I I HONES . BE caxsiRUCIFD wlTl RRE IIPRAFRARI v I _ ___ 1 I -A LANDS 01 y . 1 I I Il/ I III _ el 1 ! I tI i i , ' ouior oi[ tiuo, xiE vx.n on .DCOMaxrROneormol 1 le I j':I -(.0 ARE W m): ) swlA ROS. u, Xro.E1 a" xmlX Pe Io alawm d NODE ORROX CF It µD ..E. DY r1E ryM4 e 537- .17 -012 REV 9 DS D, y# LANDS OF SEPAHMANSOUR RM i 12-01 8 1 I CONCEPTUAL UG'UTILITY PLAN 027 56 004 AI_ 1II I I'. n 1 F I I LANDS OF THE DAGNEY GROUP, LLC YS c I .111 I I dI / - L F Is E A RA it 1 " f Los Gras cwroRxu Ii EACH $ sonrs i t . \ `. • - CINw.bN. umN+wEsM..Swu' INC. i O'FE/VCU2 & Tl 50i£ A ' / 8}4EET 6 OF 9 a 0! ° ° m° u 4,4 E'w 1.00 2.40 »W 4.00 5.W 6.0] SITE SECTION C -C SITE SECTION B -B s 4__ L EXISTING DRIVE WAY OF LOT 14 w SEC a — a KEY MAP - NOT TO SCALE SITE SECTION A - A o a4 ®a scutY -ao• SHEET 7 OF 9 SITE SECTIONS LANDS OF DAGENEY GROUP, L.L.C. om mimm I 0wi 0m01 NoIX E'w 1.00 2.40 »W 4.00 5.W 6.0] SITE SECTION C -C SITE SECTION B -B s 4__ L EXISTING DRIVE WAY OF LOT 14 w SEC a — a KEY MAP - NOT TO SCALE SITE SECTION A -A o a4 ®a scutY -ao• SHEET 7 OF 9 SITE SECTIONS LANDS OF DAGENEY GROUP, L.L.C. I1 i r 1 1 1 1 1 Ir -' I1 1 L IL L LOT A M.) 4s 6 YI s 6, LOT B04S Aq tl 0 4 9 3 19 b 11 E 11 i/ 13 LOT C 6.S I[S 9 RB55W XxL rab VICINITY MAP Mtt 10 $LVE NOTES: P E.. BUDWBB ro BE aEx01KXE0. z. PREPLOIONL m MOWS a PRf11xuW(t 4q SCFlSIIXBSnNG ro cX41DF. HRR IOHIf MMW LOi P M BE REtlWEO E11511N0 PRWgYE iMYt Ntllxx LOi > 10 BE ..D 5. DESroBSIICx. w°< oDnB NPaIaxBE+MOBBME IxmEMBlaor i4 OF IDSm Ob/RINEXI Or PNd6 NN MXESIBI. 1. 11X4. 1RM M AWEM WO LOUIICN Cr PoIM OF BEMB 10 .1DlILEBT PROPFAIY IO lxE M51 9W1 BE CflE1XlMD W CWRpe1Xi10.Y NttX ME tOxX OF l0B Gi05 iRNLS nX0 @xEwnn mxxlRE[ PP 1x I.. Or W. DESwx. i. OPFx SPKE 116 S. E10EPE Wi B . BE ..m B! 1. wuE maa1. S assO u BE u(nmOw) Dr xm0 / Om x..l l B. E.Nk mMW LOT C MM BE NNNFNNEO By 1XE X.9A y 0 w Bo EO sufE:l • -aD k ai'. B -ii ni i CONCEPTUAL SITE PLAN CIRCULATION PLAN a LANDS OF THE DAGNEY GROUP, LLC. _ n[ciPPe[4 fwsEYfMS BLiwE[N LOi ,x WO 4x05 Oi BVPxE WEX i ON LOt SIN` x0 ORNEWxv ON 4Y'JS EFOr B. BU E SS P[ R3 /0ED rOP EuEPGFNEV vF it1E KCL55 L PUPPOSEC I 1 I1 i r 1 1 1 1 1 Ir -' I 1 1 L IL L LOT A M.) 4s 6 YI s 6, LOT B04S Aq tl 0 4 9 3 19 b 11 E 11 i/ 13 LOT C 6.S I[S 9 RB55W XxL rab VICINITY MAP Mtt 10 $LVE NOTES: P E.. BUDWBB ro BE aEx01KXE0. z. PREPLOIONL m MOWS a PRf11xuW(t 4q S CFlSIIXBSnNG ro cX41DF. HRR IOHIf MMW LOi P M BE REtlWEO E11511N0 PRWgYE iMYt Ntllxx LOi > 10 BE ..D 5. DESroBSIICx. w°< oDnB NPaIaxBE+MOBBME IxmEMBlaor i4 OF IDSm Ob/RINEXI Or PNd6 NN MXESIBI. 1. 11X4. 1RM M AWEM WO LOUIICN Cr PoIM OF BEMB 10 .1DlILEBT PROPFAIY IO lxE M51 9W1 BE CflE1XlMD W CWRpe1Xi10.Y NttX ME tOxX OF l0B Gi05 iRNLS nX0 @xEwnn mxxlRE[ PP 1x I.. Or W. DESwx. i. OPFx SPKE 116 S. E10EPE Wi B . BE ..m B! 1. wuE m aa1. S assO u BE u(nmOw) Dr xm0 / Om x..l l B. E.Nk mMW LOT C MM BE NNNFNNEO By 1XE X.9A y 0 w Bo EO sufE:l • -aD k ai'. B -ii ni i CONCEPTUAL SITE PLAN CIRCULATION PLAN a LANDS OF THE DAGNEY GROUP, LLC. _ n[ciPPe[4 fwsEYfMS BLiwE[N LOi ,x WO 4x05 Oi BVPxE WEX i ON LOt SIN` x0 ORNEWxv ON 4Y'JS EFOr B. BU E SS P[ R3 /0ED rOP EuEPGFNEV vF it1E KCL55 PUPPOSEC I ` 14 I1 i r 1 1 1 1 1 Ir -' I1 1 L IL L LOT A M.) 4s 6 YI s 6, LOT B04S Aq tl 0 4 9 3 19 b 11 E 11 i/ 13 LOT C 6.S I[S 9 RB55W XxL rab VICINITY MAP Mtt 10 $LVE NOTES: P E.. BUDWBB ro BE aEx01KXE0. z. PREPLOIONL m MOWS a PRf11xuW(t 4q SCFlSIIXBSnNG ro cX41DF. HRR IOHIf MMW LOi P M BE REtlWEO E11511N0 PRWgYE iMYt Ntllxx LOi > 10 BE ..D 5. DESroBSIICx. w°< oDnB NPaIaxBE+MOBBME IxmEMBlaor i4 OF IDSm Ob/RINEXI Or PNd6 NN MXESIBI. 1. 11X4. 1RM M AWEM WO LOUIICN Cr PoIM OF BEMB 10 .1DlILEBT PROPFAIY IO lxE M51 9W1 BE CflE1XlMD W CWRpe1Xi10.Y NttX ME tOxX OF l0B Gi05 iRNLS nX0 @xEwnn mxxlRE[ PP 1x I.. Or W. DESwx. i. OPFx SPKE 116 S. E10EPE Wi B . BE ..m B! 1. wuE maa1. S assOu BE u(nmOw) Drxm0 / Om x..l l B. E.Nk mMW LOT C MM BE NNNFNNEO By 1XE X.9A y 0 w Bo EO sufE:l • -aD k ai'. B -ii ni i CONCEPTUAL SITE PLAN CIRCULATION PLAN a LANDS OF THE DAGNEY GROUP, LLC. _ If I I 14 Op kee N1 1M__ L I ` , I e" J y II Legend r, 24" Box Tress In InfOrz"'C"'t') z Tree Mart" h Rip, W'.tlan Arad. CID 'z ca L E.I.tirs Trees to Remain CID ca 3 Roll Pon.. cn_ Open Kro F.nl. Tree Palette Lagarstroamia x fouriel Crops S4jrtle Fists.]. 'Kin.nes, aln.se Pl.t..h. so Tipali. 1/ 011ay Oak I 0'... . lat'at. Coast Live Oak Sequoia ..Mp ... Iran$ Coast Redwood Tree Palette cormyq spa. Dag ... al va'l.ti.s F.P.I., F .n,ortll Fr.nnsrt Cottonwood Ouar.. agqlif.11. Coast Live Oak Sall. W.I.I.Pis Arr.p Hills. Midivriserrg Note: open Kra Fr.0 will to located Individually on each lot based on the final house FM Cls le.,stlor, Fine I ... tion. .111 be daterinlited at a later date. Op kee N1 1 M__ L I ` , I e" J y II z CID 'z ca L CID ca cn_ 0 40 80 so L1.0 TREE LIST ildi REtl6 1RUxx ILGMx PIgFO5D1 CODUfNf xe. ouxnm w:nox TREE UST m¢ SP MOis =sFOx PROPO wilssM xe. Osss m ecnOx F,,, —.. Prmw, P.— n ,^mq. w nw r,awm, nmmr m ,wrye a .11y rmvn., mmm.ueb rmWN, ntxeu n .a orrrrorrrr mr wa. Filltl itilli— Fit— eem r. P rr r nrmn. prww TREE Summ,"IRY aWFpItWAW NWRER OF OFOES ON ]NE pROFE , 9] 0 1. NUNFER OR iREES SOFYEYE 53 It— ww is.. Ci JFEES ]O BE RE,MKO'. SO mmroAv F WPRO %INAK NUY$A O! TREES TO OE PRMEFvE FIL sit is ww,l l< 3r,tt, m,mry Is. m weWm•... •w. ss 13 am tl M is Z- w.a r u+ 1. Fuy um. Oarpn 0.M L qm I. N m Y W m s gn N Wxm rya I13.. bmn Q1.43)A11 mr lwi wrs. earn Y vub mew 33 Ym eew fwm flmreF Wil xW Mw fJ Y vqh w W2 Rw' is mq M ynr Jmenrr Nn qnr M 9.443,! 3) ill, 35)0., 9,n a Mm YP. prrm. µ, 4. 11 till. A ?1.6. 40 w w 4Al! WM W w e' noWwaW.wa oM 4,4n.9 u FM vM0 m. Mnw nxr sen 11 Ili 11 t. AJ, pe 51 O' lit is L.NR+ IL14M,9.J.] n nV.N gyp. OS 11 cNOlsi,x wis fv. 11 PmJ eirvw N.101a.9Aa J9e fmn i3.0i 0. 9 Aemm y Po ' non wow NR.. bu wM wu rq.w Wsv w.a w Is F—1 A} µn 1 A 6.SJ M] wb ^ m Q??eS3A3 p3 fmn Newry 31 xY Cm. 1 r w a.) ends! 71 44. M _ is w w.a w s its " s" it, It— ill wb m w,a is b m WY Fiw a MbH 11 A u, 24 w s 117 wnJ m. 33 Wpm Nn Fit ItL Aew. e wWww m mI m m15 F. w x1 visa mi ! Imw•. 1 wu.J w P DIswsw n Imm r Wb 9wf ll3 wq ea 11 Lit A wm aM r4.. F—I, lX w.ym ls Ill Otlo m st, m> s 14144Nwe.y n urs Pis'e..M.. 335 wewebLY3anonhnnmuk .Inawn m Wn r e aw m> Y wb® wee 1am. .. zz ais.J ea J.ss Wrom a. +...ni :moronnryR. Its ma w 17 m t010 SAlitCW W wA. M b <mn fn we 6Y, w1 M Mn pn me bo NRn mr o c ex N W Cnn [v. ma we J) m o—N a.. a n) emM nr n [n r 1. m15 Rwnr a. reav,N m mn pfnewr, wG r mwry ewIF v iswea www v w F. fM. 0. Mt, s vua 113 Crop en we 11r333 U6 w wN ^+ v9J CN e) s w.aw 3410 1Y SLIM3 3sa1. O's, exI.. z.. . Il.laxLiu(.0 U e Ill x+ N Ul a. a. mMw wr: I zxn. n wn wv / n l 11 b —ite, n 1 vw /w r u en 1}6 f4en —I wub .w.mry N Bu. eea i41f I,Y [ o,.ab NMUr. Ni J., urmmry I Bin it 133 ew /v mueWn J} wb o is 133 M 9.m rob Nrwnn JS iw wP^ A m .W m w inn w w ea 0u nee. Wn.uwly. 313 M w111mwcnwb .mslur. i7 M Mvn nerv, 1 I. N ly W w n Is l. w/n uMUn 3Fit Is Iw 'tis rwisJr r)).3] I,- am] Mnrn aw rr.n ervy wMUn w en F,,, —.. Prmw, P.— n ,^mq. w nw r,awm, nmmr m ,wrye a .11y rmvn., mm m.ueb rmWN, ntxeu n . a orrrrorrrr mr wa. Filltl itilli— Fit— eem r. P rr r nrmn. prww REV 49 -05 - OI RflI: QS -OI - OIRI R R..nm Rn SHEET 8 OF 9 — TREE NOTES LANDS OF THE DAGNEY GROUP, L.L. C. TREE Summ," IRY aWFpItWAW NWRER OF OFOES ON ]NE pROFE , 9] 0 1. NUNFER OR iREES SOFYEYE 53 It— ww is.. Ci JFEES ]O BE RE,MKO'. SOmmroAv F WPRO %INAK NUY$A O! TREES TO OE PRMEFvE FIL REV 49 -05 - OI RflI: QS -OI - OIRI R R..nm Rn SHEET 8 OF 9 — TREE NOTES LANDS OF THE DAGNEY GROUP, L. L. PROPOSED LANDSCAPE GUIDELINES FOR SHANNON VALLEY RANCH 1. Use native plants, particularly along property boundaries or in corridors viewed from nearby properties. Select trees from the Town's List of Approved Trees and shrubs and ground cover from the Suggested and Supplemental native plant lists attached. 2. Use the landscape plan to address the particular needs of the property such as controlling erosion, providing privacy, creating shade, and softening or mitigating the appearance of structures. 3. Create a SIMPLE and elegant planting scheme that is not elaborate. 4. Make use of existing plant material, especially indigenous grasses, chaparral and oaks. Do not replace with incompatible plant materials. Refer to the Town's List of Approved Trees and the attached Suggested and Supplemental plant lists. 5. Plant in random groupings (cluster planting) rather than in linear form. Allow plants and shrubs to appear to flow across property lines. Avoid a cultivated, formal appearance. 6. Whenever possible leave large areas in grasses and other indigenous plants. 7. Use appropriate plant material in each location such as Alders and Redwoods in damp, shady locations and Oaks in dry, open areas. 8. Consider the future height of trees and shrubs such that major views on -and off -site will not become obstructed. 9. Avoid the introduction of non - indigenous trees that would dramatically alter the character of the landscape. 10. Planting or building of any types of structures within trail easements or conservation easements is prohibited. 11. Adjacent to street rights -of -way or trail easements avoid plantings that would restrict sight distance, require unusual maintenance to keep easements open, or interfere with already established indigenous plantings. 12. Utilize drip or bubbler irrigation to establish plantings. Minimize the use of spray irrigation. 13. Spray irrigation may be used to water lawn areas and to assist in fire suppression adjacent and /or near structures. 14. Lawns shall be limited to 10% of a lot's area and shall be drought tolerant. 15. Fencing is not allowed at property lines. Any new or replacement fences shall be open and rural, such as a wood, a wood -look polymer, or a concrete 3 or 4 -rail fence, with or without wire mesh backing. Any wire mesh should be of a color that blends into the background and not white. 16. The use of uplighting is prohibited. 17. Fountains and statues are prohibited in front yard spaces. EXV1lb(e C The first section of this list describes trees, shrubs, and ground covers which are indigenous to — or living naturally in — Los Gatos. Therefore, not only for their beauty and contribution to the rural aspect of the valley, but also because they are plants most likely to thrive with the least care, they are highly recommended choices for use here. A supplemental list follows the first and contains plants which, while not indigenous to Los Gatos, are native to other parts of California and will perform well here. NATIVE TREES COAST LIVE OAK Quercus agrifolia BLACK OAK Quercus kelloggii VALLEY OAK Quercus Lobata COAST REDWOOD Sequoia sempenrirens, including cultivars DOUGLAS FIR Pseudotsuga menziesii CALIFORNIA BAY LAUREL Umbellularia californica BIG LEAF MAPLE Acermacrophyllum MADRONE Arbutus menziesii ISLAY OR WILD CHERRY Prunus ilifolia CALIFORNIA BUCKEYE Aesculus californica NATIVE SHRUBS MANZANTA Arctostaphylos ssp., including hybrids CALIFORNIA WILD LILAC Ceanothus ssp., including hybrids COMMON FLANNEL BUSH Fremontodendro californicum SILK TASSEL BUSH Garrya elliptica TOYON, CHRISTMAS BERRY Heteromeles arbutifolia COFFEEBERRY Rhamnus californica NATIVE GROUND COVERS CALIFORNIA WILD LILAC Ceanothus, low growing species MANZATTA Arctostaphylos, low growing species DWARF COYOTE BUSH Baccharis pilularis pilularis NATIVE GRASSES Meadow Fescues — Bromes, Oats, Rye SUPPLEMENTAL PLANT LIST CALIFORNIA NATURALIZED TREES WHITE ALDER WESTERN DOGWOOD, PACIFIC DOGWOOD TANBARK, OR TAN OAK BISHOP PINE CALIFORNIA SYCAMORE CANYON LIVE OAK BLUE OAK SHRUBS CHAMISE COAST OR CALIFORNIA SAGEBRUSH SPICE BUSH BUSH ANEMONE WESTERN REDBUD SUMMER HOLLY CALIFORNIA HAZELNUT ISLAND BUSH POPPY BUSH POPPY CALIFORNIA BUCKWHEAT ST. CATHERINE'S LACE FLANNEL BUSH ISLAND SNAPDRAGON CREAM BUSH WHITE PITCHER SAGE OREGON GRAPE CALIFORNIA HOLLY GRAPE BUSH MONKEY FLOWER PLUMAS MONKEY FLOWER PACIFIC WAX MYRTLE LEATHER OAK REDBERRY COAST RHODODENDRON LEMONADE BERRY SUGARBUSH ANY CALIFORNIA CURRANT OR GOOSEBERRY MATILIJA POPPY CALIFORNIA WILD ROSE EVERGREEN HUCKLEBERRY Alnus rhombifolia Corpus nuttallii Lithocarpus densiflorus Pinus muricata Platanus racemosa Quercus chrysolepis Quercus douglasii Adenostoma fasciculatum Artemisia californica Calycanthus occidentalis Carpenteria californica Cercis occidentalis Comarostaphylis diversifolia var. Planifolia Corylus cornuta variety californica Dendromecon harfordii Dendromecon rigida Eriogonum fasciculatum Eriogonum giganleum Fremontodendron — any are fine Galvesia speciosa Holodiscus discolor Lepechinia calycina Mahonia aquifolium Mahonia pinata Mimulus aurantiacus Mimulus bifidus Myrica californica Quercus durata Rhamnus crocea Rhododendron occidentale Rhus integrifolia Rhus ovate Ribes or Grossularia Romneya coulteri Rosa californica Vaccinium ovatum N ONy OJtU GRdC OCC NLNd y N daQav00. Q3 Oh o mE v v v v v v v g N d G C C C C C C C C N ry G N N@ N N N N N N C C Y Y m 7 J J J 7 m J J Y Y N N N N N N N N N N N N N V) O O J J J J J C J J J O O G C C C C C C C C C C C C . . 0 0 A mu A P' C C N N 7 >> 7 J J 7 j 0 N N m m m m w m m m m N N N N N N N N N N N N N N Laof - Nm a mmnmm° E 0x 2 5 U m "'° Z Ja Cd' W 3 31wi O w cn " e This Page Intentionally Left Blank ATTACHMENT 4 This Page Intentionally Left Blank ATTACHMENT 5 This Page Intentionally Left Blank ATTACHMENT 6 ATTACHMENT 7 THIS PROPERTY 3862 SF 5720 SF 6441 SF 4390 SF 5239 SF 5542 SF 4328 SF 4766 SF 5800 SF 10801 SF 4644 SF 4722 SF 4502 SF 4704 SF 5265 SF 4692 SF 4699 SF 6163 SF 4310 SF 4592 SF 4908 SF 4658 SF 4612 SF 4706 SF 4612 SF 4302 SF NOTE: (1)UNIT OF HOUSE AREA: SF = SQUARE FEET; (2)THE DATA FROM ZILLOW.COM. ATTACHMENT-1 HOUSE SIZES NEAR TO THIS PROPERTY HOUSE LOCATION ATTACHMENT-2 BUILDABLE AREA AND HOUSE LOCATION BUILDABLE AREA: ±75,000 SF From: > Sent: Tuesday, May 3, 2022 4:08 PM To: Planning Comment <PlanningComment@losgatosca.gov> Cc: tim <t > Subject: Comments on 300 Mountain Laurel Ln Plans EXTERNAL SENDER Hi Los Gatos Planning, This email is in response to the solicited comments for 300 Mountain Laurel Ln plans. The following are my comments specifically regarding the “Letter of Justification” for a 6000 sq ft house for 300 Mountain Laurel Ln.: The target property 300 Mountain Laurel Ln is in the Shannon Valley Ranch neighborhood (SVR). The “Letter of Justification” is disingenuous because it compares houses NOT in the SVR neighborhood. The houses in SVR range in size from 4300 to 4800 sq ft (not including any after built additions or outbuildings) according to the original plans. I recommend the “Letter of Justification” be rewritten to be accurate for the SVR neighborhood and resubmitted to planning. This would give the proper context for people to base their comments. Note that I am not against a 6000 sq ft house, only that the planning materials should reflect the situation correctly and factually. Thank you and regards, Tim Kinslow ATTACHMENT 8 This Page Intentionally Left Blank