Loading...
Attachment 09• VICINITY MAP NO SCALE LEGEND AND NOTES ETC x SS IIIII O EM FF FL ❑ GM INV RP oSSCO OSSMH °SDMH TC TOS VCP ❑ WM D4 WV X� ° 4 ° .4 4 .. W •' 4' W W W •Y 4' 0 5 10 BOUNDARY LINE ELECTRICAL/TELEPHONE/ CABLE TV OVERHEAD LINE - - - EASEMENT FENCE LINE SANITARY SEWER LINE BENCHMARK CB CATCH BASIN ELECTRICAL METER FINISH FLOOR FIRE HYDRANT FLOW LINE GAS METER INVERT JOINT POLE ROOF PEAK SANITARY SEWER CLEAN -OUT SANITARY SEWER MANHOLE STORM DRAIN MANHOLE STREET SIGN TOP OF CURB TOP OF SLAB VITRIFIED CLAY PIPE WATER METER WATER VALVE SPOTGRADE ASPHALT BRICK CONCRETE GRAVEL LAWN 20 SCALE: 1" = 10' ETC NOTES ALL DISTANCES AND DIMENSIONS ARE IN FEET AND DECIMALS. UNDERGROUND UTILITY LOCATION IS BASED ON SURFACE EVIDENCE. ETC BUILDING FOOTPRINTS ARE SHOWN TO FINISHED MATERIAL (STUCCO/SIDING) AT GROUND LEVEL. FINISH FLOOR ELEVATIONS ARE TAKEN AT DOOR THRESHOLD (EXTERIOR). • ETC • ° CONCRETE.. CURB.• �/p'�� LOOT 2 TRACT HO. 3003 ETC NEIGHBORING HOUSE RP=358.24 ETC EASEMENT NOTE EASEMENTS SHOWN PER POLICY OF TITLE INSURANCE ISSUED BY CHICAGO TITLE INSURANCE COMPANY, POLICY NO. FWPS- 2983170011, DATED MAY 12, 2017 AND PER TRACT NO. 3003, 136 MAPS 40. ° ❑ ❑ WM W 4 4 ' •Y •V 1Y\ W 4' J- ' 4' •Y ' W \ W W._W__. W. ._' W - W..,-, �jy •Y �Y W w S �.'� W W STAMP' [ 167.53'09"E W W W 4' v w r W 4\ W W *LAWN W ■ W W �t •Y W EY w W W W W\ W •Y •Y V. •' WWW 5701-I40IC-"7 HOLE °- SERVICE EASEMENT 4' rY ' •' \W W W '4' W 136 IYI 40) W W r�Al1� EASE\IE * (136 M W W j/ y •j I. 6( 'REDWQODY4' TOP 452.94 4, / 4' 1.4' W / 4 W 334.1 o 4 31.13 1/ ��.�� 331.07 LOT 3 TRACT KO. 3003 3 // 33 FF d 4 \,. ° DAWN, ' W W W W 4.* W •Y •YY \ •Y •Y• ////////////////// 330.92 331.49 /J 331.31 ONE-STORY WOOD/STUCCO HOUSE RP=346.18 331.85 / / /z c///// // FF / 331.31 331.22 330.87 330.74 44 CON.CRE°TEE. ad TOS 4 % /4 r 330.73,1 1 3' WOOD 331 N 'RE-TA_INII�G-WACL CON RETE \ STEPS - -333 ° 25.0' LIGHT AND AIR EASEMENT (136 M 40) GARAGE TOS=330.65 330.52 330.57 //////////////////c ' 33. .. 330.73 ° �- --- X- \ 6' WOOD FENCE N67"53'09"E \ 100.00' 332.9x- ), ' \ 332.52, 333.2 /� \r 333.0 `\-:\ ,-- \ \ \ 1 4 LOT 4 TRACT NO. 3003 NEIGHBORING HOUSE 136 [Ml 40 RP=350.56 BENCHMARK CITY OF LOS GATOS BENCHMARK LG#24 SET BRASS DISK IN MONUMENT WELL STAMPED "LG#24" AT THE INTERSECTION OF BLOSSOM HILL ROAD AND CAMINO DE CERRO. ELEVATION = 348.83' (NAVD 88 DATUM) - SITE BENCHMARK SURVEY CONTROL POINT MAG AND SHINER SET IN ASPHALT ELEVATION = 329.28' (NAVD 88 DATUM) 4 G .a4 a . e a 330: 4 4 '.' 4 F a a .4 d a 413 4 d A 4. .d .' �. \ `CONCRETE 1 N o" 4 d I • d dry! AL 4 ° ° 3 � i qr_e � - _ _ 6"7"9"OLIVE MAIL --- - CB TC=326.47 RIM=325.72 V=322.22 LEA & BRAZE ENGINEERING, INC. SURVEYORS 0 z J CIVIL ENGINEERS m v) n co N N) I co N c0 0) 0) N co(� 0) 0) 0 - 1-1-1��N �LO CO W } Q 3Jow I I N U oo Q s w m 0 0 0 LL Q z Q a�Q CO N 0 523-25-009 z o_ SANTA CLARA COUNTY PI (24 REVISIONS BY JOB NO: 2170481 DATE: 6-12-17 SCALE: 1" = 10' FIELD BY: EH DRAWN BY: DDR/DB SHEET NO: Nt.„, sup 1 OF 1 SHEETS,/ GRADING & DRAINAGE NOTES: NOTE: THIS DRAWING IS APPROVED SUBJECT TO: 1. ALL GRADING IS SUBJECT TO OBSERVATION BY THE CITY. PERMITTEE OR REPRESENTATIVE SHALL NOTIFY THE CITY OF LOS GATOS DEPARTMENT OF PUBLIC WORKS PROJECT INSPECTOR AT LEAST 48 HOURS BEFORE START OF ANY GRADING. 2. APPROVAL OF THIS PLAN APPLIES ONLY TO (A) THE EXCAVATION, PLACEMENT, AND COMPACTION OF NATURAL EARTH MATERIALS, (B) THE INSTALLATION OF ON -SITE (I.E. PRIVATE PROPERTY) STORM WATER CONVEYANCE AND TREATMENT FACILITIES THAT ARE OUTSIDE OF THE 5-FOOT BUILDING ENVELOPE, AND (C) THE INSTALLATION OF RETAINING STRUCTURES. THIS APPROVAL DOES NOT CONFER ANY RIGHTS OF ENTRY TO EITHER PUBLIC PROPERTY OR THE PRIVATE PROPERTY OF OTHERS. APPROVAL OF THIS PLAN ALSO DOES NOT CONSTITUTE APPROVAL OF ANY IMPROVEMENTS WITH THE EXCEPTION OF THOSE LISTED ABOVE. PROPOSED IMPROVEMENTS, WITH THE EXCEPTION OF THOSE LISTED ABOVE, ARE SUBJECT TO REVIEW AND APPROVAL BY THE RESPONSIBLE AUTHORITIES AND ALL OTHER REQUIRED PERMITS SHALL BE OBTAINED. 3. UNLESS OTHERWISE NOTED ON THE PLAN, ANY DEPICTION OF A RETAINING STRUCTURE ON THIS PLAN SHALL NOT CONSTITUTE APPROVAL FOR CONSTRUCTION OF THE RETAINING STRUCTURE UNLESS A SEPARATE STRUCTURAL REVIEW, BY THE DEPARTMENT OF PUBLIC WORKS IS COMPLETED AND APPROVED. 4. IT SHALL BE THE RESPONSIBILITY OF THE PERMITTEE OR AGENT TO IDENTIFY, LOCATE AND PROTECT ALL UNDERGROUND FACILITIES. 5. THE PERMITTEE OR AGENT SHALL MAINTAIN THE STREETS, SIDEWALKS AND ALL OTHER PUBLIC RIGHTS -OF -WAY IN A CLEAN, SAFE AND USABLE CONDITION. ALL SPILLS OF SOIL, ROCK OR CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE PUBLICLY OWNED PROPERTY DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC SHALL BE MAINTAINED IN A CLEAN, SAFE AND USABLE CONDITION. 6. ALL GRADING SHALL BE PERFORMED IN SUCH A MANNER AS TO COMPLY WITH THE STANDARDS ESTABLISHED BY THE AIR QUALITY MANAGEMENT DISTRICT FOR AIRBORNE PARTICULATES. 7. IN THE EVENT THAT HUMAN REMAINS AND/OR CULTURAL MATERIALS ARE FOUND, ALL PROJECT -RELATED CONSTRUCTION SHOULD CEASE WITHIN A 100-FOOT RADIUS. THE CONTRACTOR SHALL, PURSUANT TO SECTION 7050.5 OF THE HEALTH AND SAFETY CODE, AND SECTION 5097.94 OF THE PUBLIC RESOURCES CODE OF THE STATE OF CALIFORNIA, NOTIFY THE MARIN COUNTY CORONER IMMEDIATELY. 8. THIS PLAN DOES NOT APPROVE THE REMOVAL OF TREES. APPROPRIATE TREE REMOVAL PERMITS AND METHODS OF TREE PRESERVATION SHOULD BE OBTAINED FROM THE CITY'S PLANNING DEPARTMENT AND THE CITY ARBORIST. 9. FOR NON-RESIDENTIAL PROJECTS, ANY NON -HAZARDOUS EXPORT RESULTING FROM PROJECT RELATED EXCAVATION OR LAND CLEARING SHALL BE 100% REUSED AND RECYCLED PER CALIFORNIA GREEN BUILDING STANDARDS CODE SECTION 5.408. 10. ALL GRADING WORK SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT AND/OR THE PROJECT SOIL ENGINEER. ALL GRADING WORK SHALL BE OBSERVED AND APPROVED BY THE SOIL ENGINEER. 11. THE SOIL ENGINEER SHALL BE NOTIFIED AT LEAST 48 HOURS BEFORE BEGINNING ANY GRADING. UNOBSERVED AND/OR UNAPPROVED GRADING WORK SHALL BE REMOVED AND REPLACED UNDER OBSERVATION. 12. PERIMETER BUILDING GRADES SHALL SLOPE AWAY FROM BUILDINGS AT LEAST 5% MINIMUM 13. ALL DOWNSPOUTS SHALL HAVE SPLASH BOXES AS SHOWN ON THE GRADING AND DRAINAGE PLAN. DIRECTION OF THE FLOW SHALL BE AWAY FROM THE BUILDING. LEGEND DESCRIPTION BOUNDARY LINE EASEMENT LINE CONCRETE/IMPERNOUS HARDSCAPE ELECTRICAL LINE GAS LINE CHAIN LINK FENCE RETAINING WALL AREA DRAIN DROP INLET EX. POWER POLE WATER METER SANITARY SEWER LATERAL WITH CLEAN OUT STORM DRAIN SANITARY SEWER WATER SLOPE ARROW EXISRNG CONTOUR PROPOSED CONTOUR OVERLAND RELEASE DIRECTION OF SURFACE DRAINIAGE 5X SLOPE AWAY FROM BUILDING PERMEABLE PAVERS SEMI -PERVIOUS COMPOSITE WOOD SYMBOL E GAS 1111- SS n 10 50 0 / 20 GRAPHIC SCALE 1" = 10' (EX)WATER METERS SS GRADING TO BE KEPT AT A MINIMUM UNDER TREE CANOPY. ANY WORK WITHIN THE CANOPY TO BE HAND DUG, AND DONE PER ARBORIST RECOMMENDATIONS AND ALSO OBSERVED BY THE ARBORIST 60" REDWOOD TREE TO REMAIN 40 w (0 SSMH I RIM=329.27 SS EARTHEN SWALE (TYP) TW 332.86 BW 332.49 9" STUMP AD RIM 331.10 INV 329.10 (N) RETAINING WALL 15" MULBERRY TREE TO BE REMOVED POOL TRENCH DRAIN RIM 331.52 INV 329.52 CONNECT TO SANITARY EARTHEN SWALE (TYP.) AD RIM 331.39 INV 329.39 TW 334.47 BW 331.49 TW 334.83 BW 331.49 UTILITY POLE 9" STUMP AD1 RIM3.08 . INV 328.3Z ROCHIN TERRACE W SYMBOL INDICATES, SLOPE 5% AWAY FROM BUILDING FOR GROUND/LANDSCAPE AREAS, OR 2% AWAY FROM BUILDING FOR HARDSCAPE AREAS, FOR TEN FEET UNLESS NOT PRACTICAL LONGITUDINAL SWALES MAY BE USED. 15" STUMP 1.0 oci N U SS SS S INSTALL SPLASHBOXES AT ALL DOWNSPOUTS LOCATIONS. REFER TO ARCHITECTURAL PLANS FOR ACCURATE DOWNSPOUT LOCATIONS (TYP.) (N) FENCE PER ARCHITECTUAL/LANDSCAPE - PLANS - N N67`53'09"E o�w ) o 1- W PERMEABLE PAVERS (TYP) SEE DETAIL ON SHEET C3 4) 10" APPLE TREE TO BE REMOVED AD RIM 331.32 INV 329.32 N o' N 7" CYPRESS TREE TO BE REMOVED TW 333.04 AD RIM 329.91 INV 327.91 (N) CONCRETE/MASONRY OR KEYSTONE RETAINING WALL. OWNER TO DECIDE. SEE DETAIL ON SHEET C3 \ CJI \ SS / SS EX. WATER METER (N) WATER LINE UNDERNEATH DEC GRADE TO SLOPE A FROM BUILDING 5% MIN (POC) POINT OF CONNECTION. SEE PLUMBING/ARCHITECTURAL PLANS FOR CONTINUATION '09"E 100.00' 3' TO 1 RET. WALL AD RIM 329.91 INV 327.63 ABBREVATIONS AC = ASPHALT CONCRETE AD = AREA DRAIN AG = ADJACENT GRADE BC = BEGIN CURVE BS = BOTTOM OF STAIR BU = BUBBLE UP BVC = BEGIN VERTICAL CURVE BRW = BOTTOM OF RETAINING WALL CB = CATCH BASIN CL = CENTERLINE CO = CLEANOUT DS = DOWNSPOUT WITH SPLASH BOX EC = END CURVE ELEV. = ELEVATION EVC = END VERTICAL CURVE EX. = EXISTING F/C = FACE OF CURB FF = FINISHED FLOOR ELEVATION FH = FIRE HYDRANT FL = FLOW LINE GB = GRADE BREAK GFF = GARAGE FINISH FLOOR HP = HIGH POINT HC = HAND/CAP UNIT INV = INVERT SS CB TC=3c?,..47 RIM=.�'5.72 INV=:M2.2 U SDMH RIM=326.40 INV=321.00 SS BUBBLE -UP \ BU RIM 329.10 INV 326.60 GAS 0 25.0' LIGHT & Al EASEMENT SD (N) GAS METER (M) ELECTRICAL METER (N) LECTRICAL LINE ALL OVERHEAD ELECTRICAL SERVICE LINES (ELECTRIC, PHONE, AND/OR CABLE) MUST BE UNQERGROUNDED FROM THE HOUSE TO THE NEAREST UTILITY POLE LP = LOW POINT PAD = PAD ELEVATION PCC = PORTLAND CEMENT CONCRETE PL = PROPERTY LINE PV = PAVEMENT GRADE PVC = POLYVINYL CHLORIDE PIPE PV/ = POINT OF VERTICAL INTERSECTION RCP = REINFORCED CONCRETE PIPE ROW = RIGHT OF WAY S=.004> SLOPE SD = STORM DRAIN SDMH = STORM DRAIN MANHOLE SG = SUBGRADE ELEVATION SS = SANITARY SEWER SSMH = SANITARY SEWER MANHOLE STA = STAT/ON TC = TOP OF CURB TF = TOP OF FENCE TRW = TOP OF RETAINING WALL TS = TOP OF STAIR TW = TOP OF WALL VCP = VITRIFIED CLAY PIPE WM = WATER METER WV = WATER VALVE • / -2.0% SS SD R=20.00' L=31.42' D=90`00'00" SS SD 5" CHERRY TO REMAIN BUBBLE -UPS BU RIM 329.10 INV 326.60 Ln cn cn (n C� (N) CLEANOUT PER C DISTRICT STDS. WITHIN SAN. CO 328.01 INV 324.01 CB TC=326.47 RIM=325.72 INV=322.22 SSMH RIM=326.00 SS JRRENT 2' OF PL 7 USE EX 4" SANITARY LATERAL. CONTRACTOR TO VERIFY EXACT LOCATION, CONDITION, SIZE, & SLOPE. 328.00 TC 328.34 C 328.99 TC 329.22 \ SS INSTALL NEW SANITARY B PREVENTOR. PER SANITA STANDARDS. CALL FOR 1 6', 7' A\ND 9" OLIVE TREE TO REMAIN CKFLOW Y DISTRICT SPECTION -(N) 4" SAN. LAT AFTER C.O. 60 PERMEABLE PAVERS (TYP) (N) GAS LIN E. I -AND DIG WITH CAUTION UNDER TREE CANOPY. WORK TO BE DONE UNDER _-j'J\-) ARBORIST RECOMME.AT101�S AND OBSERVATION- (N) STORM L HAND DIG WITH CAUTIO\ UNDER TREE CANOPY. WO;K TO BE DONE UNDER ARBCRIS' RECOMMEND A -IONS AND OBSERVATION AD RIM 329.05 INV 327.44 BENCH MARK i 10, 13' APRICOT TREE NE D TO BE REMOVED cn Ln N cfcc U) cn cn 337. NOTE: TOPOGRAPHIC AND BOUNDARY SURVEY PREPARED BY OTHERS. CITY OF LOS GATOS BENCHMARK LG#24. SET BRASS DISK IN MONUMENT WELL STAMPED "LG#24" AT THE INTERSECTION OF BLOSSOM HILL ROAD AND CAMINO DE CERRO. ELEVATION = 348.83' (NAVD 88 DATUM) ti v co C C C C Q�pFEOSCq� SS/�y\ \�Xp _ No. 70829 - Exp. 6-30-19 /JP- lF \/V1\i/ OF C\FPS PORFIRIO OSCAR OSUNA RCE 70829 EXP. 6-30-19 V c w c 0 V z J 0 w 0 z_ 0 0 z 0 z_ 0 0 Lll U w 0 w 1 z LLI O 0 0 0 w 0 QN L.L w z 0 0 N CALIFORNIA CITY OF LOS GATOS Checked: 0.0. Designed: J.%.0. Project No.: 1538 SHEET Cl OF 5 SHEETS EARTHWORK QUANTITIES DESCRIPTION CUT (—) FILL (+) HOUSE FOOTPRINT POOL, POOL DECK AREA DRIVEWAY PATIO, SIDEWALKS LANDSCAPE AREAS 126 C.Y. 112 C.Y. 23 C.Y. 10 C.Y. 19 C.Y. 0 C.Y. 0 C.Y. 0 C.Y. 0 C.Y. 8 C.Y. TOTALS RAW: 10% SHRINKAGE FACTOR (ASSUMED) 290 C.Y. 19 C.Y. 2 C.Y. TOTAL ADJUSTED: 290 C.Y. 21 C.Y. 269 C.Y. NOTES & CALCULATIONS ASSUMPTIONS: IT SHALL BE THE CONTRACTOR'S FOR HIS/HER OWN USE. TO SUB —GRADE 1. EARTHWORK QUANTITIES SHOWN ARE APPROXIMATE. RESPONSIBILITY TO INDEPENDENTLY ESTIMATE QUANTITIES 2. ASSUMED 1.0' DELTA FROM HARDSCAPE FINISH GRADE 3. ASSUMED 1.0' UNDERCUT IN DRIVEWAY AREA. 4. ASSUMED 5' DEEP POOL 10 50 0 20 GRAPHIC SCALE 1" = 10' 40 ROCHIN TERRACE MAXIMUM CUT (FT) MAXIMUM FILL (FT) 2.4 6.7 1.6 2.0 3.0 0 0 0 0 0.5 HATCH INDICATES FILL AREA o 0 o. N• off' N• x°\' x' x' x' x' x' x' O• Cr \ O� x' x' X'� x /°21 ° /* ;, • X'�. X X• (N) POOL ;G1 SD x' SD \ SD 43 SD X/O O X/X/O x' x' x' (1, (N) HOUSE x'r1/� x' :4) X°> ' (N) WAL4 X/ �x/ Pr 12. SOP (N) DRIV x :WAY C). GAS/ O'' GAS X' y0 X' O 15- O SD SD ° °LSD •° JD J -' 0 x x x x x x x x x / CC 0 U T_z U 0 CC C3 C C C CC QRpFESS/0/4 0Sc o G� cL No. 70829 Exp. 6-30-19 / `r9T'\IV1\OF CO" PORFIRIO OSCAR OSUNA RCE 70829 EXP. 6-30-19 V CONSULTING CIVIL ENGINEERS & LAND SURVEYORS z 0 w 0 z 0 0 z 0 z 0 0 V ) w_ z 0 LL 0 w w U NQ L.L w z g U CITY OF LOS GATOS Checked: 0.0. Designed: J.0/0.0. Project No.: 1538 SHEET C2 OF 5 SHEETS UU W2� OUO LLJ izz oaf 0s i P Cri2 tt 2ZW O o 02 ct • 14-1 U0J Z2Q ~0O 0 2o�iY jLs:WW 0ct2 J C� omw ▪ W oa-o Oj�� o ~ oho m�WW O c� WQ=z ( j4.1 O oCt�g Q114- oi�ct(35 • 14-1 Oc (;-))• 1 Q tim 44o� V)aso .`Lti i�Z2U U UUc) ist U��o J a w 0 O ~ E (N) CONCRETE/MASONRY OR J a w o O ~ E l / W o = L I I LI z SLOPE VARIES. GROUND TO SLOPE 5% MIN. AWAY FROM BUILDING. HARDSCAPE MIN. SAWAY FROM BUILDING i FF REVISIONS b � III KEYSTONE RETAINING WALL. v� OWNER TO DECIDE 0 -� SLOPE VARIES. GROUND TO SLOPE 5% MIN. AWAY FROM BUILDING. 0 I 1 n SLOPE VARIES. GROUND TO SLOPE 5% MIN. AWAY FROM BUILDING. HARDSCAPE TO W Q a A °' I 1 =m= SLOPE <5Z,, VARIES MAX =m=rr SLOPE •..' C HARDSCAPE TO SLOPE 2% MIN. AWAY FROM BUILDING - (N) CONCRETE/MASONRY OR SLOPE 2% MIN. AWAY FROM BUILDING v I �-- I --- KEYSTONE RETAINING WALL. OWNER TO DECIDE FF 0.5 0.5' FF 19 MINA VARIES , °' <SLOPE VARIES 19' M/N> -rrr=u�,. <S a' EARTHEN SWALE ' ; : a EARTHEN SWALE CCCCC SECTION A SECTIO\ 3 co t It- QRpFESS/0/k <0\�\p OSC4F� iCj O No. 70829 ExpC I V 1 -19 OF CPS ' IF N.T.S. N.T.S. N.T.S. A PROPERTY LINE SECTION B PROPERTY LINE SECTION C PROPERTY LINE SECTION D NOT USED POP—UP DRAfNAGE EMITTER (NDS PART NO. 620) ATTACHED TO PVC RISER OATH ONE STAINLESS STEEL SCREW PLACE 4+' MIN. DIA. NOYO COBBLE (OR APPROVED EQUIVALENT) FLUSH 5 3/4" — ���� /� 6" GRATE 1 \ \� FINISH FLOOR (FF) _� NOTE: ALL GRADING IS BASED OFF OF THIS ARCHITECTURAL SECTION. THE ADJACENT GRADE AND FF DIMENSIONS SHOWN HERE MUST BE KEPT. NOTIFY THE ENGINEER BEFORE MAKING ANY CHANGES. - 4- ° '- 4 -'O ' 11 A OSUNA RCE 70829 EXP. 6-30-19 WITH BUBBLE FINISH SURFACE 12" AROUND UP 3 7/16" .��. ��ill- USE ATRIUM i OR EQUAL UNLESS NOTED NDS #90S IN LANDSCAPE AREAS OTHERWISE. „II" „ 6 P.V.C. LENGTH AS DRAIN PIPE REQUIRED __-).,•, : ,r_y_l FILTER FABRIC MIRAFI 140 t R °' 5 3/4%j� .-„ . I � USE 9 GRAY SQUARE GRATE NDS #960 (OR EQUAL) IN CONCRETE SWALE AREAS UNLESS NOTED OTHERWISE. �2" minimum to _ _ 8 3�4 % M� \\/�\/�% / /� \ /� MIN. / �/ ' �/\\/� / I 18" treatment Facility L PVC TEE 6" P.V.C. DRAIN PIPE CONNECTION 6 6" SD PIPE 3 5/1 6" i LENGTH AS REQUIRED 18" MIN 8" MIN t 1 5�> VARIES r SEE PLAN CRAWL SPACE WYE FITTING 45° ELL 6" OR 8" P.V.C. SEE PLAN. 6" P.V.C. DRAIN PIPE ADJACENT GRADE 6" CONNECT TO STORM DRAIN LENGTH AS REQUIRED FLOW CAP 2" PERFORATED PIPE _I_(NO DRAIN ROCK -, 1 ' MIN, "j ROCK WITHIN PIPE) LANDSCAPE DRAIN DETAIL Ell -- -AP-IC: N.T.S. N.T.S. N.T.S. N.T.S. N.T.S. GreenBluEarth Inc. CONSULTING CIVIL ENGINEERS & LAND SURVEYORS 117 BERNAL RD. STE. 70-336 TEL. (408) 772-4381 SAN JOSE, CA 95119 OsunaEngineering@gmail.com f BUBBLE —UP EMITTER DETAIL I— IRE/ DRAIN DET/ IL G EARTHEN SWALE DET/ /L / / TYPICAL FOUIVDA T/ON/FF/GROUND SECTION N itterhouse NOTES: 1. SPLASH BLOCKS SHALL BE LOCATED UNDER ALL BLDG. NOTE: BASE RECOMMENDATIONS. FOR REFER THICKNESS TO SOILS OF AGGREGATE ENGINEER TYP. NO. 8 AGGREGATE IN OPENINGS CONCRETE PAVERS MIN. 1/8 IN. G MM) THICKI 1ISearch DOWNSPOUTS. Home I Company Info 1 Products I Literature & Specifications A Dealer 1 News & New Products I Associations & Links 1 Contact Us' 2. SWALE SHALL RUN FROM SPLASH BLOCK AWAY FROM r i ��0 CURB/EDGE RESTRAINT WITH CUT-OUTSLocate FOR OVERFLOW DRAINAGE (CURB SHOWN) ""' F, ' _ ` . =1t 4 rUe"`- pl,:l `I'.I:n. ``�`° BUILDIHNG TO AREA DRAIN. MIN. SWALE SLOPE 2%. AREA { : ' ." 3• ..1--�"p R S�?%9II BIOcIrs ed away Thorn the wall of a It rain is not drained building, thestanding water can damage the DRAINS PER CIVIL. DOWN SPOUT . • �I _=III=III= III _ —III —III- _ I r ` - foundation or pause damp basement Walls. r••Jitterhouse Slash Blocks divert water away from SPLASH BLOCK BUILDING GRADING AND DRAINAGE PLAN CONSTRUCTION DETAILS 15921 ROCHIN TERRACE CITY OF LOS GATOS CALIFORNIA Dote: 6/19/18 ' " r •. — - I I III—_ III— I the foundation and help to prevent soil ero.si Sri. Cry ' � �0� �.� +� 0 • 4PI �fl� �`�,� .+i ' « �r '� � — -- I I I —III I Ii I I II —III I I I' � - _ I I This is our newest design in durable and attractive splash blocks. Each is machine manufactured to quality standards, q '� Dimensions: 12 ' H 24" .,S 2-, �2 " \ \ \ 0 •�'� - _ BEDDING COURSE T� IN. rO> MM) THICK TYP, NO. 8 AGGREGATE 410 aft 0 it +� '0 d.0 `, = IN. 1 D TRICK NO. aT STONE ( MM) O O ii 41 ,"ID ' • -,� .erI OPEN -GRADED BASE OaEC�TEYTILE ON BIDE AND TOP 7F SUBBASE Colors Available: Standard Gray \ , - \ 410 *AI •` I. 0 -�_��r +ir TT7 �i =1 r �E 0. N-1111"ill T ' rCD lii Ilk II—. �� i -TT —1 i --r 11 I I MIN. IN.17 MM THICK Designed:: J.%.0. `-=`�X!•!Y.•=•����!!Y:!=. • III Irl=� I . _ =I I=III=III=I I =I 1=III= 11-1 I I- I I -1 I I -1 I I- N. STONE SUBBASE _ _ OPTIONAL ON BOTTOM 4 / AREA DRAIN La a#a ii healer i News New Produc+s. , Associations &:Link_ %entack Us NOTES: 11. 2 3/8 IN. (80 MM) 2. NO. 2 STONE SUBBASE CONSULT !CPI PERMEABLE THICK PAVERS MAY THICKNESS INTERLOCKING BE USED VARIES WITH CONCRETE IN L SUBGRADE PEDESTRIAN APPLICATIONS. DESIGN. PAVEMENT MANUAL. DRAIN ROCK IN SWALE Project No.: 1538 259 Cleueland Avenue, Chan-.bersbueg, PA 17201 717-267-4500 Fax: 717-267-4527 Email! rnasanrylanitterhouse.corn PLAN VIEW SWALE @ 2% MIN. SHRUB MASSINGS SPLASH BLOCK TO AREA DRAIN IMAGE N.T.S. PERMEABLE EABLE PAVEMENT WITH FULL DRAWING G NO. IPA-68 SHEET C3 OF 5 SHEETS 0 EXFILTRATION TOl SOIL SUBGRADE SCALE NO SCALE / PERME/ BL E PA /ERS DET/ IL J SPL/ SH BLOCK DET/ /L 10 30 50 0 20 40 GRAPHIC SCALE 1" = 20' ROCHIN TERRACE --330 INSTALL FIBER ROLLS. SEE DETAIL ON THIS SHEET 1 I II I I I 1 11 / \ i f/ El 1 N -III == -LI L=III111= n ..., SD v� -I wl I�' S"CHERRY ‘1O\ (N) HOUSE %r I 2 \ L_ ,D1 -Q333- SD INSTALL FIBER ROLLS. SEE DETAIL ON THIS SHEET NOTES: 1. PROTECT ALL INLETS IN THE PUBLIC STREETS SURROUNDING THE SITE. 2. ALL ON -SITE LANDSCAPE AREA DRAINS TO BE CAPPED OR PROTECTED UNTIL LANDSCAPING IS FINISHED. 25' MIN SLOPE AWAY 'I 0 \ i 8" THICK AGGREGATE 500X MIRAFI (OR EQUAL) PROVIDE APPROPRIATE TRANSITION ON EXISTING GROUND BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND PUBLIC RIGHT-OF-WAY 25' MIN ' o ' O O O O _ O_ O O O O O O O O O O�O�O�OO C> C> *STONES TO BE 4"-6" AGGREGATE No ss _5:! cc 0 U z 0 0 PUBLIC RIGHT-OF-WAY PUBLIC (RIGHT-OF-WAY ( MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING SEDIMENT ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHTS -OF -WAY SHALL BE REMOVED IMMEDIATELY. WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS -OF -WAY. THIS SHALL BE DONE AT AN AREA STABILIZED WITH CRUSHED STONE, WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. STABILIZED CONSTRUCTION ENTRANCE N.T.S. LEGEND PROPOSED DESCRIPTION 0 00 0 OO000 0 0 r r\0 0 0 C INSTALL FIBER ROLLS. SEE DETAIL ON THIS SHEET MAINTENANCE NOTES SITE BOUNDARY STABILIZED CONSTRUCTION ENTRANCE 4"-6'' ROCK (MIN) FIBER ROLL MAINTENANCE IS TO BE PERFORMED AS FOLLOWS: 1. REPAIR DAMAGES CAUSED BY SOIL EROSION OR CONSTRUCTION AT THE END OF EACH WORKING DAY. 2. SWALES SHALL BE INSPECTED PERIODICALLY AND MAINTAINED AS NEEDED. 3. SEDIMENT TRAPS, BERMS, AND SWALES ARE TO BE INSPECTED AFTER EACH STORM AND REPAIRS MADE AS NEEDED. 4. SEDIMENT SHALL BE REMOVED AND SEDIMENT TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO A DEPTH OF 1 FOOT. 5. SEDIMENT REMOVED FROM TRAP SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. 6. RILLS AND GULLIES MUST BE REPAIRED. CONSTRUCTION ENTRANCE, SEE DETAILS ON 11HJS SHEET. AS AN ALTERNATE CAN LEAVE EXISTING PAVEMENT INSTEAD. NO DIRT TRACKING TO THE STREETS ALLOWED REBAR INSTALL 5 STAKES TYP. FILTER FABRIC EXCAVATE 4" DEEP CUP FOR CIRCULAR WATTLE TO SIT IN INLET 10" STRAW WATTLE PLAN VIEW 10" STRAW WATTLE / FILTER FABRIC DRIVE STAKE 18" BELOW GROUND NOTE: LANDSCAPE INLETS THAT ARE NOT PROTECTED MUST BE CAPPED SECTION TO PREVENT ANY UNTREATED FLOW ENTERING THE INLET ALTERNATE FIBER ROLL INLET PROTECTION MAY BE USED IN LANDSCAPE AREA DRAINS N.T.S. REBAR d a a SILT SACK a a. A d a a REBAR TO EXTEND BEYOND INLET THROAT SILT SACK POCKET CALIFORNIA MODIFIED SILT SACK REED & GRAHAM, INC. (OR EQUAL) BEFORE & AFTER STREETS ARE PAVED N.T.S. EROSION & SEDIMENT CONTROL NOTES 1. NOT USED 2. THE DEVELOPER IS RESPONSIBLE FOR ENSURING THAT ALL CONTRACTORS AND SUBCONTRACTORS ARE AWARE OF ALL STORM WATER QUALITY MEASURES AND IMPLEMENT SUCH MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTION BEST MANAGEMENT PRACTICES WILL RESULT IN THE ISSUANCE OF CORRECTION NOTICES, CITATIONS, AND/OR STOP ORDERS. 3. ANY VEHICLE OR EQUIPMENT WASHING/STEAM CLEANING MUST BE DONE AT AN APPROPRIATELY EQUIPPED FACILITY WHICH DRAINS TO THE SANITARY SEWER. OUTDOOR WASHING MUST BE MANAGED IN SUCH A WAY THAT THERE IS NO DISCHARGE OF SOAPS, SOLVENTS, CLEANING AGENTS OR OTHER POLLUTANTS TO THE STORM DRAINS. WASH WATER SHALL DISCHARGE TO THE SANITARY SEWER, SUBJECT TO REVIEW AND APPROVAL OF UNION SANITARY DISTRICT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LITTER CONTROL AND SWEEPING OF ALL PAVED SURFACES DURING CONSTRUCTION. 5. THE FACILITIES SHOWN ON THIS PLAN ARE DESIGNED TO CONTROL EROSION AND SEDIMENT DURING THE RAINY SEASON, OCTOBER 1 TO APRIL 15. EROSION CONTROL MEASURES ARE TO BE FUNCTIONAL PRIOR TO OCTOBER 1ST OF ANY YEAR GRADING OPERATIONS HAVE LEFT AREAS UNPROTECTED FROM EROSION. 6. ALL ON -SITE STORM DRAINS SHALL BE CLEANED IMMEDIATELY BEFORE THE START OF THE RAINY SEASON BEGINNING ON OCTOBER 1ST EACH YEAR, SUBJECT TO THE REVIEW OF THE BUILDING/ENGINEERING INSPECTOR. 7. IF RAINY WEATHER BECOMES IMMINENT, GRADING OPERATIONS SHALL BE STOPPED AND EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO PROTECT DISTURBED AREAS. 8. DURING THE RAINY SEASON, ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAIN SYSTEM. 9. CONSTRUCTION ENTRANCES SHALL CONSIST OF A MINIMUM 8" THICK LAYER OF 4"-6" FRACTURED STONE AGGREGATE UNLAID WITH GEOTEXTILE LINER FOR A MINIMUM DISTANCE OF 50 FEET, AND IS TO BE PROVIDED AT EACH VEHICLE ACCESS POINT TO EXISTING PAVED STREETS. THE DEPTH AND LENGTH OF AGGREGATE MAY NEED TO BE ADJUSTED IN THE FIELD TO ENSURE NO TRACKING OF SEDIMENT ONTO EXISTING PAVED STREETS. CONSTRUCTION ENTRANCES SHALL SLOPE AWAY FROM EXISTING PAVED STREETS. 10. INLETS NOT USED IN CONJUNCTION WITH EROSION CONTROL MEASURES ARE TO BE BLOCKED UNLESS THE AREA DRAINED IS UNDISTURBED OR STABILIZED. 11. BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTORL MEASURES TO THE SATISFACTION OF THE CITY ENGINEER. 12. NO STRAW BALES OR SILT FENCES SHALL BE USED AS EROSION CONTROL MEASURES. SILT FENCES MAY ONLY BE USED AS A PHYSICAL BARRIER TO PREVENT VEHICULAR AND PEDESTRIAN TRAFFIC FROM USING NON -APPROVED ACCESS POINTS (E.G. - ALONG RIGHT-OF-WAY). 13. ALL DISTURBED AREAS INCLUDING FLAT PADS ARE TO BE TREATED WITH STRAW AND TACKIFIER AT A RATE OF 2 TONS PER ACRE APPROXIMATELY 3 INCHES THICK. SUPPLEMENTAL EROSION & SEDIMENT CONTROL NOTES 1. SEE STANDARD EROSION & SEDIMENT CONTROL NOTES ABOVE. 2. THE FACILITIES SHOWN ON THIS PLAN ARE DESIGNED TO CONTROL EROSION AND SEDIMENT DURING THE RAINY SEASON, OCTOBER 1 TO APRIL 15. FACILITIES ARE TO BE OPERABLE PRIOR TO OCTOBER 1 OF ANY YEAR. GRADING OPERATIONS DURING THE RAINY SEASON WHICH LEAVE DENUDED SLOPES SHALL BE PROTECTED WITH EROSION CONTROL MEASURES IMMEDIATELY FOLLOWING GRADING ON THE SLOPES. 3. CONSTRUCTION ENTRANCES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. ALL CONSTRUCTION TRAFFIC ENTERING ONTO THE PAVED ROADS MUST CROSS THE STABILIZED CONSTRUCTION ENTRANCE WAYS. 4. CONTRACTOR SHALL MAINTAIN STABILIZED ENTRANCE AT EACH VEHICLE ACCESS POINT TO EXISTING PAVED STREETS. ANY MUD OR DEBRIS TRACKED ONTO PUBLIC STREETS SHALL BE REMOVED DAILY AND AS REQUIRED BY THE CITY. 5. INLET PROTECTION SHALL BE INSTALLED AT OPEN INLETS TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. INLETS NOT USED IN CONJUNCTION WITH EROSION CONTROL ARE TO BE BLOCKED TO PREVENT ENTRY OF SEDIMENT. 6. THIS EROSION AND SEDIMENT CONTROL PLAN MAY NOT COVER ALL THE SITUATIONS THAT MAY ARISE DURING CONSTRUCTION DUE TO UNANTICIPATED FIELD CONDITIONS. VARIATIONS AND ADDITIONS MAY BE MADE TO THIS PLAN IN THE FIELD. NOTIFY THE CITY REPRESENTATIVE OF ANY FIELD CHANGES. HINGE POINT 3:1 SLOPE MAX. AC PAVEMENT TT - PLACE STRAW WATTLES IF VERTICAL RISE AGG. BASE FRONT YARD SLOPE DETAIL AFTER STREET ARE PAVED N.T.S. TOE OF SLOPE DRIVE STAKE 18" BELOW ROLL 4' 0.C. TOP OF SLOPE FIBER ROLL EXCAVATE 4" DEEP CUP FOR CIRCULAR ROLL TO SIT IN FIBER ROLL INSTALLATION DETAIL N.T.S. v C C C C FESS/0yq OSC N cL No. 70829 Exp. 6-30-19 k&! V CFO' V4 i PORFIRIO OSCAR OSUNA RCE 70829 EXP. 6-30-19 z J LL W 0 z_ 0 0 z 0 z_ 0 L.L 0 z 0 0 z 0 U z 0 (1) 0 w CONSULTING CIVIL ENGINEERS & LAND SURVEYORS CITY OF LOS GATOS Checked: 0.0. Designed: J.0/0.0. Project No.: 1538 SHEET C4 OF 5 SHEETS Z O o � ti �Q WZ� 0UOQ. (r)tik • W LL. 0Q� ei• 2 (I)=W Vzo 0 cC k2 jQW O cC J ZQ �0o zOJ� aZkz J C� om-`" a0 Oc o�� 00.-10 2 Zit kJ LLJ oti'' 010 oQ� WQ=z ct_k i.„ Lu Luc, j�� a491-o (f)Q� WQ�Q Qetis-m JWOJ CL >W ti0ZU LuctWW ka-?U W UOp(,) Construction Best Management Practices (BMPs) Materials & Waste Management Non -Hazardous Materials Berm and cover stockpiles of sand, dirt or other construction material with tarps when rain is forecast or when they are not in use. ❑ Use (but don't overuse) reclaimed water for dust control. D Ensure dust control water doesn't leave site or discharge to storm drains. Hazardous Materials ❑ Label all hazardous materials and hazardous wastes (such as pesticides, paints, thinners, solvents, fuel, oil, and antifreeze) in accordance with City, County, State and Federal regulations. ❑ Store hazardous materials and wastes in water tight containers, store in appropriate secondary containment, and cover them at the end of every work day or during wet weather or when rain is forecast. ❑ Follow manufacturer's application instructions for hazardous materials and do not use more than necessary. Do not apply chemicals outdoors when rain is forecast within 24 hours. ❑ Arrange for appropriate disposal of all hazardous wastes. Waste Management ❑ Cover and maintain dumpsters. Check frequently for leaks. Place dumpsters under roofs or cover with tarps or plastic sheeting secured around the outside of the dumpster. A plastic liner is recommended to prevent leaks. Never clean out a dumpster by hosing it down on the construction site. ❑ Place portable toilets away from storm drains. Make sure they are in good working order. Check frequently for leaks. ❑ Dispose of all wastes and demolition debris properly. Recycle materials and wastes that can be recycled, including solvents, water - based paints, vehicle fluids, broken asphalt and concrete, wood, and cleared vegetation. ❑ Dispose of liquid residues from paints, thinners, solvents, glues, and cleaning fluids as hazardous waste. ❑ Keep site free of litter (e.g. lunch items, cigarette butts). D Prevent litter from uncovered loads by covering loads that are being transported to and from site. Construction Entrances and Perimeter ❑ Establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges .from site and tracking off site. ❑ Sweep or vacuum any street tracking immediately and secure sediment source to prevent further tracking. Never hose down streets to clean up tracking, Construction projects are required to implement year-round stormwater BMPs. Equipment Management & Spill Control Maintenance and Parking ❑ Designate an area of the constriction site, well away from streams or storm drain inlets and fitted with appropriate BMPs, for auto and equipment parking, and storage. ❑ Perform major maintenance, repair jobs, and vehicle and equipment washing off site. ❑ If refueling or vehicle maintenance must be done onsite, work in a benned area away from storm drains and over a drip pan or drop cloths big enough to collect fluids. Recycle or dispose of fluids as hazardous waste. ❑ If vehicle or equipment cleaning must be done onsite, clean with water only in a bermed area that will not allow rinse water to run into gutters, streets, storm drains, or surface waters. ❑ Do not clean vehicle or equipment onsite using soaps, solvents, degreasers, or steam cleaning equipment, and do not use diesel oil to lubricate equipment or parts onsite. Spill Prevention and Control ❑ Keep spill cleanup materials (e.g., rags, absorbents and cat litter) available at the construction site at all times. ❑ Maintain all vehicles and heavy equipment. Inspect frequently for and repair leaks. Use drip pans to catch leaks until repairs are made. ❑ Clean up leaks, drips and other spills immediately and dispose of cleanup materials properly ❑ Use dr- cleanup methods whenever possible (absorbent materials, cat litter and/or rags). ❑ Sweep up spilled dry materials immediately. Never attempt to "wash them away" with water, or bury them. ❑ Clean up spills on dirt areas by digging up and properly disposing of contaminated soil. ❑ Report significant spills to the appropriate local spill response agencies immediately. If the spill poses a significant hazrd to human health and safety, property or the environment, you must report it to the State Office of Emergency Services. (800) 852-7550 (24 hours). Earthmoving Grading and Earthwork ❑ Schedule grading and excavation work during dry weather. ❑ Stabilize all denuded areas, install and maintain temporary erosion controls (such as erosion control fabric or bonded fiber matrix) until vegetation is established. ❑ Remove existing vegetation only when absolutely necessary, plant temporary vegetation for erosion control on slopes or where construction is not immediately planned. ❑ Prevent sediment from migrating offsite and protect storm drain inlets, drainage courses and streams by installing and maintaining appropriate BMPs (i.e. silt fences, gravel bags, fiber rolls, temporary swales, etc.). ❑ Keep excavated soil on site and transfer it to dump trucks on site, not in the streets. Contaminated. Soils ❑ If any of the following conditions are observed, test for contamination and contact the Regional Water Quality Control Board: Unusual soil conditions, discoloration, or odor. Abandoned underground tanks. Abandoned wells - Buried barrels, debris, or trash. O If the above conditions are observed, document any signs of potential contamination and clearly mark them so they are not distrurbed by construction activities. Landscaping O Protect stockpiled landscaping materials from wind and rain by storing them under tarps all year-round. ❑ Stack bagged material on pallets and under cover. O Discontinue application of any erodible landscape material within 2 days before a forecast rain event or during wet r•eather. Concrete Management and Dewatering Concrete Management ❑ Store both dry and wet materials under cover, protected from rainfall and runoff and away from storm drains or waterways. Store materials off the ground, on pallets. Protect dry materials from wind. O Wash down exposed aggregate concrete only when the wash water can (1) flow onto a dirt area; (2) drain onto a bermed surface from which it can be pumped and disposed of properly; or (3) block any storm drain inlets and vacuum washwater from the gutter. If possible, sweep first. O Wash out concrete equipment/trucks offsite or in a designated washout area onsite, where the water will flow into a temporary waste pit, and make sure wash water does not leach into the underlying soil. (See CASQA Construction BMP Handbook for properly designed concrete washouts.) Dewatering ❑ Discharges of groundwater or captured runoff from dewatering operations must be properly managed and disposed. When possible, send dewatering discharge to landscaped area or sanitary sewer. If discharging to the sanitary sewer,. call your local wastewater treatment plant. ❑ Divert run-on water from offsite away from all disturbed areas. ❑ When dewatering, notify and obtain approval from the local municipality before discharging water to a street gutter or storm drain. Filtration or diversion through a basin, tank, or sediment trap may be required. ❑ In areas of known or suspected contamination, call your local agency to determine whether the ground water must be tested. Pumped groundwater may need to be collected and hauled off -site for treatment and proper disposal. Paving/Asphalt Work Paving ❑ Avoid paving and seal coating in wet weather or when rain is forecast, to prevent materials that have not cured from contacting stormwater nunof. ❑ Cover storm drain inlets and manholes when applying seal coat, slurry seal, fog seal, or similar materials. 10 Collect and recycle or properly dispose of excess abrasive gravel or sand. Do NOT sweep or wash it into gutters. Sawcutting & Asphalt/Concrete Removal ❑ Protect storm drain inlets during saw cutting. ❑ If saw cut slurry enters a catch basin, clean it up immediately. ❑ Shovel or vacuum saw cut slurry deposits and remove from the site. When making saw cuts, use as little water as possible. Sweep up, and properly dispose of all residues. frOXIA a.0 Painting & Paint Removal Painting Cleanup and Removal ❑ Never clean brushes or rinse paint containers into a street, gutter, storm drain, or stream. ❑ For water -based paints, paint out brushes to the extent possible, and rinse into a drain that goes to the sanitary sewer. Never pour paint down a storm drain. ❑ For oil -based paints, paint out brushes to the extent possible and clean with thinner or solvent in a proper container. Filter and reuse thinners and solvents. Dispose of excess liquids as hazardous waste. ❑ Sweep up or collect paint chips and dust from non -hazardous dry stripping and sand blasting into plastic drop cloths and dispose of as trash. ❑ Chemical paint stripping residue and chips and dust from marine paints or paints containing lead, mercury, or tributyltin must be disposed of as hazardous waste. Lead based paint removal requires a state - certified contractor. Santa Clara Valley Urban Runoff Pollution Prevention Program Storm drain polluters may be liable for fines of up to $10,000 per day! 0 W k- OJ,\ �n No. 70829 Exp. 6-30-19 OF —CO PORFIRIO OSCAR OSUNA RCE 70829 EXP. 6-30-19 V W m C D a)) 0 CONSULTING CIVIL ENGINEERS & LAND SURVEYORS z t2 W 0 z_ 0 0 z 0 z_ 0 0 U) 0 m z 0 0 (/) z 0 0 W 0 W z_ 0 0 tY 0) CALIFORNIA CITY OF LOS GATOS oo Checked:• 0.0. SHEET C5 OF 5 SHEETS