Loading...
2MEETING DATE: 02/19/13 ITEM NO: .µ t tos..GaTa�, COUNCIL AGENDA REPORT DATE: FEBRUARY 4, 2013 TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER SUBJECT: PPW JOB NO. 10 -15 — BLOSSOM HILL ROAD IMPROVEMENTS (CHERRY BLOSSOM LANE TO CAMINO DEL CERRO) 812 -0111 AUTHORIZE THE TOWN MANAGER TO EXECUTE A CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION ACCEPTING THE WORK OF GRADETECH, INC. AND AUTHORIZE RECORDING BY THE CLERK ADMINISTRATOR RECOMMENDATION: Authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion accepting the work of Gradetech, Inc. and authorize recording by the Clerk Administrator. BACKGROUND: The Town's adopted FY 2011/12 — 2015/16 Capital Improvement Program (CIP) Budget designated grant funds for roadway improvements on Blossom Hill Road through the Caltrans Safe Route to School Program (SR2S). This project is consistent with the Town's goals to improve quality and safety of roadway infrastructure in Los Gatos. This project was designed to construct a curb, gutter, and sidewalk on the north side of Blossom Hill Road, from Cherry Blossom Lane to Camino Del Cerro, in areas where no infrastructure existed; and to construct a curb, gutter, and sidewalk on the south side of Blossom Hill Road, from Blossom Hill School to Atwood Way. . A lighted pedestrian crosswalk system was installed at the intersection of Blossom Hill Road and Hillbrook Drive to provide a safer and more functional crossing on the north side of Blossom Hill Road. In addition to the above mentioned improvements, four electronic radar message signs were installed in this section of Blossom Hill Road to address motorist and pedestrian safety concerns. PREPARED BY: TODD CAPURSO Director of Parks and Public Works Reviewed by:_j�_Assistant Town Manager. Town Attorney <0 Finance N:\PPW\A4ANAGEMENT\COUNCEL\COUNCILREPORTS\2013 Reports\ 021913\ 10- 05- BHRoad ,IMP.Final.Acceptance.docx PAGE 2 FEBRUARY 4, 2013 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 10 -05 — BLOSSOM HILL ROAD IMPROVEMENTS ,(CHERRY BLOSSOM LANE TO CAMINO DEL CERRO) 812 -0111 DISCUSSION: On December 19, 2011, the Town Council authorized a contract with Gradetech, Inc. to perform the improvements on Blossom Hill Road. The electronic radar signs that were installed have been effective in reducing speeds and increasing the awareness of motorists. The finished project has provided a much more functional infrastructure for vehicles, bicyclists, and pedestrians and has been well received by the local residents, nearby schools and community. The contracted work has been satisfactorily completed by Gradetech, Inc. and is being recommended for acceptance by the Parks and Public Works Department. Ten percent of the faithful performance bond will remain in effect for a'period of two years to guarantee any needed repair and /or replacement caused by defective materials and workmanship. The execution and recordation of the Certificate of Acceptance is now required to finalize the Town's acceptance of the project. CONCLUSION: Staff recommends that the Town Council authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion accepting the work of Gradetech, Inc. and authorize recording by the Clerk Administrator. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption will not be filed. PAGE 3 FEBRUARY 4, 2013 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 10 -05 — BLOSSOM HILL ROAD IMPROVEMENTS (CHERRY BLOSSOM LANE TO CAMINO DEL CERRO) 812 -0111 FISCAL IMPACT: This project was completed within the Council approved budget, as demonstrated in the fiscal table below. THIS PAGE INTENTIONALLY LEFT BLANK