Loading...
Attachment 1 - SR17_FactsheetSR 17 Congestion Relief 5/1/20 Continued FACT SHEET:Highways SR 17 Corridor Congestion Relief Project Overview The Santa Clara Valley Transportation Authority (VTA), in cooperation with the Town of Los Gatos and the California Department of Transportation (Caltrans), proposes to construct improvements on State Route (SR) 17 and upgrade the SR 17/SR 9 interchange in the Town of Los Gatos. Objectives The purpose of this project is to: •Relieve congestion and improve traffic operations on the freeways and local roadways; •Reduce cut through traffic in the Town of Los Gatos; •Improve bicycle and pedestrian facilities and connectivity; and •Support interfacing with multi-modal congestion relief solutions. Project Features The proposed improvements may include, but are not limited to, the following: •Modify on- and off-ramps at the SR 17/SR 9 interchange. •Modify SR 17 mainline lanes and shoulder to eliminate lane-drops and bottlenecks from Lark Avenue to SR 17/SR 9 interchange. •Implement and/or interface with advanced transportation technology solutions such as advanced traffic signal control systems being implemented by the Town, advanced traveler information systems, advanced ramp metering systems and web-based applications. •Implement complete streets consistent features to improve bicyclist and pedestrian travel. Capital Cost/Project Funding The project cost is estimated to be between $40 million and $50 million, contingent on the final determination of improvements. The project is to be funded by a combination of VTA 2016 Measure B, local funds and other funds as available. Project Schedule (pending funding) Alternatives Analysis and Preliminary Engineering 2020 Environmental Approval:2021 - 2022 Design Completion*:2022 - 2023 Project Construction:2024 - 2026 *Full funding for these phases of the project has not yet been finalized. Project Funding Partners ATTACHMENT 1 SR 17 Congestion Relief 5/1/20 Los Gatos SanJose 17 17 17 85 85 9 Daves Ave Winchester BlvdUniversity AveBlossom Hill Rd Shannon R d Kenned y R dLos Gatos BlvdMain StN Santa Cruz AveLar k A v e L o s G a t o s A l maden RoadNational AveSamaritan Dr Wedgewood Ave Knowles Dr Woodard Rd PROJECT LOCATION SR 17 Corridor Congestion Relief Project How to Reach Us For more information on this project, please call VTA’s Community Outreach at (408) 321-7575, (TTY) 408-321-2330. You may also visit us on the web at www.vta.org, or e-mail us at community. outreach@vta.org Project Location Map