Loading...
1988-135-Approving Amendment No. 3 To The Agreement With Ruth And Going, Inc.RESOLUTION NO. 1988 -135 RESOLUTION APPROVING AMENDMENT NO. 3 TO THE AGREEMENT WITH RUTH AND GOING, INC. RESOLVED, by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that the TOWN OF LOS GATOS execute Amendment No. 3 (a copy of which is attached hereto) to that certain agreement with Ruth and Going, Incorporated (a copy of which is attached hereto as Exhibit "A ") and amended June 2, 1986 (a copy of which is attached hereto as Exhibit "B ") for engineering consulting services, and that the Town Manager is authorized, and is hereby directed, to execute said Amendment No. 3 in the name and on behalf of the TOWN OF LOS GATOS. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos held on 20 day of June , 198 8 by the following vote: AYES: COUNCIL MEMBERS Thomas J. Ferrito, Robert L. Hamilton Brent N. Ventura and Mayor Eric D. Carlson NOES: COUNCIL MEMBERS ABSTAIN: COUNCIL MEMBERS None ABSENT: COUNCIL MEMBERS Joanne BenJamin SIGNED: ATTEST: CLERK OF THE TOWN OF LOS GA AMENDMENT NO. 3 TO THE AGREEMENT BETWEEN THE TOWN OF LOS GATOS AND RUTH AND GOING, INC. FOR PROFESSIONAL ENGINEERING SERVICES IN CONNECTION WITH LOS GATOS BOULEVARD IMPROVEMENTS Amendment No. 3, dated for convenience June 20, 1988 , to the Agreement entitled "Agreement Between the Town of Los Gatos, and Ruth and Going, Inc. for Professional Engineering Services in connection with Los Gatos Boulevard ", and as amended on June 2, 1986. The above referenced Agreement was adopted by Town Council Resolution No. 1985 -167 on November 18, 1985 and Amendment No. 1 was approved by Town Council Resolution No. 1986 -76. Item B of Article IV of the original Agreement provides for written amendments to the Agreement for changes in the scope of the services to be performed by the Engineer. WHEREAS, the Town has requested Item E, Construction Support; and WHEREAS, the Town desires the Engineer to provide for construction support of the Los Gatos Boulevard Improvements; and WHEREAS, the services have resulting in an increase in the scope of services and costs from the amended Agreement: THEREFORE, the following sections of the original Agreement shall be amended as follows: Amended Article I Item E - Construction Support (Second Paragraph) After the Town's award of the construction contract to a licensed contractor, the engineer shall provide the following services during construction: 1. Conduct a pre - construction conference with the selected contractor. 2. Sample and test materials used in the project for general conformance to the contract documents. This service will be provided by Testing Engineers, Inc. as a subconsultant to Ruth and Going, Inc. Their services will be as itemized on the attached sheet. 3. Provide intermittent observation of the contractor's operation for general compliance with the contract documents. We are allowing for an average of three site visits per week during the main period of construction of about twenty consecutive calendar weeks. Each site visit to be two to three hours in length, depending on construction activity. +23C:LD Provide construction staking for concrete median modifications, curb and gutter along the East side of Blossom Hill Road, seven (7) pork chop islands, and drainage inlets in lines within the median modifications. Layout of sawcut lines and signal modifications will be layed out by the contractor based on existing improvements and staking for proposed medians and islands. S. Attend a turn -on of the modified signal systems. This service will be performed by DKS Consultants as a subconsultant to Ruth and Going, Inc. 6. Assist the Town in review of contractor submittals required by the specifications. Assist the Town in the review of monthly progress payments as required. Prepare contract change orders, observe contractors progress during the construction period, and assist the Town in responding to plan interpretation inquiries. 7. Conduct a project acceptance walk -thru with Town staff and the contractor. 8. Prepare record drawings of the completed project noting major field changes from the original bid documents. The record drawings will be prepared from information provided by the contractor, and from contract change orders. Article VI - Fee Compensation Fees shall be determined as follows: No. 5 - The fee allowance for services specified under Item E Construction Support of Article I shall be $52,000 to be billed on a time and materials basis. There is no guarantee that said fee allowance will provide for completion of all required construction support services. During the course of work if it becomes apparent said fee allowance will be exceeded the Engineer will notify the Town of additional expected costs. WITNESS THE EXECUTION HEREOF the day and year first hereinabove written. +23C:LD APPROVED AS TO FORM: Town A `tdrney J' rr By. Town Mayor By: , Tow ENGINEER RUTH AND GOING. INCORPORATED By: - ice President Civil Engineer +23C:LD +23C:LD Imo\ J� ILI�V � I IIY l 3 2 FX #t,3rT.1i74 LQy �kS0 '7t �ii�T,FtDAKt7 TP fft \ -� �1,1 ■1p �X V �OtA -T[Dr Mkt' F-XN ►B ►T -TITS Jrr 3 MA?' D s 0 1 I� �I f /'aAF h 0 F4 b