R-4 Staff Report - Downtown Landscape PlantersMEETING DATE: 10/21 /96
ITEM NO.
AGENCY AGENDA REPORT
DATE: October 16, 1996
TO: CHAIR AND MEMBERS THE EVELOPMENT AGENCY
FROM: EXECUTIVE DIRECTOR L
SUBJECT: DOWNTOWN LANDSCAPE PLANTERS:
1. APPROVE PEDESTRIAN LIGHT STANDARD FOR DOWNTOWN.
2. APPROVE PLANS AND SPECIFICATIONS FOR LANDSCAPE PLANTERS ON
SANTA CRUZ AVENUE.
RECOMMENDATION:
1. Approve pedestrian light standard for downtown.
2. Approve plans and specifications for landscape planters on Santa Cruz Avenue.
DISCUSSION:
The 1996-97 Redevelopment Agency Budget includes funding ($72,000) for the two sets of planters on both sides of
Santa Cruz Avenue at the crosswalk in front of Mountain Charlies. The planters will include an irrigation system for
landscaping and electrical service for the landscape controller and pedestrian lights. The Agency Budget Report
indicated that the planters would be constructed in Spring 1997 to avoid potential conflicts with the
Thanksgiving/Christmas holiday season.
Staff worked with Paul Rodrigues, Landscape Architect, to develop a draft set of construction plans and specifications
for the planters. The plans reflect the conceptual design details which were approved as part of Downtown Streetscape
Plan. Together with the Los Gatos Chamber of Commerce we put up a poster in August and September asking for
public input on the type of Downtown Pedestrian Light Standard. A travelling "display" of the six light standard choices
was placed in several Downtown locations. The display will be present at the Council meeting on October 21, 1996.
Members of the public noted their preferred light standard and the Chamber of Commerce compiled the results. The
comments of 100 people who indicated their preferences are included in Attachment 1, and summarized below:
Candy Cane Style
Number 1: 6
Number 2: 7
Number 3: 33
Pole Style
Number 4: 29
Number 5: 12
Number 6: 13
The light receiving the most votes (#3) was recommended by Paul Rodrigues as part of the Downtown Streetscape Plan.
Based on the comments received, many people voted for this light because they thought it would provide more light
on the sidewalk than the "pole style" lights. Actually, the "pole style" lights are fitted with reflectors and provide the
same light levels as candy cane styles. The light which received only four less votes (#4) is recommended by staff due
to its historic character (Pre 1900's) and consistency with existing pedestrian lighting in the Town Plaza. There are
already six different styles of lights in the Downtown and introducing the "candy cane" style light would add to the
PREPARED BY:
LEE E. BOWMAN ',6
44"...
Deputy Executive Director
Reviewed by:
am
General Counsel V inance Director
Revised: 10/16/96 9:20
Reformatted: 10/23/95
PAGE 2
CHAIR AND MEMBERS OF THE REDEVELOPMENT AGENCY
SUBJECT: DOWNTOWN LANDSCAPE PLANTERS
October 16, 1996
number and detract from the historic character of the Downtown. Lights #3 and #4 are shown in Attachment 2. The
other light standards included in the public poll are shown in Attachment 3.
The Agency Interim Purchasing Manual establishes an informal bid process for projects costing less than $75,000. This
enables staff to go to bid before plans and specifications are approved. However, due to the interest in the planter design
staff decided to have the Agency and Council approve the plans and specifications before going out to bid. A detailed
construction plan for the planters is included as Attachment 4. The proposed construction schedule is provided below.
1. October 21 - Town Council/Agency Approves Plans and Specifications "Planning Department."
This will include the selection of the light standards, choice of colors & material and site selection.
2. November 18 - Town Council/Agency Awards the Bid "Building & Engineering (to finish)."
Assumes that acceptable bids are received.
3. December 9 - Contractor provides Bonds, Insurance & 1997 Business License.
Notice to Proceed is issued.
4. January 13 - Contractor begins work
Contractor will need four to six parking spaces for working and staging materials. Pedestrians will be
redirected during various phases of construction.
5. February 21* - Work is complete or Town assesses liquid damages.
*Date would be extended equal to the number of rain days.
ENVIRONMENTAL ASSESSMENT:
The installation of planters is a Class 1 Categorical Exemption pursuant to Section 15301(c) of the California
Environmental Quality Act Implementation Guidelines.
FISCAL IMPACT:
The Redevelopment Agency Budget includes $72,000 for construction of downtown planters (Account 4420-77800).
The detail costs for the planters will be included with the report requesting award of bid.
Attachments:
1. Memorandum dated September 27,1996, from Linda Asbury to Dave Knapp.
2. Light Standards #3 and #4.
3. Remaining Light Standard (#1, #2, #5, and #6).
4. Planters Construction Plan.
Distribution:
1. Paul Rodrigues, Landscape Architect, 108 Locust Street #2, Santa Cruz, CA 95060
2. Linda Asbury, Director of Membership - Sales and Marketing, San Jose Metropolitan Chamber of Commerce,
180 South Market Street, San Jose, California 95113-2307
LEB:BL
N:IDEV\RDA\PLANTERS.
,:41•09 286-5019 SAN JCc'E CHAMBER
Page 1/2 Job '38 Sep-27 Fri 13:27 1996
September 27, 1996
TO: Dave Knapp
FROM: Linda Asbu�
4,
Town of Los Gatos Ch ber of Commerce
RE: "Lamp Post" Vote
Dave, We had exactly 100 responses which makes it real easy to convert to percentages.
Also we had some great comments. I'm trying to go on vacation next week, but I will
drop the display and forms to your office Monday morning.
Candycane style Pole style
Number 1: 6
Number 2: 7
Number 3: 33
Number 4: 29
Number 5: 12
Number 6: 13
COMMENTS:
## 1:
This style combines "old fashion" with contemporary, graceful.
##2:
There all nice.
Suggest globe with cheapest globe replacement cost.
Which light fixture produces the best lighting- hence pedestrian protection safety?
What is the goal?
#3:
Tough choice- are costs all the same?
In a town known for its strict Planning Commission, I'm surprised there is such little
consistency.
Thanks for asking!
Could we replace some of the existing ones too- Funds? - special lighting fundraiser or
just a plea to citizens or groups to "adopt a light".
When replacement of existing lights are needed, will they be replaced with these new
selections of lights so there will be uniformity.
The Candycane style lamp post and light will provide lighting at crosswalks. Style #3
is most appropriate, I believe, for the historic architecture of our town.
Great project tough choices!
Least glare, focused downward.
I chose this because I feel this style will give more light.
Good aesthetic appearance and good reflection of light onto sidewalk.
Needs larger reflector.
Reflector of some sort would be good.
...ATTACHMENT
408-286-5019 SAN JOSE CHAMBER
Page 2/2 Job 238 Sep-27 Fri 13:27 1996
#3: continued
Protects against falling sky (smily face drawn).
The important information is number of watts per each type of glow
Holiday decorations would be nice on this style.
Are there significant differences between the styles other than looks? e.g. radius of light
thrown, cost, color of light, softness of light to the eyes vs. effectiveness??
Aesthetics are crucial!!
Thanks for caring about our opinions.
Thank you for installing street lights!
#4:
1900 light
Just plain cute!
Looks close to the old Los Gatos Gas Company's gas lamp of 1891.
Most old fashioned look.
Looks most authentic and old.
So glad you're asking our opinion! Also glad you're about to improve the looks of our
town.
Would really like combo of arched lamp posts.
Is more like old original gas light.
I like the pre 1900's the best.
I would like this style because it is more like the original.
Like the style #3, but think #4 would shine down better on pedestrians,
The selection of choices was great - but we liked #4 best.
Our town has so much history I would love to see it preserved.
#5:
Pole #5 with #3 with wider 18" reflector.
Thanks for giving us the opportunity to vete.
Victorian.
Candy cane light #3, though aesthetical, pie ming, would introduce yet one more street
light type to Los Gatos.
I would have liked to select two choices - one of each style.
Less likely to get broken - attractive, historic
Reminds me of those old beautiful lamp styles of victorian times, which I.os Gatos
reminds me of with all its victorian architecture.
As part of this project why don't you ask shop owners to keep their sidewalk clean! Some
do, but some areas are really filthy - doesn't lend anything to town beauty.
First three would be to easy to break fixture (believe me it would happen) #4 and
offer some protection against that.
#6:
The top look great.
Thanks!
The lights should hold a high wattage bulb.
#4 was my second choice
Great lights!
#3.
#4
aow•An.
7.) Wm TO
woitaboimr `tiv
ftccaai LAmP f
PARK RIDGE
• P-1740
StjEl"SC G91
conceptual design for central business district improvements
TOWN OF LOS GATOS
PAUL RODRIGUES
L cnlrespr Archllrcl
_redevelopment agency
Akiir
•
ATTACHMENT 2
• PEDESTRIAN STYLE LIGHT STANDARDS
INCLUDED IN THE PUBLIC POLL
#1
"Candy Cane" Style
#2
"Post" Style
#5
#6
revisions
by
, Location Map
IA
srroirf T -L TloN17-.—
Drawings
construction documents for
project 9617 DOWNTOWN
Streetscape Improvements
North Santa Cruz Avenue •south end planters_
1 Ga'1� - • uEt-T
Z. EXI' T INb C mDfr or-5/ T7E/IA.9L.ITl0r1
3 Gor•{SjWJGT Ir1 t'11\ flap vuvYra%)
PLAHTINb 6 it F-Ic.t.TioN
�GN.IIL kelp tvvyr.lS,
cc, l :ik I.7").:,1 �1_:. t11tr(t� s e rAJiNb
(,tN1`--�FJt:TIN 47.ETAIt.: il,+-ICr1I(.r-I
Design
flu)L. R0pR-IbUE5
LL IP -fr P e /-41,1
1v9 LO .0 cT 9". 2-
:ANTA G=UL , GA. 15o'a
FH0NI£/ Fi 40e, • 456 1�59
O, ii-1 ER5 P£I'K£SFSITATI JE .
p friNEEIL)Nly .BRJIC£st
GNP -is bOE•fLbE • • 61514
faRK3 k t ones iq
JCMN SAQtkNro • 519 •517f
Notes
Notes
The Contractor shall be fully licensed under state lam to perform'
the various phases of the work and shall provide the tow wick •
appropriate documentation. Such documentation shall also include
certificates of i oeuranca, bonds and any other warranties as may
be required under the Central Conditions of the Contract.
2. The Contractor agrees to wawa complete responsibility for the job
site conditions during thecourseof construction. Chia shall include
but may not be limited to the safety of all persons and property. in
the area. The Contractor further agrees to [eke necessary safety
precautions such es erecting safety warning signs, barricades and or
other devices co protect the public end workers during the course of
the construction.
T. All work shall conform to all local and applicable building codes.
The Contractor shall work closely with the Town staff to be mute that
the work meets all the requirements of the building department. Any
ark deemed not acceptable to the Town shall be repaired of replaced
at no additional expense to the to. A11 work all conform to the
requirementswAral
o! the Americans with Disabilities Act and any other
federal of state regulations.
4. A11 layout shall be approved by the tow eta!f prior to the installation
of any construction.
5. Utilities and underground service. noted of the construction plan
chat are part of this work shall be coordinated with the requirements
of the various
us agencies and departments having jurisdiction over them.
It shall be the responsibility of the Contractor to coordinate this -
work and to be sure that there ie minimal disruption to the surround-
ing businesses in the area.
6. The Contractor shall be held to have examined the existing conditions
of the areaand site and to be familiar with the scope of the work es
it relates to the location. No allowance shall be made for expenses
which may occur, that would have been ascertainable by making such
an examination.
7. The Contractor shall contact U.S.A. (Underground Service Alert)
I-900-642-2444 prior to the start of the work to verify the location
of utilities. Consult with the Tow staff to verify locations.
IMPROVEMENTS
1"
drawn ri
chocked
dateT;ib / / 9/
sheet
1LJ
of b sheets
-�14 �F
0.
revisions
10
1141.4Pc
507*0.
/
-
CANA:4A I 14,24,
CPC A7740
Ev5r: —
Nt be
•
•
le
0
IS`
•
10
•
•
-
V
Mores
' • STANDARD CONSTRUCTION NOTES ,•• - •
I, All work shall be ht accordance with the Standard Phrased Specifications -
approved by the Town Engineer of die Timm of Los Gatos, eventide and on.:
file in the Office of du Town Engineer.
1 All contractors reM be responeible for verification of loathe of all existins .
With: In the tleld. Localism Mom on phm are epproximate and for
general information ooty.
3. In existing paved sheets, all nits shall be enooth and verlicaL with the ems
being generally rectangular. Nati., material may be used as *Mil if 4'-:-
epprored by the Inspector, and must be compacted to ninety (90%) per ,
cent compaction below two (2') feet of surface. and ninety-five (95%) '•
per cent compaction within two (r) het et surface. (Test Method No.
California 2I6-F). If land backlit! 6 rased, it must be wee graded, tamped [.-•,,;--,`;
with vibratory compactor, or other equipment. at the direction of the
Inspector, and lightly Jetted, if necessary. •
4. A semi -finished truism of cutback sr lowered cross section (maximum ..."
lowered depth. I /2 inch) of asphai,ic COnatie nal be allowed for s ,
mum of thirty (30) days after back/Wing to allow for settling. Applicant
• shall patch st any Moe that excessive settling occum - _ •
•
Within thirty (30) drys, spplicant shell restore surface to Its original "
condition and be responsible for any further settling or fame for s period
of ore (I) year. If cutback Is used as a semi -finished surface. it shell be .
removed prior to finishing, A 6" edge of existing A.0 shall be removed
around the perimeter of the cum prior to pharnent of asphaltic concrete.
A oo 16") inch course of crushed rock bete (I Si" max. aasteg.) and nye (21
inch asphaltic concrete le the minimum surfacing to be motored. However,
00 reSloralian shag be less mbstan dal thus existing composition. In CMOS
of concrete streets. a six 16") inch thickness of concrete on four (4") inch ..--
rook cushion is minimum standard.
S. All =nave used for Curb. Gutter and Skiewalk most be Clam ••A" (6 lecke
per cubic yard). as per State of California Speeitiotions. and must attain
a strength of 3,300 pi. minimum in tweolyeight (20) days. Sidewalk
concrete shall include one (I ) pound lampblack per cubic yard of concrete.
6. Town Inspector is to be notified twenty-four (24) boors in advence of arty
consuuction work.
+ANTA CRUZ. Ava.
Rxhr cg0$Sw44.4 1011
•Scrzhcac.,_
Aceli oreen, WALL-
, N RellaV6 q/C.
•
mbv. be.YoNa) NEW c•olcS•
1,41,14 •
7000
ALMENDRA AREA
0600
LIJ
LL.1
1"1"1
> .ea
:5 0 2
L.8
414' c-
(,)
> tn
< 0
LL.1 7-0
00
C-
3
U 03 0
t
kl--* Cn °
c
0 0
Z 1—
LP)
1
checked
192
sh•a
l'nhr-e"
of 4. •hersts
(r•e I•ion•
+4
•
FIl77 GPsai+WAA�_,
Na CmAN6G
44
69 4;1f>r
•
Mlle _' EA/7 i/UENALr<
'owl r
Ganes i aAOIS-
1 RuwN
4.0
i
- 4; --4h
iemA,N
N
(C a RAN7EL1
to-mnw i..�
r
C/LMSW Aryls' 7i't4 tone
AFf4 of GIN s/IsuGT oN 6r, rower'''.
,¢Eniav fiP.✓J.'"e.u_ e G✓G>
A/c —
ousts. a"
fi
NO( -TN b)ANTA CR.UZ AVENUE
p`
sea
4'JF GaNS /za-7✓rnt
r � GX.b, SAWC4r ✓/ . �' f•1.,n euay
l i l
-
J 14T 5✓14N41.-C 7r ✓L .0A/N `
-! 1
tiotTMt, De
(
E4157. GCNc- 7r
'ZAN
�>Q OF iE.NGeNLNETC a
/L An TCXS ✓F A/G 'YVA✓,!/Alf
.'.ONL. G:✓LA. '+I MI ✓T C.
N11N. IL" SEioND NEW G✓ice
?A✓!Nc
BACHMAN_- AREA
As'E4 of AZ•0/ CvNs774✓.
WAL.-
ya,v - A
r2"4.5�
Ana ! &Mit As
weC0 %A AF7olt
PCSN E L%l emWe AYfrAc6A170V
sea
(/,ill: Gdir si covinh' or
UTft?fes Paid° 7d t -micro'
•
.t'
RZ Ya Re'syse Self
OerA.A Isere
MAIN STREET AREA
IZ"/ZGI Sr7 ��
P 5i
---s� 0
0) �I lits
r1I
/0`
ff.
Eeelm
Alerts
STANDARD CONSTRUCTION NOTES • • "'-�.
1, AO work Mail be In accordance with the Stallard Phrased Specifk•tiwr
approved by the Town Engineer of the Town of Los Gatos. ama0able end on.;
file in the Office of the Town Engineer.
2. Al contractors will be responsible for verification of locatb• ogee existing
utditles in the field. Locatiara shown on pions are epproamute and for -
general information only. -
3. In existing paved streets, all enla ahaS be smooth and medal. eith the area „n
being generally rectangular. Native material may be used u backffl if
approved by the Inspector, and must be compacted to ninety (9014per
ant compaction below two (21 feet of surface, and ninety-five (95%)
per ant compaction within two (27 f t of surface. (Test Method No. - _„
California 2164). Hand backlit! 6 rased, it must be well graded, tamped
with vibratory compactor, or other equipment, at the direction of the
Inspector, and lightly Jetted. if mammy. - 4. A semi -finished Artefact of oasis, or teemed cross solos (maximum ..'.. .
lowered depth. In inch) of asphaidk concrete w01 be showed for maxi-
mum of thirty (30) days after backflling to allow for settling. Applicant
shall patch at my time that excessive settling ocean. - -
Within thirty (30) days, spplka0t dull wtore surface to itemising '
condition and be responsible for any further settling or faluse for a period
of one (I) year. If cutback 6 used as asemi-Miahed surface. it shall be -
removed prior to finishing. A 6" edge of existing A.0 shall be removed
around the perimeter of the cut prior to placement of asphaltic commie.
A six )6") inch course of gushed rock bar (Ili" max. earn) and two (2")
inch asphaltic concrete it the minimum surfacing to be t stored. However,
no aestoration shall be lea mhstan dal than existing composition In cases
of concrete Greets. a sac (6") inch thickness of coahcaee on four (4") inch
rock cushion 6 minimum standard.
S. All coacrele used for Curb. Gutter and Sidewalk must be O. "A" (6 sack
per cubic yard). as per State of California Specifaotiom. and must attain
a ssreogth of 3,300 p J. minimum in menry<ight (28) days• Sidewalk
concrete shall include one (1) pound lampblack per cubic yard of concrete.:
6. Town Inspector k to he notified twenty-four 124) hours in sdnnce of arty
construction work.
r. 4ANTA cRJz AdE.
gf✓ST CeLoSSW44.4 No G✓AN6 j
ActA OFjrtN C.LW!-. WALL.
ft N11�C C. A1J70✓& A/c.,
M✓N, IL. Dt1"oND NEW G...,44=0
•
/ IP ova
of \
hit dWAi.e.
ACT
ALMENDRA AREA
I'010-
checked,
dal•
1)/6
46
sheet
01 fj sheets
w1
-Rrdr c:' i. "ANTE.
1
-«t r. No.. CAANrt
h• rflAMs.rN MAf %lVAt ���^�
7..AEN W11 d t �T ieisr
5/OhwAI.K
/II.J.,s 7 , NEM 60ED-MAY4
rt. IAI•^,
Illlflllill .
Al•l
_.,iIliIIIIII' :
crLO
L/l LEVEL n.er
NOIErW 0A///4 C..OZ. A/e/vde
fAPNSJM✓ dNNT
Ir-TrooN Iwlrti
erg —�
r.A/ST cum, if RAA/7L . ----'"
fAl51; 0VDEWALK
/VL / anZfri1 (f• z/ w/
_..-" WEZ#a L)Er1.- FelA7
cKo[flAal -^-7
`\\\` bJT7t).
NG7! /L"
4coJ7LD
G
l AAArrT 71V A4
• NE-if/Artr Nc,/
4rD6..4s
a
EAr.T, 7].Ar'/ /NCe7
yr/ R,rrJr/J Hr/ c6j
ae /sr. /L. rtE.P
O✓Trt•
R4/6E rA/sT. ar T, Nor. sr:EKML LE✓tL
AS RLUJr6$D, /rVrrILL NEW AI,N. DG iE'
4.:4.T/LANs STD. YW✓VJ C • 7-// ACTH[. (/' 05
#.4 "4,A4. /N C.)C., Aco%/I0 c/J.
lI
}
er'
—/KW V ' aro- &4S/N
4,4.4177 "V-Ll' W/ l/ELoED
5lltL e=4., l: W Lttsssees
co,rNfLT Tr Er/sr
w/ ncw/ /Z" RCP P3c4%L '"r.
OPEr Gam/:
/7Er C3)
eis f'I
1 r.,l
nLW V" Utnu' tntW
•L✓Lrsrr •.J-z/' w/ W A.D
erefJ- U•'Afi' ./ C4.0460Art
3.$AL 1 Tv t..rrs7. r =
At,/ /L" RLP, e9K!,I. /Mu
. bt 7 .�
SEt
//A 4 ' (2" l wit
DJweib C,. u "a4.
e/
n�y eto.
R1 ''mmNEW
n111111111)'%
'�11111111111111111NEW��,11111111111111111111�
u4Nr /ttEX
/Ns7711c r01-oNi AN
otrC7S r Car/d.rrs rc
'M/LF 44(4, A4
Tu ALE 4ECtc7ED 4
/0•-G
lC. 411/m LGYr..1.
•iiKLr l
'I I
RA'.E ES/7.'TG AMA/
s/oe wilco_ Lcie.L As AtQJ/43�
MI -ALL Arid r1.r1, L/4
U1L77W/6VS .517). YLAN 1,5•7.1/
LETArL ✓fS 4!4 IiE64K
/N GJI/G,; A?ioA/p "IA
ir41 Ilr (,.
BPI4.1
rr�W *near
RB ✓eE
reersT .Fo45W'4..L.
rk Ji 'i 40Loit. L
/6'-
t3 y -: r •bids
R`R 'MANY/.
1ill111111
D'•o"
1:40( FAC 6LEcT,eir.AL
ArgyW)4. . _Cr1r.fZujcTI ereea Putt, w/rPE
rezerl/• is fa:-iJ3'3/%4✓LLs
GtKATfAIL_.Xa_.$e.. _ APP/LlwEL
ter A/Er6.
No7C: G4INCRIVcT/oN K /)/f'i D 7a
IIEPLACE ExltliNG ftAhtlU3 f ✓/Nl..
Nett/ WOtt SNALL C.GA/Fce.4 w/%1 ALL
EllstiNG PA✓OltaiT t s/DotiALK E3,r/A7io/Vs
4It IIIIii1!II[ -AE.. •
1 41P. LILT •
//yyo, I POWts -(2 Lwr)
POri4L> , _ Zr"o c. 7Yr
AMP Grob EtLv.
E)1/1f s/Deti4LA. -%
i
1.? -LAMfn Lt✓tL r.
f14wraR0 a 'MN Sliree7 . i„,rup &vb
2G.L8f L(If7Er"
j Ft JSrr ,y PAi l,uN7
G ,"i'GJKG! GJ17er*
Mil• BL-ac.c.
34c44 was e
SSGT/ON
FLF 4.4XN f Ga1Ary/�
w )A ✓unE+✓-
,J INA roe- 4LBc7NCAL . PY✓✓/DE
c.44/GU/r , /VLL w u-''E a SIiE✓ES
76' RANTf/CS 6 Fvvlve., see_
ur./r /LE4, 6,,CA/MJ 76 de
A3$.3 Eu DY 0,01E4.,
3r.
7}I' eF ptAY✓TL .
L.t rt2 L /h4x. /0 •" ,
Grr /A•CA ± organ-
�. Ffl��l)LkIAc�
ch.ck.dlk
dal.}
4l,lii
shoal
NEk) CAT[( ? AJ7H t ErAII,
NO SCALE
J
of ( shoots
by
FEG.Ifi,R AgeLolcE s
'La AAA. ✓ ctere
rM Y G/ac r i'L^ hir'1
em.i wRTEt MAW. L•
eiy,0911.ro TAP /NlD
FOP- /!eN IP-Afi. UNNLG71iN
/1E ,flea-Y
>fNiD gwiwr
at& F2,13
:AI'T. —fig, f PLANTat -
• [AIV.. SfDiA/ALA —"
/^AEMeik colt ✓Aai
rEHsT6406.traGDS
J
KAPeolEpIS f'AJI STrG 9E1.?Y'
Le' b(Y( PrAI/lN,'u vane rksE
MY I'�i.
FEL.g4 A /IDLDIPg5
3 A VE MA[k✓ELITE
L : f J TfMDti N>°autx
P Rimort roNr/Ld ✓AµA
%!y• hLrLD 4v f✓- , /I 4o MAIN
flare: Pcmriec 15.814.
INs7Au MA•w GINE F VA 1- yEf
'Z ••
Al re: fGA t7EL- ,15 1J.1.C.
/NSTAu. MA/N r {/ALMS
Meier- / d•% E (4)A/TtOLLerZ-
• Coveter 72, ✓A.✓
4�R�d ,74t 7•
1.1 1 0e KYCD fD //L
rca.r. Alaw
(.ONNker 7'e A^AiN
Ara,. spider
.YJRT-/ 'h v711
1
I
1 m- s(- NiD AKIN /VG
1
_--_ 7//' ONLY FA D.P.
et& TticAG 67'
D•Tr S43 one
.. Srw•AYES.
l
/it" 0Gf/L6 40 /A.d.a, MAW. ?It,
RAPNrat?h. YoktsTiL 3tAm-
1i "SxN 61A1/ 4.t7 ✓C. yATi. 7-Qt.
YIN.
£MAfi M%WPA( ✓Ai Va /N
NA&• LA.
t Y57Li1DN NYY-L)Os
J
0L4.1(4A ,N'Lj.'i( 4
'X.✓E MAI:r $lr E
A4PNIekg.1$ 'MAJEsrz. harry'
2f dx ,vpigp —ate Afro This
w,✓. r• er
dcrialdar
LAP At Foyle -
ran wars fuC VArAsr •
W 14t M✓[B �,
e?AA what rm. ✓A(w
QW.iM OW(.ds�%
✓ktE �1�---i
op
LA;1'//DN
7D et ANAWi? DY
fARrf /N PIeW
/ Y/DE fifties /N
RAVIeA Wind.
/'ki.v1L Nib ✓A..0 0e
LaarlAl or ✓AWE.( ys
lb A//b✓1D by PAR
rJ
/N F/KD. mime Reeves
w PLAAI7r& watts
G. 1 avommoA/ Ares r
G.. AMU vat fE
1 RAPM/D[EP/S D14.E577,. acq(gy'
1!•rw
's•.:T GFo St/.Lt
{
I At N101f/If 'M "-u-burr.
1A•G>K •fr/WA4.'P DR you �lft
Awn/.
n
iTili111iIi!liii
6 PtN5rIMon NA'AD(X
J
%tUG/A MIELOID .5
eq.✓E Aw4b/Ew7-E
(1 lli..In
/r-Alir AWN sifter
y7Ae/D1,LD .. eR /Aro 7'04..e
M N, OP AZ
FEuvA-AA•ELOIbE$
J
i
fEN57pAlel/ At'Tdt'Df
1 RAN//D(EPK 'MAX''1, K.
Z!"9oA 01AY 4 R PATIO TREF
J
PAUL RODRIGUES.
Landsea pe Arehneer
po
drawn i%
data
thNo
rl
.hoot
of shoals
` re"isiOnS
by,
11 1/2'
"0
;if
rue 0i CWB•-••
I H1111t111111
lummI
NOTES:
1. WHOM !NAIL BE IC NOA WIRE CUT REO'CORED JUMBO
E 3 1/2' K I1 I/11 OR APPROVED EOONALENT,
2. MORTAL Jowl BET'KEEN PRICKS TO BE 1/2 RACK
r—}
L'VILLA POIM054' INEME DEPRESS CONCRETE SLAB TO RECEIVE BRICK STRIPS
12' * WIDE. LIORTM SET FLUSH MMTN CONCRETE. GROUT JOINTS PLUMP+.
EQUALLY SPACE BREN STRIPS BETREEN STREET TREES (10'2).
Inl11Dn1111
INSTALL'OREM ACCESSORIES- STANDARD 21E3' TREE CRATES NM.
STANDARD FRALIES OR APPROVED EQUIVALENT.
INSTALL TOOLED SCORE UANE 12' FROM PANEL COCES.
INSTALL. TRANS/MSC vela •'112• 'SOLDIER COURSE BRICK- PATTERN
M BOI.wdTE BRICK RED COLOR. MULL 2 to REAP R PER BOMANITE STMP.
1ntnUo1lnl 111111 mu
1
caossvwl
111111111111 W
NOTES:
1. AN "w1 NAIL c•nlw,. to ROA NNAAND1N.nls.
2. Sr. SMM 2 el au t.IMT lw PAPA el YIP N.rmas YE.+P.M .ran
TOWN OF LOS GATOS
MAL WIN/'N
ea:.9 n tAr (¢µK
VILLA
HERMOSA
DETAIL
DWG.
No. S — 6
SAT. 1 OF 2
hIPek/AGK/ PAV/N6 ber,4/L
144
NOTE: fors • RA47 7 ;E /zzGT. yris . W Pt" s *. >tor'(x
/ATt Lnrt .IIt; NGT 2IP/LD LAC✓. F4drG/A7/al
Am,, 4 41/4)E/4„ c8AT. T,+lo F-Pl/SJ/ C/47; [frog'
tQ.) rLN:r C-+LJr- $4,11)43Er f3L
A rn,W/(L by G y c
tie465 F'N/Ai - 44.1490 at cA 'r CAT T1, ,.E 1:01e/ED
�7 c/7r.
lit."42' u2. of .cA✓ u+
1 I %(/P
PT: Il i'L/. ^, -\, I� ,— � " �a a. '%'a G. •ra.
r
(o<. .3r.E r; rNLi LPuhT , *is. l"mis GA✓)
1
12AlclN4 teTAIL
NOTE USE .4ETNAY /N (wit, Wke.0 cuL9 v 61g7EIL
Nor 3V�,:Lo OIou4Vr2IC41.4.T. csa(y "A" GrA,c,
(. Stle3G AC. c./.) SALT/ANC cm si's e..
le
4'.
DAr
ZE'
7 ye"a..fTP
, I.F yLKe � l 43p' ; ) Ak. al
1:.u•
NL.
t✓Ir 'd d T IYR" d'I (2,t PMI))
.
•
u, J. ;- O u J o
CAVE/5 1c b(/17ZZ De7'AIL
NoSCA/E
VI
(4, S
/MAA
"T•r P2M/7
Lt /L c
—4-
1 se
"—el" MIN, . NEW pr5OI(.
/,/
—li Ir—➢—II I1 Ihr !—rf
JUL] L
r,
8da
/PLAN VIE tA/
lz"
FEitL 1n 7 ✓N
STD. PLAINV/ii OeT41L
illli III-�UJ�-11�-�
11E llitjof 11L—r-�• V il1a111—
►— In
1011 II ki n=Jll III�p11=
// NO peA/N l .0
-✓tr.T/Uy ;aft. UNf ,c.a3r
At'i1 - bGTAIL4.
AN -Nor f3Rtxb cAO, 54"t//84 )(ZPM
(f'ACIPIC GLAy HlolwcT, Od EA)
FLAtoe. AA CJtr", PIiuW E
$t4NIPLE S fuL 4PeriPol .
yv P✓•cc#i4>t. ,✓�' .10/i1Aq,.
bL4/lli - 2'I OP¢rCkik9 r C 0071/pE
I"an dvs,CE .. Lbuelf Pao Au.
gm*,
▪ 9iZti. ,EA,uN4 SO. 57EE4..
• 7HEE vt,r,CA1. fos7S W/44'I/'
WOW. 2 /AI /A7TALMY])NTE/
6.//oVIOE S./Ce .C.nA1/NCi) k: "•2, • D
NMI •l/Two FLINT* C4A7 /Aa/T-(4
Al✓ELL .5e1 ev1.4 *. 'RI✓EK
GAP i.' mo,t//v d0/P/f$
Ayala /LED Ah itAL2 CPNG, P4At3 6"
IV NO. 4 ££>71S • it/LT. /. /i"
W/ LAMP EIAL[ Trr MATE..' italLUALLI
CAI? e/O/PJT • Att. A'Towr]
EMU 711 O' - , zs" PErr
" 44414,.. lR"c - 8" . Oot•C.
soce
ZE
�GomP47LO AAtleOuctc (colt z j
157,, a. f kin)E]El.• NAt .
CCE*N
JCL
,/4 PP.I,oe
J
MPROVEMENTS
raw
checked
dale
sheet
Of
sheets
(revisions
by
IRRIGATION ngt(S; SPECIFICATIONS
Omfelptlan: It Is the .tent.n of these speciflcellans to mctollo
flea nore of t ana installing
rallingr the a rlgAccordingioat., worth wi111 0Der14 1n an ef-
far s Y*1 her 4 ❑1 ra h like standards
prinkl tr operations. It hallM Ile responsibility of tot scat easful
lull rf 4ren0ea.ilf ll tnel eiywt ttem min such a armor that It shall operate with
Enenl:t TM Contractor Doll furnish all 1.00,.'penelts, e1[ ar41s. sup-
, tM..aM tran4ortet10 .40 perfor• ail .peratienc an ` onnettiOn
with owl reason.), Incidentel to the coml.. lnslellatami ofthe imam.
and mirk
gulationss of the Natrona Elecll tric Cord try Uniform *11M1n9 ruins
Ind Ili athar &pine.. state of local laws.
e wonmghip of UV entire job shall n. r.wary way be first floss .
lb cot4w wnt uptrlencad shall
14 nployed to porte..
p
The Contractor Moll stal all 1pri.ler end voles location% and check all
layout conditions prier to be91m1n9 the tr1Mnln9 operations.
Joe SJYv: The Coetr.tar snail pr0viee an maintain an Pry safe-
ty
rootours*
, flooging tape.
c0 . sige or mot, safety device. tthat maybe
readur-
ing r knot Nerwrt. Cho N/etynof um puoli[lor n Motersls: (automat of eMasi quality mid eta loty .ill M co0fl4ree for
c .once. Submit copies of descrtptiva Iletrlture for all propose .ate,-
Iola for reviess w
ltlor, t ndn0ll thee. inning wart. A11 terl.l tall 0* new. In
111a[
first one year. • * guarktme by the 1aeJacturer for as
Excavation: Trenenet my be uu0aud tit... by bane or gtnlne, but -Shall
o[ be maser than Isnice Pry to I.y the pipet. Cart mould be ttsen to
auoid.mmage to other utilities s the ire.. Minimm depth of Cower shill be
ai fallo.t: (totem Inches (IY) for .unitm pressure piping and 2A volt
war,. r roller Imam wolves% and ImlSothis (12') foe all l,tor11
dii[ributlan`II control....
Pipe Points and ConneC.lans: Jointing, 4 wore!. shell M performed by
coa0etent *r4en. do Araatl0 4 IRS onnect:one. the Contractor snail work
t
on me cho [I( coon. [ohs first. A mil-nde arntry plat daps snail be used
these connections Moment. .14 a Hoot *rent, 'resort wily. Caution:
Only bikes !elmUm
cycdla1 itnslwave. and heeds.d at a ler fittings red to
- kpla
-
Ca a tau u any tile solvent. Cle.Irr me pram* %molts .
[r t
Commenced s by ate unuc[urer Loma. pl. Ports. All pap* and fittingsr
shallp. cleanest t 000o00ly atoll ...t doss. 9Nze and moisture before pylp any1m4ntl. Anappnv*d 900 Drawer otn be voed
ctionsan0 fittings prior any solvent old operations.mini try
all
reeling of Pot: lynd11n9 and .lamely of pipe shall be done lea con-
note00 a Ilbt somner. Interior f pipe Irttlism any oriel
11.10 Claud at se. cleanf tt all f[Ims0frt .11 openl*99s In[ppiping ff i mall b
4is. Alessi, pipe snalln0 a 0fnblsters-`Internal striations,nde
..male%, rafts. holes and any fore,2n a ❑Is Ilya stall be mum
cOntinyonetn
u tracts.
with I mnulatmrer'p ea duality Control Ioentiftcatlen.
NationalSonislion.Foundetion stela Clio. O costa of `pipe.
ratans and
ndY M read sale.ips Pipe 'hall bemnllnturn.
upptduring i a InstalIfnfnu so
sap. Inn Aiwaya1 ss.ne0 . that PM willl`Ise`. all haunt or`
ascos%,eng * 1. se tare to compose. for'... lion and contractions.
{ pl epmM etcvplioea by %Mont. tie Pipe In the Trento during In-
MCslw prevent.: contractor shell verify MCUioe prerenson ran4Yemenis
wacn r
ne local qua M department and llalrg InSPOCtawInform..oe prior 4 Inf 116ian.
Inforwoathe plans hes born te100 fro. water department but
Contractor .Mil be reable for confining all 0ec111s. _T
;siting: All testing hall be cadre after eatiftcslon of tn. awn
e re-
pretentattve or job Inspect. The 1Ctu11 testing procedure shall batcon-
ducted by toe contraccor.Contor lone all mina with clean soil or ant to
tic hydraulic pressure and leave 'too factions e.pose0 for lneoectlot,
All valves
Rains shallShall
4a40natplate
100 PSI andleft
11traltpatd65 PSI. Providegatsuitable
pump for tests. rill pipelines slowly and bred 1I1 altos of A. as they ar
Ming fill.. min Ilse soup held gauge prnmre for lour 11) noun mitn-e
out Ness. lltraee1 • ea`ecteo to ape t 1*1 Intl.
NM, lease. will t M &c ble. laterals fnaule se tested at lull pres-
stiart to r eea1 any parting or assembly flaws.
System adjuster., 1M entire system shall be properly 1d)uate0 before
all sOrin.lors.te. [Iuaing chase moll ngingpe imago.:Arc and eei if at Cara control devices a On
vapor
erase; Relucltldn a iota. of sprinkler `Meaf 4 1t41n prober cover-
age. w tno0cmi q .act r to Pe lair.. ontOebuilding%send va n0u throwing
awt.tic control v Iwictr onto ma basing; and Inrottl fig 1
oncost.* opentet,prantlert t eppro4r4t1 arsons.
Record Onwings: The Coetr.ctor Mall prow.* Ina S1Inteln le good order.
�llier set
off o prints snowing all +atom finest s rinklers, ',elves
cone and stub 0*0* y variation from the0lo*aclons showo
on tte plant `snailnbe anted on 4ese plant. These retard drawings shall 0
submitted far realer to toe Ml lainq Inspector end turned Over to tan owner
at lM co .potion of toe wort.
nectrl4i ore. The leo volt.9e eking and connections for the Irrlga-
tlOn Sy hall be consist of nil of controller wiring to the
resat rot velar. Connectaon otetht tx,0 roller [ 120-.me span M
tar>ayln ae alecoracalInt.!
contractor. `Controller t .t1on shoal be con-
firm.] prl r '. n t 100 on. Controller Volt 4 tc my d
mounted
eall 10 And
properly Aromael. A loop [oflasra wart. n Minimum, 24. Iluppn9, n
ProviAll ded [brownoutvided she` system Item coke 1 fan ion a
paces.) Rs. and hunk. Cannecrormall semu ercoml. n9 9NISko enlOeaS nS.al stress.
Sire sate for 24 volt control lines %M11 be do black no. 11.IIIr,
minufo to.OF.
for *mast
0na1 lrragat pre wa mte
. Caon grounds snail while
N
Ufa ort.,90slble piano natant I .me a Moms.. main
lens. Tape a bundle ovary ton feet. All wiring nu a 01.earnas snail
be placed in sleeves. an &ends shall be Oone with vtnr AMC elect Ic.l long
matp/ tM ils.n Sin. % mall poled: a least six Im s 16.1 Myon0r tat edge
Aderoy.l 0 a(t.tence: Shall 1 .0,401 lend am 1 Meter ,l.l lar to that
outlined„nr acCeprance of the painting.
Clean-+p: TM Contractor stall t w n free f deeds and as
sale ai r 1 nlliablel cleaned tM%wo , kcourse eno
fncm eors'Mfore final inspection. all
:,a_teg: TM anttn irragatIon system hell M guaranteed by to Contractor
yam fr. t 1 dale toff `IMna eptenceaat workmanship for ansteol al one
ude
nh,r Isteandomo. t ptving,:mocape m tother improvementsaof Ill ny nstal
Owner's :elpoliter to toe Owner up wa aeoletlon of me : Cap.. w r-
antee dan en certificates for All e0uite[: Keys for Au4m[ac Control.r
.0 OuiekCdulpler Pelves: and A set of -As-duilt- irrigation plans.
_Tg.gIoAr/on/ EG PM CRT • 5c#500L e
IRRflA•/ioN 1(/4Ie/ 'MEW /N C'NG. iestA. /h'
RED✓tsD P/ESSI(!E IRRlbAT1,N LiActf(oa) ✓WIT • FEaeo %D ) owe EQ /rf "
QG PEDESTAL
0
e
MD11NT• 1WLGATi4N CavTeaette- G L>AT/shy . /,¢Izrrpo( MG PUS
ae eQOAt
duartc REM07e ceh✓TRo( ✓AtY . /" (uNtEsr AV) on/dt,,✓ur) a vita z5x sealer
FLI/D
Ulu.. Fa uv NEAD • G" vi 808t5LER r✓02z LE TOR*
r 1/ 5' 'PLAY ISo.sz to e
//h" /. C4. MA/N (1NE Se/WO. 44 eve
57o i w/ 2 GPI, AN. F(ef✓ /JOULE
da/!O. ./e Pit //tp/4 (A1ERAC, - 4/Ye Ar were-0 ON P(.1N.
01t/tat: COI.JPtea MLA . /t /L9/NhiRD 4f RL
OR too,(
O¢y.10--- �- E sr..aL
elipue woo
A J0".eo s1M1,L
Gw taw rmer
r0... me
04ieew00 e•g
trot onw r"�
L e. i RI.' 001r<�r eu.
qua. per r t w% "V=w,Cr w•0L.
OFop Vr H9..Q oerA4-
how "Mr* .N Ila W..A-Afyauo
ro w
ar�IO.E: ou. artaa:ca.
cart' aeavcs
r
0, a
•mmu ann..r rw1
aarra..u.
Ouf
maw.. uss ewe
up z.: man
faZ woopa.uvb
/ O L 4M�,itsy ^-cat. !4YY`1
�/� -0M/
(Th, 6NLr.iElpe
11111 getel
U iii 9i%,,�M1rFra"ea'
j2. item .`.iarrte-tee'trri9
I
',gamin a
g-rcl"d} ew
G. LA. -ran L PCS 40
1y94 PTPa+4w(ffr)
"I I+ ',PP")tom.* e*Mtexvw.v1
(S7ulGK catirtez
rare ' 625 Y 1t •L mut.
%r ual
i[V.rllr`v
Wnu 044y.
.APw� C o;: 4.)
E L E VATI ON
U QEDik,e PREssvte C24(.& FLoh/
hM 404 9
drawn
checked
date f I
9ll'R4
sheet
OI ,o sheets