Loading...
Item 2 - 101 S Santa Cruz Avenue PREPARED BY: JENNIFER ARMER Associate Planner Reviewed by: Planning Manager and Community Development Director 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6832 www.losgatosca.gov TOWN OF LOS GATOS CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE MEETING DATE: 06/14/2017 ITEM NO: 2 DATE: JUNE 8, 2017 TO: CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE FROM: JOEL PAULSON, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE APPLICATION CD-17-001 PROJECT LOCATION: 101 S. SANTA CRUZ AVENUE. APN 529-01-022. PROPERTY OWNER: CSM INVESTMENTS, LLC. APPLICANT: TERRY J. MARTIN, AIA REQUESTING PRELIMINARY REVIEW OF PLANS TO DEMOLISH AN EXISTING BUILDING AND TO CONSTRUCT A MIXED-USE DEVELOPMENT WITH A BELOW GRADE PARKING GARAGE AND TWO-STORIES OF RESIDENTIAL ABOVE ONE-STORY OF RETAIL ON PROPERTY ZONED C-2. ROLE OF THE CDAC: The Conceptual Development Advisory Committee advises a prospective applicant on the overall consistency of a project with Town policies prior to submitting a formal application and investing in the development review process. The Committee also endeavors to identify the potential issues that will need to be addressed during the development review process should the applicant wish to submit an application. The issues identified by the Committee are not intended to be all-inclusive and other additional issues may be identified during the formal development review process. None of the Committee's comments are binding on the Town and in no way are they intended to indicate whether the project will be received favorably by the various review bodies that are charged with evaluating and deciding the application. As noted in this memorandum, if an application is filed, technical analysis would need to be done during the evaluation of the proposal. In addition, public input is a required and essential component in the development review process. All applicants are strongly encouraged to hold neighborhood meetings to receive input as the design of the project evolves should they decide to proceed with the development review process. PAGE 2 OF 4 SUBJECT: CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE APPLICATION CD-17-001 JUNE 8, 2017 N:\DEV\CDAC\CDAC MEMO\SSC 101_06-14-17.doc 6/8/2017 10:43 AM PROJECT DESCRIPTION: The applicant has submitted a project description and preliminary plans for 101 S. Santa Cruz Avenue, a 0.8-acre property located to the south of Town Plaza Park. The existing parcel contains the existing Post Office building and a small parking lot. Key elements of the proposed project, as listed on the project description and plans submitted, are as follows: • Demolition of the existing Post Office building • Construction of a new three-story mixed-use building • 12,220 square feet of ground-floor retail • 19 two-story townhome residential units above the retail • 31 space surface parking lot • 58 space underground parking garage EXISTING GENERAL PLAN AND ZONING DESIGNATIONS: 1. General Plan designation: Central Business District designation (C-2) applies exclusively to the downtown and accomplishes the following: a. Encourages a mixture of community-oriented commercial goods, services and lodging unique in its accommodation of small-town style merchants and maintenance of small-town character. b. Maintains and expands landscaped open spaces and mature tree growth without increasing setbacks. c. Integrates new construction with existing structures of historical or architectural significance and emphasizes the importance of the pedestrian. 2. Surrounding General Plan designations: Central Business District to the east and west (across Montebello Way and S. Santa Cruz Avenue), and Public (parking) to the south and Open Space (Town Park Plaza) to the north. 3. Zoning designation: C-2 4. Surrounding zoning designations: C-2 on all sides except for Town Park Plaza to the north which is zoned Resource Conservation (RC), and the southern corner of the lot which touches a lot zoned R-1D. POTENTIAL CONSIDERATIONS AND ISSUES: The following is a brief list of issues and topics for consideration by the Conceptual Development Advisory Committee (CDAC). Staff has not reached conclusions on these topics. Staff is identifying them here to help frame the discussion and to solicit input. The main question for the CDAC is whether or not the applicant’s concept for the project creates a high quality plan appropriate for Los Gatos in this location. If an application is filed, staff will evaluate the technical issues. PAGE 3 OF 4 SUBJECT: CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE APPLICATION CD-17-001 JUNE 8, 2017 N:\DEV\CDAC\CDAC MEMO\SSC 101_06-14-17.doc 6/8/2017 10:43 AM POTENTIAL CONSIDERATIONS AND ISSUES (cont’d): 1. General Plan a. General Plan Policy LU-10.4 states, “Encourage mixed uses to increase residential opportunities in commercial zones Downtown, taking into consideration potential impacts to the loss of commercial opportunities.” The proposal would retain a commercial presence on the ground floor, but would add residential above. 2. Zoning a. Project site is zoned C-2 and is surrounded by lots with the same designation except for Town Park Plaza to the north which is zoned RC, and the southern corner of the lot which touches a lot zoned R-1D. 3. Parking a. EXISTING: Project site is currently developed with a single story 12,444-square foot commercial building (Post Office) with 32 parking spaces shown on the plans (not including five parallel parking spaces which cross the front property line such that they are each half on private property and half in the public right-of-way. b. REQUIRED: The proposed 12,220 square feet of ground-floor retail, would require 41 parking spaces (based on a one parking space per 300 square feet). c. REQUIRED: The proposed 19 two-story townhome residential units would require 29 to 38 resident parking spaces (1.5-2 spaces per unit, depending on ownership type) and 19 guest parking spaces (one space per unit unless exception is granted by Planning Commission) for a total of 48 to 57 parking spaces. d. PARKING DISTRICT: The site has 23 parking space credits in the parking assessment district. e. PROVIDED: The proposed project includes a 31-space surface parking lot (not including five parallel parking spaces half on-site along the Broadway frontage). f. PROVIDED: The proposed project includes a 58-space underground residential parking garage, 18 for guests and 40 for residents. g. The total provided parking spaces (including parking district credits) for the proposed project exceeds the current minimum required parking for the proposed uses. 4. Design a. The project plans provided do not include any elevations for the proposed building, but the site plan and floor plans do show that the building would have multi-tenant retail space on the ground floor facing both Broadway and S. Santa Cruz Avenue and would locate the residential townhomes directly above with no additional setback from the street. b. The building setback from Broadway is proposed to be approximately half that of the existing setback, but existing diagonal parking is proposed to remain. PAGE 4 OF 4 SUBJECT: CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE APPLICATION CD-17-001 JUNE 8, 2017 N:\DEV\CDAC\CDAC MEMO\SSC 101_06-14-17.doc 6/8/2017 10:43 AM POTENTIAL CONSIDERATIONS AND ISSUES (cont’d): c. Project site is located in the C-2A subdistrict of the Central Business District in the Commercial Design Guidelines and directly adjacent to the C-2C subdistrict. ATTACHMENTS: 1. Location map (one page) 2. CDAC application (one page) 3. Project Description Letter (one page) 4. Conceptual Plans (six sheets) Distribution: Terry Martin, AIA, 61 E Main Street, Suite D, Los Gatos CA 95030 CSM Investments LLC, 873 Blossom Hill Road, San Jose, CA 95123 Project Scope Of Work LaBarbera Building 101 South Santa Cruz Ave Los Gatos, California RECEIVED ~; :i '( 2 L~ 201 7 TOWN OF LOS GATOS PLANNING DIVIS ION The project site is located across Broadway from Los Gatos Town Plaza Park. The proposal includes demolition of the existing post office building and construction of mixed-use commercial retail and multifamily residential with parking both at street level and below grade. The retail component on the main floor at street level is served by public sidewalks. Proposed retail space is 12,220 square feet. Allowable floor area is 21,535 sf. based upon lot size and 60 % FAR. 36 parking spaces are proposed on site at street level. 16 parking spaces are included as credit in the parking asse ssment district. 52 total parking available for retail use. We feel that the Downtown Core could really benefit by introducing higher density residential to help support the Downtown Businesses. The residential component consists of two-story townhomes above the retail. Residential floor area is not included in allowable floor area in the C-2 Zoning district. 19 units are proposed, including one below market rate unit (BMR). 58 parking spaces are proposed in a parking garage below grade. 18 Guest spaces and 40 Residence Spaces Terry J. Martin Associates, A.I.A. 61 Eas t Main Street, Suite D, Los Gatos, California 95030 Terry@tma-arch.com Tel: 408 395-8016 Brad@ tma-a rch .com ATTACHME NT 3 A-0 Sheet Title: COVER SHEET & PROJECT INFO Drawn by: Project: Scale: Date: #17001 MAY 2017LaBarbera BuildingNew Mixed Use Development101 S Santa Cruz AvenueLos Gatos, CA 95030Project License # C23221RESIDENTIAL & COMMERCIAL ARCHITECTURE61 East Main Street, Suite DLos Gatos, CA 95030Phone: 408-395-8016Fax: 408-395-5732terry@tma-arch.comTERRY J. MARTIN ASSOCIATES, A.I.A.RevDescriptionPrint Date: 6/1/17 Date:Conceptual development advisory committee5/24/17TERRY J. MARTIN ASSOCIATES, A.I.A.TERRY J. MARTIN, AIA61 E MAIN STREET, SUITE DLOS GATOS, CA 95030(408) 395-8016 CSM INVESTMENTS LLC873 BLOSSOM HILL ROADSAN JOSE, CA 95123(408) 947-1166 WECKER SURVEYSCRAIG WECKER1623 BRUBAKER STREETWOODLAND, CA 95776(530) 219-9119 DJ ENGINEERS & ASSOCIATESDAN DREMALAS, PE780 MAIN STREET, SUITE 203PLEASANTON, CA 94566(925) 846-9429FAX 846-9653 FRI ENERGY CONSULTANTS, LLCNICHOLAS BIGNARDI21 N HARRISON AVE, SUITE 210CAMPBELL, CA 95008(408)866-1620 LaBarbera Building ABBREVIATIONS & AND∠ ANGLE @ AT ° DEGREE (ANGLE, BEARING, TEMP) Ø DIAMETER ∆ DELTA, REVIISION/ DIVIDE, DIVIDED BY, SEQUENCE =, ≠ EQUAL (TO), NOT EQUAL (TO) ' FOOT/FEET, MINUTES (BEARING) " INCH(ES), SECONDS (BEARING) >, ≥ GREATER THAN, OR EQUAL TO <, ≤ LESS THAN, OR EQUAL TO- MINUS, SUBTRACT(ED) # NUMBER, POUND(S) % PERCENT + PLUS, ADD(ED) ± PLUS/MINUS (APPROXIMATELY) AB ANCHOR BOLT ABV ABOVE AC ASPHALTIC CONCRETE A/C AIR CONDITIONING ACOUST ACOUSTIC(AL)AD AREA DRAINADDL ADDITIONAL ADJ ADJUST(ABLE) AEJ ALL EDGE JOINTS AFF ABOVE FINISH FLOOR AHJ AUTHORITY HAVING JURISDICTIONAIA AMERICAN INSTITUTE OF ARCHITECTS ALT ALTERNATE, ALTERNATIVE ALUM ALUMINUM AMP AMPERE ARCH ARCHITECT(URAL) ASPH ASPHALTASSOC ASSOCIATION AWN AWNING BD BOARD BEL BELOW BLDG BUILDINGBLK, BLKG BLOCK, BLOCKING BM BEAM BN BOUNDARY NAIL BOT BOTTOM BS BOTH SIDES BTU BRITISH THERMAL UNITBTWN BETWEEN CAB CABINET CB COLUMN BASE CBC CALIFORNIA BUILDING CODE CEC CALIFORNIA ELECTRICAL CODECEM CEMENT(ITIOUS) CER CERAMIC CF CUBIC FEET CFC CALIFORNIA FIRE CODE CFM, CFS CUBIC FEET PER MINUTE, SECOND CI CAST IRONCIR CIRCLE, CIRCULAR CIRC CIRCULATION CJ CONTROL JOINT CL CENTER LINE CLG CEILING CLO CLOSETCLR CLEAR CMC CALIFORNIA MECHANICAL CODE CNTR COUNTER CO CLEAN OUT, COMPANY COL COLUMN COMP COMPOSITECONC CONCRETE CONN CONNECT(ION) CONST CONSTRUCTION CONT CONTIN UE/UAL/UOUS COR CORNERCORR CORRIDORCPC CALIFORNIA PLUMBING CODE CPR COPPER CPT CARPET CRC CALIFORNIA RESIDENTIAL CODE CSMT CASEMENTCW COLD WATER CU CUBIC DBL DOUBLE DBL HNG DOUBLE HUNG DEG DEGREE DEPT DEPARTMENT DET DETAIL DF DOUGLAS FIR, DRINKING FOUNTAINDIA DIAMETER DIAG DIAGONAL DIM DIMENSION DISP DISPENSER, DISPOSAL DIST DISTANCEDIV DIVIDE, DIVISION DN DOWN DOUG DOUGLAS (FIR) DR DRAIN, DOOR DWG DRAWING DTL DETAILDW DISHWASHER DWR DRAWER E EAST EA EACH EL ELEVATIONELEC ELECTRICAL ELEV ELEVATION, ELEVATOR EMER EMERGENCY EN EDGE NAILING ENCL ENCLOSUREENGR ENGINEER EP ELECTRICAL PANEL EQ EQUAL PROJECT TEAM OWNER ARCHITECT AREA CALCULATIONS GENERAL CONTRACTOR IS REQUIRED TO SCHEDULE & COORDINATE THE FOLLOWING MANDATORY CONSTRUCTION OBSERVATION SITE VISITS WITH ARCHITECT PRESENT. PROVIDE NOTICE TO ARCHITECT AT LEAST 48 HOURS PRIOR TO SUCH VISITS. PRIOR TO BEGINNING WORK, PROVIDE ARCHITECT & OWNER WITH A CRITICAL PATH SCHEDULE SHOWING THE FOLLOWING CONSTRUCTION MILESTONES: PARCEL MAP VICINITY MAP PROJECT DATACONSTRUCTION OBSERVATION REQUIRED ADDITIONALLY, CONTRACTOR SHALL SCHEDULE A MANDATORY WALKTHRU WITH ARCHITECT & OWNER PRESENT AT SUBSTANTIAL COMPLETION. INITIALS REQD SITE VISIT MILESTONE ROUGH FRAMING WINDOW SELECTION, PRIOR TO ORDERING WINDOWS ROUGH ELECTRICAL, MOUNTED BOXES PRIOR TO PULLING WIRE SUBSTANTIAL COMPLETION PRIOR TO GRANTING OCCUPANCY PRE CONSTRUCTION SITE MEETING FRAMING & INSULATION, PRIOR TO COVERING FRAMING W/ FINISHES AFTER FINISH REMOVAL, PRIOR TO STRUCTURAL DEMOLITION ARCHITECT'S INITIALS ARE REQUIRED TO THE LEFT OF EACH SITE VISIT LISTED PRIOR TO PROCEEDING WITH SUBSEQUENT WORK & INDICATE ONLY THAT ARCHITECT WAS PRESENT & PROVIDED WITH THE OPPORTUNITY TO OBSERVE CONSTRUCTION AT THAT PHASE. Terry J. Martin Associates, A.I.A. A Certified Build It Green Rater Smart Solutions From The Ground Up Build It Green PROJECT ADDRESS: 101 S Santa Cruz Avenue Los Gatos CA 95030 OWNER: La Barbera APN: 529-01-022 ZONING: C-2 (Central business district commercial zone) LOT AREA: 35,893 Sq Ft (0.824 Acres ±) BUILDING AREA: See Area Calculations on this sheet T.B.D STORIES: 2 Stories Residential O/ Retail & Parking O/ Basement garage CONSTRUCTION TYPE: Type I and VB FIRE SPRINKLERS: To be provided OCCUPANCY: Group R Residential, M Retail and U Garage APPLICABLE CODES: Los Gatos Municipal Code2016 CA RESIDENTIAL BUILDING CODE2016 CA Bldg Code, 2016 CA Res Bldg Code, 2016 CA Elec Code2016 CA Mech Code, 2016 CA Plmbg Code, 2016 CA Energy Code2016 CA Fire Code, 2016 CalGreen Code, 2016 CA Ref Stds CodeAll as amended by The State Of California and Local Jurisdiction(s). ADDITIONAL DOCUMENTS & REQUIREMENTS SHEET INDEX PROJECT SCOPE New Mixed Use Development 101 S Santa Cruz Avenue Los Gatos, CA 95030 • BUILDING AREA: (N) RETAIL GRADE LEVEL: 52 PARKING SPACES, 12,220 SF (Not Including Residential accessories) ALLOWABLE FLOOR AREA: @60% = 21,535 SF (N) RESIDENTIAL PODIUM LEVEL: 58 PARKING SPACES, 19 UNITS (Not Included in site FAR) + (N) BASEMENT GARAGE: 34,000 SF +/- (Not Counted As Floor Area) REMOVAL OF EXISTING SUB-STANDARD BUILDING (POST OFFICE) PROVIDE NEW SUB-GRADE PARKING STRUCTURE W/ GRADE LEVEL RETAIL AND PARKING WITH 2 STORIES RESIDENTIAL UNITS ABOVE STRUCTURAL ENGINEER TOPOGRAPHIC SURVEY GEOTECHNICAL INVESTIGATION / SOIL REPORT SOILS REPORT TO BE PREPARED FOR THIS PROPERTY. NOTIFY THE ARCHITECT OFRECORD IF ANY OTHER SUBSTANDARD CONDITIONS ARE ENCOUNTERED. TITLE 24 CALIFORNIA ENERGY CODE COMPLIANCE NAD CALGREEN PROJECT TITLE 24 ENERGY CONSULTANT, IS PART OF THE CONSTRUCTIONDOCUMENTS. ALL WORK MUST COMPLY WITH ENERGY REPORT REQUIREMENTS &RECOMMENDATIONS, CALIFORNIA ENERGY CODE, & ALL OTHER APPLICABLE CODES &ORDINANCES AS ADOPTED, AMENDED, & ENFORCED BY LOCAL JURISDICTION. ARBORIST DUE TO THE SCOPE OF WORK FOR THIS PROJECT, NO ARBORIST REPORT HAS BEENPREPARED. IN THE EVENT THAT PROJECT SCOPE CHANGES, CONTACT ARCHITECT &AUTHORITY HAVING JURISDICTION (AHJ) TO DETERMINE IF AN ARBORIST REPORT ISREQUIRED. NO WORK SHALL BE COMMENCED WITHIN THE DRIPLINE OF ANY TREEPROTECTED BY ANY AHJ PRIOR TO RETAINING A LICENSED ARBORIST. N/A Please Note: Orientation of other plans within the set may vary from this Vicinity Map.Please Note: Orientation of other plans within the set may vary from this Parcel Map. TJ EQUIP EQUIPMENT ETC ET CETERA, AND OTHER THINGSEW EACH WAY EXT EXTERIOR (E) EXISTING EQ EQUAL EW EACH WAY EXH EXHAUSTEXP EXPANSION, EXPANDING EXT EXTERIOR FAB FABRICATE, FABRICATION FD FLOOR DRAINFDN FOUNDATION FE, FEC FIRE EXTINGUISHER, FE CABINET FF FINISH FLOOR FG FIBERGLASS FH FIRE HYDRANT FIN FINISHFLR FLOOR FOC FACE OF CONCRETE FOS FACE OF STUD FRP FIBERGLASS REINFORCED PANEL FS FAR SIDE FT FOOT, FEETFTG FOOTING FURR FURRING FUT FUTURE FV FIELD VERIFY GA GAUGEGAL GALLON GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACOR GD GARBAGE DISPOSAL GL GLASSGND GROUND GSM GALVANIZED SHEET METAL GYP GYPSUM HB HOSEBIB HD HOLDDOWNHDR HEADER HDWD HARDWOOD HDWR HARDWARE HGR HANGER HM HOLLOW METAL HORIZ HORIZONTALHT HEIGHT HVAC HEATING VENTILATION & AIR CONDITIONING ID INSIDE DIAMETERIN INCHINCL INCLUDE(S), INCLUDING INFO INFORMATION INSUL INSULATION INV INVERTED INT INTERIOR JAN JANITOR JBOX JUNCTION BOX JCT JUNCTION JH JOINT HANGER JT JOINT KIT KITCHEN KW KILOWAT LAB LABORATORY LAV LAVATORYLAT LATERAL LB POUND LF LINEAL FEET, LINEAR FEET LIN LINEAL, LINEAR LT LIGHT LVR LOUVER M, m METER MATL MATERIAL MAX MAXIMUM MB MACHINE BOLTS MAX MAXIMUMMECH MECHANICAL MEMB MEMBRANE MFR, MNF MANUFACTURER MIN MINIMUM, MINUTE MIR MIRRORMISC MISCELLANEOUSMTD MOUNTED MTL METAL MUL MULLION N NORTHNEC NATIONAL ELECTRICAL CODE NIC NOT IN CONTRACT NO NUMBER NOM NOMINAL NS NEAR SIDE NTS NOT TO SCALE(N) NEW O/ OVER (ORDER OF INSTALLATION) OAI OUTSIDE AIR INTAKE OC ON CENTER OD OUTSIDE DIAMETEROFCI OWNER FURNISHED GC INSTALLED OFOI OWNER FURNISHED & INSTALLED OPNG OPENING OL OCCUPANT LOADOPG OPENING OPP OPPOSITE ORIG ORIGINAL P, | |, // PARALLEL PA PUBLIC ADDRESS PC PIECEPERP, ⊥ PERPENDICULAR PH PANIC HARDWARE PL PLATE PLAM PLASTIC LAMINATEPLAS PLASTER PLMBG PLUMBING PLYWD PLYWOOD PNL PANEL POL POLISHED PR PAIRPREFAB PREFABRICATED PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POINT, PRESSURE TREATED PTN PARTITION R RISER (R) REPLACED, RELOCATED RAD RADIAL, RADIUS RCP REFLECTED CEILING PLAN RD ROOF DRAINRECPT RECEPTACLE REF REFERENCE REINF REINFORCE(MENT) REQD REQUIRED REQMTS REQUIREMENTS RESIL RESILIENTREV REVISION RM ROOM RPM REVOLUTIONS PER MINUTE RV ROOF VENT RWL RAIN WATER LEADER S SOUTH SAD SEE ARCHITECTURAL DRAWINGS SAN SANITARY SASM SELF ADHERED SHEET MEMBRANE SC SOLID CORESCD SEAT COVER DISPENSER SCHED SCHEDULE SEC, SECT SECTION SF SQUARE FOOT, FEET SHT SHEET SHWR SHOWERSIM SIMILAR (TO) SJ SEISMIC JOINT SLD SEE LANDSCAPE DRAWINGS SM SHEET METAL SMS SHEET METAL SCREW SND SANITARY NAPKIN DISPENSERSNR SANITARY NAPKIN RECEPTACLE SPEC(S) SPECIFICATION(S) SPN SOLE PLATE NAILING SQ SQUARE SQ FT SQUARE FOOT, FEET SS, SSTL STAINLESS STEELST STRAP TIE, STREET STA, STN STATION STE SUITE STL STEEL SUSP SUSPENDED SY, SQ YD SQUARE YARD(S)SYM SYMMETRICAL SW SHEAR WALL T, TRD TREAD TB TOWEL BAR T&B TOP AND BOTTOMTBC TO BE CONFIRMED TBS TO BE SELECTED TD TIE DOWN TEL TELEPHONE TEMP TEMPORARY, TEMPERATURE TEMPD TEMPEREDTER TERAZZO THRESH THRESHOLD T&G TONGUE AND GRROVE THK THICK(NESS) THRU THROUGH TOC TOP OF CONCRETETOS, TS TOP OF SLAB TP TOP PLATE TRANS TRANSFORMER TSTAT THERMOSTAT TV TELEVISION TYP TYPICAL UC, U/C UNDER-COUNTER UNF UNFINISHED UNO UNLESS NOTED OTHERWISE UON UNLESS OTHERWISE NOTEDUR URINAL V VOLT VB VAPOR BARRIER VCT VINYL COMPOSTION TILE VEN VENEERVERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD VOL VOLUME W WESTW/ WITH W/O WITHOUT WC WATER CLOSET WD WOOD WDW WINDOW WH WATER HEATERWO WHERE OCCURS WP WATERPROOF(ING) WT WEIGHT YD YARD TITLE 24 ENERGY COMPLIANCE A-0 COVER SHEET & PROJECT INFO C-1 SITE TOPOGRAPHIC SURVEY A-1 PARKING GARAGE - BASEMENT LEVEL A-2 RETAIL / PARKING - GRADE LEVEL A-3 RESIDENTIAL MAIN FLOOR - PODIUM LEVEL A-4 RESIDENTIAL UPPER FLOOR - PODIUM LEVEL ATTACHMENT 4