M12-19-05 study sessionDRAFT TOWN OF LOS GATOS
CALIFORNIA
TOWN COUNCIL/STUDY SESSION
December 19, 2005/MINUTES
Los Gatos Civic Center
110 E. Main Street
Los Gatos, CA 95030
TIME ITEM ACTION ON ITEM
6:00 PM TOWN COUNCIL The Town Council/Parking Authority/Redevelopment Agency of the Town
of Los Gatos met in the Council Chambers of the Town of Hall,
110 East Main Street, at 6:00 PM, December 19, 2005 in a study session.
6:00 PM ATTENDANCE Present: Steve Glickman, Diane McNutt, Joe Pirzynski, Barbara Spector,
and Mayor/Chairman Mike Wasserman
Absent: None
6:01 PM OPENCLOSE
VERBAL
COMMUNICATION
6:01 PM DISCUSSION
UPDATE ON
FISCAL YEAR
2005/06 CAPITAL
IMPROVEMENT
PROGRAM.
Update on Fiscal Year 2005/06 Capital Improvement
Program.
Staff report made by John Curtis.
6:06 PM COUNCIL
DISCUSSION
COUNCIL
MAIN STREET RESURFACING
Questioned outreach efforts that will be made to residents and
community prior to the start of the project.
Commented on not recommending the bulb out on University
Avenue due to the traffic circulation.
Questioned if the pavement overlay would be done during a
week night in the summer and if Main Street would be open
during the day.
Clarification regarding issues with noise affecting the
residents at night.
Commented that grinding on Main Street would be done
during the day.
Questioned if sidewalk work would be done in sections with
open access for people to traverse the area.
MAIN STREET RESURFACING
Town Council Minutes December 19, 2005
Study Session Los Gatos, California
3/25/2019 1:11 PM Page 2 of 3
E:\uploadedFiles\d4ade5f12b93c12191acdf19b7f7d67-75456fa3c7d7c1\p1d6r0onjs1op3fk31rlarcm184rk.doc
DISCUSSION
Continued
COUNCIL
Continued
Questioned need for signage and traffic circulation during the
project.
Questioned life expectancy of the sidewalks and root guards
used for the trees.
Clarification regarding the hours of work to be done at night
and effects on the residents of College Avenue.
PARKING LOT 5
Questioned the merchants’ opportunity to make modifications
or improvements to their back entrances.
Commented on outreach and notification to the affected
businesses prior to the start of the project.
WEDGEWOOD STORM DRAIN IMPROVEMENTS
Clarification regarding working with the water district and
cost sharing for this project.
Clarification regarding a new pedestrian strip along
Wedgewood Avenue.
ROBERTS ROAD BRIDGE
Clarification on the two year time frame for completion.
Questioned addressing the traffic issues relating to the
Festival of Lights until completion of the Roberts Road
Bridge project.
STREET REPAIR AND RESURFACING PROGRAM
Commented on finding the funding to maintaining the road
system at the current pavement condition index of 75.
Clarification regarding funding options to maintain the
Town’s road system.
Questioned correlation of the PCI and maintenance costs.
Clarification regarding funds and the priority of streets which
need repair.
Clarification regarding a plan and funding strategy for streets
that are in serious despair.
SIDEWALK REPAIR AND RESURFACING
Commented regarding the 50/50 program and what programs
other cities are implementing.
HIGHWAY 9 SAFETY IMPROVEMENTS PROJECT
Town Council Minutes December 19, 2005
Study Session Los Gatos, California
3/25/2019 1:11 PM Page 3 of 3
E:\uploadedFiles\d4ade5f12b93c12191acdf19b7f7d67-75456fa3c7d7c1\p1d6r0onjs1op3fk31rlarcm184rk.doc
DISCUSSION
continued
Commented regarding cost sharing with Los Gatos, Monte
Sereno and Cal Trans on the project.
Commented on outreach to neighbors along Highway 9.
6:43 PM MEETING
ADJOURNED
Submitted by: Attest:
Jackie D. Rose, Deputy Clerk MarLyn J. Rasmussen, Clerk Administrator
Secretary to the Redevelopment Agency