Loading...
Attachment 1SECOND AMENDMENT TO AGREEMENT This SECOND AMENDMENT TO AGREEMENT is dated for identification this 17th day of January, 2017 and amends that certain agreement for First Amendment to Contracting Agreement dated December 17, 2015, made by and between the Town of Los Gatos, ("Town,") and Trinity Source Group, Inc. ("Consultant.") RECITALS A. Town and Consultant entered into a Contracting Agreement on June 18, 2015, ("Agreement"), a copy of which is attached hereto and incorporated by reference as Attachment 2 to this Amendment. B Town and Consultant entered into a First Amendment to Contracting Agreement on December 17, 2015, ("Agreement"), a copy of which is attached hereto and incorporated by reference as Attachment 1 to this Amendment. C. Town desires to amend the Contracting Agreement to provide additional compensation for additional services and extend the term of the agreement. AMENDMENT 1. Scope of Services. Consultant shall conduct additional environmental consulting services as described in the Time and Materials Fee Estimate dated November 30, 2016, a copy of which is attached hereto as Exhibit A and incorporated herein by reference. 2. Compensation is amended to provide an additional amount not to exceed $17,628. The total compensation for the agreement shall not exceed $62,430. 3. All other terms and conditions of the Agreement remain in full force and effect. IN WITNESS WHEREOF, the Town and Consultant have executed this Amendment. Town of Los Gatos Trinity Source Group, by: By: By: Laurel Prevetti, Town Manager Page 1 of 2 Name/Title Trinity Source Group - Second Amendment to Contracting Agreement ATTACHMENT 1 Recommended by: Matt Morley Director of Parks and Public Works Approved as to Form: Attest: Robert Schultz, Town Attorney Shelley Neis, CMC, Clerk Administrator Page 2 of 2 Trinity Source Group - Second Amendment to Contracting Agreement Table 1 Time and Materials Fee Estimate Client: Mr. Jim Harbin Town of Los Gatos Corporation Yard 41 Miles Ave. Los Gatos, CA Project: UST Case Closure Status Prot No 532.002 E'" TRINITY ••t+l� • source group, inc. '• :".. WORK TASK SUMMARY AND COST ESTIMATE TOTAL Task Subtotals TASK 9: 3rd Groundwater Monitoring Event - 7 Monitoring Wells $5,730 TASK 10: Reporting - 3rd Groundwater Monitoring Event $2,489 TASK 11: 4th Groundwater Monitoring Event- 7 Monitoring Wells $5,730 TASK 12: Reporting • 4th Groundwater Monitoring Event $3,679 Total: $17,628 DETAILED SUMMARY TASK 9: 3rd Groundwater Monitoring Event - 7 Monitoring Wells LABOR & EQUIPMENT Number Units Rate Extended Cost 0.00 Hrs Principal Geologist $Y00 $0 2.00 Hrs Senior Geologist $180 $360 4.00 Hrs Project Geologist/Scientist $124 $496 6.00 Hrs Staff Geologist/Scientist $99 $594 24.00 Hrs Field Technician II $83 $1,992 1.00 Day Misc. Small Tools, Materials, and Equipment $75 $75 14.00 Each Bailer $15 $210 70.00 Miles Vehicle - Round Trip Travel $0.95 $66.50 1.00 Day GW Sampling Pump $15 $15 1.00 day Cond TDS pH meter 25.00 $25 1.00 day Water level meter 25.00 $25 1.00 Day Dissolved Oxygen Meter 25.00 $25 3.00 Each 55-gallon drum $57 $171 SUBCONT. & MATERIALS 7.00 ea GW Analysis for TPHd and TPHg -ESC 8015B $55 $443 7.00 ea GW Analysis for VOCs full list - ESC 8260E $70 $564 1.00 ea ESC charges for disposal, energy $32 $37 1.00 ea Drum Delivery/Pickup Stop Fee $100 $115 3.00 ea Drum Disposal $150 S518 Two adaMlonV GWM Events Eatlmm 11.30.10.v1s Page 1 11R012016 Table 1 Time and Materials Fee Estimate TASK 10: Reporting - 3rd Groundwater Monitoring Event LABOR & EQUIPMENT Number Units Task 9 Subtotal $5,730 Rate Extended Cost 0.50 Hrs Principal Geologist $200 $100 2.00 Hrs Senior Geologist $180 $360 2.00 Hrs Project Geologist/Scientist $124 $248 14.00 Hrs Staff Geologist/Scientist $99 $1.386 0.00 Hrs Field Technician II $83 $0 5.00 Hrs Drafter $79 $395 0.00 Miles Vehicle - Round Trip Travel 0.95 $0 Task 10 Subtotal $2,489 TASK 11: 4th Groundwater Monitoring Event - 7 Monitoring Wells LABOR & EQUIPMENT Number Units Rate Extended Cost 0.00 Hrs Principal Geologist $200 $0 2.00 Hrs Senior Geologist $180 $360 4.00 Hrs Project Geologist/Scientist $124 $496 6.00 Hrs Staff Geologist/Scientist $99 $594 24.00 Hrs Field Technician II $83 $1 992 1.00 Day Misc. Small Tools, Materials, and Equipment $75 $75 14.00 Each Bailer $15 $210 70.00 Miles Vehicle - Round Trip Travel $0.95 $66.50 1.00 Day GW Sampling Pump $15 $15 1.00 day Cond TDS pH meter 25.00 $25 1.00 day Water level meter 25.00 ' $25 1.00 Day Dissolved Oxygen Meter 25.00 $25 3.00 Each 55-gallon drum $57 $171 SUBCONT. & MATERIALS 7.00 ea GW Analysis for TPHd and TPHg - ESC 80156 $55 $443 7.00 ea GW Analysis for VOCs full list - ESC 82608 $70 $564 1.00 ea ESC charges for disposal, energy $32 $37 1.00 ea Drum Delivery/Pickup Stop Fee $100 $115 3.00 ea Drum Disposal $150 $518 Task 11 Subtotal $5,730 TASK 12: Reporting - 4th Groundwater Monitorng Event LABOR & EQUIPMENT Number Units Rate Extended Cost 1.00 Hrs Principal Geologist $200 $200 2.00 Hrs Senior Geologist $180 $360 6.00 Hrs Project Geologist/Scientist $124 $744 20.00 Hrs Staff Geologist/Scientist $99 $1,980 0.00 Hrs Field Technician II $83 $0 5.00 Hrs Drafter $79 $395 0.00 Miles Vehicle- Round Trip Travel 0.95 $0 Task 12 Subtotal $3,679 Two Adtlalona OWN Events ESIImsN_11.30.16Als Pegs s nrdwxma