Loading...
Item 2 - 304 Charles StTOWN OF LOS GATOS COMMUNITY DEVELOPMENT DEPARTMENT 11 0 E. Main Street, Los G at os, CA 95032 Ph one : (408) 354-6874 Fax : (408) 354-7593 HISTORI C PRESERVATIO N COMMITTEE PROJECT DATA SHEET 1. PROJECT DE TAIL Project address: 304 Charles Street Project description : demolition of pre-1941 residence . 2. PROPERTY DE TA IL Date structure was built 1925 Town of Los Gatos Historic Status Code None Does property have an LHP Overlay zone? NO Is structure in a historic district? NO If yes , what district? If yes , is it a contributor? Findings required? YES If yes , see back page of this document. Co nsiderations required? NO If yes , see back page of this document. Comments: The request was previously cons idered by the HPC , and add itional information was requested of the applicant. The applicant has provided the additional materials for consideration by the Committee. Required Findings _X_As required by Section 29.10.09030(e)(2) ofthe Town Code for the demolition of a single family residence (Preservation of historically or architecturally significant buildings) and the Secretary of Interior Standards of any historic structure. 1. The building is not associated with any events that have made a significant contribution to the Town. 2. No significant persons are associated with the site. 3. There are no distinctive characteristics of type, period or method of construction or representation ofwork of a master. 4. The structure does not yield information to Town history. 5. Structural integrity of the building. Required Considerations Sec. 29.80.290. Standards for review. In evaluating applications , the deciding body shall consider the architectural style, design, arrangement, texture, materials and color, and any other pertinent factors. Applications shall not be granted unless: 1 On landmark sites, the proposed work will neither adversely affect the exterior architectural characteristics or other features of the landmark (and, where specified in the designating ordinance for a publicly owned landmark, its major interior architectural features) nor adversely affect the character ofhistorical, architectural or aesthetic interest or value of the landmark and its site. 2 In historic districts, the proposed work will neither adversely affect the exterior architectural characteristics or other features of the property which is the subject of the application, nor adversely affect its relationship, in terms of harmony and appropriateness, with its surroundings, including neighboring structures, nor adversely affect the character, or the historical , architectural or aesthetic interest or value of the district. 3 For pre-1941 structures, the proposed work will neither adversely affect the exterior architectural characteristics or other features of the property which is the subject of the application. Town Policy __ That the work proposed is compatible with the neighborhood. MG CONSTRUCTORS & ENGINEERS, INC . INSPECTORS•ENGINEERS•BUILDERS CALIFORNIA EN G INEERI NG A ND BUI LD ING LICENSE A /8 64205 8 MGCE15-246DG September 1oth, 2015 Sam ir Sharma 206-931-4169 I samir19@gmail.com Foundation and Drainage Inspection for 304 Charles St. Los Gatos, CA On Friday, August 21st and 28th, 2015 , MG Constructors and Engineers , Inc. (MGC&E- Devorah Gomez and Timur Saripov) performed a limited foundation inspection at the above-mentioned structure. Disclaimer: The professional opinions offered are based on visual observations of apparent conditions existing at the time of inspection. Latent and concealed defects and deficiencies are excluded . Destructive testing, subsurface investigation , structural calculations and seismic analysis as well as preparation of design drawings detailing any recommended repairs or improvements are beyond the scope of the services provided. An independent Geotechnical Engineer and/or geologist should be retained if a complete geotechnical investigation is desired . Owner/Agent/Buyer i s granted a single use of th is report for one transaction and agrees that this report is not intended for use in any legal action without written consent from MGC&E . Findings: This foundation is comprised of a partial cast-in-place concrete spread footing and slab on grade , on a flat building pad and site, constructed in 1925. The original construction drawings, soils report and building permits were not available for Page of 1 of 10 review to verify the structure was done in conformance with construction documents. The following observations were noted regarding the critical elements of the foundation and related components. 1. Exterior Drainage. The following was noted : • There are rain gutters and downspouts installed around the roof perimeter, directed into underground drainage pipes. • There were various downspouts that were draining water directly next to the foundation. • There was excess soil and debris along the North side of the structure (Refer to photo #1 ). This is causing water to be directed towards the crawl space. • There was a low area adjacent to the foundation along the middle of the structure (Refer to photo #2). This is causing water to be directed towards the crawl space. These conditions may allow for water to collect at the foundation. This may cause settlement, mold, dry rot and damage to the foundation and floor framing . Recommended Action: Add extensions to downspouts to direct water away from the foundation along perimeter of the structure. Flush, test and clean all roof gutters, and underground drainage pipes to verify functionality. Install surface drain in the middle of property to collect and discharge water away from foundation. Excavate soil along the North side and re-grade to slope away from the foundation. 2. Crawl Space Drainage. There is evidence of water intrusion in the crawl space. The nails at the bottom of the supporting wood posts were severely corroded and there were water marks on the wood posts in the crawl space. The water intrusion has caused water damage to various wood framing members in the crawl space (Refer to photo #3). Water and termite damage greatly reduces the structural capacity of the wood members. Recommended Action: Install a front footing drain on the interior of the crawl space and a professionally installed sump pump per Professional Engineering (PE) design by a qualified and experienced company in this type of work. 3. Relative Humidity. Relative Humidity (RH) is the measured ambient quantity of water in comparison to the temperature . This measurement is important to maintain at acceptable levels (optimal readings are below 40% and acceptable ranges are between 40 to 60% R.H .) to minimize potential degradation and damage to composite structural members and ferrous metal building components. The RH was measured as follows : Crawl Space: 70.4%@ 67.1 oF. Corrosion of metal components were visible due to the high relative humidity (Refer to photo #4 ). Corrosion of the metal components reduces the strength of the metal connectors. Recommended Action: These elevated levels are due to the seasonal amount of water in the crawl space, and we recommend installing a heavy duty, sealed crawl space liner throughout the crawl space, along with the above recommended drainage to mitigate the higher levels of RH and reduce the accelerated corrosion. Page of 2 of 10 Photo #1, Debris and Leaves Along North Side of Structure Photo #2, Low Area Adjacent to Foundation Page of 3 of 10 Photo #3, Wood Post with Water Damage Photo #4, Corroded Nails in Crawl Space Page of 4 of 10 4 . Floor Frame Structure & Support Framing. The floor framing is comprised of wood floor joists supported by wood girders and wood posts on top of concrete bearing piers, at standard spacing. The following issues were noted with the floor and support framing in need of repair: (a) There was shimming in between the mud sill and foundation along the South side of the crawl space (Refer to photo #5). It is crucial that this section of the floor framing be re-framed to provide a solid continuous connection between the upper floor framing down to the foundation. It is important that the floor framing be properly connected to allow proper transfer of forces between the floor and foundat ion in a lateral event, such as, an earthquake. Recommended Action : Remove shims andre-frame floor framing to provide continuous load path per PE design. (b) There was water and termite damage to various wood framing members including the rim joist, floor joists and mud sill (Refer to photo #6). Water and termite damage greatly reduces the structural capacity of the wood members. It is crucial that the rim joist be replaced to allow proper transfer of forces between the floor and foundation in a lateral event, such as, an earthquake. Recommended Action : Remove and replace wood framing members with termite and water damage throughout the crawl space per PE design. Photo #5, Shimmed Floor Framing Page of 5 of 10 Photo #6, Termite Damage to the Rim Joist and Floor Joist 5. Foundation Anchorage. No foundation bolting, straps or other related seismic hardware was present in the crawlspace. Proper anchorage and fastening is necessary throughout the foundation system. The lack of properly installed foundation anchorage increases the risk of failure during seismic activity potentially causing the structure to lift or slide off of the foundation . Recommended Action: Install retrofit anchorage and seismic upgrade to crawl space per PE design . 6. Concrete Foundation. The existing concrete foundation is in good, overall continued service providing condition , installed within acceptable guidelines for structural concrete at the time of original construction. Due to the age and wear on the foundation, the following items are recommended for repairs: There was a section of exposed steel reinforcement at the East side of the crawl space (Refer to photo #7). Exposed steel re inforcement typically will corrode and damage the foundation if left exposed over time. Recommended Actions: Repair exposed steel reinforcement per PE design and American Concrete Institute (ACI) guidelines for structural concrete repair. Page of 6 of 10 Photo #7, Exposed Steel Reinforcement 7. Floor Elevation Survey: The floor elevation was measured throughout with a liqu id "zip level" to compare the floor elevation for flatness (Reference Attachment 1 ). This is important to check because in some situations floors can settle , due to varying causes , usually stemming from soil settlement in parts or entirely throughout foundations. These floor measurements showed the floor diaphragm to be outside of the normal , acceptable tolerances of 1" in 20', along the North , a portion of the West side and central portion of the structure. This is likely due to expansive clay soil supporting this structure and corresponding poor original soils compaction in the area below the footing causing foundation settlement. Recommended Action : Underpin foundat ion and grouVurethane inject below slab. This provides permanent transfer of building weights to helical anchor or other deep foundation structural elements , along with central slab lifting to m atch exterior el evat ions. This type of repair doesn 't allow future moveme nt of e xterior underpinned foundation areas . If this work is performed, the flooring , interior walls and potentially doors/windows may crack or move out of plumb/level as part of the lifting process , which will most likely require repairs . Pag e of 7 of 10 Maintenance: We recommend implementing a standard maintenance program as follows: 1. Keep rain gutters, downspouts and drain lines clean and directed away from foundation to lower areas in front of site. 2. Monitor foundation & Sub floor condition for changes every 2-3 years, by a qualified professional . 3 . Maintain proper function of existing interior and exterior drain and plumbing lines, monitor annually for functionality. 4 . Monitor crawl space annually during winter months for any signs of moisture or leaks . 5 . Implement a professional pest control program per current residential standards for foundations with crawl spaces. Summary: For the longevity of the structure, we recommend a competently engineered and building code compliant repair of the foundation by a drilled pier or equivalent stabilization of the foundation. As noted above, this work is recommended to be performed by a qualified company experienced in this type of work. If this work is to be done the owner should maintain a 15% contingency of the total amount to repair the finishes (plaster, drywall, windows, etc.) which may occur during the lifting component of work. We recommend normal and continuous seasonal maintenance as recommended above to be implemented by the owners for the longevity of the structure. Sincerely, Devorah Gomez Staff Engineer MG Constructors & Engineers, Inc. California Engineering and Bu ilding License A/8642058 Disclaimer: This inspection rep ort has been developed and prepared to address observations, site conditions and evaluations relating to professional construction standards at the time of construction for this type of structure. Current Building Code (2013 California Building Code/2012 International Residential Code IRC) has been revised from the time of original construction, and is only used as a basis of knowledge, not as a comparison. This inspection report is contingent only on what was visible at the time of inspection, and excludes any hidden, latent or other defects/situations which were undetectable to the naked eye during inspection . MGC&E Inc. assum es no liability for all unforeseen problems. Th is report s hould not be construed as a warranty of any kind, express or implied. Page of 8 of 10 Attachment 1, Floor Elevation Survey r------,21'-10"'------..- 11'-----:37'-1"'--1--1 -----,r ,- Cl' CP-fl' 13· • 4 -1" 3· ·a S lAB-OOGAAOE J• -4 -~· -1" 22· 2* 2 ~' -1~· 17. V' -l! y 11• • 2 ~ ·1i" o· 10~" ..J• FP.-V' T~· 4 -1 ~" -1f' ~·v 1" J6" • 4 1'-4"_J._, SLAB-ON -G RADE L-11'-3"__J 10 -4" .,. J ~® L -2!·-zl 1S• • 8 ' -2" CHARLES ST *D IMENSIONS NOT EXACT LEGEND ® DOWNSPOUT (TYP .) CE3::l CRAWL SPACE ACCESS INTERIOR WALLS Page of 9 of 10 LIMIT AllONS The conclusions and recommendations stated in th is report are based on a visual survey of the structure. Deficiencies which were not apparent at the time of this survey are not included in this report. This survey is limited to the foundation area. This report is designed to give a general status of the structure 's foundation system . You have not requested or authorized any destructive testing , subsurface investigation, structural calculations or seismic analysis and you have not provided MG with a geotechnical report. It in no way precludes the possibility of hidden damage nor guarantees that additional damage may not occur following the survey. INITIALASSESSMENT REPORT ONLY This report is intended to be used for information purposes only. The information presented should not be used by others to make repair recommendations or as construction documents. The recommendations presented in this report are intended to give general direction for repairs. Complete repair detail will be specified as a part of the construction documents. AREA THIS REPORT IS LIMITED TO This report is limited to the substructure only. No investigation was made as to the structural integrity (specifically the seismic stability) of the superstructure section of the residence . LIMITATION OF LIABILITY In using this report Owner/Agent agrees that the liability of MG, its officers, agents , employees, affiliates , used on this inspection and to the extent such liability arises from professional acts, errors and/or omissions , shall be limited in the aggregate to a sum that is no greater than the total fee of MG for services rendered on this inspection. Page of 10 of 10 .. Gllrovf CA. Lkl A/1 &420$1 MG Constructors & Engineers, Inc. 15650 Vineyard Blvd. #232, Suite A Morgan Hi ll, CA 95037, CA License A/B 642058 Phone (408} 842-5599 Fax (408) 842-5655 Date: 09/10/2015 Proposal: MGCE15-246DG C/0: Samir Sharma 206-931-4169/ samir19@gmail.com Project Location Address: 304 Charles Street Los Gatos, CA 95032 Item: Scope of Work 1 Professionally Engineered Design Drawings Third Party Geotechnical Eng ineering, Testing and Report Writing (To Be Paid 2 By Owner) 3 Permit Coordination/Permit/City Inspections 4 Mobilization: Saw Cutter, Drill Rig, Hydraulic Gear, Compressor Lifting Gear 5 Remove Leaves and Debris Along North Side of Structure and Re-Grade Soil Install Surface Drain at Center Portion of Property and Discharge to Lower 6 Section of Property 7 Install Below Grade Footing Drain Along North and East Side of Crawl Space 8 Install New Heavy Duty Sump Pump, with Effluent to Side 9 Install New Ground Fault Circuit to Sump Pump Per Building Code 10 Clean Crawl Space and Dispose of Debris 11 Install Drain Mat and Heavy Duty Sealed Crawl Space Liner System Remove Exterior Finishes for Rim Joist and Mud Sill Repair. Repair Exterior 12 Wood Siding After Repair is Complete 13 Repair Shimmed Mud Sill Per PE Design 14 Repair Rim Joist and Mud Sill Per PE Design 15 Repair Floor Joist with Termite Damage Per PE Design 16 Install New Foundation Anchorage/Pre-Engineered Hardware Per PE Design 17 Excavate Soil at New Underpinning Anchor Locations 18 Install Underpinning Anchors 19 Install Brackets and Lifting Hardware ~ift Foundation to Acceptable Tolerance 1"-20LF*, Shim Interior Posts and 20 Interior Footings 21 Place Concrete Fill at Holes, and Off haul Soils 22 Prep Work for Urethane on Interior Sections of Slab on Grade** 23 Urethane Injection for Under Slab Lifting on Interior 24 Repair Exposed Steel Reinforcement Per PE Design 25 Punch List, Clean Up, Final Permit Sign Off, Demobilize TOTA L COSTS '' Notes: Design: Design includes structural drawing details for work noted above only. Permit: Scope of work includes permit fees, permit coordination and City inspections. Totals $ 4,444.95 $ - $ 2,771.02 $ 15,284.74 $ 2,915.80 $ 3,528.61 $ 5,262.81 $ 2,215.06 $ 1,231.57 $ 2,277 .89 $ 6,969.16 $ 5,756.19 $ 3,726.49 $ 4,995.89 $ 1,747.00 $ 1,980.06 $ 9,539.30 $ 30,690.12 $ 15,580.69 $ 6,908.38 $ 4,181.54 $ 2,350.28 $ 5,793.64 $ 2,727.29 $ 4,367.28 $147,245.75 Construction: Workmen to access all necessary areas for duration of work. Add $ 150 plus the cost of detectors if additional smoke/carbon detectors are required . Work Schedule Time Duration: After issuance of Notice to Proceed, Signed Agreement and Deposit by Owner to start. Completion of work varies depending on scope of work. Engineering/Permits up to 3 weeks to complete, prior to start of work. Permit cost is based on valuation at this writing, actual cost may vary. Any additional fees for building permit will be added to this proposal after permit issuance . Lifting of MG Constructors & Eng ineers. Inc. Job Pro posal/Contract. Rev. September 20 14 1