Attachment 4 - Mountain View Sustainability Action Plan Staff ReportCOUNCIL
REPORT
C111 u1 \lut \111\ VI1l‘
RECOMMENDATION
DATE: October 22, 2019
CATEGORY: New Business
DEPT.: City Manager's Office
TITLE: Sustainability Action Plan 4
1. Adopt the Sustainability Action Plan 4 (SAP-4) for Fiscal Years 2019-20 through
2021-22 (Attachment 1 to the Council report).
2. Approve a three-year spending plan for the $7.5 million Sustainability Fund
appropriated by Council in April 2019 (Attachment 2 to the Council report).
BACKGROUND
The City Council adopted an original Environmental Sustainability Action Plan (ESAP)
in March 2009 for Fiscal Years 2008-09 through 2010-11, to serve as a plan for achieving
the City's short- and long-term sustainability goals. Subsequently, the Council adopted
Environmental Sustainability Action Plan 2 (ESAP-2) in April 2012 for Fiscal Years 2011-
12 through 2013-14. In 2015, the Council adopted a communitywide Climate Protection
Road Map and Municipal Operations Climate Action Plan as road maps for achieving
the City's greenhouse gas (GHG) reduction targets through 2050. In September 2016,
the Council adopted Environmental Sustainability Action Plan 3 (ESAP-3) for Fiscal
Years 2016-17 through 2018-19.
Between September 2017 and June 2018, the City convened the Environmental
Sustainability Task Force 2 (ESTF-2), an advisory body of appointed community
members who lived or worked in Mountain View. The core purpose of ESTF-2 was to
evaluate whether current City sustainability plans and goals should be modified based
on new technologies and processes for addressing climate change. ESTF-2 produced a
Final Report that recommended 36 actions to reduce community GHG emissions
through 2030, which was presented to Council in June 2018. Staff performed an
analysis of these recommendations to verify assumptions on cost and GHG emissions
reductions and presented these results to Council in December 2018.
Attachment 4
Sustainability Action Plan 4
October 22, 2019
Page 2 of 23
In response to the ESTF-2 recommendations, the City hired a consulting firm (Cadmus)
in fall 2018 to conduct a Sustainability Program Assessment (including staffing,
governance, and a benchmark against other cities) and develop a Sustainability
Strategic Plan. On April 30, 2019, staff presented the Sustainability Strategic Plan to the
City Council during a Study Session, offering three levels of response to climate change
(Foundational, Advanced, and Innovative), with corresponding actions to be taken and
additional program budget and staffing needed at each level. The Strategic Plan called
for the following estimated three-year funding levels: Foundational ($3.8 million),
Advanced ($11.8 million), and Innovative ($13.6 million). At the Study Session, the
Council directed the following:
Overall Direction
• Strive to achieve an Advanced or higher level of response.
• Identify and prioritize strategies to achieve the largest reduction in GHG emissions
per funds spent.
• Return to the Council with specific initiatives to be undertaken as part of
Sustainability Action Plan 4 (SAP-4).
Funding
• Create a three-year fund for sustainability projects of $7.5 million from the
unallocated General Fund balance and a redirection of Fiscal Year 2018-19 and
Fiscal Year 2019-20 Strategic Property Acquisition Reserve (SPAR) contributions.
Identify other sources of ongoing funding, such as revenue from the new business
license tax, short-term rentals, cannabis sales, the Development Services Fund, the
Shoreline Community District, and Enterprise Funds.
• Explore the creation of new impact fees, as well as a revenue measure to increase
the Transient Occupancy Tax (TOT), as other potential funding sources.
In accordance with the direction from the April 2019 Study Session, Council approved
the creation of a Capital Improvement Program (CIP) (20-99) for Sustainability Projects
1 Includes a very modest $2.5 million in various capital and program costs; additional, unquantified but
substantial costs are anticipated.
2 The Innovative level of funding was much more difficult to estimate, and there would be considerable
additional unquantified transportation project/service costs.
Sustainability Action Plan 4
October 22, 2019
Page 3 of 23
(the "Sustainability Fund") on June 11, 2019, with an allocation of $7.5 million from the
General Non -Operating Fund ($6.5 million Fiscal Year 2018-19 carryover and $1.0
million Fiscal Year 2019-20 GOF).
The Council Sustainability Committee (CSC) met on September 16, 2019 to provide
feedback on a Draft SAP-4 for Fiscal Years 2019-20 through 2021-22. CSC comments are
included toward the end of this report.
Broader Sustainability Scope
As identified in the Sustainability Strategic Plan, leading cities have incorporated social
equity as a formal component of their sustainability programs. While this term can
have different meanings in different contexts, it generally prioritizes the need to sustain
people, not just the planet, and it acknowledges that sustainability impacts and
solutions may vary across different socioeconomic groups. With an intention to
formally incorporate a social equity lens, and in support of its long history of focus on
its diverse community members, the City changed the name of the "Environmental
Sustainability" Program to the "Sustainability" Program in July 2019.
ANALYSIS
Staff has prepared a Draft SAP-4 plan for Fiscal Years 2019-20 through 2021-22 to serve
as the City's continued road map for strategic investment in sustainability. Among its
proposed 81 new actions and 79 already -approved actions, SAP-4 contains both smaller
projects that provide GHG reductions in the near term, and larger, longer -term
infrastructure projects that may not have immediate impact but will yield significant
GHG reductions over time. A combination of both of these strategies is needed to
achieve the GHG emissions reduction targets adopted by Council.
SAP-4 Goals
While achieving the City's short- and long-term GHG reduction targets remains the
overall focus of the City's sustainability program, the proposed SAP-4 actions
encompass the broader spectrum of sustainability. As outlined in Attachment 3, SAP-4
actions are organized around high-level goals in each sector, to highlight the synergies
between different actions across City departments and to recognize the broad array of
interdependent policies and programs needed to achieve the City's sustainability goals.
Focusing on goals rather than stand-alone initiatives responds to a core theme in the
ESTF-2 Final Report. These goals will enable the City to operate more systematically
and increase the chance of reaching our emissions reduction targets over time.
Sustainability Action Plan 4
October 22, 2019
Page 4 of 23
The following list outlines the 27 goals around which the SAP-4 actions are organized.
These goals were developed by staff and reviewed by the newly formed, cross -
departmental Sustainability Governance Committee, and build on our existing efforts.
Transportation
The vast majority of transportation -related GHG emissions in Mountain View are due
to single -occupancy vehicle travel. Therefore, the City's GHG reduction strategy in this
area focuses on: (1) reducing the total vehicle miles traveled by encouraging a shift to
walking, biking, transit, carpooling, and other alternatives to driving alone; and (2)
encouraging drivers to switch to electric vehicles.
Ti. Develop comprehensive, multi -modal transportation plans and strategies to
decarbonize the sector. Multi -modal transportation planning that assesses GHG
impacts of new infrastructure, systems, and programs is a key foundation for
programs and policies to reduce GHG emissions from the transportation sector.
(1 new action; 4 existing actions)
T2. Complete a low -stress network of active transportation infrastructure. A
Citywide network of safe, convenient, and accessible active transportation with
regional connections is necessary to support walking and bicycling, which have
the lowest GHG impacts of any transportation mode and promote physical health
and well-being. (3 new actions; 14 existing actions)
T3. Develop policies and programs that support active transportation in
Mountain View. In addition to infrastructure, City programs can support and
incentivize active transportation to catalyze mode shift away from vehicles.
(5 new actions; 2 existing actions)
T4. Improve transit access and connections through regional collaboration.
Collaboration with transit providers on infrastructure and service is critical to
make transit more convenient for residents and employees, improve connections
and local service, increase capacity, and reduce emissions from buses and trains.
(7 existing actions)
T5. Improve road safety for all users. Properly designed, safety -focused
initiatives are a critical component of supporting active transportation since they
ensure that people of all abilities feel comfortable using pedestrian and bicycle
infrastructure in the City. (1 new action; 2 existing actions)
Sustainability Action Plan 4
October 22, 2019
Page 5 of 23
T6. Expand Transportation Demand Management efforts in Mountain View.
Expanding TDM efforts to new areas of the City, and developing new programs to
support existing businesses and residents will help reduce single -occupancy
vehicle trips Citywide. (3 new actions; 4 existing actions)
T7. Accelerate the electrification of vehicles. While reduction of vehicle miles
traveled is the primary focus of transportation -sector efforts, supporting the
electrification of the on -road vehicle fleet through infrastructure and vehicle
adoption is a key component of decarbonizing the transportation sector. (9 new
actions; 2 existing actions)
T8. Reduce GHG emissions from City -owned fleet vehicles and equipment.
Addressing this major contributor to the City's municipal operations GHG
inventory will require improving fuel efficiency, electrifying fleet and equipment,
and exploring other alternatives to fossil fuels. (4 new actions; 1 existing action)
T9. Reduce GHG emissions associated with City employee commutes. This
sector is the second largest contributor to GHG emissions from City operations.
(2 new actions; 1 existing action)
Buildings and Energy
With the launch of Silicon Valley Clean Energy, which provides carbon -free electricity
to its customers in Mountain View, the majority of communitywide emissions from the
energy sector come from natural gas usage. Reducing natural gas use in both new and
existing buildings is critical to achieving further GHG reductions in the Buildings and
Energy sector. In addition, integrating decarbonization measures into the design and
operation of City facilities helps the City be a more effective leader in identifying the
opportunities and challenges to reducing building emissions and motivating the
broader community to make these changes.
B1. Reduce GHG emissions from energy use in new buildings. Mountain View
has planned for a significant amount of new development, and reducing the use of
natural gas in new buildings reduces the need for future electrification retrofits to
meet GHG reduction targets. (3 new actions)
B2. Reduce GHG emissions from energy use in existing buildings. Despite the
significant amount of new construction expected in Mountain View, the current
building stock will continue to be responsible for the vast majority of energy -
related GHG emissions, and it is critical to address this emissions source. (5 new
actions; 1 existing action)
Sustainability Action Plan 4
October 22, 2019
Page 6 of 23
B3. Decarbonize the energy supply. As new and existing buildings are
electrified, it will be important to continue to develop a resilient, carbon -free
energy supply for the community. (3 new actions; 1 existing action)
B4. Decarbonize and improve the efficiency of City facilities. While City
buildings are responsible for a relatively small portion of emissions from
municipal operations, implementing energy efficiency upgrades and engaging in
efforts to eliminate the use of fossil fuels in City facilities offers cost savings
benefits, enables the City to lead by example, and fosters a new mindset among
employees that can enable staff to develop more effective community -focused
programs. (8 new actions; 3 existing actions)
Land Use
Li. Develop land use strategies and policies that support VMT reduction.
Planning for complete neighborhoods, addressing the jobs -housing imbalance, and
creating and maintaining opportunities for residents of a broad socioeconomic
range to live closer to where they work reduces GHG emissions from
transportation and improves quality of life. (6 existing actions)
L2. Incorporate broad sustainability measures into land use planning. In
addition to GHG reduction, land use planning should support broad sustainability
efforts such as green building, access to open space, green infrastructure and
stormwater management, water conservation, and protection of wildlife habitat.
(3 existing actions)
Zero Waste
Z1. Achieve the dity's Zero Waste goals. Reducing the amount of waste sent to
landfill, especially organic material, reduces GHG emissions from the waste sector.
(15 existing actions)
Water
W1. Reduce potable water use through efficiency and conservation measures.
Ensuring that potable water is used as efficiently as possible helps create a
community that is more resilient to drought and other climate change impacts.
(1 new action; 1 existing action)
Sustainability Action Plan 4
October 22, 2019
Page 7 of 23
W2. Increase the use of alternative water sources for nonpotable uses.
Maximizing the use of alternative water sources (e.g., stormwater, rainwater, and
recycled water) improves drought resilience by developing alternative supplies
and reducing potable water use. (3 existing actions)
Parks and Ecosystems
P1. Manage open space to protect wildlife habitat, provide ecosystem services,
and support sustainability goals. Open space and parks provide a broad array of
sustainability and health benefits to the environment and community. (2 existing
actions)
P2. Increase the City's tree canopy to provide environmental benefits, including
carbon sequestration. The City's tree canopy goals support the broad
sustainability and social benefits provided by trees, which include GHG emissions
reduction and carbon sequestration. (3 new actions)
P3. Reduce emissions from landscaping equipment. While landscaping
equipment represents a very small portion of community GHG emissions,
electrifying this equipment wherever possible also reduces air pollution and noise.
(2 new actions)
Core Sustainability Programs and Governance
Si. Integrate sustainability across City government. Improvements to
interdepartmental sustainability governance, metrics, and reporting across all City
departments will elevate the importance of sustainability and create a more
integrated approach to developing new sustainability programs and achieving the
City's sustainability goals. (7 new actions, 1 existing action)
S2. Improve GHG management and accounting. Achieving the City's GHG
reduction targets requires efforts to improve the climate action and GHG
inventory reporting processes, and to evaluate the City's GHG targets. (12 new
actions)
S3. Provide accessible, engaging information about City sustainability
initiatives and provide opportunities for community input. Engaging residents
from across Mountain View's neighborhoods and different demographic and
socioeconomic groups is critical to development of equitable sustainability goals
that can realistically be achieved through community action. (2 new actions;
1 existing action)
Sustainability Action Plan 4
October 22, 2019
Page 8 of 23
S4. Facilitate programs, tools, and events to educate residents about actions they
can take to reduce their impact. Outreach to engage residents in making more
sustainable choices is necessary to achieving the City's GHG reduction targets and
addressing consumption -based emissions, some of which are not accounted for in
the City's official GHG inventory but represent a significant contribution to
climate change. (4 new actions; 3 existing actions)
S5. Engage businesses to educate, share best practices, and pilot new
sustainability initiatives. Businesses are key partners in achieving the City's
GHG reduction and sustainability goals since employee commutes and
commercial energy use are responsible for the majority of communitywide GHG
emissions in both the transportation and energy sectors. (2 new actions; 1 existing
action)
S6. Create and implement outreach programs to encourage City employees to
adopt sustainable practices. Engaging with City employees is important to
reducing emissions associated with City facilities and commuting, and to
encourage employees to make more sustainable choices outside of work. By
modeling this behavior, City staff can influence community members in Mountain
View and beyond. (1 new action; 1 existing action)
How the Actions for SAP-4 Were Developed
Staff developed SAP-4 based on the recommendations in the Environmental
Sustainability Task Force 2 Final Report and Sustainability Strategic Plan, both of which
used intensive stakeholder processes involving outreach to the Mountain View
community and City staff. Staff discussed both sets of recommendations, along with
direction from the City Council, and refined the list of proposed new actions through a
series of interdepartmental meetings. These proposed new actions are outlined in
Attachment 1 and include all items not previously approved by Council or otherwise
incorporated into a department work plan. These actions are intended to be started
within the three-year time frame of SAP-4 and, in some cases, completed as well.
In addition, where possible, staff collected relevant actions from existing department
work plans that supported GHG reduction and sustainability goals. Attachment 3 has
the full list of newly proposed and currently planned actions, and indicates the relevant
Strategic Plan and ESTF-2 recommendations for each action, if applicable. (A full
update on the status of existing and planned actions related to each component of the
ESTF-2 recommendations, including both City initiatives and those led by other
organizations, can be found in Attachment 4.) The intent of presenting the new and
Sustainability Action Plan 4
October 22, 2019
Page 9 of 23
existing actions is to highlight the full range of the City's sustainability efforts and show
how the proposed new initiatives fit into a broader set of actions.
While SAP-4 is an attempt to capture relevant strategies, policies, programs, and
projects from each City department, it is not an exhaustive list of all relevant
sustainability actions under way. Rather, it is intended to broaden the scope of
Sustainability Action Plans and increase interdepartmental collaboration in response to
many of the recommendations in the Sustainability Strategic Plan. Staff expects the
tracking of relevant sustainability efforts across all departments to improve as many of
the strategies related to governance and interdepartmental collaboration and reporting
are implemented over the next three years.
As part of its analysis of newly proposed actions, staff considered an estimate of each
action's GHG reduction potential and resulting cost-effectiveness, the overall benefit
realized, and the synergies among different actions, current staff resources and
workloads, the implementation timeline, the level of effort required, whether additional
staff is needed, the cost, and the availability of funding to implement the action
(including the new Sustainability Fund).
Staff identified the following seven different overall benefits to be used as criteria for
including actions in SAP-4 (also shown at the end of Attachment 1):
1. Action results in direct GHG emissions reduction.
2. Action enables measures that create long-term GHG reduction.
3. Action results in improved internal sustainability/GHG management.
4. Action improves outreach and community engagement efforts.
5. Action yields cost savings to the City.
6. Action reduces consumption -based emissions.
7. Action supports other sustainability goals.
The above benefits resulted in the inclusion of actions that directly or indirectly reduce
emissions, produce cost savings for the City, and improve the effectiveness of the City's
sustainability efforts through cross -departmental coordination and governance. Staff is
confident the full set of actions being proposed represents best practices among cities,
customized for Mountain View. Further, many of the actions have co -benefits beyond
Sustainability Action Plan 4
October 22, 2019
Page 10 of 23
emissions reductions, such as increased air quality, safer streets, improved public
health, and cost savings.
Staff has provided a Spending Plan (Attachment 2) that provides a detailed breakdown
of staffing and program costs during the three fiscal years of SAP-4. In some cases,
proposed new actions have been grouped as a "package" to specify which actions are
collectively dependent on the indicated additional staffing and to show the synergies
that would be lost if the actions were implemented separately.
Many of the proposed items are contingent on additional staffing for implementation,
as outlined in the later section titled "Proposed New Staffing to Support SAP-4." In
some cases, proposed positions fill critical staffing needs to support existing programs
that are not feasible with current workloads. The Spending Plan specifies if
programs/actions are already in the Adopted Budget or will be funded through other
sources, and identifies whether costs are Limited -Period or ongoing (beyond the three-
year time frame of the Sustainability Fund).
Greenhouse Gas Emissions
In November 2009, the City adopted short- and long-term GHG reduction targets,
expressed as a percentage below the City's baseline 2005 emissions levels, as shown in
Table 1.
Table 1: Mountain View Community -wide GHG Reduction Targets
Year
GHG Reduction Target
2012
5 percent
2015
10 percent
2020
15 percent to 20 percent
2025
26 percent
2030
37 percent
2035
48 percent
2040
58 percent
2045
69 percent
2050
80 percent
The preliminary 2017 Community GHG inventory, presented to Council in March 2019,
showed that GHG emissions in Mountain View have for the first time begun to
decrease, though the preliminary total of 716,535 metric tons of carbon dioxide
equivalent (MT CO2e) was still 2.9 percent above the 2005 baseline and nearly 100,000
MT CO2e above the level needed to stay on track to reach the City's adopted reduction
Sustainability Action Plan 4
October 22, 2019
Page 11 of 23
targets. Staff has begun to calculate the final 2017 Community GHG inventory and
believes the final total will be closer to 660,000 MT CO2e. This level of emissions is still
about 7 percent above the interpolated 2017 target. (The 2017 target is interpolated
because our official target years are 2015 and 2020.) Staff will present the final 2017 and
preliminary 2018 inventories to Council in December.
The "Proposed New Actions" document (Attachment 1) outlines the annual GHG
reductions and cost-effectiveness of each proposed action, where possible. These
actions are separated into Community and Municipal and organized roughly by GHG
emissions sector in the Community and Municipal inventories. Staff included an
annual amount of GHGs reduced (in metric tons of carbon dioxide equivalent (MT
CO2e)) where the scope of an action has been reasonably defined and its emissions
reductions can be calculated. These estimations were calculated by staff based on
examples of similar types of programs, making basic assumptions for scaling the
proposed program to Mountain View. GHG reductions were not calculated for actions:
(1) already approved by Council (included in Attachment 3), although many of these
actions are expected to result in significant GHG reduction; (2) that have not yet been
fully scoped; or (3) where it is impossible to accurately estimate the level of emissions
reductions. Of the 81 new actions in SAP-4, 43 are expected to result directly in GHG
reductions. (As mentioned above, some actions are necessary in order to enable future
measures with significant GHG reduction benefits and achieve other important
sustainability benefits.) We were able to estimate reductions for 40 percent of those 43
actions, and the total amount of annual GHG reductions would be 27,562 MT CO2e.
Per Council direction in April 2019 to identify and prioritize specific strategies to
achieve the largest GHG reductions for the investment, staff has estimated the cost-
effectiveness of GHG-reducing actions in terms of cost per MT CO2e reduced. The
exact cost-effectiveness of each measure will depend on the final program details. The
cost-effectiveness calculation in Attachment 1 represents the cost per total emissions
reduction expected through 2030, to allow for more accurate comparison among actions,
since some actions result in a one-time GHG reduction while others yield ongoing
annual emissions reductions.
When designing the details of the proposed programs, there is often a tradeoff between
cost-effectiveness and total GHG reductions. For example, increasing the amount of a
City rebate may increase the participation in the program and, therefore, the total GHG
reductions achieved, but it will lower the cost-effectiveness of the measure. While some
initiatives may appear to be highly cost-effective due to their relatively low cost, their
potential to reduce GHG emissions in a significant way is limited. As staff is designing
the specific scope of the initiatives, we will seek to optimize the balance between cost
effectiveness and total GHG reductions.
Sustainability Action Plan 4
October 22, 2019
Page 12 of 23
Emissions Reduction Strategy Primary Areas of Focus
To date, the majority of the City's success in reducing GHG emissions has been by
supporting the creation of Silicon Valley Clean Energy (SVCE), which provides carbon -
free electricity to the vast majority of residential and business customers in Mountain
View. The proposed actions in SAP-4 support continued energy sector
"decarbonization" through reducing natural gas use.
Given that the largest portion of communitywide emissions is from transportation, it is
important for the City to focus its efforts on encouraging active transportation, public
transit use, and alternative -fuel vehicles. As such, the majority of actions in SAP-4 are
transportation -related and, therefore, staff proposes using the majority of the total
funding leveraged from the Sustainability Fund and other sources to support
transportation -related programs and staff.
Staff has proposed some actions that are not expected to result in direct GHG
reductions because these actions are critical to supporting or enabling future programs
and strategies that will yield significant GHG emissions reductions. In a few cases, staff
is proposing actions that may not yield large GHG reductions, or ones that reduce
emissions not currently accounted for in our City inventories (such as consumption -
based emissions), because these actions support broader sustainability goals. The
"Benefits Realized" column in Attachment 1 indicates the criteria satisfied by each
action.
Key Actions
Many of the actions included in SAP-4 focus on the two largest contributors to the
City's communitywide GHG emissions: transportation and natural gas use. Reducing
vehicle miles traveled, electrifying vehicles, and reducing natural gas use in new and
existing buildings are critical to achieving Mountain View's near- and long-term GHG
reduction targets. The following list highlights nine of the key, new actions being
proposed. The full list of 81 new actions is in Attachment 1.
Transportation
• Accelerate implementation of active transportation infrastructure projects for the
next three years with the new, Limited -Period Active Transportation CIP team.
(T2.17)
Sustainability Action Plan 4
October 22, 2019
Page 13 of 23
• Develop and implement a Citywide Bicycle Monitoring Program and Pilot Bicycle
Facilities Project to enhance bicycle infrastructure, systems, and programs in the
near term, including deployment of monitoring systems Citywide, pilot bike lanes
on key corridors, and supporting infrastructure such as bike racks. (T2.16)
• Install additional EV chargers in downtown parking garages and evaluate
opportunities to add EV chargers to other City facilities. (T7.3 and T7.5)
• Explore the feasibility of a downtown Transportation Demand Management pilot
program to support small businesses and employees of the Downtown Parking
District, which represents the part of the City best served by transit, in
coordination with the TMA. This would allow the TMA to pilot new initiatives
that may better serve smaller businesses and potentially help expand TDM
programs and TMA membership beyond the large employers that are already
members. (T6.5)
Buildings and Energy
Develop a reach code to incentivize or require electrification measures in newly
constructed buildings through a regional process that includes robust outreach to
the community and staff training. (B1.1)
Explore development of a second Energy Upgrade Mountain View -type of
program, leveraging all available third -party and City -funded. rebates to promote
energy efficiency and fuel switching of appliances and vehicles. Develop a City -
funded pilot program for fuel -switching rebates to address gaps in existing
rebate/incentive programs. (B2.4 and B2.5)
Develop a building energy benchmarking ordinance to address commercial energy
use, possibly including mandatory audit or retro-commissioning measures. (B2.6)
Proposed New Staffing to Support SAP-4
There are a total of 10 new positions proposed to support key actions in the SAP-4. Six
of the positions are three-year Limited -Period, and four are ongoing. These staff
positions were detailed in the Sustainability Strategic Plan, which identified a total of
15.75 FTE in new staff capacity required to support actions at the "Advanced" level.
The Fiscal Year 2019-20 budget funded 3.75 FTE of the identified positions, 7 FTE are
proposed as part of SAP-4, and an additional 5 FTE are proposed as part of other
budget processes (three in the CIP and two in the Zero Waste Plan). The positions
included in SAP-4 are described below, along with the key programs they support.
Sustainability Action Plan 4
October 22, 2019
Page 14 of 23
• TDM and Parking Demand Management Analyst (1 FTE ongoing, CDD)—This
position provides policy evaluation and analysis support for Transportation
Demand Management and Parking Management programs. The role also
supports TDM compliance analysis and enforcement since additional staff will be
needed to support the planned expansion of TDM requirements Citywide.
• Active Transportation CIP Team (3 FTE Limited -Period — three years, PWD) —
This team of three limited -period staff will focus on active transportation projects,
enabling the City to accelerate design and implementation of key infrastructure
projects toward achieving long-term GHG emissions reductions in the
transportation sector. Staff recommends that this team be funded as part of the
capital improvement projects on which they would be working. Staff also
recommends that the City Council take action on funding this team and the
associated projects (including Transportation Items T2.16 and T2.17) as part of the
next (2020-21) Capital Improvement Program so that the projects can be scoped,
planned for, and approved in the context of all projects competing for funding.
Transportation Planner (1 FTE ongoing, PWD) — This position addresses a gap in
current staff capacity to support already -approved programs, particularly those
related to overseeing projects that require regional coordination with transit
agencies. The role would create capacity to manage transit -related projects,
including supporting Caltrain electrification, expansion/modification of the
Community Shuttle, and oversee "new mobility" services.
• Program Manager for Building and Vehicle Electrification (1 FTE Limited -
Period — two years, CMG) — This position creates the capacity to develop key
building and vehicle electrification programs. The programs supported are
limited -period but are expected to yield high annual ongoing GHG emissions
reductions. These programs require staff support beyond the existing capacity of
the Sustainability Division, along with specialized expertise in key areas.
• Deputy Building Official (1 FTE ongoing, CDD) — This position was identified in
the Sustainability Strategic Plan as addressing a gap in current staffing capacity to
achieve the foundational level of green building programs. Due to the volume of
the current workload in the Building Inspection Division, staff has needed to
prioritize the critical life safety issues that is the Division's core responsibility,
leaving little time to focus on green building and other relevant sustainability
issues. The addition of a Deputy Building Official would provide the Division
with the bandwidth to be forward -looking in addressing sustainability and climate
goals in the building sector, including evaluating new building code
Sustainability Action Plan 4
October 22, 2019
Page 15 of 23
considerations such as reach codes, developing policies and programs to
streamline the provision of services to support green building, and providing
input into State -level conversations on green building standards. This expansion
of staff capacity could also help the City accelerate the adoption of advanced
technologies that reduce GHG emissions in new development such as EVs, solar
hot water systems, heat pumps, energy storage, cool roofs, green roofs, and many
more. Due to the specialized expertise required to develop and implement these
programs, these duties cannot sufficiently be filled by staff in other departments.
• Sustainability Facilities Project Manager and Sustainability Facilities
Maintenance Worker I/II (2 FTE Limited -Period — two years, PWD) — These two
positions address a gap in current capacity to support basic energy efficiency
projects, such as City facility lighting upgrades, due to prioritization of urgent
maintenance needs. The roles would implement a backlog of key energy efficiency
and electrification upgrades, as well as implementation of renewable energy
projects, yielding annual savings for the City from reduced utility costs.
• Chief Sustainability and Resilience Officer (1 FTE ongoing, CMO) — This
position would oversee the City's sustainability program, providing oversight and
strategic direction as well as critical upper -level management capacity to support
new interdepartmental and regional collaboration. The CSRO would provide
expertise on sustainability, resilience, and equity, and oversee the integration of
sustainability into City policies and programs across the organization.
Additionally, the CSRO would: (1) support the new Sustainability Governance
Committee; (2) oversee developing interdepartmental sustainability metrics and
reporting, future action plans, and a Citywide climate adaptation and resilience
plan; and (3) lead collaboration on sustainability initiatives with peer cities and
other sustainability networks. This position provides needed capacity to support
existing and planned sustainability program management that cannot be
accomplished with the current core staffing of one Coordinator and two Analysts.
The Sustainability Strategic Plan estimated that 10 percent to 20 percent of an FTE
is needed to support the Governance Committee and lead a proposed new
manager -level working group. In addition, significant capacity impacts are
expected to implement proposed new programs and outreach. Without this
position, Sustainability Division staff would need to defer development and
implementation of a significant number of other SAP-4 programs to support these
new interdepartmental coordination responsibilities. It is anticipated that a CSRO
would work in partnership with the Assistant City Manager/Chief Operating
Officer, who serves as the department head for Sustainability, thus freeing up
capacity for the full range of responsibilities for that position.
Sustainability Action Plan 4
October 22, 2019
Page 16 of 23
Council Environmental Sustainability Committee Comments
The Council Committee reviewed a Draft SAP-4 plan at its September 16, 2019 meeting.
The staff memo recommended that the Committee recommend to the Mayor to change
the committee name from "Council Environmental Sustainability Committee" to
"Council Sustainability Committee" (or CSC). This proposed change reflected the
City's renaming of the "Environmental Sustainability" Program to the "Sustainability"
Program in July 2019, consistent with the inclusion of social equity as discussed in the
Sustainability Program Assessment and Strategic Plan presented to Council in April
2019. The Committee was supportive of recommending renaming the Committee, and
subsequently the Mayor approved this change.
The CSC provided comments on the Draft SAP-4. Staff evaluated the Committee's
feedback and has provided responses as summarized in Table 2.
Table 2: CSC Comments and Staff Responses to Draft SAP-4
CSC Comment
Staff Response
A. Build flexibility into the
plan to adjust as things
change, including
Federal or State policy
or programs. Include a
plan to revisit SAP-4 to
course -correct as
necessary.
Staff agrees with the need for adaptability in SAP-4
and will develop a plan for ongoing reporting to
the CSC and Council, including proposed changes
based on annual GHG inventories and program
evaluations. Staff also requests flexibility to make
changes in the implementation timelines and
budget allocation for proposed projects as needed
within the total $7.5 million Sustainability Fund.
B. Include an evaluation of
carbon offsets, includ-
ing the potential to
offset the City's entire
inventory.
Evaluation of carbon offsets is proposed in SAP-4
Actions S2.1 and S2.7. Consistent with existing
Council direction, staff plans to present an analysis
of all ESTF-2 recommendations about the City's
GHG targets and inventories, including purchase
of carbon offsets, to Council on December 3, 2019.
Staff will include an evaluation of offsetting the
City's full inventory in this analysis.
Sustainability Action Plan 4
October 22, 2019
Page 17 of 23
CSC Comment
Staff Response
C. Investigate potential
carbon sequestration
projects, including tree
canopy goals.
The SAP-4 Proposed New Actions document
(Attachment 1) includes a section on Carbon
Sequestration/Offsets with actions related to
investigating potential local carbon sequestration
projects (S2.10) and quantifying the carbon
sequestration benefits of the City's tree canopy
(P2.1 and P2.2).
D. Include pedestrians
more in promoting
active transportation,
rather than focusing on
bicycle infrastructure,
and support this
through both infra-
structure and land
use/planning.
More than half of the active transportation
infrastructure projects listed under Goal T2 in
Attachment 4 are pedestrian -focused or include
pedestrian infrastructure, including signalization
changes and crosswalk improvements. Programs
such as Vision Zero (T5.1) and Safe Routes to
School (T5.2) are focused on both pedestrian and
cyclist safety. Staff will consider this feedback
when identifying potential active transportation
projects along with the proposed new active
transportation CIP team.
E. Incorporate adaptation
measures into
sustainability planning,
including addressing
sea level rise.
Staff has proposed a new position, Chief
Sustainability and Resilience Officer (CSRO), in
SAP-4 in part to provide the staff capacity to
incorporate adaptation and resilience measures
into the sustainability program. This would
include developing a city resilience and adaptation
plan (S1.7) to address climate impacts such as sea
level rise.
F. Consider moving up
outreach programs
related to SVCE's
programs (such as the
heat pump water heater
rebate), and prioritize
items that enable the
City to leverage outside
funds.
Staff has adjusted the proposed timeline for some
outreach programs that could leverage SVCE
incentives and other related programs, and will
further align outreach efforts with outside
incentives wherever possible.
Sustainability Action Plan 4
October 22, 2019
Page 18 of 23
CSC Comment
Staff Response
G. Evaluate an increase in
the Transient
Occupancy Tax as a
potential source of
funding for the $889,200
in ongoing costs.
Staff recognizes the need to plan for ongoing
funding sources to support ongoing expenses,
beyond the three-year timeframe of the dedicated
sustainability funding. Beginning in spring 2020,
and as directed by Council, sustainability staff (in
collaboration with other staff) will evaluate the
Transient Occupancy Tax as well as other potential
sources of revenue to support ongoing costs
expected from this plan.
H. Examine the potential
to conduct a
consumption -based
GHG inventory on a
periodic basis.
Staff plans to include an evaluation of conducting
consumption -based GHG accounting in the
analysis of the City's GHG targets and inventories
(S2.1), which will be presented to Council on
December 3, 2019.
I. Consider additional
funding to promote
plant -based diets (Item
S4.7) based on com-
munity feedback,
including leveraging
outside funding
sources.
Staff originally proposed funding this item at
$10,000 (nearly four times the level of program
costs identified by the ESTF-2 for the first three
years), and reached out to community members
and relevant organizations to determine the value
of providing additional funding. Based on this
further assessment, staff has proposed a total of
$30,000 for the three years. Staff plans to leverage
resources and volunteer support provided by
organizations such as Green Monday to support
this effort. Other proposed programs in SAP-4,
such as the Community Climate Solutions platform
(S4.3), will also include outreach about the impacts
of a plant -based diet, so the funding for item S4.7
does not reflect the full amount of resources
allocated to this effort. Staff has also accelerated
the implementation of this item, to begin in the first
rather than second half of 2020.
Sustainability Action Plan 4
October 22, 2019
Page 19 of 23
CSC Comment
Staff Response
J. Investigate the potential
of additional efforts to
address plastics reduc-
tion and recycling,
including increased
outreach around this
issue at City events and
public recycling bins
along Castro Street,
since the State did not
pass legislation to
address this issue this
year.
There are several proposed items in the Zero Waste
Plan that address outreach to improve recycling
and other waste reduction efforts, as well as
legislative advocacy at the State level. Some are
among the already -approved items included in
SAP-4 (Goal Z1) to showcase the full breadth of
supporting efforts across all departments. While
these items may be included in future
sustainability reporting, they have their own work
plan at the department level and are considered
separately by Council. The Committee's comments
have been shared with Solid Waste program staff.
K. Leverage outreach
programs to support
multiple sustainability
goals wherever
possible.
Two of the proposed outreach programs in SAP4,
Community Climate Solutions (S4.3) and Cool
Block (S4.5), are specifically designed to support a
broad range of sustainability goals through
household -level engagement. Staff intends to
leverage all planned residential and business
outreach programs to support multiple
sustainability goals wherever feasible.
L. Include some
consideration of
methane emissions
from landfills.
These emissions are accounted for in both of the
City's inventories: solid waste emissions in the
Community GHG inventory estimate the methane
emissions from landfilled waste disposed by the
Mountain View community, and the Local
Government Operations inventory includes
measured methane emissions from the Shoreline
landfill that is managed by the City.
Sustainability Action Plan 4
October 22, 2019
Page 20 of 23
CSC Comment
Staff Response
M. Investigate the ability to
get better transportation
data to evaluate trans-
portation impacts of
resident displacement,
and quantify impacts of
new development.
Staff is working to identify potential new sources
of transportation data for the City's GHG
inventories, including Google's new
Environmental Insights Explorer tool, which
would provide measured rather than modeled
transportation data. While this would provide
better data on transportation trends across multiple
transportation modes (rather than just vehicle
miles traveled), it will not allow staff to attribute
these changes to any specific cause. Instead, it will
represent the combined impact of all programs,
policies, and development in Mountain View as
well as external factors and individual behavior
change.
N. Look into quantifying
any revenue or cost
savings expected from
SAP-4 measures.
Staff has identified municipal energy efficiency
projects that will result in cost savings to the City,
included in the Municipal Operations Actions list
of SAP-4. The cost savings from these projects will
be quantifiable when the scopes of various
upgrades are defined. As proposed, savings from
municipal energy efficiency projects would be
reinvested in the energy efficiency revolving loan
fund (B4.7) to fund future energy efficiency
projects. At this time, staff does not anticipate
revenue from any SAP-4 actions.
Sustainability Action Plan 4
October 22, 2019
Page 21 of 23
CSC Comment
Staff Response
O. Incorporate social
equity elements into
sustainability programs,
e.g., ensure that any
rebates or other
programs are accessible
to all community
members.
Staff will consider how best to incorporate social
equity into existing programs in consultation with
the interdepartmental Sustainability Governance
Committee and the Multilingual Community
Outreach Program, and will include social equity
in the development of proposed new SAP-4
programs. Since the City has already been
focusing on equity issues outside of the
sustainability program, it makes sense to track
equity issues more explicitly and explore best
practices to see if there are gaps that need to be
addressed (S1.6). Toward these goals, staff
proposes $80,000 in funding during the three years
for (1) staff training/development, (2) community
engagement resources and events, (3) community
partnerships development, and (4) equity
consultants.
FISCAL IMPACT
The proposed new actions are estimated to cost $10.6 million over the Plari s three-year
time frame, using approximately $7.2 million from the Sustainability Fund (established
as a CIP by Council in June 2019) and $3.4 million of capital improvement funding
(Construction/Conveyance Tax, CIP reserve, or other), which will be proposed as part
of the next CIP funding cycle. The plan includes $889,200 in annual ongoing costs,
begmning in Fiscal Year 2022-23 to support the four ongoing staff positions
recommended in SAP-4.3 Specific funding for these ongoing costs is not currently
identified but, if approved by Council, the costs would be built into long-range
forecasts, as would any funding sources that may be developed.
The Sustainability Fund Spending Plan (Attachment 2) outlines staffing and other
program costs necessary to accomplish the recommended programs and other actions.
(It should be noted that staff costs are based on 2019 salary data and will be adjusted in
future years as necessary.) Staff has estimated the cost as closely as possible. However,
staff expects to refine the costs as the programs/actions are further developed and,
therefore, requests discretion to allocate funds based on final SAP-4 program/action
3 Additional ongoing costs may be incurred beginning in Fiscal Year 2022-23 if any of the proposed
Limited -Period staff positions are extended beyond their initial term.
Sustainability Action Plan 4
October 22, 2019
Page 22 of 23
expenses. Staff also seeks discretion to utilize the approximately $300,000 in
unallocated funds within the total $7.5 million Sustainability Fund for additional
expenses associated with any approved actions in SAP-4, such as extending a successful
pilot program or funding additional rebates beyond the initial amount budgeted.
Should staff identify additional need for funding, or identify the need for new programs
or projects, we would return to the Council for direction.
The City received a $125,000 grant from the County of Santa Clara, to be disbursed over
three years, to support community sustainability and disaster preparedness education
through the Cool Block neighborhood program (S4.5). The $125,000 shown in the
Spending Plan (Attachment 2) is Mountain View's matching portion for three years.
Table 3, below, outlines the total costs expected in each of the three fiscal years of the
Spending Plan, both from the Sustainability Fund and all sources, including CIP funds.
They also provide the breakdown of staff versus program costs, as well as community -
focused actions and staffing versus municipal operations -focused actions and staffing.
Table 3: SAP-4 Total Costs by Fiscal Year and by Program Versus Staff
FY 19-20
FY 20-21
FY 21-22
TOTAL
Total from Sustainability Fund
$1,795,900
$3,521,800
$1,862,500
$7,180,200
Total Cost (including CIP Funds)
$2,937,900
$4,663,800
$3,004,500
$10,606,200
Total Program Costs:
$5,300,000
Total Staff Costs:
$5,306,200
Total Costs:
$10,606,200
Total Program and Staff Costs (Community):
$9,617,000
Total Program and Staff Costs (Municipal):
$989,200
Total Costs:
$10,606,200
CONCLUSION
Since its initial adoption in March 2009, the ESAP has served as a road map for
achieving the City's short- and long-term sustainability goals. Adoption and
implementation of the proposed SAP-4 will allow the City to build on its past
sustainability successes and be well positioned to proactively address additional
sustainability challenges in the future.
Since the sustainability landscape is constantly evolving, staff will annually report to
the CSC so that it may assess the progress of SAP-4 initiatives and, as appropriate,
Sustainability Action Plan 4
October 22, 2019
Page 23 of 23
recommend additions or other modifications to SAP-4 for Council consideration in the
context of Citywide and department funding priorities and workload.
ALTERNATIVES
1. Modify the proposed SAP-4 by adding, removing, or changing the timeline of the
proposed actions.
2. Do not adopt SAP-4.
3. Provide other direction.
PUBLIC NOTICING
Agenda posting and e-mails sent to community members interested in sustainability.
Prepared by:
Erin Brewster
Sustainability Analyst II
Steve Attinger
Sustainability Coordinator
Reviewed by:
Audrey Seymour Ramberg
Assistant to the City Manager/
Chief Operating Officer
EB-SA/ 2/ CAM/ 620-10-22-19CR/ 190510
Approved by:
Daniel H. Rich
City Manager
Attachments: 1. SAP-4: Proposed New Actions
2. SAP-4: Sustainability Fund Spending Plan
3. SAP-4: Newly Proposed and Currently Planned Actions