2020-027 - Adopt a list of Projects for FY 2020-21 Funded by SB1, the Road Repair and Accountability Act of 2017RESOLUTION 2020-027
RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2020/21
FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 to address the significant multi -modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the Town are aware of the projects proposed for funding in the community and
which projects have been completed each fiscal year; and
WHEREAS, the Town must adopt a list of all projects proposed to receive funding from
the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution,
which must include a description and the location of each proposed project, a proposed
schedule for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the Town, will receive an estimated $532,580 in RMRA funding in Fiscal Year
2020/21 from SB 1; and
WHEREAS, this is the fourth year in which the Town is receiving SB 1 funding and will
enable the Town to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the communities' priorities for transportation investment; and
Iof3
Resolution 2020-027 June 16, 2020
WHEREAS, the 2016 California Statewide Local Streets and Roads Needs Assessment
found that the Town's streets and roads are in a fair condition and this revenue will help
increase the overall quality of the road system and over the next decade will bring Town streets
and roads into a good condition;
NOW, THEREFORE, BE IT RESOLVED: The Fiscal Year 2020/21 list of projects planned to
be funded with Road Maintenance and Rehabilitation Account revenues include:
Location
Description
Scheduled
Completion
Estimated
Useful Life
Winchester from Lark to Santa
Placement of rubber cape seal or overlay
Fall 2021
10 - 25 years
Cruz
to maintain pavement surface. This is an
arterial road and is critical for transit
needs in the Town.
Union Avenue from Blossom Hill
Placement of rubber cape seal or overlay
Fall 2022
10 - 25 years
Road to Los Gatos -Almaden Road
to maintain pavement surface. This is an
arterial road and is critical for transit
needs in the Town.
2of3
Resolution 2020-027 June 16, 2020
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los
Gatos, California, held on the 1611 day of June of 2020 by the following vote:
COUNCIL MEMBERS:
AYES: Rob Rennie, Marico Sayoc, Barbara Spector, Mayor Marcia Jensen
NAYS: None
ABSENT: None
ABSTAIN: None
SIGNED:
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: V 20
ATTEST:
M• • •
TOWN CLERK, OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: oYJoiU
3of3
Resolution 2020-027 June 16, 2020