2013-048 - Adopt Addendum to the General Plan 2020 Final Environmental Impact Report
RESOLUTION 2013 -048 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING AN ADDENDUM TO THE GENERAL PLAN 2020 FINAL ENVIRONMENTAL IMPACT REPORT WHEREAS, the Town Council of the Town of Los Gatos certified and adopted a Final Environmental Impact Report (FEIR) for the 2020 General Plan by Resolution 2010 -091; and WHEREAS, the Town Council of the Town of Los Gatos adopted the 2007 - 2014 Housing Element by Resolution 2012 -008; and WHEREAS, Housing Element Action Item HOU -2.1 calls for the establishment of an Affordable Housing Overlay Zone (AHOZ) as the principal means for meeting the Town's regional share of housing needs allocation (RHNA) for persons and families of low and moderate income; and WHEREAS, the AHOZ as revised and recommend by the Town's General Plan Committee on September 25, 2013 and Planning Commission on October 9, 2013 encompass potential projects with less intensive development and less impacts than what was originally considered in the 2020 General Plan FEIR; and WHEREAS, Pursuant to Section 21166 of the California Environmental Quality Act (CEQA) and Section 15162 of the State CEQA Guidelines, after an EIR has been certified for a project, if some minor technical changes to the previously certified EIR are necessary, preparation of an Addendum to the EIR is appropriate and a supplemental EIR is not required unless there is substantial evidence that modifications to the project would substantially increase the severity of the impacts identified in the previous EIR; and WHEREAS, CEQA defines substantial evidence as facts, reasonable assumptions predicated upon facts and expert opinion supported by facts; and WHEREAS, the Town has prepared an Addendum to the 2020 General Plan FEIR in accordance with CEQA Guidelines Section 15162; and WHEREAS, the Addendum provided a detailed analysis that determined that the approval of the AHOZ would not involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects beyond those already indentified in the certified FEIR; and WHEREAS, on October 9, 2013, the Planning Commission recommended approval of the Addendum to the 2020 General Plan FEIR the Town Council; NOW, THEREFORE, BE IT RESOLVED: the Town Council of the Town of Los Gatos adopts the Town of Los Gatos General Plan 2020 FEIR Addendum attached hereto as Exhibit A. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 4`h day of November 2013, by the following vote: COUNCIL MEMBERS: AYES: Marcia Jensen, Steven Leonardis, Diane McNutt, Joe Pirzynski, and Mayor Barbara Spector NAYS: ABSENT: ABSTAIN: SIGNED: `� MAYOR OF THE T OS GATOS LOS GATOS;-tALIFORNIA ATTEST: i EL ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA September 2013 Affordable Housing Overlay Zone TOWNor LOS GATOS GENERAL PLAN 2020 FEIR ADDENDUM is- In Association with Kimley Horn and Associates Orange County • Northern California • Los Angeles/ Downtown • Los Angeles /West • Inland Empire • San Diego 1625 Shattuck Avenue, Suite 300 i Berkeley, California 94709 1 510.848.3815 i 510.848.4315(f) www.planningcenter.com TABLE OF CONTENTS I. INTRODUCTION II. ANALYSIS Appendices Appendix: Transportation and Circulation 13 TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM TABLE OF CONTENTS List ofFigunes Figure 1 Affordable Housing Overlay Zone Sites ................... ............................... 7 Figure 2 Cumulative 2020 Condition — Lane Geometry and Traffic Figure 3 Cumulative 2020 Condition — Peak Hour Turning Movements................................................................... ............................... 49 Figure 4 2020 Plus AHOZ (without Density Bonus) Peak Hour Turning Movement Volumes .................................... ............................... 55 Figure 5 2020 Plus AHOZ (with Density Bonus) Peak Hour Turning MovementVol umes .................................................... ............................... 61 List of Tables Table 1 Parcels Removed from AHOZ Consideration since Certification of the Final EIR ...................................... ............................... 4 Table 2 Allowed Density on AHOZ Parcels ............................................ 5 Table 3 Change in AHOZ Units Analyzed in the Certified Final EIR ............. 6 Table 4 Changes in Potential Housing Sites by School District ....................... 41 Table 5 Cumulative 2020 Level of Service Summary .......... ............................... 51 Table 6 Sites with Modified Densities in AHOZ ................. ............................... 54 Table 7 Trip Generation Summary at 20 Units per Acre (AHOZ without Density Bonus) .............................................. ............................... 57 Table 8 2020 Level of Service Summary at 20 Units per Acre (AHOZ without Density Bonus) .............................. ............................... 58 Table 9 AHOZ Sites with added Bonus Densities .............. ............................... 60 Table 10 Trip Generation Summary at 27 Units per Acre (AHOZ withDensity Bonus) .................................................... ............................... 63 Table 11 2020 Level of Service Summary at 27 Units per Acre (AHOZ with Density Bonus) .................................... ............................... 64 TOWN OF LOS GATOS GENERAL PLAN 1010 FE /R ADDENDUM I N T Q 0 D U C T 1 ON cil, analyzed the application of the AHOZ to nine parcels on six sites, with capacity to accommodate a total of 621 units. C. PmposedModlredPioject Since the Final FIR was certified in 2010 and Housing Element was certified by the State HCD in September 2012, the Town has been working to implement the pro- visions of the Housing Element. This effort included the development of the AHOZ program to address the remaining unmet Regional Housing Needs Alloca- tion (RHNA) since the document was adopted and certified. In the process of developing the AHOZ, the Town has updated the list of potential housing sites, which includes the designated AHOZ parcels, as well as the density allowed under the AHOZ. Table 1, Parcels Remomd fmm AHOZ Conriderakon since Certiftcatian of the F1nalEIR, shows the eight parcels, on five sites, that have been removed from con- sideration as potential AHOZ sites since the General Plan Final EIR was certified. The proposed AHOZ designations in the Housing Element Technical Appendix would be removed from these eight non - designated parcels. These parcels will continue to be listed in the Housing Element's Housing Sites Inventory since the Est is intended to be an inclusive list of potential housing opportunity sites docu- mented by the Town during 2007 -2014 Housing Element Period and is not limited only to AHOZ- designated sites. The eight non - designated opportunity sites will not be included in the AHOZ and the existing underlying General Plan land use designations and Zoning designations of these parcels will remain unchanged. 1. Sites Removed from the Final EIR AHOZ Under the proposed modified project, these parcels would not receive the AHOZ designation and their current base General Plan land use designation and zoning designations would remain unchanged. The existing land use and zoning designa- tions are: ♦ Los Gatos Courthouse: Public land use designation, Office zone ♦ Oka Road /Lark Avenue: Low Density and Medium Density Residential land use designations, R -1:S and RM -5:12 zones ♦ Swanson Ford: Mixed Use Commercial land use designation, Highway Com- mercial zone, Planned Development (CH;PD) ♦ South Bay Honda: Mixed Use Commercial land use designation, Highway Commercial zone, Planned Development (CH:PD) ♦ Dittos Lane: Mixed Use Commercial land use designation, Downtown Resi- dential zone (R 1:D) TOWN OF LOS GATOS GENERAL PLAN 2020 FEIR ADDENDUM INTRODUCTION TABLE 1 PARCELS REMOVED FROM AHOZ CONS /DERATIDN SINCE CERT/FICAT/ON OF THE FINAL EIR m Developable Allowed Realistic Decrease Acreage Density Development From GP Site Name (Acres) (units /acre) Capacity Final EIR Los Gatos 5.2 20 104 -104 Courthouse Oka Road /Lark 6.4 20 128 -128 Avenue Parcel A Oka Road /Lark 3.0 20 60 -60 Avenue Parcel B 3.0 20 60 -60 Avenue Parcel C Swanson Ford 4.5 12.7 57 -57 Single Parcel South Bay Honda 1.0 20 20 -20 Parcel South Bay Honda 0.9 20 18 -18 Parcel B Dittos Lane 1.6 20 32 -32 Total 479 -479 Source: Tom. of Los Gatos, 2013. 2. AHOZ Sites Added since the Final EIR In addition to removing some parcels from AHOZ consideration, under the modi- fied project the Town would also apply the AHOZ to the following four sites. ♦ Los Gatos Lodge Site A (single parcel) ♦ Los Gatos Lodge Site B (single parcel) ♦ Higgins Business Park (single parcel) ♦ Oak Rim /North Blossom Hill Site N (single parcel) Under the modified project, the AHOZ would continue to apply to the Southbay Development site (single parcel) that was included in the AHOZ in the certified Final FIR but at a reduced base density. Table 2, Allowed Density on AHOZ Pareelr, quantifies the effects of potential devel- opment on the site remaining from the previous evaluation of the AHOZ, the � \ \\ « ƒ^ ) \ }} ) \ 9p ; ®4 ; ! 3f: ; ; \j ! r ) {) ® )} � \ \ /)\ \ �� \\ 4I! � )]) ){ \)\ )\ \ \j /� ) [} )! �§a :) \ \( §). |} q ƒ § � �). 7 q / f @)� f ~ k \ ! � « / \ � § � \ \\ « ƒ^ ) \ }} ) \ 9p ; ®4 ; ! 3f: ; ; \j ! r ) {) ® )} � \ \ /)\ \ �� \\ 4I! � )]) ){ \)\ )\ \ \j /� ) [} )! �§a :) \ \( TOWN OF LOS GATOS GENERAL PLAN 2010 FEIR ADDENDUM I N T P 0 0 0 C T I ON Southbay Development site, as well as the additional four sites proposed for AHOZ consideration under the modified project. This Addendum considers the maximum possible development on each site for purposes of environmental evalu- ation. Figure 1, Affordable Housing Overlay Zone Sites, shows the locations of the elim- inated and currently proposed AHOZ sites fisted in Tables 1 and 2. The AHOZ designation on these sites would allow up to 20 units per acre as a base density, as evaluated in the certified Final EIR. However, a potential density bonus of up to 35 percent could be applied to the sites with the AHOZ depending on the final site development and design guidelines adopted by the Town Council. The density bonus would not automatically be applied, but could be allowed by right as a potential developer requested concession based on an individual development project conforming with the final AHOZ site development standards and design guidelines as adopted by the Town Council. The proposed modifications to the approved project that would be necessary to implement the AHOZ would allow 32 fewer affordable housing units town -wide, from 621 potential units to 619 potential units (589 new units) if the maximum density bonus were developed on all sites, as shown in Table 3, Change in AHOZ Units Analyzed in the Certifier/ Final EM. TABLE 3 CHANGE IN AHOZ UN/TS ANALYZED /N THE CERTiF /ED FWAL E/R Total Units Evaluated on AHOZ Sites in General Plan Final UAR 621 units Units Removed from AHOZ (See Table 1) - 479 units Units Added to AHOZ (See Table 2) +447 units Total Units Allowed under Modified Project 589 net new units^ Change from Units Evaluated in General Plan Final FIR -32 units A maximum of 619 units would be allowed on identified AHOZ sites under the AHOZ. New units on the Oak Rim /North Blossom Hill Site N would be in addition to the existing 30 units on the site. Therefore, of the 619 total units allowed on the sites, 589 could potentially be net new units. Source: Town of Los Gatos, 2013. City of ViT City of Monte Sereno 09x \Os TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M I N T R O D U C T I O N City of Campbell Vasona Lake County Park 9 ,,a.. Town of Los Gatos. DC E2013. Sites Proposed for Affordable Housing Overlay Zone Sites Removed from Consideration as Affordable Housing Overlay Zone E wn Boundary ter Body hway ek Development /t Oak Rim /N. Blossom Site N �L--. BLOSSOM HILL i ;gins Business Park Ltos Lodge Sites A & B City of San Jose wrN 0 0.25 0.5 Mile FIGURE I AFFORDABLE HOUSING OVERLAY ZONE SITES TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M I N T R 0 0 0 C T I O N Based on these modifications, Table 3 -1, Draft Hoxsing Element Sites, of the certified Final EIR has been updated. A revised Table 3 -1 is included on page 9 of this chapter. Changes made to the table are identified in strikeeet =tex to indicate dele- tions and in underlined text to signify additions. D. Environmental Setting This EIR Addendum addresses potential environmental impacts of amending the Town's General Plan and Town Code to adopt the AHOZ and implement the adopted Housing Element. These amendments represent a modification of the General Plan and Housing Element (the "Approved Project ") that were analyzed in the certified Final EIR. As described above, the modified project includes remov- ing some parcels from consideration as AHOZ sites, retaining one site, and adding new sites. In the interest of full disclosure, this section describes existing land uses and current land use designations on the eliminated, remaining, and new AHOZ sites. 1. Project Location The Town of Los Gatos is in Santa Clara County. It is part of the Bay Area region and lies approximately 8 miles to the southwest of San Jose, the region's largest city. It is nestled against the foothills of California's Coast Range and is located on the Bay Area's southwestern urban edge. For a more detailed description of the Town of Las Gatos and its setting, see Chapter 1 of the Los Gatos General Plan 2020, as well as Chapters 1 and 3 of the certified Final EIR. Figure 1 illustrates the location of the project area within the regional and local contexts. 2. Existing and Surrounding Land Use The predominant developed land uses in the Town of Los Gatos are residential, commercial, retail, office, medical, civic, and institutional. The following are narra- tive descriptions of existing General Plan land use designations and existing land uses on each of the AHOZ sites in the modified project. q ] \ 7 § \ / !aa !;$ +ma I a 4 a � ;IIlIIIIIIIIIII - ¢ &14 f= 10 \ ) \} « .§ $ \� \3 ƒ! . - a) � ® § 2 � )�] LL §2. � q ] \ 7 § \ / !aa !;$ +ma I a 4 a � ;IIlIIIIIIIIIII - ¢ � \3 II , ) » § § § G / m % a 4 a a q � � @ E § j 6 ± . / > - ! } ( \ § c ! \ \ \�\ E ■ § § ) a a + / ) ) \ \\ \\ } \\ \ � } (\ \ ]/ \ }! / \\ \ \\ \ \\ }\ \\ \\ \\ �\ \) \�\ 3\ /f )EZr) 7 j)){ \ \ \\ \\ TOWN OF LOS GA TO$ GENERAL PLAN 2020 FE /R ADDENDUM INTRODUCTION a. Southbay Development (Single Parcel) The Southbay Development site is a single parcel near Highway 17, Highway 85, and the site of the future Vasona Light Rail Station. The parcel is 7.4 acres and contains aging office buildings. The General Plan designates the property for High Density Residential development. The existing zoning designation is Controlled Manufacturing (CM). b. Los Gatos Lodge Site A (Single Parcel) The Los Gatos Lodge Site A is a single parcel adjacent to Los Gatos Lodge Site B. The site consists of 1.5 acres and currently contains a hotel parking lot located on the Los Gatos - Saratoga Road at Highway 17. The General Plan designates the property for Mixed Use Commercial development. The existing zoning designation is Restricted Commercial Highway, Planned Development (CH:PD). C. Los Gatos Lodge Site B (Single Parcel) The Los Gatos Lodge Site B is a single parcel adjacent to Los Gatos Lodge Site A. The site consists of 7 acres and currently contains a 129 room hotel. The General Plan designates the property for Mixed Use Commercial development. The exist- ing zoning designation is Restricted Commercial Highway, Planned Development (CH:PD). d. Higgins Business Park (Single Parcel) The Higgins Business Park site is a single parcel located on the north side of Blos- som Hill Road, adjacent to Highway 17. The site currently contains an office com- plex situated on 3.2 acres of land. The General Plan designates the property for Office Professional development. The existing zoning designation is Office (0). e. Oak Rim /North Blossom Hill Site N (Single Parcel) The Oak Rim /North Blossom Hill Site N site is a single parcel located on the north side of Blossom Hill Road. The rear lot line of the parcel abuts Highway 17. The site currently contains an apartment complex with 30 units situated on 3.8 acres of land. The General Plan designates the property for Medium Density Resi- dential development. The existing zoning designation is Multi-family Residential, 5 -12 dwelling units per acre (RM:5 -12). S. Decision to prepare an Addendum Pursuant to Section 21166 of the California Environmental Quality Act (CEQA) and Section 15162 of the State CEQA Guidelines, after an EIR has been certified II TOWN OF LOS GATOS GENERAL PLAN 1010 FEIR ADDENDUM I N T R O D U C T I O N for a project, if some minor technical changes to the previously certified EIR are necessary, preparation of an Addendum to the EIR is appropriate. A supplemental EIR is not required unless there is substantial evidence that modifications to the project would substantially increase the severity of the impacts identified in the previous EIR. Under CEQA, "substantial evidence" includes facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts. As determined through the detailed analysis of the Initial Study checklist in Chapter II of this document, the approval of the AHCZ would not involve new significant environmental effects or a substantial increase in the severity of previously identi- fied significant effects beyond those already identified in the certified Final EIR. Given this finding, an Addendum to the existing EIR has been prepared in accord- ance with CEQA Guidelines Section 15162. Therefore, this addendum to the Los Gatos General Plan 2020 EIR is sufficient. Chapter II of this Addendum contains additional explanation regarding the decision to prepare an Addendum. 12 II ANALYSIS This chapter considers the provisions of Sections 15162 and 15164 of the CEQA statutes and discusses how an addendum to the Los Gatos General Plan 2020 EIR is appropriate for the modified project. This chapter also applies the CEQA Guidelines Appendix G checklist to provide evidence to substantiate the conclu- sions set forth in this analysis. A discussion will be provided to determine whether or not the modified project is consistent with the findings contained in the General Plan EIR. A. CEQA Guidelines Sections 15162 and 15164 in the CEQA statutes provide, respectively, detailed in- formation on when subsequent EIRs must be prepared, and direction on when and how to instead issue an addendum to an EIR. This section addresses the stated requirements and instructions for the preparation of such documents, and demon- strates why the preparation of an addendum to the Los Gatos General Plan 2020 EIR is appropriate for the proposed project changes. 1. 15162. Subsequent EIRs and Negative Declarations The most applicable CEQA Guideline regarding analysis of the modified project and the appropriate level of review is from Section 15162, which provides: (a) When an EIR bat been ee#ified or a negative declaration adopted for a project, no subsequent EIR sball be prepared for that pmject unless the lead agency determines, on the bans of substan- tial evidence in the Ggbt of the mbole record, one or more of the following: (a)(1) Substantial cbanges are proposed in the pmject vhich mill require major revisions of the previous EIR or negative declaration due to the involvement of new tign,hcant envimnmental effects or a substantial increase in the seventy ofpnviously identified sign ficant ects; The proposed changes to the location of the housing sites and number of dwelling units included in the Los Gatos General Plan 2020 and Housing Element are a result of the creation of the Affordable Housing Overlay Zone (AHOZ). The AHOZ was anticipated in the General Plan. Specifically, Action HOU -2.1 in the Housing Element stipulates the need to amend the Town Code to include the AHOZ. The modified AHOZ would result in the removal of the AHOZ designa- tion from parcels on five sites, maintain the AHOZ designation for one site, apply the AHOZ designation to four new sites, and increase the maximum allowed densi- 13 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 2 0 F E I R ADDENDUM A N A L Y S I S ty on all AHOZ sites.' Overall, these modifications would result in a net decrease of 32 dwelling units from what was analyzed in the General Plan FIR and a de- crease in the total development capacity from 621 units to 619 units (589 new units) during the 2007 -2014 planning period. These changes are illustrated in Ta- bles 1, 2, and 3 of the Chapter I, Introduction, of this Addendum. The proposed change does not require major revisions of the 2010 General Plan certified Final EIR, and as substantiated in this document, the modified project would not result in new significant environmental effects or significantly increase the magnitude of previously identified significant effects whereby new mitigation measures would be required. (a)(2) Substantial changer occur with respect to the circumstances under which the project is un- dertaken which wall require major revisions of the previous EIR or Negative Declaration due to the involvement of new sign ficant environmental eectr or a substantial immase in the sevevity of premourly identified significant effects; or No substantial changes have occurred with respect to the circumstances under which General Plan 2020 was crafted and adopted, and as mentioned above, the creation of the AHOZ was anticipated as a part of the implementation of the Housing Element. As substantiated in this document, the proposed project chang- es will not require major revisions of the General Plan EIR. (a)(3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as com- plete or the Negative Declaration was adopted, shows any of the following: (a)(3)(A) The project will have one or mom significant eects not discussed in the previous EIR or negative declaration; (a)(3)(B) Significant effects previously examined will be substantially more severe than shown in the previous EM- (a) (3) (C) Mitigation measures or alternatives previous# found not to be feasible would in fact he feasible, and would substantially reduce one or more significant effects of the project, t, the project proponents decb'ne to adopt the mitigation measure or alternative; or I The base density allowed under the AHOZ would be 20 dwelling units per acre. The maximum allowed density could be reached through a 35 percent density bonus. The density bonus would not automatically be applied, but could be allowed by right as a re- quested development concession based on compliance with the AHOZ Site Development Standards and Design Guidelines as adopted by the Town Council. 14 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S (a)(3)(D) Mitigation measures or alternatives which are considerably different fmm those an- alyzed in the previous EIR would substantially reduce one or more signocant effects on the environment, but the pmjett proponents decl'ne to adopt the mitigation measure or alternative. Since the certification of the General Plan EIR, no new, previously- unknown infor- mation of substantial importance to the General Plan 2020 has come to light that will affect the mitigation measures that were adopted and the alternatives that were considered as a part of the decision - making process for the certified Final EIR. The proposed project modifications will not create new significant effects that were not previously analyzed, nor will the magnitude of impacts exceed the established thresholds of significance. No new mitigation measures are proposed, and the M d- gation Monitoring and Reporting Program adopted as a part of the certified Final EIR remains adequate to mitigate impacts caused by the modified project. The alternatives that were analyzed also remain applicable to the project and do not need to be reconsidered; the modified project does not create new impacts that would require new analysis of project alternatives. (b) If changes to a project or its circumstances occur or new information becomes available after adoption of a negative declaration, the lead agency sballprepare a subsequent EIR if required under subdivision (a). Otherwise the lead agency shall determine whether to prepare a subsequent negative declaration, an addendum, or no further documentation. Since the findings under Section 15162 subdivision (a) indicate that it is not neces- sary to prepare a subsequent EIR, the lead agency has determined that it is appro- priate to prepare an addendum to the certified Final EIR. (c) Once a project has been approved, the lead ageney's role in project approval is completed, unless farther discretionary approval on that pmjett is required Information appearing after an approval does not inquire reopening of that approval If after the pmjett is approved, any of the conditions described in subdivision (a) occurs, a subsequent EIR or negative declaration shall only be pre- pared by the pubh'c agency which grants the next discretionary approval for the project, if any. In this situation no other msponsible agency shall grant an approval for the project until the subse- quent EIR has been certified or subsequent negative declination adopted The Town of Los Gatos will be seeking discretionary approval for the modified project associated with and to amend the zoning map in order to apply a parcel - specific AHOZ to five individual parcels. As substantiated in this document, the modified project does not create new significant impacts that would require the preparation of a subsequent EIR, and an addendum to the certified Final EIR would be appropriate to satisfy CEQA. The California Department of Housing 15 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S and Community Development (HCD) is a responsible agency that certified the Town's Housing Element in September 2012, with a requirement that the Town adopt an AHOZ as noted in the Housing Element implementation action. The Town Council will consider the addendum to the certified Final FIR, in addition to the certified Final EIR in its decision - making process. (d) A .subsequent EIR or subsequent negative declaration .shall begiven the same notice and pub& review as required under Section 15087 or Section 15072. A subsequent EIR or negative decla- ration shall state where the previous document is available and can be reviewed Since the proposed modified project would require no subsequent EIR, it is not necessary to provide the notice or provide for the public review referenced in sub- division (d). 2. 15164. Addendum to an EIR or Negative Declaration (a) The lead agency or responsible agency shall prepare an addendum to a previously certified EIR f some changes or additions are necessary but none of the conditions described in Section 15162 calk'ng forpreparation of a subsequent EIR have occurred The AHOZ represents an anticipated implementing action called for in the Hous- ing Element; this EIR addendum provides additional information specifically rele- vant to the changes to the certified General Plan EIR caused by the AHOZ. As discussed above and substantiated below, none of the conditions from Section 15162 which would require a subsequent EIR are present. (b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calkng for the preparation of a subsequent EIR or negative declaration have occurred. The Los Gatos General Plan 2020 was the subject of a full EIR, not a negative declaration; therefore subsection (b) does not apply. (c) An addendum need not be circulated for pubk'c review but can be included in or attached to the final EIR or adopted negative declaration. Acknowledged. Although not required, this Addendum will be made available for public review as part of the packet for the Planning Commission and Town Coun- cil meetings at which the AHOZ will be considered. ire TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S (d) The decision making body shall consider the addendum udtb the final EIR or adopted negative declaration prior to making a decision on the project. Acknowledged. The Town Council will consider the addendum to the General Plan EIR and act on the AHOZ prior to the end of 2013. (e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead ageng s findings on the project, or elsewhere in the record The explanation must be supported by substantial evidence. The preceding discussion and the analysis below serve to explain the decision not to prepare a subsequent EIR and to demonstrate, with substantial evidence from the CEQA Appendix G checklist, why a subsequent EIR is not required. B. Appendix GCheckhst The following analysis uses the CEQA Guidelines Appendix G Environmental Checklist to demonstrate using substantial evidence, that the proposed changes caused by the AHOZ would not create new environmental impacts, or otherwise exacerbate those discussed in the certified Final EIR. Development of the modified project would result in: ♦ the removal of the AHOZ designation from eight parcels on five potential housing sites; ♦ continued application of the AHOZ to one parcel on one potential housing site that was included in the certified Final EIR; ♦ application of a site - specific AHOZ designation to four parcels on four new potential housing sites, for a total of five AHOZ parcels on five separate sites; ♦ a slight increase in the density allowed on all AHOZ sites; and ♦ a net decrease in the total number of dwelling units on the potential housing sites from what was analyzed in the certified Final EIR The proposed project does not include construction of any units, but rather, would allow construction of new housing units. 17 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 3 0 F E I R A D D E N D U M A N A L Y S I S 1. Aesthetics No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Additions Impact AESTHETICS: Would the project: a. Have a substantial adverse effect on a scenic vista? X b. Substantially damage scenic resources, including, but not limited to, trees, rock X outcroppings, and historic buildings within a state scenic highway? e Substantially degrade the existing visual character or X quality of the site and its surroundings? d. Create a new source of substantial light or glare which X would adversely affect day or dohttime views in the azea? Future development of the five parcels would be subject to the oversight and re- view processes envisioned by the goals and policies stipulated in the General Plan 2020 and established within the Town Code. They would be consistent with the Town's numerous policies which strive to: promote high quality, compatible design in order to preserve the small -town visual quality and character; protect existing scenic vistas, viewsheds, and visual resources, including views of ridgelines and other prominent features of the natural environment; and minimize potential light pollution and glare. Similar to the analysis in the certified Final EIR, adherence to existing laws and regulations would minimize potential aesthetic impacts that would be created by the proposed modified project. Therefore, the modified project would not create new aesthetic impacts that have not been previously analyzed in the certified Final FIR, and no new mitigation measures are required. IN TOWN OF L O S G A T O S G E N E R A L P L A N 1 0 2 0 F E I R ADDENDUM A N A L Y S I S 2. Agriculture and Forestry Resources Impacts to forest resources were not analyzed in the certified Final FIR as the re- quirement to analyze forest resources in environmental documents did not become effective until the adoption of the Senate Bill (SB) 97 amendments (adopted De- cember 31, 2009, effective March 18, 2010) to the CEQA Guidelines, which oc- 19 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alterative to Minor Resuhing in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Pierian. EIR Declined Additions Impact AGRICULTURE AND FORESTRY RESOURCES: Would the project: a. Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the x Farmland Mapping and Moni- toring Program of the Califor- tda Resources Agency, to non- agricultural use? b. Conflict with existing zoning for agricultural use, or a Wil- x liamson Act contract? C. Conflict with existing zoning for, or cause rezoning of, for- est land (as defined in Public Resources Code section 12220(8)), timberland (as de- fined by Public Resources x Code section 4526), or timber- land zoned Timberland Pro- duction (as defined by Gov - emment Code section 51104(5))? d. Result in the loss of forest land or conversion of forest land to x non forest use? e. Involve other changes in the existing environment which, due to their location or nature, could result in conversion of R Farmland, to non - agricultural use or conversion of forest Impacts to forest resources were not analyzed in the certified Final FIR as the re- quirement to analyze forest resources in environmental documents did not become effective until the adoption of the Senate Bill (SB) 97 amendments (adopted De- cember 31, 2009, effective March 18, 2010) to the CEQA Guidelines, which oc- 19 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S curred after the commencement of the General Plan 2020 Update and EIR. Prior to the adoption of SB 97, forest resources had not yet been generally recognized as an environmental issue. Therefore, the analysis to impacts on forest resources is new in this addendum. Since little agricultural land remains in Los Gatos, the General Plan FIR addressed agricultural impacts under the Land Use and Planning environmental topic. The EIR found one significant impact related to agricultural resources. It was deter- mined that the conversion of Unique Farmland to other uses in the North Forty Specific Plan Area would constitute a significant and unamirlable impact and that no feasible mitigation measure existed. None of the parcels associated with the modi- fied project are within the North Forty Specific Plan Area. Additionally, none of the sites include parcels that are designated as Prime, Unique, or Farmland of Statewide Importance; agriculturally zoned; or designated as Williamson Act land; forest land; timberland; or timberland zoned for Timberland Production. All pro- posed AHOZ parcels under consideration in the modified project are disturbed and have been developed with urban uses. Development of the modified project would continue to be subject to the oversight and review processes envisioned by the General Plan and established within the Town Code. Its implementation would not alter or substantially worsen the signif- icant impact to agricultural resources specified in the EIR or any other agricultural and forestry resource impact. The modified project would not result in new im- pacts to agricultural and forestry resources. No new significant impact would oc- cur, and no new mitigation measures are required. 3. Air Quality No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Changein New New Project or Information Mitigation or Circumstances Showing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effectu or No Issues Effects Previous EIR Declined Additions Lannert available, the significance criteria established by the applicable air quality district may be relied N11 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 3 0 F E I R ADDENDUM A N A L V$ 1 S viome, any an qut ury s or contribute eubstantic an existing or projected X c. o esutun a cummanvety con- siderable net increase of any criteria pollutant for which the project region is non - attainment under an applicable X federal or state ambient as quality standard (including re- leasing emissions which exceed quantitative thresholds for ozone precursors)? d. Expose sensitive receptors to substantial pollutant concen- X centers? e. Create objectionable odors affecting a substantial number X Implementation of the modified project could generate new short -term (construc- tion- related) emissions, as well as long -term (operation - related) emissions. The individual developments would be required to be consistent with federal, State, and regional policies, goals, and actions, including those set by the Bay Area Air Quality Management District (BAAQMD). They would also be required to comply with the goals, policies, and actions of the Los Gatos General Plan. Through the envi- ronmental review process for the individual projects, additional mitigation may be required to further reduce emissions and potential project -level impacts. However, at this programmatic level of analysis, because the modified project would result in a net decrease of 32 housing units, the impacts associated with the modified project would be similar to or less severe than those analyzed in the certified Final EIR 21 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Cimu mantes Showing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Addition. Impact determinations. Would the project a. Conflict with or obstruct implementation of the appli- X viome, any an qut ury s or contribute eubstantic an existing or projected X c. o esutun a cummanvety con- siderable net increase of any criteria pollutant for which the project region is non - attainment under an applicable X federal or state ambient as quality standard (including re- leasing emissions which exceed quantitative thresholds for ozone precursors)? d. Expose sensitive receptors to substantial pollutant concen- X centers? e. Create objectionable odors affecting a substantial number X Implementation of the modified project could generate new short -term (construc- tion- related) emissions, as well as long -term (operation - related) emissions. The individual developments would be required to be consistent with federal, State, and regional policies, goals, and actions, including those set by the Bay Area Air Quality Management District (BAAQMD). They would also be required to comply with the goals, policies, and actions of the Los Gatos General Plan. Through the envi- ronmental review process for the individual projects, additional mitigation may be required to further reduce emissions and potential project -level impacts. However, at this programmatic level of analysis, because the modified project would result in a net decrease of 32 housing units, the impacts associated with the modified project would be similar to or less severe than those analyzed in the certified Final EIR 21 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S Although housing on the Los Gatos Lodge sites would be adjacent to two road- ways with more than 10,000 vehicles per day (Highway 17 and Saratoga -Los Gatos Road), fine particulate matter (PM,.,) and cancer risks would be below the screen- ing thresholds established by BAAQMD's Risk and Hazard Screening Analysis guidelines. Therefore, a Health Risk Assessment would not be required prior to approval of housing on this site. Housing on the Oak Rim /North Blossom Site N and Higgins Business Park site would be adjacent to Highway 17 and exceed the BAAQMD screening thresholds for cancer risks and PM2.5. BAAQMD's CEQA guidelines would recommend that future development projects on these sites conduct a site - specific Health Risk As- sessment to determine whether proposed housing would expose sensitive receptors to significant risks, prior to approval of a specific housing project on these sites. The certified Final EIR found that implementation of General Plan 2020 would have a tigmfrtant and unavoidable impact under air quality threshold (a). Though the General Plan itself would contain a variety of provisions to reduce vehicle miles traveled, these provisions would be insufficient to reduce the impact to less than significant It was further determined that there were no feasible mitigation measures for this significant impact. Implementation of the proposed modifica- tions would result in a net decrease in the number of new units and associated con- struction activity, and would therefore not worsen this or any other air quality im- pact, not would it result in new significant impacts to air quality. Therefore, technical changes to the air quality analysis in the General Plan EIR are not required, and no new mitigation measures are necessary. 4. Biological Resources No Additional Subsequentor Envirovioental Supplemental EIR Required Analysis Required 22 Substantial New Change in New Mitigation Projector lnfoaotd.. or Circumstances Showing Ahemadve Minor Resulting in Greater, m Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Additions Impact BIOLOGICAL RESOURCES: Would the project: a. Have a substantial adverse effect, either directly or through habitat X 22 TOWN OF G E N E R A L PLAN 2 0 2 0 F E I R identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or LOS G A T O S ADDENDUM A N A L Y S I S on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by R the California Department of Fish and Game or U.S. Fish and Wildlife Service? c. Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, mush, vernal pool, R coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native X resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e. Confbct with anv local ..tries or ordinances protecting bi resources, such as a tree Dreservation nohcv or of adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or stare habitat conservation plan? X The parcels that would be subject to the modified project are already disturbed and have been developed with urban uses. The parcels are not within areas identified with special -status plant and wildlife species, wetlands, or wildlife movement corri- 23 No Additional Subsequentor Environmental Supplemental EIR Required Analysis Required Substantial New Change in New Mitigation Projector Information or Circumstances Showing Alternative Minor Resulting in Greater to Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Effects Previous EIR Declined Additions Impact on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by R the California Department of Fish and Game or U.S. Fish and Wildlife Service? c. Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, mush, vernal pool, R coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native X resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e. Confbct with anv local ..tries or ordinances protecting bi resources, such as a tree Dreservation nohcv or of adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or stare habitat conservation plan? X The parcels that would be subject to the modified project are already disturbed and have been developed with urban uses. The parcels are not within areas identified with special -status plant and wildlife species, wetlands, or wildlife movement corri- 23 TOWN OF LOS GATOS G E N E R A L P L A N 3 0 1 0 F E I R ADDENDUM A N A L Y S I S dors and nursery sites. Development of each parcel would be subject to the over- sight, review processes, and regulations that are envisioned by the General Plan; established within the Town Code (including the Tree Protection Ordinance); and /or otherwise required by State and federal statutes, including those for endan- gered species protection. Implementation of the modified project would therefore neither cause new impacts to biological resources nor exacerbate any existing im- pacts. Technical changes to the biological resources analysis in the certified Final EIR are not required, and no new mitigation measures are required. 5. Cultural Resources c. vuecuy ur utuaeary uca.y a unique paleontological re- X source or site or unique geo- logic feature? interred out X cemeteries? The parcels that would be subject to the modified project are not in any historic districts and have already been disturbed with urban uses. Implementation of the modified project would not contravene any aspects of the General Plan, including historic preservation, pre - construction review, and /or land -use that could cause increased potential to impact cultural resources. Development allowed by the AHOZ on the five parcels would be subject to the oversight and review processes envisioned by the General Plan and established within the Town Code. Additional- ly, development would be required to cease construction or other ground- 24 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circ mstanees Showing Ahemative m Resulting in Greater Reduce Minor No New Significant Significant Technical Change/ Significant Effects than Effect is Changes or No Issues Effects Previous EIR Declined Additions Impact CULTURAL RESOURCES: Would the project: a. Cause a substantial adverse change in the significance of a X historical resource as defined in 15064.57 b. Cause a substantial adverse change in the significance of an X archaeological resource pursu- ant to 6 15064.57 c. vuecuy ur utuaeary uca.y a unique paleontological re- X source or site or unique geo- logic feature? interred out X cemeteries? The parcels that would be subject to the modified project are not in any historic districts and have already been disturbed with urban uses. Implementation of the modified project would not contravene any aspects of the General Plan, including historic preservation, pre - construction review, and /or land -use that could cause increased potential to impact cultural resources. Development allowed by the AHOZ on the five parcels would be subject to the oversight and review processes envisioned by the General Plan and established within the Town Code. Additional- ly, development would be required to cease construction or other ground- 24 TOWN OF L O S G A T O S G E N E R A L P L A N 1 0 2 0 F E I R A D D E N D U M nNALYSIS disturbing activities, and immediately report upon any discovery of potentially sig- nificant cultural, paleontological, or Native American resources. Such discoveries would also continue to be subject to the jurisdiction of anthropological or tribal experts, who would be responsible for inspection and potential relocation of dis- covered cultural resources. Implementation of the modified project would there- fore neither cause new impacts to cultural resources, nor exacerbate any existing impacts. Technical changes to the cultural resources analysis in the certified Final EIR are not required, and no new mitigation measures are required. 6. Geology and Soils a. Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: earthquake fault, as dchne- ated on the most recent Alquist- Priolo Earthquake Fault Zoning Map, issued by the State Geologist for X the area or based on other substantial evidence of a known fault? Refer to Di- vision of Mines and Geol- ogy Special Publication 42. ii. Strong seismic ground - 1 -, --- , X in. Seismic - related ground failure, including hquefac- X iv. Landslides? X b. Result in substantial soil ero- X Sion or the loss of topsoil? 25 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Infuriation Mitigation or Circumstances Showing Alteroative m Resulting in Greater Reduce Minor No New Significant Significant Technical Change/ Significant Effects than Effect is Changes or No Issues Effects Pren us EIR Declined Additions Impact GEOLOGY & SOILS: Would the project a. Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: earthquake fault, as dchne- ated on the most recent Alquist- Priolo Earthquake Fault Zoning Map, issued by the State Geologist for X the area or based on other substantial evidence of a known fault? Refer to Di- vision of Mines and Geol- ogy Special Publication 42. ii. Strong seismic ground - 1 -, --- , X in. Seismic - related ground failure, including hquefac- X iv. Landslides? X b. Result in substantial soil ero- X Sion or the loss of topsoil? 25 TOWN OF LOS GATOS G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required d. be located on expansive sod, as defined in Table 18 -1 -B of the Uniform Budding Code (1994), X creating substantial risks to life or mosa rr,? quately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disoosal of waste water? Bi The parcels that would be subject to the modified project are disturbed and feature existing urban uses, and are located within broader areas characterized by other urban uses. Implementation of individual projects would be subject to the over- sight and review processes and standards that are envisioned by the General Plan, established within the Town Code, and /or otherwise required by the California Building Code. They would not contravene any aspects of the General Plan, in- cluding land -use designations, allowed uses, or pre- construction review that address geology- and soils - related impacts. None of the parcels which are proposed to receive an AHOZ designation under the modified project are located within a designated Alquist - Priolo fault zone or within areas identified as being prone to landslides; therefore, there would be no impact in either regard. Even so, all of the AHOZ sites could potentially be ex- posed to strong seismic shaking in the event of a large earthquake on a nearby fault. Additionally, several of the potential AHOZ parcels are located in areas that are identified as potentially susceptible to liquefaction in the event of an earthquake. Nevertheless, these impacts would be mitigated to a less - than - significant level, as 26 Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alternative to Resulting in Greater Reduce Minor No New Significant Significant Technical Change/ Significat, Effects than Effect is Changes or No Issues Effects Previous EIR Declined Additions Impact c. Be located on a geologic uttit or soil that is unstable, or that would become unstable as a result of the project, and po- X sensually result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or col- d. be located on expansive sod, as defined in Table 18 -1 -B of the Uniform Budding Code (1994), X creating substantial risks to life or mosa rr,? quately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disoosal of waste water? Bi The parcels that would be subject to the modified project are disturbed and feature existing urban uses, and are located within broader areas characterized by other urban uses. Implementation of individual projects would be subject to the over- sight and review processes and standards that are envisioned by the General Plan, established within the Town Code, and /or otherwise required by the California Building Code. They would not contravene any aspects of the General Plan, in- cluding land -use designations, allowed uses, or pre- construction review that address geology- and soils - related impacts. None of the parcels which are proposed to receive an AHOZ designation under the modified project are located within a designated Alquist - Priolo fault zone or within areas identified as being prone to landslides; therefore, there would be no impact in either regard. Even so, all of the AHOZ sites could potentially be ex- posed to strong seismic shaking in the event of a large earthquake on a nearby fault. Additionally, several of the potential AHOZ parcels are located in areas that are identified as potentially susceptible to liquefaction in the event of an earthquake. Nevertheless, these impacts would be mitigated to a less - than - significant level, as 26 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A l V 5 1 5 addressed in the General Plan EIR. Specifically, the policies, regulations, and re- quirements of the Safety Element of the General Plan and the California Building Code would continue to ensure that new development analyze local liquefaction, seismic, and other soils - related risks and undertake appropriate development and construction techniques adequate to mitigate these hazards. Adherence to these policies and regulations would likewise ensure no new impacts would occur as a result of unstable soils, soil spreading, or expansive soils. By complying with these General Plan policies and State regulations there would therefore be no change to these particular impacts as analyzed by the General Plan EIR, and they would re- main lest than significant. The same General Plan and State policies and regulations discussed above would also serve to prevent impacts related to erosion and topsoil loss. Individual pro- jects would be required to demonstrate compliance with all applicable local, region- al, and State regulations, including best practices for the prevention of erosion and runoff related to both construction activities and to ongoing stormwater drainage. Finally, all potential AHOZ- designated parcels would be served by municipal sewer systems, and there would therefore be no impact in regard to the ability of area soils to support septic systems. By complying with these General Plan policies and State regulations, there would therefore be no change to these particular impacts as analyzed by the General Plan EIR, and they would remain less than significant. Given all of the above, it is concluded that implementation of the modified project would neither cause new geological and soils impacts nor exacerbate any existing ones. Technical changes to the geology and soils analysis in the certified Final EIR are not required, and no new mitigation measures are required. 7. Greenhouse Gas Emissions EMISSIONS: Would the No Additional Subsequentor Environmental Supplemental EIR Requited Analysis Required Substantial New New Change in Information Mitigation or Projector Showing Alteroative to Minor Ciecumstanees Greater Reduce Technical No Resulting in Significant Significant Changes Change/ New Significant Effects than Effect is or No Effects Previous EIR Declined Additions Impact 27 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 3 0 F E I R ADDENDUM A N A L Y S I S Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. Development of the AHOZ parcels would not generate enough GHG emissions on its own to influence global climate change significantly; hence, the issue of glob- al climate change is by definition a cumulative environmental impact. The General Plan EIR found that implementation of General Plan 2020 would have a .fignicant and unavoidable impact to GHG emissions until a climate action plan is prepared. The Town has adopted a Sustainability Plan to mitigate impacts to GHG emis- sions. The Sustainability Plan will actively serve to reduce GHG emissions to be- low levels set by adopted State legislation and would therefore mitigate GHG emis- sions within the Town limits. Any development allowed under the AHOZ would be required to be consistent with the measures in the adopted Sustainability Plan. The modified project would result in a net decrease in the number of housing units and therefore overall vehicle miles traveled (VIu1T) analyzed in the certified Final EIR. Adherence to the Sustainability Plan, the General Plan, and statewide measures, including the Building and Energy Efficiency Standards (part of the Cali- fornia Building Code) and the California Green Budding Code (CALGreen) adopt- ed for the purpose of reducing GHG emissions would adequately ensure that the modified project would neither cause significant new GHG emissions impacts nor exacerbate any existing impacts. Technical changes to the certified Final EIR are not required, and no new mitigation measures are required. ®. No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial New New Change in Information Mitigation or Projector Showing Altemative to Minor Circumstances Greater Reduce Technical No Resulting in Significant Significant Changes Change/ New Significant Effects than Effect is or No Issues Effecs Previous EIR Declined Additions Impact a. Generate greenhouse gas entissions, either directly or indirectly, that may have a X significant impact on the eu- vnonment? b. Conflict with an applicable plan, policy, or regulation adopted for the purpose of X reducing the emissions of Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. Development of the AHOZ parcels would not generate enough GHG emissions on its own to influence global climate change significantly; hence, the issue of glob- al climate change is by definition a cumulative environmental impact. The General Plan EIR found that implementation of General Plan 2020 would have a .fignicant and unavoidable impact to GHG emissions until a climate action plan is prepared. The Town has adopted a Sustainability Plan to mitigate impacts to GHG emis- sions. The Sustainability Plan will actively serve to reduce GHG emissions to be- low levels set by adopted State legislation and would therefore mitigate GHG emis- sions within the Town limits. Any development allowed under the AHOZ would be required to be consistent with the measures in the adopted Sustainability Plan. The modified project would result in a net decrease in the number of housing units and therefore overall vehicle miles traveled (VIu1T) analyzed in the certified Final EIR. Adherence to the Sustainability Plan, the General Plan, and statewide measures, including the Building and Energy Efficiency Standards (part of the Cali- fornia Building Code) and the California Green Budding Code (CALGreen) adopt- ed for the purpose of reducing GHG emissions would adequately ensure that the modified project would neither cause significant new GHG emissions impacts nor exacerbate any existing impacts. Technical changes to the certified Final EIR are not required, and no new mitigation measures are required. ®. TOWN OF LOS GATOS G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L V 5 1 S 8. Hazards and Hazardous Materials we No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Project or let ..do. Mitigation or Circumstances Showing Alremadve to Resulting in Greater Reduce Mirror No New Significant Significant Technical Change/ Significant Effects than Effect is Changes or No Issues Effects Previous EIR Declined Additions Impact FIAZARDS & HAZARDOUS MATERIALS: Would the project a. Create a significant bazard to the public or the environment through the routine transport, X use, or disposal of hazardous materials? b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions X involving the release of haz- ardous materials into the envi- ronment? c. Emit hazardous emissions or handle hazardous or acutely hazardous materials, substanc- es, or waste within one - quarter X mile of an existing or proposed school? d. Be located on a site which is included on a Est of hazardous materials sites compiled pursu- ant to Government Code Sec- tion 65962.5 and, as a result, X would it create a significant hazard to the public or the en- vironmem? e. For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use X airport, would the project re- sult in a safety hazard for peo- ple residing or working in the pro, area? f For a project within the vicinity of a private airstrip, would the project result in a safety hazard X for people residing or working in the project area? we TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S 9. No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Changein New New Projector Information Mitigation or Cimumsta.ces Showing Alternative to Resulting in Greater Reduce Minor No New Significant Significant Technical Change/ Significant Ef ,cts than Effect is Changes or No Issues Effects Previous EIR Declined Additions Impact physically interfere with an adopted emergency response plan or emergency evacuation Expose people or structures to a significant risk of loss, injury or death involving wildland are adjacent to urbanized areas or where residences are inter - mixed with wddlands? The potential AHOZ parcels are disturbed and feature existing urban uses, and are located within broader areas characterized by other urban uses. The parcels are not on wildland /urban areas and are not near any airports or private airstrips. None of the potential AHOZ parcels are located within one - quarter rode of any the six re- maining leaking underground fuel tank (LUF"I) sites identified by the General Plan EIR. Additionally, the modified plan would relate strictly to residential uses and would not result in the development of land uses typically associated with hazard- ous materials handling, transportation, or storage. The development of these resi- dential uses would result in fewer new units than what was analyzed in the General Plan EIR, and there would be no new impacts to emergency response, evacuations, or general preparedness. Moreover, compliance with existing federal, State, and regional laws and regula- tions, as well as goals and policies proposed in the General Plan 2020 would reduce potential risks and impacts associated with hazardous materials. Project implemen- tation would not contravene any aspects of the General Plan, including land -use designations, allowed uses, or oversight procedures that address hazards and haz- ardous materials. Additionally, each project would be subject to the oversight and review processes, and standards that are envisioned by the General Plan, estab- lished within the Town Code, and /or otherwise required by the federal and State regulations. Implementation of the modified project would therefore neither cause 30 TOWN OF LOS GATOS G E N E R A L P L A N 2020 F E I R ADDENDUM A N A L Y S I S new hazards and hazardous materials impacts nor exacerbate any existing ones. Technical changes to the hazards and hazardous materials analysis in the certified Final EIR are not required, and no new mitigation measures are required. 9. Hydrology and Water Quality water supplies or interfere sub- stantially with groundwater re- charge such that there would be a net deficit in aquifer vol- ume or a lowering of the local groundwater table level (e.g., X the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been panted)? c. Substantially alter the existing drainage pattern of the site or area, including through the al- teration of the course of a X stream or river, in a reamer which would result in a sub- stantial erosion or siltation on- or off -site? d. Substantially alter the existing drainage pattern of the site or area, including through the a]- teration of the course of a stream or river, or substantially X increase the rate or amount of surface nu off in a manner which would result in flooding on- or off- ite? 31 No Additional Subsequent or Enviroumental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Insinuation Mitigation or circumstances Showing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Additions Impact HYDROLOGY & WATER QUALITY: Would the project: a. Violate any water quality standards or waste discharge X water supplies or interfere sub- stantially with groundwater re- charge such that there would be a net deficit in aquifer vol- ume or a lowering of the local groundwater table level (e.g., X the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been panted)? c. Substantially alter the existing drainage pattern of the site or area, including through the al- teration of the course of a X stream or river, in a reamer which would result in a sub- stantial erosion or siltation on- or off -site? d. Substantially alter the existing drainage pattern of the site or area, including through the a]- teration of the course of a stream or river, or substantially X increase the rate or amount of surface nu off in a manner which would result in flooding on- or off- ite? 31 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S f Otherwise substantially de- grade water quality? X g. Place housing within a 100 year flood hazard area as mapped on a federal Flood X Hazard Boundary or Flood In- surance Rare Map or other Place within a 100 -year flood hazard area structures which would impede or redirect flood X t. expose people or structures to a significant risk of loss, injury or death involving flooding, X including flooding as a result of the failure of a levee or dam? j. Inundation by seiche, tsunami, or mud6.w? X Compliance with existing federal, State, and local water quality regulations, includ- ing those specified in the General Plan 2020, would minimize potential water quah- ty impacts associated with construction and operation of the modified project. The proposed modification would result in new residential uses, the construction and operation of winch would be subject to applicable local, State, and federal stand- ards and best practices for managing on- and off -site water quality. These residen- tial uses would therefore not contribute to new or exacerbated water quality im- pacts. Additionally, the modified project would not result in new ground water usage in the immediate vicinity, and, as discussed in the General Plan EIR, applica- tion of General Plan policies related to mnoff and groundwater recharge would prevent negative development - related impacts to groundwater, drainage patterns, 32 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Changein New New Projector Information Mitigation or Circumstances Shneing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Additions Impact e. Create or contribute mnoff water which would exceed the capacity of existing or planned storm water drainage systems X or provide substantial addi- tional sources of polluted run- off? f Otherwise substantially de- grade water quality? X g. Place housing within a 100 year flood hazard area as mapped on a federal Flood X Hazard Boundary or Flood In- surance Rare Map or other Place within a 100 -year flood hazard area structures which would impede or redirect flood X t. expose people or structures to a significant risk of loss, injury or death involving flooding, X including flooding as a result of the failure of a levee or dam? j. Inundation by seiche, tsunami, or mud6.w? X Compliance with existing federal, State, and local water quality regulations, includ- ing those specified in the General Plan 2020, would minimize potential water quah- ty impacts associated with construction and operation of the modified project. The proposed modification would result in new residential uses, the construction and operation of winch would be subject to applicable local, State, and federal stand- ards and best practices for managing on- and off -site water quality. These residen- tial uses would therefore not contribute to new or exacerbated water quality im- pacts. Additionally, the modified project would not result in new ground water usage in the immediate vicinity, and, as discussed in the General Plan EIR, applica- tion of General Plan policies related to mnoff and groundwater recharge would prevent negative development - related impacts to groundwater, drainage patterns, 32 TOWN OF LOS GATOS G E N E R A L P L A N 1 0 2 0 F E I R ADDENDUM A N A L Y S 1 S and polluted runoff. None of the sites would experience development that would alter the drainage pattern or course of a stream or river. One proposed AHOZ parcel, the Southbay Development Site, includes a small area that falls within the 100 -year floodplain of Los Gatos creek. However, the policies of the General Plan would ensure that development would either not take place in the 100 year flood plain, or would be required to show it adequately miti- gates potential flooding impacts. Given the small area of this site which falls within the floodplain, site design, including situating occupied structures away from the flood zone, would be able to easily preclude any development in the vulnerable area. The modified project would therefore not result in construction of housing or buildings within a 100 -year flood hazard area. No other potential AHOZ par- cels are within a 100 -year flood hazard area. Since all of the proposed AHOZ parcels are within the inundation areas of the Lenihan and /or Vasona dams, allowing development on these parcels has the po- tential to expose structures and occupants to flood hazards in the event of dam failure. However, each of these projects would be subject to the oversight and review processes, and standards that are envisioned by the General Plan, estab- lished within the Town Code, and /or otherwise required by State and federal regu- lations. Through the environmental review process for the individual projects, additional mitigation may be required to further reduce impacts and risks associated with placing the subject housing developments within dam inundation areas. There are no areas of Los Gatos that have been identified as vulnerable to tsunami or seiche. None of the proposed AHOZ sites are located in areas characterized by steep hillsides or significant grades, and all sites are located one - quarter mile or greater from areas with significant topography. Additionally, conformance with the policies of the General Plan would serve to prevent conditions conducive to mud- slides, further reducing potential impacts. Therefore, potential impacts from these phenomena would be unchanged from the General Plan EIR and would remain lest tban significant. Overall, the modified project would not contravene any aspects of the General Plan, including land use designations, allowed uses, or oversight procedures that address hydrology and water quality. Implementation of the modified project would therefore neither cause new hydrology or water quality impacts, nor exacer- bate any existing ones. Technical changes to the hydrology and water quality analy- sis in the certified Final EIR are not required, and no new mitigation measures are required. 33 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S 1 5 10. Land Use and Planning The modified project would apply an overlay zoning district to identified parcels to allow housing and would not involve the construction of physical features (e.g. major roadways or infrastructure projects) that would create barriers within existing neighborhoods. The proposed AHOZ sites are located such that they do not in- tervene between any established communities. The proposed AHOZ sites are not located in areas of sensitive habitats or species and would not conflict any applica- ble habitat or natural community conservation plan. The certified Final EIR found that implementation of General Plan 2020 would have a significant and unamidable impact in regard to the conversion of unique farmland in the North Forty Specific Plan Area to urban use and that no feasible mitigation measure existed. However, none of the proposed AHOZ parcels are within this Specific Plan area. The modi- fied project would therefore not contravene any aspects of the General Plan or of other adopted plans, including land -use designations, allowed uses, or oversight procedures. Moreover, individual projects would be subject to the oversight and review processes and standards that are envisioned or established by the General 34 No Additional Subsequentor Envimnmeutal Supplemental EIR Required Analysis Required Substantial Changein New New Projector Information Mitigation or Circumstances Showing Almmative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is c No Issues Effects Previous EIR Declined Additions Impact LAND USE & PLANNING: Would the project: a. Physically divide an established community? X b. Conflict with any applicable land use plan, policy, or regula- tion of an agency with jurisdic- tion over the project (includ- ing, but not limited to the gen- eral plan, specific plan, local X coastal program, or zoning or- dinance) adopted for the pur- pose of avoiding or mitigating an environmental effect? c. Conflict with any applicable habitat conservation plan or natural community conserva- X The modified project would apply an overlay zoning district to identified parcels to allow housing and would not involve the construction of physical features (e.g. major roadways or infrastructure projects) that would create barriers within existing neighborhoods. The proposed AHOZ sites are located such that they do not in- tervene between any established communities. The proposed AHOZ sites are not located in areas of sensitive habitats or species and would not conflict any applica- ble habitat or natural community conservation plan. The certified Final EIR found that implementation of General Plan 2020 would have a significant and unamidable impact in regard to the conversion of unique farmland in the North Forty Specific Plan Area to urban use and that no feasible mitigation measure existed. However, none of the proposed AHOZ parcels are within this Specific Plan area. The modi- fied project would therefore not contravene any aspects of the General Plan or of other adopted plans, including land -use designations, allowed uses, or oversight procedures. Moreover, individual projects would be subject to the oversight and review processes and standards that are envisioned or established by the General 34 _»s3&�Er!V_ --F. G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A A LYI!S Plan, other applicable plans, or the Town Code. Implementation of the modified project would therefore not lead to new impacts or substantially worsen existing impacts that divide an established community, conflict with any land use plans, or conflict with any habitat or natural community conservation plans. Technical changes to the land use and planning analysis in the certified Final FIR are not required, and no new mitigation measures are required. 11. Mineral Resources No Additional Subsequentor Environmental Supplemental EIR Required Analysis Required Analysis on mineral resources was scoped out of the certified Final EIR because it was determined that it is not significant in Los Gatos. Nonetheless, the AHOZ parcels are disturbed and feature existing urban uses, and are located within broad- er areas characterized by other urban uses. These sites are not mineral extraction or recovery sites. Additionally, mineral or other resource extraction would not be compatible with the surrounding uses of the sites. Therefore, implementation of the modified project would not create a loss in availability of mineral resources. Additionally, individual projects would be subject to the oversight and review pro- cesses, and standards that are envisioned by the General Plan, established within the Town Code, and /or otherwise required by the federal and State regulations. Implementation of the proposed modifications would therefore neither cause new 35 Suh uand.1 Change in Project or New New Circ mstsn Information Mitigation or Showing Alternative to Resulting in Greater Reduce Min No New Significant Significant Technical Change/ Significant, ERec" than Effect is Changes or No Issues Effre" Previous EIR Declined Additions Impact MINERAL RESOURCES: Would the project a. Result In the loss of availability of a known mineral resource that would be a value to the X region and the residents of the state? b. Result in the loss of availability of a locally important nuneral resource recovery site delineat- X ed on a local general plan, spe- cific plan or other land use Analysis on mineral resources was scoped out of the certified Final EIR because it was determined that it is not significant in Los Gatos. Nonetheless, the AHOZ parcels are disturbed and feature existing urban uses, and are located within broad- er areas characterized by other urban uses. These sites are not mineral extraction or recovery sites. Additionally, mineral or other resource extraction would not be compatible with the surrounding uses of the sites. Therefore, implementation of the modified project would not create a loss in availability of mineral resources. Additionally, individual projects would be subject to the oversight and review pro- cesses, and standards that are envisioned by the General Plan, established within the Town Code, and /or otherwise required by the federal and State regulations. Implementation of the proposed modifications would therefore neither cause new 35 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S mineral resource impacts, nor exacerbate any existing ones. No new mitigation measures are required. 12. Noise a. Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable generation of excessive groundbome vibration or c. A substantial permanent in- crease in ambient noise levels in the project vicinity above levels existing without the pro- X X 13 m. n suustannai temporary or periodic increase in ambient noise levels in the project vi- g entity above levels existing without the project? e. For a project located within an airport land use plan or, where such a plan has not been adopted, within two mules of a public airport or public use g airport, would the project ex- pose people residing or work- ing in the project area to ex- For a project within the vicini- ty of a private airstrip, would the project expose people re- siding or working in the pro- ject area to excessive noise lev- c X No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous FIR Declined Additions Imnaet NOISE: Would the project: a. Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable generation of excessive groundbome vibration or c. A substantial permanent in- crease in ambient noise levels in the project vicinity above levels existing without the pro- X X 13 m. n suustannai temporary or periodic increase in ambient noise levels in the project vi- g entity above levels existing without the project? e. For a project located within an airport land use plan or, where such a plan has not been adopted, within two mules of a public airport or public use g airport, would the project ex- pose people residing or work- ing in the project area to ex- For a project within the vicini- ty of a private airstrip, would the project expose people re- siding or working in the pro- ject area to excessive noise lev- c X TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S Construction and operation of individual developments under the modified project would generate both temporary and permanent noise and vibration impacts. The modified project would allow residential development on the Los Gatos Lodge Sites A and B, Oak Rim /North Blossom Site N, and Higgins Business Park sites. Portions of these Los Gatos Lodge sites are be within the 60 dB CNEL contour of Highway 17 and Saratoga — Los Gatos Road, with the parts of the sites closest to Highway 17 within the 65 dB CNEL contour of highway 17. The Oak Rim /North Blossom Site N and Higgins Business Park sites are within the 65 dB CNEL con- tour of Highway 17, with the parts of the sites closest to Highway 17 within the 70 dB CNEL contour of Highway 17. These noise levels are "conditionally accepta- ble" according to the Noise Element of General Plan 2020 and multifamily residen- tial development within these noise contours would require special study and miti- gation prior to approval. However, compliance with the goals, policies, and actions of the General Plan, the Town's Noise Ordinance, and California Noise Insulation Standards would control these impacts, there would be no change from the impacts analyzed under the cer- tified Final FIR, and these noise impacts would therefore remain lest than significant. Individual projects would be subject to the oversight and review processes, and standards that are envisioned by the General Plan, established within the Town Code, and /or otherwise required by the federal and state regulations. In compli- ance with local and State standards, individual projects would be required to ensure interior and exterior noise levels consistent with applicable land use compatibility standards. Additionally, the modified project would not contravene any aspects of the General Plan, including land -use designations, allowed site uses, noise limits, or other restrictions that address noise and vibration impacts. Implementation of the modified project would therefore neither cause new noise impacts, nor exacerbate any existing ones. Technical changes to the noise and vibration analysis in the cer- tified Final EIR are not required, and no new mitigation measures are required. 37 TOWN OF LOS G A T O S G E N E R A L P L A N 1 0 2 0 F E I R ADDENDUM A NA L 515 13. Population and Housing POPULATION & HOUSING: Would the a. Induce substantial population growth in an area, either direct- ly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or of existing housing, necessitat- ing the construction of re- of people, necessitating the X construction of replacement housing elsewhere? The modified project would result in a decrease of 32 dwelling units and approxi- mately 75 persons below what was previously analyzed in the certified Final EIR.2 This decrease of 32 units would not induce population growth in Los Gatos. Ra- ther, this would result in a decrease in the growth potential of the Town. Four of the five parcels on which the AHOZ would allow residential development do not contain existing housing. On these sites, implementation of the modified project would not displace any existing houses or people. However, the Oak Run /North Blossom Hill Site N site currently contains an apartment complex with 30 units. If this site were to be redeveloped under the AHOZ, 30 existing units would need to be demolished. With the density bonus, the resulting redevelopment at this site would provide a net increase of 73 units, for a total of 103 units. Because more than three times the number of housing units lost will be built on the same site, substantial numbers of housing or persons would '- Assuming 2.35 persons per household, based on the 2010 Decennial Census. CRl No Additional Subsequeritor Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Altemmive to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Additions hunter POPULATION & HOUSING: Would the a. Induce substantial population growth in an area, either direct- ly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or of existing housing, necessitat- ing the construction of re- of people, necessitating the X construction of replacement housing elsewhere? The modified project would result in a decrease of 32 dwelling units and approxi- mately 75 persons below what was previously analyzed in the certified Final EIR.2 This decrease of 32 units would not induce population growth in Los Gatos. Ra- ther, this would result in a decrease in the growth potential of the Town. Four of the five parcels on which the AHOZ would allow residential development do not contain existing housing. On these sites, implementation of the modified project would not displace any existing houses or people. However, the Oak Run /North Blossom Hill Site N site currently contains an apartment complex with 30 units. If this site were to be redeveloped under the AHOZ, 30 existing units would need to be demolished. With the density bonus, the resulting redevelopment at this site would provide a net increase of 73 units, for a total of 103 units. Because more than three times the number of housing units lost will be built on the same site, substantial numbers of housing or persons would '- Assuming 2.35 persons per household, based on the 2010 Decennial Census. CRl TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 3 0 F E I R ADDENDUM A N A L Y S I S not be displaced nor would displacement necessitate construction of replacement housing elsewhere. New units constructed on the site would be subject to the Town's inclusionary housing requirements, which would require that 10 to 20 per- cent of the total units be below market price (for low- and median- income house- holds). Market factors will ultimately determine whether the Oak Rim /North Blossom Hill Site N site is redeveloped, and would dictate the precise method through which redevelopment occurs. Therefore, construction of replacement housing elsewhere would not be necessary and the impact would be lest than sigmfr- rant. The modified project would not contravene any aspects of the General Plan, including land use designations and allowed building intensities that could impact population and housing. Implementation of the modified project would therefore neither cause new population and housing impacts, nor exacerbate any existing ones. Technical changes to the population and housing analysis in the certified Final EIR are not required, and no new mitigation measures are required. 14. Public Services No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required b. Police protection? X c. Schools? X Substantial Change in New New Projector Information Mitigationor Circumsmnces Showing Alternative to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Addaions Impact PUBLIC SERVICES: Would the project result in substantial adverse physical impacts asso- ciawd with the provision of new or physically altered gov- ernmental facilities, need for new or physically altered gov- emenental facilities, the con- struction ofwhich could cause significant environmental impacts, in order to maintain acceptable service ratios, re- spouse times or other perfor- mance objectives for any of the public services: a. Fire protection? X b. Police protection? X c. Schools? X TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 3 0 F E I R ADDENDUM A N A L Y S I S e. Other public facilities? X The modified project would slightly decrease the need for fire and law enforcement services in the Los Gatos from what was analyzed in the Final EIR. Since fire and police services operate on mutual aid agreements and the modified project would decrease the planned number of dwelling units by 32, both the Santa Clara Fire Department and Los Gatos /Monte Sereno Police Department would be able to continue providing mutual fire and law enforcement protection services. Addition- ally, the General Plan 2020 includes goals, policies, and actions that improve re- sponse times and support the activities of the fire and police departments. Adher- ence to the General Plan would reduce potential impacts to fire and law enforce- ment services to the level of lest than rign�6cant. Under the modified project, Los Gatos area school districts would experience slightly altered projected enrollments from those that were analyzed under the cer- tified Final EIR. Table 4, Changes in Potential Housing Sites by School District, shows the number and type of housing units that have been removed and added within each district since certification of the Final EIR. In the Campbell Union Elementary School and High School Districts, an increase of 58 allowed units on the Southbay Development AHOZ site would be more than cancelled out by the removal of 104 allowed units on the Los Gatos Courthouse AHOZ site, resulting in lower projected student enrollment than was identified in the certified Final FIR. The remaining removed and added AHOZ sites are located in the Los Gatos Un- ion School District (LGUSD) and the Los Gatos - Saratoga Joint Union High School District (LGSJUHSD). As enumerated in Chapter I, Introduction, the remov- al of the Oka Road /Lark Avenue, Swanson Ford, South Bay Honda, and Dittos 40 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alternative to Minor Re ultingin Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect b or No Issues Effects Previous EIR Declined Additions Impact d. Parks? X e. Other public facilities? X The modified project would slightly decrease the need for fire and law enforcement services in the Los Gatos from what was analyzed in the Final EIR. Since fire and police services operate on mutual aid agreements and the modified project would decrease the planned number of dwelling units by 32, both the Santa Clara Fire Department and Los Gatos /Monte Sereno Police Department would be able to continue providing mutual fire and law enforcement protection services. Addition- ally, the General Plan 2020 includes goals, policies, and actions that improve re- sponse times and support the activities of the fire and police departments. Adher- ence to the General Plan would reduce potential impacts to fire and law enforce- ment services to the level of lest than rign�6cant. Under the modified project, Los Gatos area school districts would experience slightly altered projected enrollments from those that were analyzed under the cer- tified Final EIR. Table 4, Changes in Potential Housing Sites by School District, shows the number and type of housing units that have been removed and added within each district since certification of the Final EIR. In the Campbell Union Elementary School and High School Districts, an increase of 58 allowed units on the Southbay Development AHOZ site would be more than cancelled out by the removal of 104 allowed units on the Los Gatos Courthouse AHOZ site, resulting in lower projected student enrollment than was identified in the certified Final FIR. The remaining removed and added AHOZ sites are located in the Los Gatos Un- ion School District (LGUSD) and the Los Gatos - Saratoga Joint Union High School District (LGSJUHSD). As enumerated in Chapter I, Introduction, the remov- al of the Oka Road /Lark Avenue, Swanson Ford, South Bay Honda, and Dittos 40 TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S TABLE 4 CHANGES IN POTENTIAL HOUSING SITES BY SCHOOL DISTRICT (57 Units Removed) -57 Change in South Bay Honda +94 Site Number of -38 District (Removed /Added) Units Housing Type Dittos -31 5 2 Below Market +37 Los Gatos Courthouse som Hill Site N Price Apartments Campbell Union (104 Units Removed) _52 A artments P Campbell High +41 +2 9 Below Market +20 Southbay Development Net Change in LGUSD and LGSJUHSD Price Apartments Apartments (58 Units Added) -95 Attached Notes: LGUSD =Los Gatos Union School District +29 Apartments Source: The Planning Center I DC&E, 2013. Below Market Net Change g Campbell Union and -23 Price Apartments Campbell High Districts -23 Apartments Oka Road 124 Below Market Price Apaznnents (248 Units Removed) _124 Apartments (57 Units Removed) -57 Attached South Bay Honda +94 Apartments (38 Units Removed) -38 Attached Higgins Business Park Below Market Dittos -31 Price Apartments (32 Units Removed) +37 Below Market som Hill Site N _1 Apartments LGUSD os Gatos Lodge Site A +21 Below Market Price Apartments LGSJUHSD, (4] Units Added) +41 Below Market +20 Apartments Los Gatos Lodge Site B +95 price Apartments (189 Units Added) +94 Apartments +43 Below Market Higgins Business Park Price Apartments _ (86 Units Added) +43 Apartments Oak Rim /North Blos- +37 Below Market som Hill Site N Price Apartments (73 Units Added) +36 Apartments +41 Below Market Price Apartments Net Change in LGUSD and LGSJUHSD +68 Apartments -95 Attached Notes: LGUSD =Los Gatos Union School District LGSJUHSD =Los Gatos — Saratoga Joint Union High School District. Source: The Planning Center I DC&E, 2013. 41 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 3 0 F E I R ADDENDUM A N A L Y S I S Lane AHOZ sites would result in a total 375 unit decrease in the amount of poten- tial new housing within LGUSD and LGSJUHSD; however, the addition of the Los Gatos Lodge, Higgins Business Park, and Oak Rim /North Blossom Hill AHOZ sites would result in a 389 unit increase in the amount of potential new housing within these Districts. This would therefore result in a net increase of 14 new units above the levels of development analyzed in the certified Final EIR. Using student generation rates used for the analysis in the certified Final EIR, this would result in the addition of six new students in the LGUSD and three new stu- dents in the LGSJUHSD.; There is no change to the number of units proposed within the Union or Cambrian School Districts from what was analyzed in the certified Final EIR. The need for additional school services is addressed by compliance with school impact assessment fees per Senate Bill 50. Pursuant to Section 65996(3)(h) of the California Government Code, payment of these fees is considered full and com- plete mitigation that would offset impacts from any increased demand for school facilities. Development of 32 fewer units would decrease the need for additional park space and library facilities. The General Plan contains goals, policies, and actions that ensure adequate and accessible park and open space and trail systems are provided and that Los Gatos residents have sufficient access to library services and facilities. Compliance with these regulations would further ensure that impacts associated with the modified project would remain at less - than - significant levels. Implementation of the modified project would not contravene any aspects of the General Plan, including land use designations and allowed building intensities that could impact demand for Town services. Therefore, project implementation would neither cause new impacts in regard to provision of Town services, nor exacerbate any existing ones. Technical changes to the public services analysis in the certified Final EIR are not required, and no new mitigation measures are required. 3 Based on the student generation rates shown in Table 4.12 -6 of the certified Final EIR and assuming that half of the units on the proposed AHOZ sites would be below - market rate apartments and half would be market -rate apartments. 42 TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S 15. Recreation o. noes me project mcmde recre - ational facilities or require the construction or expansion of recreational facilities which `Y r eight have an adverse physical effect on the environment? The 32 -unit decrease in potential dwelling units that would occur under the modi- fied project would generate 75 fewer residents that would require access to park and open space and recreational facilities. As discussed above, the General Plan contains goals, policies, and actions that ensures adequate and accessible park and open space and =fl systems are provided. Expansion of park and recreational facilities would have the potential to result in environmental impacts. However, as concluded in the certified Final EIR, with adherence to existing regulations and policies of the General Plan 2020, impacts would be less than significant. Imple- mentation of the modified project would therefore neither cause new impacts in regard to recreational opportunities /facilities, nor exacerbate any existing ones. Technical changes to the recreation analysis in the certified Final EIR are not re- quired, and no new mitigation measures are required. 43 No Additional Subsequent or Environmental Supplemental FIR Required Analysis Required Substantial Linage in New New Projector Information Mitigation or Circ mstances Showing Munantive to Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Pmv ous EIR Declined Additions Impact RECREATION: a. Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that X substantial physical deteriom- 6" of the facility would occur o. noes me project mcmde recre - ational facilities or require the construction or expansion of recreational facilities which `Y r eight have an adverse physical effect on the environment? The 32 -unit decrease in potential dwelling units that would occur under the modi- fied project would generate 75 fewer residents that would require access to park and open space and recreational facilities. As discussed above, the General Plan contains goals, policies, and actions that ensures adequate and accessible park and open space and =fl systems are provided. Expansion of park and recreational facilities would have the potential to result in environmental impacts. However, as concluded in the certified Final EIR, with adherence to existing regulations and policies of the General Plan 2020, impacts would be less than significant. Imple- mentation of the modified project would therefore neither cause new impacts in regard to recreational opportunities /facilities, nor exacerbate any existing ones. Technical changes to the recreation analysis in the certified Final EIR are not re- quired, and no new mitigation measures are required. 43 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 1 0 F E I R ADDENDUM A N A L Y S I S 16. Traffic No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial congestion management pro- gram, including, but not lim- Charge in New New ards and travel demand R Projector laforrution Mitigation or gestion management agency Circumstances Showing Ahcroarive to ways? Resulting Greater Reduce Minor No in New Significant Significant Technical Change/ Significant Effects than Effect is Changes or No Issues Effects Previous EIR Declined Additions Impact TRAFFIC: Would the project: cy access? % a. Conflict with an applicable plan, ordinance or policy es- tablishing measures ofeffec- tiveness for the performance of the circulation system, tak- ing into account all modes of transportation including mass transit and non - motorized R travel and relevant compo- nents of the circulation system, including but not limited to in- tersections, streets, highways and freeways, pedestrian and b. Conflict with an applicable congestion management pro- gram, including, but not lim- ited to level of service stand- ards and travel demand R measures, or other standards established by the county con- gestion management agency for designated roads or high- ways? c. Result in a change in air traffic patterns, including either an inceease in traffic levels or a X change in location that results in substantial safety risks? d. Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous in- X tersections) or incompatible uses (e.g., farm equipment)? e. Result in inadequate emergen- cy access? % 44 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alternative to Resulting Grearer, Reduce Minor No in New Significant Significant Technical Change/ Significant EBects than Effect is Changes or No Effects Previous EIR Dedined Additions Impact plans, or programs regarding public transit, bicycle, or pe- X destrian facilities, or otherwise decrease the performance or safety of such facilities? Kitnley -Horn Associates, traffic engineers for the 2020 General Plan and EIR, were retained to determine whether the modifications to the project would result in dif- ferent or more significant traffic impacts than were identified in the certified Final EIR. a. Cumulative Conditions Traffic opexations, under 2020 traffic conditions, were evaluated at 38 intersections based on the 2020 General Plan adopted in September 2010. Cumulative lane con- figurations and traffic controls are illustrated in Figure 2, Cumulative 2020 Condition — Lane Geometry and Traffic Control. The intersection of Winchester Boulevard and Albright Way (intersection 39) and the intersection of Winchester Boulevard and Courtyard Club entrance (intersection 40) were added in supplemental analyses and are also shown in Figure 2. This analysis is not based on current lane configurations and traffic controls but considers lane configurations and traffic controls that are anticipated to be in place in 2020, based on the Town's adopted 2020 General Plan and current Capital Im- provement Program (CIP). Traffic signals are located at all study intersections, with the exception of the Winchester Boulevard and Albright Way intersection, which is a side -street stop - controlled intersection. The intersection of Winchester Boulevard and Courtyard Club entrance is currently a side -street stop- controlled intersection with only an eastbound approach from the Courtyard Club entrance. This intersection will become signalized with the addition of the Albright develop- ment and add a westbound approach for access to the Albright development. 45 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S Cumulative 2020 volumes are based on the land use designations in the adopted 2020 General Plan and; are illustrated in Figure 3, Cumulative 2020 Condition — Lune Geometry and Traffic Control. From the General Plan, the long range travel demand model (the "model' maintained by VTA was utilized to generate the future growth. Since the 2010 General Plan certified Final EIR utilized the 2005 (base- line) and 2030 horizon years, these analysis years and their output were retained for use in this 2013 Addendum. Using the model, volumes were determined by grow- ing the existing volumes to obtain 2020 link volumes during the AM and PM peak hours, and future, balanced peak -hour intersection turning movement volumes were projected based on existing trip patterns and existing and future link volumes. Year 2020 link volumes were then converted to year 2020 peak hour intersection turning movement volumes to allow for direct comparison to the existing condi- tion turning movement volumes. These volumes were evaluated at the study intersections. Results of the LOS analy- sis are presented in Table 5, along with the minimum standard for acceptable LOS and the planned 2020 traffic control at each intersection. Detailed evaluation re- sults are included in the Appendix. According to evaluation results, all intersections satisfy operational standards. b. Project Impacts This analysis evaluates the turning movement volumes that would result from the potential land use changes that would be allowed under the implementation of the proposed AHOZ, as compared to the approved project analyzed in the 2020 General Plan Draft EIR. Additional information and data used in this transportation analysis can be found in the Appendix. Trip generation for the AHOZ sites was calculated using trip generation rates from the industry standard reference, the Institute of Transportation Engineer's Tnzb Generation, 9tb Ee&kon. For each site, an apartment land use was used for determining rates. The impact analysis includes adjustments to the North 40 project traffic generation assumed in the General Plan model. The North 40 project was evaluated by Fehr and Peers in a separate study. Two alternatives were proposed: Alternative A, which does not include an office component; and Alternative B, which does in- clude an office component. For this analysis, Alternative A was used, which in- cludes 278,000 square feet of shopping center, 20,000 square feet of supermarket, 46 Source: Kimley Horn and Associates, 2013. . TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S FIGURE 2 CUMULATIVE 2020 CONDITION — LANE GEOMETRY AND TRAFFIC CONTROL DROP �'yy 11 11 LL - -� - 9 -- B R&53BOf� T1r� ITT TT TTr DROP g I �' ! iyy X65 1-350' • �. f I Im DROP r yy 1y X85 leek Avenue lak Aenue A L kAwme S•nmbn Di" 95'� 125' T ,:: I � T T T I 125' N4 I� —>• X25' w m m `�" F— X230 `°�' 30 o a __ IedcAVemn _J� RueJd� 5T°�1L001°°d. �5 _ __- WroAS- �T 340' �� T T I 135' -� � T T I � � T � r 120' DROP m0 fp 25'� S O o o N a "-25 S X150' • S X230' 125' I - _ � r y y ley y ��...._ _. +' 90'-� � T 340' T Y' 135' T TIT �' 35' DROP m0 -> 25' $ O I o b! �50, rn DROP �X- 100 I x50' X ,! y y � �dl , W.MaiStrat Ins Getce- Selebp d ffie IN Ram BbiiiwHlIBxd Y - 90' � 400' T I 13S-11 p� m p 55 1 FIGURE 2 CUMULATIVE 2020 CONDITION — LANE GEOMETRY AND TRAFFIC CONTROL Source: Kimley Hom and Associates, 2013. TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S FIGURE 2 (CONTINUED) CUMULATIVE 2020 CONDITION - LANE GEOMETRY AND TRAFFIC CONTROL X50 11y X40' Bb HAMSE BlawnH0Ra0 IDe G9a- PYaOen DR. m 125' 50' 250' T r � Tr n °m N o 125' 9 1 Ali _ 110' IakAieme - 125' PdIeN RmO_ _ 95' 85' � � � 120'--l' 105' n • lmI I n V-- o 25� 0 /N I I I c°l� of DROP Ramps �M — Gadailene Y _? Od'.�e1_�_ �LOe Bala NNeye B9 — Ch4m Drts Ngmedm R_m7 ?BB T Ir I�I ���� J� I ��� I 30� I i 25'- I fn f I i X160' '210' 4- ----1-1- �Mbews Bbeel _a_r Bbswm HN �etl , --. ..._�_Ramm HW ikietl -, &oseam He Raa 50' r 50' ii r� X70 Io ! �I `� II� 1d gIIIm �11y Aso' ebasam_w_B_a_e lnamos- Atrreaem aenomwai_ aauh Abl,11 r,aA>rr 45'-," Tr 50 -", T T I FIGURE 2 (CONTINUED) CUMULATIVE 2020 CONDITION - LANE GEOMETRY AND TRAFFIC CONTROL TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S FIGURE 3 CUMULATIVE 2020 CONDITION - PEAK HOUR TURNING MOVEMENT VOLUMES 1068(680) ��44) a n X26(26) °II g', II 11 i 1 1- 30(56)1) e-50(314) L 1x30(50) y II y X273(270) I AVmue KrwAes 04s VRldq Gtle __. _.__.. 3185 NROnaalryi_ SO -8558 0A -ranp i x(225) R 1 T I� * 1 I r(2�) 1 2021503) _( �, ` �''n. -„ 294(247) - A 234(190) K `� o `� X315(237) c o' • n `^ � L 1-1575(1159) 1� 1 1 y F 1197(867) t -1354( 972) I I c�. 1 F�593) ar'325(407) i'I 1 Le�t Avenue x18(17) Awn __.I IeMAV --- DNG 100(92) 139(122) IW�k d r 370481) 1444 r 37(M) I�59refi1m I r B�(1385) --! 902(1543) —>' 6(6) --s I ,�^,_ S: m & 1248(1991) -y 9(n _ _ 37(46) 65(33) '1 e N g ip � X9(26) m �9) §. a. Iv III J i II�11 c� 1 1 F -8211) e-236(75) ff i y 1 Ir9(�) e-346(376) lark Avenue Blossom Fell Raatl RDWe RW Shemon raetl - __'.. Nion Amnoe 786926) � '. I� } r 117(236) r 151(57) } � I r 141(14) 2(16) —! 647(1473) 1 I S �. 202(414) 73(183) 9N16) N e°fi `gym 90(5) w wax m$m m. X157(95) ._f<_II v'', �'1D0(96) a S_ P X222(171) 1 1[ i 4- 330(358) I( 1 e-246(151) I! X253(328) KennM RW l GeM- S•Aoga t Gmas- SmaMga W. Main Street CGZ ('/,.� � � r 467(539) -lX R � 45(119) 1 160(150) � 360(299) 6(1) 1 839(1151) -� _ 14(7) 3 m'ff' 433(350) 59(210) S 4i§ S 5: � S • �� m. ?f_ X142(121) _ ` X133(223) 1I11 = ,�'�`y 1I11 397(244) �.=� II$ 1 50 X2(1) 1 937 (629 ) x1149(:5)7) i y X9228(346) i 1 W-543(414) e-63(34) W. MVn 8beal I GB7 -S oga Boasom HiF RO Bosom Hlll Rwd 49(52) r 419(342) r 47(30) I r 2(3) 352(831) I r 443) -,A I e +. 645(959) —1 123(202) m $ 31(36) —i 27(35) a .- ..-„ -. a M 213(120) _ eR F m FIGURE 3 CUMULATIVE 2020 CONDITION - PEAK HOUR TURNING MOVEMENT VOLUMES Source: Kimley Horn and Associates, 2013. x-W90) ara ' '--46(109) d 1 11( 172(406) �' ,-44(18) 0(4) Bbsmm Wl RUad 751(1417) 106(186) err 1124� R° 39(88) 1j I n 353(586) �Nm 0 G 85 17 £ae Wy oe d •m •k 85 a 17 a 8� I i p � E °•M am NOT TO SCALE STUDY AREA © INTERSECTIONS PROJECT HOUSING SITE AWPM PEAK HOUR - - AM(PM) VOLUMES Source: Kimley Horn and Associates, 2013. r• �m � x-W90) ara ' '--46(109) d 1 11( 172(406) �' ,-44(18) 0(4) Bbsmm Wl RUad 751(1417) 106(186) err 1124� R° 39(88) 1j I n r• �m � x-W90) 1 (-1945(1066) � (`Mi� ! 8(31) --A X307(114) 172(406) �' lark Awnu�ar 0(4) r I 751(1417) 106(186) m,o 512(158) 26(31) 39(88) 1j I � S e r• �m � x-W90) L NMrers 60eat � (`Mi� ! 8(31) --A SRA5SB RamPa 172(406) �' r r 328(383)'A 9� 11 bbd x-W90) L NMrers 60eat � (`Mi� ! 8(31) --A err = 1l gig �a Mal � ._R �- 144(31) 1 +-1543(552) 1l ,- 33(61) 1 1 _ Blc4wm. Hll Rued 1D4(137) r r 512(158) 26(31) 39(88) 1j I � S e Mal � ._R 1L"M65(224) 1 at)�%) 1 L I r 44(48) 1 1 BOeearn HF ROed 1D4(137) r r 382(970) 26(31) C X210(159) q. 1 +-753(431) 1 L I r 44(48) 1 1 Pollard Bwd 109(28) r r 606(415) 26(31) 56(49) r r C X210(159) q. 8 6-459(177) 1 L I Gmdenlare �- 1 1 +-846(560) �Tr e-243(132) 206(565) 26(31) a'F4 r r 353(586) �Nm 0 C C � w,777(134) 8 6-459(177) 1 L I e- 42(70) 1 1 +-846(560) 1 e-243(132) 206(565) Bbm Hill Poetl 41(43) r r 353(586) �Nm 68(43) G n X172(40) 1 6-653(265) 73(66) 174(661) —1 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S Los.G %- araden ) C � w,777(134) 1 I' 6-459(177) 1 L I e- 42(70) _ _. lns Galcs- Nmaden 176(210) r r 206(565) m 32(142) 3 198(150) -1 �Nm Los.G %- araden ) INTERSECTION NOT ANALYZED IN ORIGINAL EIR Deyes AWN R 183(128) ---I 1 r 155(99) -% C � �- 8(130) 1 537( 649) 1 L I :: 5 -5(1) KnwA. Drive tm Gales A160 Sq 13(5) �I 620(629) -� 4(3) m INTERSECTION NOT ANALYZED IN ORIGINAL EIR Deyes AWN R 183(128) ---I 1 r 155(99) -% C � �- 8(130) 1 Nmedmr Raed x-19(104) 111 tm Gales A160 Sq 4(11) err 39(75) -,A m 8(0) -,. of 198(150) -1 6� INTERSECTION NOT ANALYZED IN ORIGINAL EIR Deyes AWN R 183(128) ---I 1 r 155(99) -% C � X0(14) ?+-1271(739) �. Nmedmr Raed a- 26(30) 111 BRbsaan Hill Road 4(11) 1 r 586(965) -� m 8(0) -,. of 198(150) -1 9 m 3 INTERSECTION NOT ANALYZED IN ORIGINAL EIR Deyes AWN R 183(128) ---I 1 r 155(99) -% '-- 532(186) . 6-1350(616) Bbasom Hill Rsad 37(58) 382(1351) INTERSECTION NOT ANALYZED IN ORIGINAL EIR FIGURE 3 (CONTINUED) CUMULATIVE 2020 CONDITION - PEAK HOUR TURNING MOVEMENT VOLUMES d 1 i +-32(22) , -243(IBB) Nmedmr Raed 111 27(57) wmgadm od:a 9(35) 49(42) --A 86(59) r 03)—' 198(150) -1 9 m '-- 532(186) . 6-1350(616) Bbasom Hill Rsad 37(58) 382(1351) INTERSECTION NOT ANALYZED IN ORIGINAL EIR FIGURE 3 (CONTINUED) CUMULATIVE 2020 CONDITION - PEAK HOUR TURNING MOVEMENT VOLUMES d 1 i +-32(22) , -243(IBB) Nmedmr Raed 27(57) r r 9(35) 49(42) --A '-- 532(186) . 6-1350(616) Bbasom Hill Rsad 37(58) 382(1351) INTERSECTION NOT ANALYZED IN ORIGINAL EIR FIGURE 3 (CONTINUED) CUMULATIVE 2020 CONDITION - PEAK HOUR TURNING MOVEMENT VOLUMES TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S TABLE 5 CUMULATIVE 2020 LEVEL OF SERVICE SUMMARY Cumulative 2020 20 Blossom Hill Rd. and Signal D C 25.8 B 15.8 EB E. Roberts Rd. 21 Blossom Hill Rd. and Signal D B 17.6 B 13.1 WB Cherry Blossom Lane 51 AM PM Int. Traffic Town Delay Delay Critical # Intersection Control Criteria LOS (Seconds) LOS (Seconds) Approach(es) 1 Winchester Blvd. and Signal D C 30.8 D 43.8 SB, EB Knowles Dr. 2 Winchester Blvd. and Steal D B 17.3 C 23.9 SB Hwy 85 NB On Ramp 3 Winchester Blvd. and Signal D B- 18.7 B 14.5 NB, SB Hwy 85 SB Off Ramp 4 Winchester Blvd. and Signal D C 24.9 C 23.7 SB Lark Ave. 5 Lark Ave. and Signal D B- 19.5 B- 18.9 WB Oka Rd. 6 Lark Ave. and Hwy 17 SB Signal D D+ 373 C 31.3 WB, EB Ramps - Garden Hill Dr. 7 Lark Ave. and Hwy 17 Signal D B 17.0 B 17.9 WB, EB NB Ramps 8 Los Gatos Blvd. and Signal D D+ 36.0 D+ 35.6 NB, SB, WB Samaritan Dr. 9 Los Gatos Blvd. and Signal D D 40.1 D 47.5 NB, SB Lark Ave. 10 Los Gatos Blvd. and Signal D C- 32.7 D+ 35.1 NB, SB Blossom Hill Rd. 11 Los Gatos Blvd. and Signal D C- 32.9 C+ 22.6 NB Roberts Rd. - Shannon Rd. 12 Los Gatos Blvd. and Signal D B- 18.1 A 9.3 SB Nino Ave. ]3 Los Gatos Blvd. and Signal D C- 32.4 C 29.6 NB Kennedy Rd. - Caldwell Ave. 14 Los Gatos Blvd. and Signal D C- 34.8 D 49.4 SB, EB Saratoga - Los Gatos Rd. 15 Saratoga - Los Gatos Rd. and Signal D C 25.9 C 31.0 EB University Ave. 16 W. Main St. and Signal D C+ 20.7 C 25.5 WB, SB University Ave. 17 Santa Cmz Ave. and Signal D C 27.6 D+ 38.3 WB, NB W. Main St. 18 Santa Cmz Ave. and Signal D D 48.5 D 44.0 WB, EB Saratoga -Los Gatos Rd. Santa Cmz - Winchester Blvd. 19 and Blossom Hill - Mariposa Signal D D+ 38.5 C- 34.8 WB, SB 20 Blossom Hill Rd. and Signal D C 25.8 B 15.8 EB E. Roberts Rd. 21 Blossom Hill Rd. and Signal D B 17.6 B 13.1 WB Cherry Blossom Lane 51 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 2 0 F E I R ADDENDUM A N A L V S 15 TABLE 5 CUMULATIVE 2020 LEVEL OF SERVICE SUMMARY Cumulative 2020 AM PM Int. Traffic Town Delay Delay Critical # Intersection Control Criteria LOS (Seconds) LOS (Seconds) Approach(es) 22 Blossom Rd. and Union Ave. e. Signal D B- 18.4 D 47.9 EB, WB 23 Blossom Hill Rd. and Signal D C 31.5 D+ 36.8 NB, SB, EB 30 Los Gatos - Alm Signal D D 42.3 D- 54.4 EB, SB, WB 24 Winchester Blvd. and Daves Ave. Signal D B- 19.6 B 16.6 SB 25 Lark Ave. and Univers ity Ave. Signal D B- 18.8 C 26.7 WB, EB 26 nd Signal D C 26.2 C 26.0 NB, SB 33 e. More Ave. Signal D C 24.3 C+ 20.9 EB 27 Knowles Dr. and Dardanelli Lane Signal D B+ 11.3 B 14.3 WB, EB 28 Winchester Blvd. and D C+ 22.1 C 24.0 WB, EB 35 Wimbledon Dr. Signal D C 26.0 B 16.8 NB, SB 29 H, bat5 SB oS "Ramps lvd. and Hwy 8 Signal D C 31.5 D+ 36.8 NB, SB, EB 30 Los Gatos Blvd. and Garden Gateway Signal D C+ 20.9 B 17.8 NB, SB 31 LLoos s GGatos VillBlvd, end atos ag Square Signal D B+ 10.9 B 17.0 NB, SB 32 Los Gatos Blvd. and Almaden Rd. - Chirco Dr. Signal D C 26.2 C 26.0 NB, SB 33 Andrews Ave. and St Signal D B 15.1 B 18.0 SB 34 Blossom Hill and University e . Ave Signal D C+ 22.1 C 24.0 WB, EB 35 Blossom Hil] Rd. and W. Roberts Rd. Signal D B 14.3 B- 19.9 WB, EB 36 Blossom Hill Rd, and Leigh Ave. Signal D B+ 10.8 C 24.7 WB, EB 37 Blossom Hill Rd. and Harwood Rd. Signal D B 16.1 B- 18.0 WB, EB 38 Los Gatos - Almaden Rd. and Signal D B+ 11.9 B- 19.2 WB, EB National Ave. Winchester Boulevazd and Side Street 39 Albright Way Stop D - _ _ _ _ WorrtAppmarb Control 40 Winchester Boulevard and Signal D Courtyard Club Entrance - - - - - Notes: Locations operating at unacceptable levels aze shown in BOLD. Intersections 39 and 40 were not analyzed in the original EIR published in 2010. Source: Kimley Hum and Associates, 2013. 52 TOWN OF LOS GATOS G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S 150 rooms of hotel, 30,000 square feet of movie theater, 25,000 square feet of health /fitness club, 37,000 square feet of quality restaurant, 10,000 square feet of high- mmover sit -down restaurant, 73 single - family homes, 73 apartments, and 218 residential condominiums /townhouses. Trip generation and trip distribution in- formation was obtained from the Fehr and Peers study and utilized in this AHOZ Addendum. Since the model output used for the 2010 certified Final EIR assumed a higher trip generation and land use intensity for the current North 40 project, a net decrease in trips was applied to the network. The impact analysis includes adjustments to the Albright project as well. The Al- bright project was recently approved for 485,000 square feet of office /research and development building. It was originally assumed that the Albright project would be 550,000 square feet. The project will also remove ten existing buildings totaling 250,000 square feet, for a net new 235,000 square feet of office /research and de- velopment building. The Albright project will install a traffic signal at the intersec- tion of Winchester Boulevard and the Courtyard Club entrance for access to the project site. This intersection is currently a side -street stop- controlled intersection with only access on the eastbound approach for the Courtyard Club entrance. The project will construct a westbound approach for access to the Albright project. Both the development allowed under the approved Albright project, and new traf- fic signal and westbound approach, are considered to be in place for the purposes of the AHOZ project impact analysis. i. Impacts at 20 Dwelk'ng Units perAm Density ( 4HOZ w1bout Density Bonus) This section addresses potential transportation impacts of the proposed 2013 AHOZ at 20 dwelling units per acre, without an additional density bonus. Table 6 presents the AHOZ sites as proposed under the modified project. Table 7 shows the number of trips generated for each site in the AM and PM peak hours. As shown in Table 7, there would be a net increase in daily trips of 902 trips, a net decrease in AM peak trips of -13 trips, and a net increase in PM peak trips of 84 trips for the new AHOZ. The updated 2020 General Plan with the proposed 2013 AHOZ turning movement volumes were evaluated at the smdy intersections and can be seen in Figure 4, 2020 Plus AHOZ (without Den.aty Bonus) Peak Hour Turning Movement Volumes. Results of the LOS analysis are presented in Table 8, along with the minimum standard for acceptable LOS and the planned 2020 traffic control at each intersection. Detailed evaluation results are included in the Appendix. 53 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S TABLE 6 SITES WITH MODIFIED DENSITIES IN AHOZ Source: Kin ley Hom and Associates, 2013 As shown in Table 8, all study intersections operate acceptably (at LOS D or bet- ter) under 2020 General Plan Plus 2013 AHOZ conditions. ii. Imparts at 27 Units perAme Density (AHOZ with Density Bonus) This section addresses potential transportation impacts of the proposed 2013 AHOZ at 20 dwelling units per acre, with an additional density bonus. Table 9 presents the AHOZ sites as proposed under the modified project, with the addi- tional density bonus. Table 10 shows the number of trips generated for each site in the AM and PM peak hours. As shown in Table 10, there would be a net increase in daily trips of 1,914 trips, a net increase in AM peak trips of 67 trips, and a net increase in PM peak trips of 173 trips for the new AHOZ with Bonus Density. The updated Draft 2020 General Plan with the proposed AHOZ Bonus Density turning movement volumes were evaluated at the study intersections and can be seen in Figure 5, 2020 Plus AHOZ (oath Denrity Bonus) Peak Hour Turning Movement Volumes. Results of the LOS analysis are presented in Table 11, along with the minimum standard for acceptable LOS and the planned 2020 traffic control at each intersection. Detailed evaluation results are included in Appendix. 54 Density Allowed (Dwelling Existing Proposed Units per Site Name Acreage Land Use Land Use Acre) Research and South Bay Development 7.4 Development Apartments 20 Center Oak Rim and North Blossom Hill 3.8 Apartments Apartments 20 Los Gatos Lodge (Parking Lot) — Site A 1.5 Parking Lot Apartments 20 Los Gatos Lodge (Main Complex) — Site B 7.0 Hotel Apartments 20 Higgins Business Park 3.2 Office Apartments 20 Source: Kin ley Hom and Associates, 2013 As shown in Table 8, all study intersections operate acceptably (at LOS D or bet- ter) under 2020 General Plan Plus 2013 AHOZ conditions. ii. Imparts at 27 Units perAme Density (AHOZ with Density Bonus) This section addresses potential transportation impacts of the proposed 2013 AHOZ at 20 dwelling units per acre, with an additional density bonus. Table 9 presents the AHOZ sites as proposed under the modified project, with the addi- tional density bonus. Table 10 shows the number of trips generated for each site in the AM and PM peak hours. As shown in Table 10, there would be a net increase in daily trips of 1,914 trips, a net increase in AM peak trips of 67 trips, and a net increase in PM peak trips of 173 trips for the new AHOZ with Bonus Density. The updated Draft 2020 General Plan with the proposed AHOZ Bonus Density turning movement volumes were evaluated at the study intersections and can be seen in Figure 5, 2020 Plus AHOZ (oath Denrity Bonus) Peak Hour Turning Movement Volumes. Results of the LOS analysis are presented in Table 11, along with the minimum standard for acceptable LOS and the planned 2020 traffic control at each intersection. Detailed evaluation results are included in Appendix. 54 Source: K inley Horn and Associates, 2013. TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S i 85 _$ X41(100) i." X6(19) $IIII `11' X1200(818) II 1 e(50) r- 50(239) II�_11 i L a ) yr- 23(86) 17 i L x226(291) KmMes Cm�e d LaIlcArenue s SR451460uamp — SRA5 SR O8 a� 316(759) —7 T 71 I�$1 I� 7� I T 1 ip 4 ? %s 323(450) ^j H a2 � 312(238) � 85 a a X361(212) X241(139) X751(564). m S1' R- 435(588) 1 @� t- 1508(1353) 4- 1212(808) "m ' 1288(541) 1$ 4- 47(39) L m yr303) H IC 1 x289(379) LerkAmm 60(140) Laokwe T Inds Avenue 67(154) -� Seme wOme T 141(121) --'v 773(1658) �1 907(1574) 9(7) I 17 1199(1990) —. a N !W f rim X32(34) FX10(25) $ °I �,. X279(195) Iti H1 � X291(101) mf 9I� 1" 0(19) I� � � 1 119 e— 1 �3R3*) i L �220(4(p9) ) Il ,r1s(1z) Lark Avenue BbswmHll ROed Shemon med _ H15sA6 Rpetl NiroAssnue —.. I M ) } T I 338 199(101) 141(14) � I 173(427) 36(41) —! 7(1) —i 804(1392) r 28(43) a c= 90(5) m, N NOT TO SCALE STUDYAREA S. I ® INTERSECTIONS 8 �2�328 y PROJECT HOUSING III, Il SITE I f ���� �- 246(151) AM(PM) AWPM PEAK HOUR y � 53( ) I[ VOLLMES Source: K inley Horn and Associates, 2013. TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S i FIGURE 4 CUMULATIVE 2020 PLUS AHOZ (WITHOUT DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES _$ X41(100) i." X6(19) $IIII `11' X1200(818) II 1 e(50) r- 50(239) II�_11 i L a ) yr- 23(86) i i L x226(291) KmMes Cm�e NntlWSler Grtle LaIlcArenue SR451460uamp — SRA5 SR O8 316(759) —7 T 71 I�$1 I� 7� I T 1 326( 28) ? %s 323(450) ^j H � 312(238) X361(212) X241(139) X751(564). m S1' R- 435(588) 1 @� t- 1508(1353) 4- 1212(808) ' 1288(541) 1$ 4- 47(39) L m yr303) H IC 1 x289(379) LerkAmm 60(140) Laokwe T Inds Avenue 67(154) -� Seme wOme T 141(121) --'v 773(1658) �1 907(1574) 9(7) I g V 1199(1990) —. 36(38) 79(232) --m N !W f rim X32(34) FX10(25) $ °I �,. X279(195) Iti H1 � X291(101) mf 9I� 1" 0(19) I� � � 1 119 e— 1 �3R3*) i L �220(4(p9) ) Il ,r1s(1z) Lark Avenue BbswmHll ROed Shemon med _ H15sA6 Rpetl NiroAssnue —.. I M ) } T I 338 199(101) 141(14) � I 173(427) 36(41) —! 7(1) —i 804(1392) r 28(43) a c= 90(5) m, S. I 157 8 �2�328 S FI �m 772(171) III, <-1011 98fi ) I f ���� �- 246(151) i y � 53( ) I[ kenniMy Fl d "Gelas-5vmega L Gaz - Sambge W M S*e CeMee9 A� (1, T r ( ) q 1 T � T 180(150) 82;91 361(302) —f 14(7) �, 3 E .`4^, 435(353) --A o 59Q70) �, S b3 "-145(122) 7(228) 9' X367(102) 3 x`'-5(22) IL 1 y rl (29)7) i X23 (345) 11g j 1 1 W-2380(3302) ✓) 99) W.Mein$� Mml aea AVen�e RI Hitl Rwd —. Rowan Wll Reed 49(52) T r 418(338) p T 1 4111 q p I T I 1(5) I� I T 1 p 70(74) —� 10(43) �j a gg55) —s 123(202) 29(42) --0 32(25) --A H A 3(61 —s 242(140) -'y FIGURE 4 CUMULATIVE 2020 PLUS AHOZ (WITHOUT DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES Kimley Horn and Associates, TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S FIGURE 4 (CONTINUED) CUMULATIVE 2020 PLUS AHOZ (WITHOUT DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES "-465(224) �_ § X777(134) w 11 y F1151(975) x44(16) I I I! 1 � �' 4- 782(481) e-0(1) 11 i L �I <- 485(157) e43(72) I i 311 Hill ROeE 9bsvrrl HiLRa _ Ua Gala- ArreSSn 39(34) 479(525) —• 108(138) �' 394(917) —1 176(210) � 216(449) —1 1 l3limA�0 155(83)1 �_ 171(124)�� °0 32(142) 128(88) $_ •m • X913) X173(42)'3, R- 92(27) .`� ( V!14(1094) II 11 E 4- 502(420) II a F447(560) I — Z75(167) y 1 x16(44) y e-6(14) LAA . Pollird RB _ __ - 141vxles Dmre Wmbladon l� 71 0(1)—.3 ) T 1 57(23) � R r I T I 18(3) � q } r I I I 79(50) � 622(1425) y a 110(89) on 595(42,) � 136(70) $ $ 616(530) ---) 5(4) -1 „'°sl R 159(133)'A • 8� �� �'� LR � ?2 g. X217(146).C' m X4(29) 9 X345(167) �11 F1 E 5(6) �&. — 14(126) 1 i y x69(82) x208(146) 911E5 S8 RW — a �r�r� G� .yol tns Geks_Nlbga Sq Almaden Ra Chum Orrx — ,27(3502' � T! �j,3; r ) t 1 r� 7l I T I 6( 9J t r 716(330) °"' 26(9) Y e $ 41(16) --A m �m �48(W) 235(77) =_ �__. III_ Eg '. [- 1298(600) y 1 L-68(9)) I[ y r- 249(142) �26(39J�) AMrm SM 9bssom Hill R c a , _ _ li-b p Hill Fowl Obssorn Hill R d 21(36) r ^�93) ) t -,,, �1) t r x(99) 394(1298) � 29(42) _T 266(483) — 519(874) --1 49 ` 8(34) c 41(43) , 12(7) -,A y, & ro 5 $ 3 • �� `fy_ X144(31) w X172(40) Y m X6(56)`g� "-2(16) II11 F 599(265) I i X73(494) I[ 1 1 x33(61) 9bsscm Hlll ROed Los Getcs.NneOm Anfttwe Cwrt�2rOClub. _ _Ahril Gri w F110•IC0 8(44) 73(66) a ? T I 1 r.� } r 16(16) I I I 524(1528) ` 164(605) —>• 50(67) 39 (88) u fi ° 3 FIGURE 4 (CONTINUED) CUMULATIVE 2020 PLUS AHOZ (WITHOUT DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S TABLC / TRIP GENERATION SUMMARY AT 20 UNITS PER ACRE (AHOZ WITHOUT DENSITY Existing/ Proposed Land Use Land Use Acreage Size Daily In .N� AM Peak Out Total In PM Peak Out Total South Bay Development Existing Land Use Research and Development Center 7.4 - 111,000 SF -904 -113 -23 -136 -18 -101 -119 Proposed Land Use Apartments 7.4 148 units 986 15 61 76 64 35 99 Net Increase /Decrease 82 -98 38 -60 46 -66 -20 Los Gatos Lodge (Parking Lot) — Site A Existing Land Use Parking Lots 1.5 - 0 0 0 0 0 0 0 Proposed Land Use Apartments 1.5 30 units 306 4 14 18 22 12 34 Net Increase /Decrease 306 4 14 18 22 12 34 Los Gatos Lodge (Main Complex) — Site B Existing Land Use Hotel 7.0 -128 Rooms -1046 -44 -28 -72 -40 -36 -76 Proposed Land Use Apartments 7.0 140 units 972 14 58 72 62 33 95 Net Increase /Decrease -74 -30 30 0 22 -3 19 Higgins Business Park Existing Land Use Office 3.2 - 18.394 KSF -204 -26 -3 -29 -5 -22 -27 Proposed Land Use Apartments 3.2 64 units 512 7 28 35 34 19 53 Net Increase /Decrease 308 -19 25 6 29 -3 26 Oak Rim and North Blossom Hill Existing Land Use Apartments 3.8 -30 units -306 -4 -14 -18 -22 -12 -34 Proposed Land Use Apartments 3.8 76 units 586 8 33 41 39 20 59 Net Increase /Decrease 280 4 19 23 17 8 25 Total Net Increase /Decrease 902 439 126 -13 136 -52 84 Source: Kindey Horn and Associates, 2013 57 TOWN OF LOS G A T O S G E N E R A L P L A N 1 0 2 0 F E I R A D D E N D U M A N A L Y S I S TABLE 8 2020 LEVEL OF SERVICE SUMMARY AT 20 UNITS PER ACRE (AHOZ WITHOUT DENSITY BONUS) 5 Lark Ave. and Oka Rd. Signal D B- 19.0 -0.5 B 17.0 -1.9 WB 6 Lark Ave. and Hwy 17 SB Signal D Ctunulative 2020 + Modified Project 26.3 -11.0 C 30.9 -0.4 WB, EB AM Ramps - Garden Hill Dr. Signal PM C- 32.2 Int. C Traffic Town NB Delay A Signal Delay A Critical # Intersection Control Criteria LOS (Sec) Delay LOS (Sec) Delay Approach(es) 1 Winchester Blvd. and Signal D C 25.7 -5.1 C- 35.0 -8.8 SB, EB -6.0 Knowles Dr. 46.2 10.6 NB, SB, WB 9 Los Gatos Blvd. and Lark Ave. Signal D D+ 38.6 2 Winchester Blvd. and Signal D B 16.4 -0.9 C+ 21.4 -2.5 SB 2.9 Hwy 85 NB On Ramp 33.1 -2.0 NB, SB 20 Blossom Hill Rd. and Signal D C 27.6 3 inchester Blvd. and WHwy Signal D B 16.5 -2.2 B 12.5 -2.0 NB, SB 85 SB Off Ramp 21 Blossom Hill Rd. and Signal D C+ 22.5 4 Winchester Blvd. and Signal D C 24.1 -0.8 C 24.0 0.3 SB Lack Ave. 5 Lark Ave. and Oka Rd. Signal D B- 19.0 -0.5 B 17.0 -1.9 WB 6 Lark Ave. and Hwy 17 SB Signal D C 26.3 -11.0 C 30.9 -0.4 WB, EB 13 Ramps - Garden Hill Dr. Signal D C- 32.2 -0.2 C 29.7 0.1 NB 7 Lark Ave. and Hwy 17 Signal D B- 19.5 2.5 B 16.5 -1.4 WB, EB 15 NB Ramps Signal D C 30.2 4.3 D 47.4 16.4 EB 8 Los Gatos Blvd. and Samaritan Dr. Signal D C 30.0 -6.0 D 46.2 10.6 NB, SB, WB 9 Los Gatos Blvd. and Lark Ave. Signal D D+ 38.6 -1.5 C- 34.7 -12.8 NB, SB 10 Los Gatos Blvd. and Blossom Hill Rd. Signal D D+ 35.6 2.9 C- 33.1 -2.0 NB, SB ]] Los Gatos Blvd. and Signal D C- 32.6 -0.3 C 24.5 1.9 NB Roberts Rd. - Shannon Rd. 12 Nino Ave. _ Signal D C 23.4 5.3 B- 19.8 10.5 SB 13 Los Gatos Blvd. and Kennedy Rd. - Caldwell Ave. Signal D C- 32.2 -0.2 C 29.7 0.1 NB 14 Los Gatos Blvd. and Saratoga -Los Gatos 12d. Signal D D+ 36.1 1.3 D- 51.4 2.0 SB, EB 15 Saratoga - Los Gatos Rd. and Signal D C 30.2 4.3 D 47.4 16.4 EB University Ave. 16 W. Main St. and University Signal D C+ 20.7 0.0 C 26.3 0.8 WB, SB 17 Santa Cruz Ave. and W. Main Signal D C 27.0 -0.6 C 26.2 -12.1 WB, NB 18 Santa Cruz Ave. and Saratoga Signal D D 48.6 0.1 D 42.7 -1.3 WB, EB - Los Gatos Rd. Santa Cruz - Winchester 19 Blvd. and Blossom Hill - Signal D D 41.2 2.7 D+ 35.9 1.1 WB, SB Mariposa Ave. 20 Blossom Hill Rd. and Signal D C 27.6 1.8 B- 19.8 4.0 EB E. Roberts Rd. 21 Blossom Hill Rd. and Signal D C+ 22.5 4.9 B 17.1 4.0 WB Cherry Blossom Lane RE TOWN OF LOS GATOS G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S TABLE 8 2020 LEVEL OF SERVICE SUMMARY AT 20 UNITS PER ACRE (AHOZ WITHOUT DENSITY BONUS) Cumulative 2020 + Modified Project AM PM Int. Traffic Town Delay A Delay A Critical # Intersection Control Criteria LOS (Sec) Delay LOS (Sec) Delay Approach(es) 22 Blossom Hill Rd. and Signal D B 17.5 -0.9 D 42.8 -5.1 EB, WB Union Ave. 23 Blossom Hill Rd. and Signal D C 30.3 -12.0 D 49.3 -5.1 EB, SB, WB Los Gatos - Almaden Rd. 24 Winchester Blvd. and Daves Signal D C 24.1 4.5 B- 19.8 3.2 SB Ave. 25 Lark Ave. and University Signal D C 27.3 8.5 C 28.5 1.8 WB, EB Ave. 26 Pollard Rd. and More Ave. Signal D C+ 20.8 -3.5 C 25.6 4.7 EB 27 Knowles Dr. and Dardanelli Signal D B+ 10.3 -1.0 B 12.7 -1.6 WB, EB 28 Winchester Blvd. and Signal D B 16.4 -9.6 B 16.5 -0.3 NB, SB Wimbledon Dr. 29 Los Gatos Blvd. and Signal D B- 19.9 -11.6 C 29.0 -7.8 NB, SB, EB Hwy 85 SB Ramps 30 Los Gatos Blvd. and Signal D B- 18.9 -2.0 B- 19.1 1.3 NB, SB Garden Gateway 31 Los Gatos Blvd. and Signal D B+ 11.8 0.9 B 14.9 -2.1 NB, SB Los Gatos Village Square 32 Los Gatos Blvd. and Signal D C 25.0 -1.2 C 23.8 -2.2 NB, SB Almaden Rd. - Chirco Dr. 33 Santa Cruz Ave. and Andrews Signal D B 13.9 -1.2 B 16.4 -1.6 SB 34 Blossom HID Rd. and Signal D C 28.0 5.9 C- 32.5 8.5 WB, EB University Ave. 35 Blossom Hill Rd. and Signal D B 14.7 0.4 B- 19.4 -0.5 WB, EB W. Roberts Rd. 36 Blossom HID Rd. and Signal D B 13.0 2.2 B- 19.7 -4.4 WB, EB Leigh Ave. 37 Blossom Hill Rd. and Signal D B 14.4 -1.7 B- 18.1 0.1 WB, EB Harwood Rd. 38 Los Gatos - Almaden Rd. and Signal D B 13.5 1.6 B 15.7 -3.5 WB, EB National Ave. Winchester Boulevard and Side Street A 0.0 - A 0.3 - 39 Albright Way Stop D WB VorttApprsaab Control C 15.5 - B 13.5 - 40 Winchester Boulevard and Signal D C 25.1 - C 26.0 - NB Courtyard Club Entrance Note: Locations operating at unacceptable levels me shown in BOLD. Source: Knoley Horn and Associates, 2013. 59 TOWN OF LOS GATOS G E N E R A L PLAN 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S TABLE 9 AHOZ SITES WITH ADDED BONUS DENSITIES Oak Rim and North 3.8 Apartments Apartments 27 Blossom Hill Los Gatos Lodge 1.5 Parking Lot Apartments 27 (Parking Lot) — Site A Los Gatos Lodge (Main 7.0 Hotel Apartments 27 Complex) — Site B Higgins Business Park 3.2 Office Apartments 27 As shown in Table 11, all study intersections operate acceptably (at LOS D or better) under 2020 General Plan Plus 2013 Housing Element (Bonus Density) adjustments conditions. The proposed 2020 General Plan includes a number of policies to address future impacts to the capacity of the roadway system. Transportation Goal TRA -1 and Policy TRA -1.1 require that development not exceed transportation capacity and to develop transportation systems that meet current and future needs of residents and businesses. Policy TRA -3.3 calls for an evaluation of all new developments to en- sure that they are in compliance with the Town's LOS intersection policy; Policy TRA -3.4 states that new projects shall not cause an intersection at LOS of Level A, B, or C to drop more than one level and an intersection at LOS D or below to drop at all, and Policy TRA -3.5 states that if a new project causes an intersection LOS to drop more than one level from Level A, B, or C or to drop at all from Lev- el D or below, the project shall mitigate traffic so that the LOS will remain at an acceptable level. In addition, Action TRA -3.1 will implement the local roadway improvements listed in Section E.2 and E.3 of Transportation Element of the 2020 General Plan in the •1 Density Allowed (Dwelling Existing Proposed Units per Site Name Acreage Land Use Land Use Acre) Research and South Bay Development 7.4 Development Apartments 27 Oak Rim and North 3.8 Apartments Apartments 27 Blossom Hill Los Gatos Lodge 1.5 Parking Lot Apartments 27 (Parking Lot) — Site A Los Gatos Lodge (Main 7.0 Hotel Apartments 27 Complex) — Site B Higgins Business Park 3.2 Office Apartments 27 As shown in Table 11, all study intersections operate acceptably (at LOS D or better) under 2020 General Plan Plus 2013 Housing Element (Bonus Density) adjustments conditions. The proposed 2020 General Plan includes a number of policies to address future impacts to the capacity of the roadway system. Transportation Goal TRA -1 and Policy TRA -1.1 require that development not exceed transportation capacity and to develop transportation systems that meet current and future needs of residents and businesses. Policy TRA -3.3 calls for an evaluation of all new developments to en- sure that they are in compliance with the Town's LOS intersection policy; Policy TRA -3.4 states that new projects shall not cause an intersection at LOS of Level A, B, or C to drop more than one level and an intersection at LOS D or below to drop at all, and Policy TRA -3.5 states that if a new project causes an intersection LOS to drop more than one level from Level A, B, or C or to drop at all from Lev- el D or below, the project shall mitigate traffic so that the LOS will remain at an acceptable level. In addition, Action TRA -3.1 will implement the local roadway improvements listed in Section E.2 and E.3 of Transportation Element of the 2020 General Plan in the •1 I Source: Kimley Hom and Associates, 2013. TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M A N A L Y S I S FIGURE 5 CUMULATIVE 2020 PLUS AHOZ (WITH DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES ✓8(19) R F �I 1-1 2 01 2 ✓) X49(103) 19 II11 y L 4- 13(50) e-63(246) I 1 1 �13(84) M--23(8% II i 1 1 1 X225(291) Kmalee Ddre 4Wrdre Ords 3skA M SA95NBOrwamy SRffiSB O9+amp 318(25B)� I� 1 '�' r I� } p 1 I 1 221a31)� ? �' r up) 929(459) l .., 912899) ? eTi og pm$ a i51 • "'� X381(212) $ N '-241(139) r' X752(565)'° -' X438(598) _ A 1 A i-- 1511(1390) 1 I 1- b 11 X1213(914) h 4- 1297(945) 1 L!!,kAIgMe I! X3(13) Lmk Avenue Lek Avenue 9emedlen Dmre 141(121) 62 (141) �--� 97(154) )_ 78 0115 9 01 —� 812(1577) —>' %7) 1203(1994) —!' 39) —i 791%2232) —,% N 1085) o_ s X279(185) '- E 292(102)_`II X1(92(34) y 1 '1) II i'. e-354(352) II`.� i �204(90)) X15(12) Le Avenue Bbasom Nll ROed flooeM Rmtl 9hemon bed i Niro 7� 177(429) } 7� 11 139(41) I� } T 1 ( 141(`" 1 36(36) 947(1395) I 177(429) _..� 31(44)--, `� m y 19(10) TI+ v C� 9D(5) �Tm ff S f m� ^g 157(95) :d R3 F $. IP^i F6S aII P X100(96) • a ro_II �271(1T7) IQ II II i y �"F 1 j <--M357) i X246(151) i e-253(328)) Keno Road Im Gems- Sereta9e I Gmoe.Smeb9a W. Mein Street Cal20,all Avaua 20(1) � R % 470(549) � I 45(119) � ) t r 180(158) —w 3(1) 1 I 830(1157) —1 ' 381(302) —1 14(7) ax§fW 437(354) 59;210) 03.5 Ek Ci mp$ Is & • R.$, • gg 1 122) ^ 3221) 9( a 370(195)F . '` -8(27) II 11 r3 i L �149(2B7) — X233(348) 29 M-303) 958(6 8) e-5 I W. MelnStreet Lose" "sm ope I 81 a Nl RDad &sewn Hin RO d _ _ _ _ N v i.A- 49(52) 419(338) I� } p 1 1 1 48( 36) I f 6- —> I� } I I r 70(74) 10(43) 1 I 63g(955) —�1 123(202) �L �' q 21(4 —�f g85) 1 .°—„ n 378(642) 242(140) ti FIGURE 5 CUMULATIVE 2020 PLUS AHOZ (WITH DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R A D D E N D U M AN A LY S S =ILURE 5 (CONTINUED) CUMULATIVE 2020 PLUS AHOZ (WITH DENSITY BONUS) PEAK HOUR TURNING MOVEMENT VOLUMES TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 3 0 F E I R ADDENDUM A N A L Y S I S TABLE 10 TRIP GENERATION SUMMARY AT 27 UNITS PER ACRE (AHOZ WITH DENSITY BONUS) Existing/ Proposed Land Use Land Use Acreage Size Daily In AM Peak Out Total In PM Peak Out Total South Bay Development Existing Land Use Research and Development Center 7.4 - 111.348 KSF -904 -113 -23 -136 -18 -101 -119 Proposed Land Use Apartments 7.4 200 units 1336 20 82 102 83 45 128 Net Increase /Decrease 432 -93 59 -34 65 -56 9 Los Gatos Lodge (Parking Lot) — Site A Existing Land Use Puking Lots 1.5 - 0 0 0 0 0 0 0 Proposed Land Use Apartments 1.5 41 units 374 5 19 24 26 14 40 Net Increase /Decrease 374 5 19 24 26 14 40 Los Gatos Lodge (Main Complex) — Site B Existing Land Use Hotel 7.0 -128 Rooms -1046 A4 -28 -72 -40 -36 -76 Proposed Land Use Apartments 7.0 189 units 1270 19 77 96 79 43 122 Net Increase /Decrease 224 -25 49 24 39 7 46 Higgins Business Park Existing Land Use Office 3.2 - 18.394 KSF -204 -26 -3 -29 -5 -22 -27 Proposed Land Use Apartments 3.2 86 units 646 9 37 46 42 23 65 Net Increase /Decrease 442 -17 34 17 37 1 38 Oak Rim and Nonh Blossom Hill Existing Land Use Apartments 3.8 -30 units -306 -4 -14 -18 -22 -12 -34 Proposed Land Use Apartments 3.8 103 units 748 11 43 54 48 26 74 Net Increase /Decrease 442 7 29 36 26 14 40 Total Net Increase /Decrease 1914 -123 190 67 193 -20 173 63 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S 1 5 TABLE 11 2020 LEVEL OF SERVICE SUMMARY AT 27 UNITS PER ACRE (AHOZ WITH DENSITY General Plan 2020 + Modified Project + Density Bonus 64 AM PM Int. Traffic Town Delay A Delay A Critical # Intersection Control Criteria LOS (Sec) Delay LOS (Sec) Delay Approach(es) 1 Winchester Blvd. and Signal D C 26.2 -4.6 D+ 35.2 -8.6 SB, EB Knowles Dr. 2 Winchester Blvd. and Signal D B 16.4 -0.9 C+ 21.4 -2.5 SB Hwy 85 NB On Ramp 3 Winchester Blvd. and Signal D B 16.5 -2.2 B 12.5 -2.0 NB, SB Hwy 85 SB Off Ramp 4 Winchester Blvd. and Signal D C 24.1 -0.8 C 24.1 0.4 SB Lark Ave. 5 Lark Ave. and Oka Rd. Signal D B- 19.0 -0.5 B 17.0 -1.9 WB 6 Lark Ave. and Hwy 17 SB Signal D C 26.3 -11.0 C 30.9 -0.4 WB, EB Ramps - Garden Hill Dr. 7 Lark Ave. and Hwy 17 Signal D B- 19.5 2.5 B 16.5 -1.4 WB, EB NB Ramps 8 Los Gatos Blvd. and Signal D C 30.0 -6.0 D 46.4 10.8 NB, SB, WB Samaritan Dr. 9 Los Gatos Blvd. and Signal D D+ 38.7 -1.4 C- 34.8 -12.7 NB, SB Lark Ave. 10 Los Gatos Blvd. and Signal D D+ 35.8 3.1 C- 33.2 -1.9 NB, SB Blossom Hill Rd. 11 Los Gatos Blvd. and Signal D C- 32.5 -0.4 C 24.4 1.8 NB Roberts Rd. - Shannon Rd. 12 Los Gatos Blvd. and Signal D C 23.4 5.3 C+ 20.0 10.7 SB Nino Ave. 13 Los Gatos Blvd. and Signal D C- 32.5 0.1 C 30.0 0.4 NB Kennedy Rd. - Caldwell Ave. 14 Los Gatos Blvd. and Signal D D+ 36.5 1.7 D- 53.1 3.7 SB, EB Saratoga - Los Gatos Rd. 15 Saratoga - Los Gatos Rd. and Signal D C 30.2 4.3 D 47.5 16.5 EB University Ave. 16 W. Main St. and University Ave. Signal D C+ 20.7 0.0 C 26.3 0.8 WB, SB 17 Santa Cruz Ave. and W. Main Signal D C 27.0 -0.6 C 26.3 -12.0 WB, NB 18 Santa Cruz Ave. and Saratoga - Signal D D 48.8 0.3 D 42.9 -1.1 WB, EB Los Gatos Rd. Santa Cruz - Winchester Blvd. 19 and Blossom Hill - Mariposa Signal D D 41.6 3.1 D+ 36.1 1.3 WB, SB Ave. 20 Blossom Hill Rd. and Signal D C 27.7 1.9 B- 19.8 4.0 EB E. Roberts Rd. 64 TOWN OF LOS GATOS G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S TABLE 11 2020 LEVEL OF SERVICE SUMMARY AT 27 UNITS PER ACRE (AHOZ WITH DENSITY BONUS) Signal D B 13.5 1.6 B General Plan 2020 + Modified Project National Ave. Winchester Boulevard and + Density Bonus 0.0 - A 0.3 - 39 Albright Way Stop D AM WB WorrtAppromh PM C 15.5 Int. 13.6 Traffic Town C Delay A 26.2 - NB Delay A Critical # Intersection Control Criteria LOS (Sec) Delay LOS (Sec) Delay Approach(es) 21 Blossom Hill Rd. and Chary Blossom Lane Signal D C+ 22.5 4.9 B 17.1 4.0 WB 02 Blossom Hill Rd. and Union Ave. Signal D B 17.5 -0.9 D 43.0 -4.9 EB, WB 23 Blossom Hill Rd. and Los Gatos - Allm Signal D C 30.3 -12.0 D 50.1 -4.3 EB, SB, WB 24 Winchester Blvd. and Daves Signal D C 24.0 4.4 B- 19.7 3.1 SB Ave. 25 Lark Ave. and University Ave. Signal D C 27.3 8.5 C 28.5 1.8 WB, EB 26 Pollard Rd. and More Ave. Signal D C+ 20.8 -3.5 C 25.6 4.7 EB 27 Knowles Dr. and Dardanelli Signal D B+ 10.3 -1.0 B 12.7 -1.6 WB, EB Lane 28 Winchester Blvd. and Wimbledon Dr. Signal D B 16.4 -9.6 B 16.5 -0.3 NB, SB 29 Los Gatos Blvd. and Hwy 85 SB Ramps Signal D B- 19.8 -11.7 C 29.1 -7.7 NB, SB, EB 30 Los Gatos Blvd. and Garden Gateway Signal D B 18.8 -2.1 B- 19.0 1.2 NB, SB 31 Los Gatos Blvd. and Signal D B+ 11.8 0.9 B 14.9 -2.1 NB, SB Los Gatos Village Square 32 Los Gatos Blvd. and Almaden Rd. - Chirco Dr. Signal D C 25.0 -1.2 C 23.8 -2.2 NB, SB 33 Santa Cruz Ave. and Andrews Signal D B 13.9 -1.2 B 16.4 -1.6 SB 34 Blossom Hill Rd. and Signal D C 28.0 5:9 C- 32.5 8.5 WB, EB University Ave. 35 Blossom Hill and W. Roberts Rd. d. Signal D B 14.7 0.4 B- 19.4 -0.5 WB, EB 36 Blossom Hill Rd. and Signal D B 13.0 2.2 B- 19.7 -4.4 WB, EB Leigh Ave. 37 Blossom Hid Rd. and Signal D B 14.4 -1.7 B 18.0 0.0 WB, EB Harwood Rd. 38 Los Gatos - Almaden Rd. and Signal D B 13.5 1.6 B 15.6 -3.6 WB, EB National Ave. Winchester Boulevard and Side Street A 0.0 - A 0.3 - 39 Albright Way Stop D WB WorrtAppromh Control C 15.5 B 13.6 40 Winchester Boulevard and Signal D C 25.2 - C 26.2 - NB Courtyard Club Entrance Note: Locations operating at unacceptable levels are shown in BOLD Source: Kimley Horn and Associates, 2013. 65 TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 3 0 F E I R ADDENDUM A N A L Y 5 1 5 CIP. With the implementation of these improvements, all study intersections operate at LOS D or better. Right -of -way is currently owned by the Town at some of the locations proposed for improvement; however, other locations would require right -of -way acquisition and some specific locations may require removal of parking or other existing roadway features to adequately design the proposed improvement. Overall, the proposed roadway and intersection improvements called for in the 2020 General Plan would be constructed within an area that is already utilized for existing roadway features. These improvements would not require development of undeveloped land and therefore would not be expected to have significant environmental impacts. However, an appropriate level of project - specific environmental review would be required at the time each improvement is designed and approved. The General Plan EIR found that implementation of General Plan 2020 would have a significant and unavoidable impact in regard to traffic and transportation. The General Plan EIR identified a set of roadway improvements that were neces- sary to rnitigate potentially significant traffic impacts; however, at the time of the EIR, there were insufficient funds to undertake those projects. Since these modifi- cations were not certain to take place, the impact remained significant and unavoid- able, as of the time of General Plan adoption. Adoption and implementation of the proposed AHOZ is not anticipated to substantially worsen this or any other traffic or transit related impacts. In fact, because the AHOZ may enable people who work in Los Gatos to live in Los Gatos, implementation of the AHOZ could serve to decrease traffic and transportation impacts. 17. Utilities and Service Systems Exceed waste water treatment requirements of the applicable X Regional Water Quality Coo- F• No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Subsantial Change in New New Projector Information Mitigation or Circumstances Showing Altemarive m Minor Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Effects than Effect is or No Issues Effects Previous EIR Declined Additions Impact UTILITIES & SERVICE SYSTEMS: Would the nmiect. Exceed waste water treatment requirements of the applicable X Regional Water Quality Coo- F• TOWN OF LOS G A T O S G E N E R A L P L A N 3 0 1 0 F E I R ADDENDUM A N A f Y 5 1 5 available to serve the project from existing entitlements and X resources or are new or ex- panded entitlements needed? e. Result in a determination by the waste water treatment pro- vider, which serves or may serve the project that it has ad- X equate capacity to serve the project's projected demand in addition to the provider's ex- isting commitments? E Be served by a landfill with sufficient permitted capacity to X accommodate the project's sol- g. Comply with federal, state, and local statures and regulations X related to solid waste? As mentioned in Section 9, Hydrology and IY/adefQualiy, the modified project would comply with existing federal, State, and local water quality requirements and regula- tions, including those specified in the General Plan 2020 in order to minimize im- pacts to water quality. The modified project would result in a decreased water de- mand below what was analyzed in the certified Final EIR. This incremental de- crease in water demand and, consequently, in wastewater generation is negligible 67 No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Project or Information Mitigation or Circumstances Showing Alternative m Min Resulting in Greater Reduce Technical No New Significant Significant Changes Change/ Significant Elicits than Effect is or No Issues Effects Previous EIR Dhrfined Additions Impact b. Require or result in the con- struction of new water or waste water treatment facilities or expansion of existing facili- X ties, the construction ofwhich could cause significant envi- ronmental effects? e Require or result in the con- struction of new storm water drainage facilities or expansion of existing facilities, the con- X striation of which could cause significant environmental ef- available to serve the project from existing entitlements and X resources or are new or ex- panded entitlements needed? e. Result in a determination by the waste water treatment pro- vider, which serves or may serve the project that it has ad- X equate capacity to serve the project's projected demand in addition to the provider's ex- isting commitments? E Be served by a landfill with sufficient permitted capacity to X accommodate the project's sol- g. Comply with federal, state, and local statures and regulations X related to solid waste? As mentioned in Section 9, Hydrology and IY/adefQualiy, the modified project would comply with existing federal, State, and local water quality requirements and regula- tions, including those specified in the General Plan 2020 in order to minimize im- pacts to water quality. The modified project would result in a decreased water de- mand below what was analyzed in the certified Final EIR. This incremental de- crease in water demand and, consequently, in wastewater generation is negligible 67 TOWN OF LOS G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S compared to the overall demand analyzed in the EIR. The San Jose Water Com- pany and San Jose /Santa Clare Water Pollution Control Plant would continue to have sufficient capacity to accommodate water and wastewater treatment needs. The General Plan also includes goals, policies, and actions to reduce water con- sumption and ensure water and wastewater facilities are expanded and /or con- structed, as needed to meet the projected demand. The General Plan also address- es planned growth to ensure that the projected demand on utilities and infrastruc- ture, including storm drain facilities, landfills, and energy consumption, are met. Since the total number of new units would be slightly decreased under the modified plan, there would be no new utilities - related impacts or increases to the severity of these impacts, and the overall impact would remain leas than sigmfieant. As the modi- fied project would adhere to the vision by the General Plan and all subsequent land use and zoning designations, it would therefore neither cause new impacts in regard to provision of utility services, nor exacerbate any existing ones. Technical changes to the utilities and infrastructure analysis in the certified Final EIR are not required, and no new mitigation measures are required. 18. Mandatory Findings of Significance N No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Subsundal Changein New New Projector Information Mitigationor Circumstances Starring Altemative to Resulting in Greater Reduce Minor No New Significant Significant Technical Change/ Significant Effects than Effect is Changes or No Issues Effects Previous EIR Declined Additions Impact MANDATORY FINDINGS OF SIGNIFICANCE: a. Does the project have the potential to degrade the quality of the environment, substan- tially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining lev- els, threaten to eliminate a X plant or animal community, re- duce the number or restrict the range of a care or endangered plant or animal or eliminate important examples of the ma- jor periods of California histo- N TOWN OF LOS GATOS G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S b. Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental ef- fects of a project are consider- % able when viewed in connec- tion with the effects of past projects, the effects of other current projects, and the ef- fects of probable future pro- jects.) c. Does the project have envi- ronmental effects which will cause substantial adverse ef- X fecs on humor beings, either directly or indirectly? Based on the substantiations provided in the certified Final EIR and with imple- mentation of the mitigation measures identified therein, the General Plan 2020, as amended with the September 2012 Addendum for the Sustainability Plan, would have a significant adverse effect on the environment, either individually or cumula- tively, directly or indirectly with regards to Air Quality, Land Use and Planning, and Transportation /Traffic. The proposed modified project would result in additional a reduced amount of residential development on sites that have been previously disturbed with urban uses. None of the proposed AHOZ sites are located in areas of sensitive habitat or in close proximity to documented populations of endangered or other special -stams species. As with development anticipated under the General Plan 2020, future development associated with the modified project would not reduce the habitat of fish and wildlife species; cause a fish or wildlife population to drop below self - sustaining levels; threaten to eliminate a plant or animal community; reduce the M No Additional Subsequent or Environmental Supplemental EIR Required Analysis Required Substantial Change in New New Projector Information Mitigation or Circumstances Showing Alternative to Resulting in Greater Reduce Mivor No New Significant Significant Technical Change/ Significant Effects than Effect is Changes or No Effecm Previous EIR Declwed Additions Impact b. Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental ef- fects of a project are consider- % able when viewed in connec- tion with the effects of past projects, the effects of other current projects, and the ef- fects of probable future pro- jects.) c. Does the project have envi- ronmental effects which will cause substantial adverse ef- X fecs on humor beings, either directly or indirectly? Based on the substantiations provided in the certified Final EIR and with imple- mentation of the mitigation measures identified therein, the General Plan 2020, as amended with the September 2012 Addendum for the Sustainability Plan, would have a significant adverse effect on the environment, either individually or cumula- tively, directly or indirectly with regards to Air Quality, Land Use and Planning, and Transportation /Traffic. The proposed modified project would result in additional a reduced amount of residential development on sites that have been previously disturbed with urban uses. None of the proposed AHOZ sites are located in areas of sensitive habitat or in close proximity to documented populations of endangered or other special -stams species. As with development anticipated under the General Plan 2020, future development associated with the modified project would not reduce the habitat of fish and wildlife species; cause a fish or wildlife population to drop below self - sustaining levels; threaten to eliminate a plant or animal community; reduce the M TOWN OF L O S G A T O S G E N E R A L P L A N 2 0 2 0 F E I R ADDENDUM A N A L Y S I S number or restrict the range of a rare or endangered plant or animal; or eliminate examples of major periods of California history or prehistory. Additionally, as with development anticipated under the General Plan 2020, future development associated with the modified project would be consistent with the long -term goals of developing affordable housing in accordance with the Town's General Plan. Because the modified project would result in a decrease in the amount of residential development proposed by the project, the project would ex- acerbate or create any new cumulative impacts. Implementation of the proposed AHOZ by incorporating it into the Town Code would not result in impacts that are individually limited but cumulatively considerable. Cumulative impacts of the modified project would not be greater than those determined by the General Plan EIR. This addendum reviewed the modified project's potential impacts to all of the envi- ronmental topics included in Appendix G of the CEQA Guidelines. The rnitiga- tion measures contained in the General Plan EIR would remain sufficient to ensure that potential impacts remain less than significant and no new significant impacts would occur from implementation of the modified project. The changes to the proposed project evaluated in this addendum would not result in new significant impacts or affect the severity of the identified significant or significant and una- voidable impacts of the General Plan 2020 as evaluated in the certified Final EIR. Therefore, the modified project's impacts to human beings, either directly or indi- rectly, would not be greater than those determined by the General Plan EIR. 70