My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010080205 - Desk Item 09-10C-FY 2009/10 Street repair and resurfacing
LFTOWN
>
Clerk
>
Council Agendas and Reports
>
2010
>
08-02
>
2010080205 - Desk Item 09-10C-FY 2009/10 Street repair and resurfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2010 4:39:35 PM
Creation date
8/2/2010 4:18:10 PM
Metadata
Fields
Template:
Clerks
Docs Ref Code
REPORTS
Item Ref
5
Doc Date
8/2/2010
Expiration Date
8/2/2010
Department
CLK
Retention #
com
Notes - Clerk
Desk Item - PPW job No. 09-10C-FY 2009/10 Street repair and resurfacing project 811-9901. Authorize the town manager to execute a construction contract with intermountain in an amount not to exceed $1,725,121. Authorize staff to execute future change orders to the construction contract as necessary in an amount not to exceed $200,000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
toW" of MEETING DATE: 08/02/10 <br />'• ITEM NO: 5 <br />>;~"' DESK ITEM <br />- ~, <br />tos ~"Ajos <br />COUNCIL AGENDA REPORT <br />DATE: AUGUST 2, 2010 <br />TO: MAYOR AND TOWN COUNCIL <br />FROM: GREG CARSON, TOWN MANAGER <br />SUBJECT: PPW JOB NO. 09-lOC - FY 2009/10 STREET REPAIR AND RESURFACING <br />PROJECT 811-9901 <br />A. AUTHORIZE THE TOWN MANAGER TO EXECUTE A <br />CONSTRUCTION CONTRACT WITH INTERMOUNTAIN IN AN <br />AMOUNT NOT TO EXCEED $1,725,121. <br />B. AUTHORIZE STAFF TO EXECUTE FUTURE CHANGE ORDERS TO <br />THE CONSTRUCTION CONTRACT AS NECESSARY IN AN <br />AMOUNT NOT TO EXCEED $200,000. <br />Attached is an e-mail from Graham Contractors Inc. regarding the bidding process for the FY <br />2009/10 Street Repair and Resurfacing project. This resurfacing involves the application of a <br />Rubber Chip Seal and a final surface of a Slurry Seal. This project was designed using technical <br />specifications that are developed and approved by Caltrans for use by the State, Counties, and <br />municipalities. This resurfacing application has been used by the Town in past years with very <br />good results and has been economical compared to an application of the typical Asphalt Overlay. <br />Graham Contractors, whose original bid was over the project budget by $273,000, then contacted <br />the Town and proposed the use of products other than the specified Caltrans-approved Asphalt <br />Rubber. Graham Contractors claimed the material would be as good as the material in the <br />project specifications and would also be a cost savings to the Town. Over the years, a number of <br />companies haue proposed resurfacing products they claim are substitutes for Caltrans-approved <br />Asphalt Rubber.. However, as part of the project design, staff verified with Caltrans that none of <br />these products are approved or are equal in quality or specification to the Asphalt Rubber. <br />This project was re-advertised and re-bid based on Town guidelines according to the formal bid <br />process. "The notice for advertising was published in the legal section of Los Gatos Weekly <br />newspaper by the Town Clerk's office and all formal procedures were followed without <br />exception. <br />PREPARED BY: TODD CAPURSO <br />Director of Parks and Public <br />Reviewed by: ~'`~ ~ Assistant Town Manager ~ ~'T{iwn Attorney <br />Clerk Administrator ~ Finance Community Development <br />N:\PPW\MANAGEMEN"ACOUNCIL\COUNCIf. REPORTS\2010 Reports\Augnst 2\09-10Cshcetresm~face.capeseaLDESK ITEM.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.