Loading...
Attachment 3Town of Los Gatos Parks and Public Works Department Project #13 -31 Almond Grove Street Reconstruction Phase I (Concrete) Certified Bid Tabulation Bid Opening. February 1, 2016 at 10.00 A.M. at the Civic Center Page 1 of 2 ATTACHMENT 3 FBD Vanguard Construction Redgwick Construction Co. Jos J. Albanese Interstate Grading and Paving Galeb Paving, Inc. Granite Rock Company ITEM NO ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 1 Mobilization (Max. 5% of contract price) L.S. 1 $110,000.00 $110,000.00 $98,500.00 $98,500.00 $110,000.00 $110,000.00 $15,000.00 $15,000.00 $110,000.00 $110,000.00 $110,000.00 $110,000.00 2. Clearing and Grubbing L.S. 1 $9,500.00 $9,500.00 $10,000.00 $10,000.00 $60,000.00 $60,000.00 $30,000.00 $30,000.00 $300,084.00 $300,084.00 $36,000.00 $36,000.00 3. Environmental Protection L.S. 1 $11,165.00 $11,165.00 $5,000.00 $5,000.00 $55,000.00 $55,000.00 $5,000.00 $5,000.00 $65,904.00 $65,904.00 $2,000.00 $2,000.00 4. Traffic Control L.S. 1 $173,500.00 $173,500.00 $179,300.00 $179,300.00 $165,000.00 $165,000.00 $75,000.00 $75,000.00 $147,162.00 $147,162.00 $105,000.00 $105,000.00 5. Construction Staking and Layout L.S. 1 $29,143.00 $29,143.00 $5,000.00 $5,000.00 $24,000.00 $24,000.00 $25,000.00 $25,000.00 $12,000.00 $12,000.00 $20,000.00 $20,000.00 6. 6 " -12 "Tree Removal Ea. 12 $513.00 $6,156.00 $250.00 $3,000.00 $480.00 $5,760.00 $300.00 $3,600.00 $544.00 $6,528.00 $250.00 $3,000.00 7. 12" -18" Tree Removal Ea. 11 $685.00 $7,535.00 $450.00 $4,950.00 $750.00 $8,250.00 $500.00 $5,500.00 $1,190.40 $13,094.40 $450.00 $4,950.00 8. 18" or Greater Tree Removal Ea. 5 $1,026.00 $5,130.00 $800.00 $4,000.00 $933.00 $4,665.00 $1,600.00 $8,000.00 $2,140.80 $10,704.00 $1,450.00 $7,250.00 9. Remove Existing Hardscape S.F. 1,306 $5.65 $7,378.90 $7.00 $9,142.00 $8.00 $10,448.00 $1.90 $2,481.40 $5.20 $6,791.20 $17.00 $22,202.00 10 Remove Existing Pavement, Sidewalk and Curb & Gutter (FPO) S.F. 123,905 $3.60 $446,058.00 $2.50 $309,762.50 $2.50 $309,762.50 $2.00 $247,810.00 $3.18 $394,017.90 $5.00 $619,525.00 11. Excavation& Embankment(FPQ) C.Y. 1,367 $75.00 $102,525.00 $68.00 $92,956.00 $152.00 $207,784.00 $225.00 $307,575.00 $60.50 $82,703.50 $95.00 $129,865.00 12 Over - Excavation (Revocable) C.Y. 137 $300.00 $41,100.00 $130.00 $17,810.00 $200.00 $27,400.00 $190.00 $26,030.00 $121.50 $16,645.50 $120.00 $16,440.00 13. Install Aggregate Base - Pavement (FPQ) S.Y. 9,888 $12.00 $118,656.00 $11.00 $108,768.00 $9.50 $93,936.00 $18.00 $177,984.00 $5.86 $57,943.68 $13.00 $128,544.00 14. Install 5" PCC Pavement S.Y. 9,888 $56.00 $553,728.00 $69.00 $682,272.00 $51.00 $504,288.00 $75.00 $741,600.00 $65.00 $642,720.00 $70.00 $692,160.00 15. Install Asphalt Transition Ton 51 $380.00 $19,380.00 $300.00 $15,300.00 $280.00 $14,280.00 $200.00 $10,200.00 $452.50 $23,077.50 $500.00 $25,500.00 16 Install Driveway/ Walkway Conform- Hardscape S.F. 279 $35.00 $9,765.00 $26.00 $7,254.00 $23.00 $6,417.00 $50.00 $13,950.00 $43.44 $12,119.76 $52.00 $14,508.00 17. Install Driveway / Walkway Conform - PCC S.F. 172 $15.00 $2,580.00 $21.00 $3,612.00 $36.00 $6,192.00 $19.00 $3,268.00 $13.67 $2,351.24 $23.00 $3,956.00 18 Install Driveway/ Walkway Conform - Asphalt Pavement S.F. 598 $20.00 $11,960.00 $10.00 $5,980.00 $19.00 $11,362.00 $12.00 $7,176.00 $18.20 $10,883.60 $26.00 $15,548.00 19. Install Stairs S.F. 10 $50.00 $500.00 $109.00 $1,090.00 $255.00 $2,550.00 $216.00 $2,160.00 $150.00 $1,500.00 $400.00 $4,000.00 20. Install Curb and Gutter L.F. 3,073 $28.00 $86,044.00 $55.00 $169,015.00 $44.00 $135,212.00 $66.00 $202,818.00 $39.60 $121,690.80 $58.00 $178,234.00 21. Install Sidewalk S.F. 8,803 $6.75 $59,420.25 $12.00 $105,636.00 $12.00 $105,636.00 $10.50 $92,431.50 $8.73 $76,850.19 $13.00 $114,439.00 22. Install Villa Hermosa Sidewalk S.F. 2,888 $10.00 $28,880.00 $19.00 $54,872.00 $21.00 $60,648.00 $14.00 $40,432.00 $15.50 $44,764.00 $17.00 $49,096.00 23. Install Curb Ramp Ea. 19 $3,200.00 $60,800.00 $5,100.00 $96,900.00 $4,300.00 $81,700.00 $3,900.00 $74,100.00 $2,400.00 $45,600.00 $3,200.00 $60,800.00 24. Install Residential Driveway S.F. 9,074 $9.50 $86,203.00 $15.00 $136,110.00 $17.00 $154,258.00 $12.50 $113,425.00 $13.36 $121,228.64 $17.00 $154,258.00 25. Install Commercial Driveway S.F. 1,825 $13.00 $23,725.00 $19.00 $34,675.00 $20.00 $36,500.00 $16.50 $30,112.50 $14.10 $25,732.50 $18.00 $32,850.00 2G: !Mall RaRtff S-F- 0-.739 WI6 W16 MG Ni WIG W16 Page 1 of 2 ATTACHMENT 3 Town of Los Gatos Parks and Public Works Department Project #13 -31 Almond Grove Street Reconstruction Phase I (Concrete) Certified Bid Tabulation Bid Opening. February 1, 2016 at 10.00 A.M. at the Civic Center This certifies that all bids were received and opened on February 1, 2016 and that this is a copy of the bid tabulation with bids corrected for errors in addition and multiplication. By: J. Chin, Assistant Engineer Page 2 of 2 ATTACHMENT FBD Vanguard Construction Redgwick Construction Co. Jos J. Albanese Interstate Grading and Paving Galeb Paving, Inc. Granite Rock Company ITEM NO ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 27. Install 24" Box Tree - Chinese Pistache Ea. 41 $913.00 $37,433.00 $690.00 $28,290.00 $825.00 $33,825.00 $900.00 $36,900.00 $800.00 $32,800.00 $800.00 $32,800.00 28. Install 24" Box Tree - Eastern Redbud Ea. 25 $913.00 $22,825.00 $690.00 $17,250.00 $1,400.00 $35,000.00 $900.00 $22,500.00 $800.00 $20,000.00 $800.00 $20,000.00 29. Plant Establishment Maintenance (120 Days) L.S. 1 $22,828.00 $22,828.00 $3,600.00 $3,600.00 $24,000.00 $24,000.00 $27,000.00 $27,000.00 $20,000.00 $20,000.00 $5,000.00 $5,000.00 30. Install Centerline Monument Ea. 6 $1,365.00 $8,190.00 $1,000.00 $6,000.00 $1,395.00 $8,370.00 $1,000.00 $6,000.00 $865.00 $5,190.00 $1,200.00 $7,200.00 31. Install Catch Basin Ea. 4 $4,400.00 $17,600.00 $4,200.00 $16,800.00 $7,685.00 $30,740.00 $3,000.00 $12,000.00 $4,200.00 $16,800.00 $3,500.00 $14,000.00 32. Install Storm Drain Manhole Ea. 1 $7,275.00 $7,275.00 $7,200.00 $7,200.00 $11,300.00 $11,300.00 $9,000.00 $9,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 33. Install Storm Drain Pipe L.F. 47 $163.00 $7,661.00 $220.00 $10,340.00 $555.00 $26,085.00 $210.00 $9,870.00 $297.00 $13,959.00 $350.00 $16,450.00 34 Remove and Reset SSMH Ring and Cover (Revocable) Ea. 8 $1,800.00 $14,400.00 $800.00 $6,400.00 $1,340.00 $10,720.00 $1,000.00 $8,000.00 $500.00 $4,000.00 $1,200.00 $9,600.00 35. Remove and Reset SS Cleanout Cover (Revocable) Ea. 21 $240.00 $5,040.00 $350.00 $7,350.00 $1,065.00 $22,365.00 $560.00 $11,760.00 $250.00 $5,250.00 $600.00 $12,600.00 36. Remove and Replace Water Meter Box and Cover( Revocable) Ea. 50 $525.00 $26,250.00 $150.00 $7,500.00 $1,240.00 $62,000.00 $620.00 $31,000.00 $300.00 $15,000.00 $700.00 $35,000.00 37 Remove and Replace Water Valve Box and Cover (Revocable) Ea. 23 $900.00 $20,700.00 $400.00 $9,200.00 $1,065.00 $24,495.00 $620.00 $14,260.00 $150.00 $3,450.00 $1,000.00 $23,000.00 38 Remove and Reset Electrical Vault Box and Cover (Revocable Bid Item) Ea. 5 $1,090.00 $5,450.00 $1,500.00 $7,500.00 $1,375.00 $6,875.00 $1,350.00 $6,750.00 $500.00 $2,500.00 $2,000.00 $10,000.00 39 Remove and Reset Cable Vault Box and Cover (Revocable) Ea. 2 $1,090.00 $2,180.00 $1,500.00 $3,000.00 $1,375.00 $2,750.00 $1,350.00 $2,700.00 $500.00 $1,000.00 $1,500.00 $3,000.00 40. Remove and Reset SDMH Ring and Cover Ea. 5 $1,800.00 $9,000.00 $850.00 $4,250.00 $1,350.00 $6,750.00 $1,000.00 $5,000.00 $500.00 $2,500.00 $1,200.00 $6,000.00 41. Adjust Catch Basin Ea. 5 $1,525.00 $7,625.00 $1,300.00 $6,500.00 $2,265.00 $11,325.00 $2,500.00 $12,500.00 $2,400.00 $12,000.00 $1,800.00 $9,000.00 42. Thermoplastic Traffic Stripe - Detail 22 L.F. 150 $2.30 $345.00 $2.00 $300.00 $5.00 $750.00 $4.50 $675.00 $2.00 $300.00 $4.00 $600.00 43. 12" Solid White Limit Line L.F. 300 $4.00 $1,200.00 $3.50 $1,050.00 $8.00 $2,400.00 $4.50 $1,350.00 $3.50 $1,050.00 $7.00 $2,100.00 44. Thermoplastic Pavement Marking S.F. 380 $5.70 $2,166.00 $5.00 $1,900.00 $11.00 $4,180.00 $4.50 $1,710.00 $5.00 $1,900.00 $9.00 $3,420.00 45. Red Curb Painting L.F. 801 $2.00 $1,602.00 $1.75 $1,401.75 $3.00 $2,403.00 $2.00 $1,602.00 $1.75 $1,401.75 $3.00 $2,403.00 46 Blue Retroreflective Raised Pavement Marker Ea. 8 $17.00 $136.00 $15.00 $120.00 $11.00 $88.00 $30.00 $240.00 $15.00 $120.00 $10.00 $80.00 47. Remove and Reset Existing Sign Ea. 38 $186.00 $7,068.00 $163.00 $6,194.00 $260.00 $9,880.00 $250.00 $9,500.00 $163.00 $6,194.00 $225.00 $8,550.00 48. 2" PVC Conduit L.F. 2,400 $50.00 $120,000.00 $44.00 $105,600.00 $20.00 $48,000.00 $55.00 $132,000.00 $49.00 $117,600.00 $45.00 $108,000.00 49. Install No. 3.5 Pull Boxes Ea. 4 $1,000.00 $4,000.00 $900.00 $3,600.00 $500.00 $2,000.00 $1,000.00 $4,000.00 $450.00 $1,800.00 $800.00 $3,200.00 TOTAL $2,361,806.15 TOTAL $2,422,250.25 TOTAL: - $2,567,349.50 TOTAL i. $2,626,970.40 TOTAL $2,641,911.16 TOTAL $2,892,128.00 This certifies that all bids were received and opened on February 1, 2016 and that this is a copy of the bid tabulation with bids corrected for errors in addition and multiplication. By: J. Chin, Assistant Engineer Page 2 of 2 ATTACHMENT