Loading...
Ord 2216 - Amend Zoning Ordinance Albright Way/WinchesterORDINANCE 2216 ORDINANCE OF THE TOWN OF LOS GATOS RESCINDING ORDINANCES 1247, 1366, AND 1955 AND AMENDING THE ZONING ORDINANCE EFFECTING A ZONE CHANGE FROM CM:PD TO CM:PD AT 90 - 160 ALBRIGHT WAY AND 14600 WINCHESTER BOULEVARD (APNS: 424 -31 -053, 054, 063,424-32-038, 045, 049, 054, 059, 060, 063 ) THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES ORDAIN AS FOLLOWS: SECTION I The Town Code of the Town of Los Gatos is hereby amended to rescind Ordinances 1247, 1366, and 1955 and to change the Zoning at 90 — 160 (Ninety to One Hundred and Sixty) Albright Way and 14600 Winchester Boulevard as shown on the map which is attached hereto as Exhibit A and is part of this Ordinance (the "Property') from CM:PD (Controlled Manufacturing, Planned Development) to CM:PD (Controlled Manufacturing, Planned Development). APN's 424 -31 -053, 054, 063, 424 -32 -038, 045, 049, 054, 059, 060, 063. SECTION lI The PD (Planned Development Overlay) zone established by this Ordinance (the "PD Overlay") authorizes the following construction and use of improvements: 1. The development of the Properly includes up to a maximum of 485,000 square feet of office/R &D space (including office serving amenities), one parking garage, surface parking areas, new access driveways, and new landscaping and open space. 1 2. Uses permitted and conditionally permitted are: Permitted Uses: • Office, including corporate, administrative, business, and professional offices, but excluding medical and dental offices; • Light manufacturing, light assembly, research and development, wholesaling, warehousing, and other light industrial uses (including indoor storage of materials and products); and • Office serving uses designed to serve those employed at the site or visiting the site for other business purposes, such as: recreational facilities; conference and training- facilities; restaurants, cafeterias, and other eating establishments; health and wellness facilities; and ancillary uses such as on -site banking, ATMs, private post offices, personal services (such as dry cleaning pick up), and similar support uses. These office serving and ancillary uses shall not be available to the general public. Conditional Uses: • No conditionally permitted uses are allowed SECTION III COMPLIANCE WITH OTHER DEVELOPMENT STANDARDS All provisions of the Town Code apply, except when the Official Development Plan (as defined in Section V), and/or this ordinance specifically indicate otherwise. 2 SECTION IV Regardless of the type of permit, Architecture and Site Approval is required before any construction work for the project is performed and before any permit for construction is issued. Construction permits shall only be issued in a manner complying with Section 29.80.130 (Architecture and Site Approval) of the Zoning Ordinance. SECTION V The attached Exhibit A (Map) and Exhibit B (Development Plans received by the Town of Los Gatos on June 13, 2013 (21 sheets) constitute the Official Development Plan. The following must be complied with before issuance of any grading, demolition or construction permits, unless otherwise stated below. TO THE SATISFACTION OF THE COMMUNITY DEVELOPMENT DIRECTOR: Planning Division 1. APPROVAL: This application shall be completed in accordance with all of the performance standards listed below and the Official Development Plan. Any further changes or modifications made to the Official Development Plan shall be approved by the Community Development Director, Development Review Committee, Planning Commission or the Town Council, depending on the scope of the change(s). 2. TOWN INDEMNITY: Applicants are notified that Town Code Section 1.10.115 requires that any applicant who receives a permit or entitlement from the Town shall defend, indemnify, and hold harmless the Town and its officials in any action brought by a thud party to overturn, set aside, or void the permit or entitlement. This requirement is a condition of approval of all such permits and entitlements whether or not expressly set forth in the 3 approval. 3. ARCHITECTURE AND SITE (A &S) APPROVAL REQUIRED: A separate A &S application shall be required for future changes to the project. Any future A &S application shall be referred to Planning Commission for a recommendation to Town Council. Town Council shall make the final determination on any future A &S applications. 4. COMMERCIAL DESIGN GUIDELINES: Future A &S applications shall be reviewed for compliance with the Common Design Guidelines of the Commercial Design Guidelines. 5. GUIDELINES AND STANDARDS FOR LAND USE NEAR STREAMS: Future A &S applications shall be reviewed for compliance -with applicable sections of the Guidelines and Standards for Land Use Near Streams. 6. SUBDIVISION REQUIRED: A subdivision map application shall be approved prior to the issuance of building permits. The Development Review Committee may be the deciding body for the tentative map. 7. BUILDING COMPOSITION: The project shall not exceed 485,000 square feet of office/R &D space, inclusive of any indoor conference facilities, cafeteria, fitness center or other amenities. 8. BUILDING HEIGHT: The maximum all inclusive height of the buildings shall be as follows: • Building 1— 50' (fifty feet) • Building 2 — 65' (sixty five feet) • Building 3 — 65' (sixty five feet) • Building 4 — 50' (fifty feet) • Parking Garage 35' (thirty five feet), ' exclusive of tower elements, elevator overrun structures, and other similar architectural elements and inclusive of solar panels with 11 underground parking possible after subsequent review. 9. SETBACKS: Minimum setbacks are as set forth on Sheet A -04 of the Official Development Plan (Exhibit B). 10. LOT COVERAGE: Maximum lot coverage for both buildings and parking structures is limited to 50% of the lot area. 11. OFFICIAL DEVELOPMENT PLANS: The Official Development Plan provides the permitted development parameters applicable to the property. Final building designs in compliance with the Official Development Plan shall be determined during the A &S Approval process. 12. WATER EFFICIENCY: This project is subject to the Town's Water Efficient Landscape Ordinance, Chapter 26, Article IV of the Town Code, or the State Model Water Efficiency Ordinance, whichever is more restrictive. A fee as established by Town Council resolution shall be paid when the landscape, irrigation plans and water calculations are submitted for review prior to the issuance of building permit. 13. COMPLIANCE MEMORANDUM: A memorandum, in compliance with standard Town practice, shall be prepared and submitted with the building permit and final subdivision map detailing how the performance standards will be addressed. 14. LANDSCAPE PLAN: The final landscape plan shall be reviewed by a restoration ecologist for compliance with the Guidelines and Standards for Land Use Near Streams prior to the issuance of a building permit. All Tree Protection measures recommended by the Consulting Arborist in reports dated February 18, 2011, December 18, 2012, and January 16, 2013, shall be followed. 15. TREE REMOVAL PERMIT: A Tree Removal Permit shall be obtained for trees approved for removal prior- to the issuance of any permits. E 16. TREE FENCING: Protective tree fencing shall be placed at the drip line of existing trees and shall remain through all phases of construction. Fencing shall be six foot high cyclone (chain link) attached to two -inch diameter steel posts drive 18 inches into the ground and spaced no further than 10 feet apart. Include a tree protection fencing plan with the construction plans. 17. RECYCLING: Prior to the issuance of a demolition permit, the developer shall provide the Community Development Director with written notice of the company that will be recycling the building materials. All wood, metal, glass, and aluminum materials generated from the demolished structure shall be deposited to a company that will recycle the materials. Receipts from the company(s) accepting these materials, noting type and weight of material, shall be submitted to the Town prior to the Town's demolition inspection. 18. PARKING: The minimum parking ratio for the project is 3.3 spaces /1000 square feet. Wheel stops may be used in the parking garages where deemed appropriate and necessary for safety. Wheel stops shall not be used in any surface parking areas. Parking spaces shall be double striped per Town standards. 19. NETWORK ACCESS: Network access shall be provided in the outdoor common areas, to allow people to work outside. 20. PROJECT PHASING: The project may be constructed in phases. If the applicant/developer elects to build the project in phases, then any undeveloped site(s) for future phase(s) shall include provisions for landscaping and other attractive low maintenance improvements, and security and maintenance of any undeveloped land to be developed under future phases. 21. DEVELOPMENT IMPACT FEES: The developer is required by law to pay development impact fees to the Los Gatos Union School District (LGUSD) and the Los Gatos - Saratoga Union High School District (LGSUHSD) at the time of the building permit issuance. 1 22. LANDSCAPE SCREENING: All buildings and parking structures shall be significantly buffered from Winchester Boulevard and adjacent properties by the existing and proposed tree screen as shown on the Planting Plan. All healthy redwoods and other significant trees along the Winchester Boulevard frontage screen shall be retained except for those that would be removed with the construction of the new signalized project entry or other required roadway improvements as shown on the Tree Disposition Plan. The proposed parking structure would also be screened by the existing vegetation and additional landscaping as shown on the Planting Plan. 23. PERIMETER TREES: The proposed trees to be planted along the perimeter of the property shall be planted during the first phase of construction. 24. TREE MAINTENANCE AGREEMENT: The applicant shall enter into a Tree Maintenance Agreement with the Town for five years for the twelve proposed trees to be transplanted. Should any of the transplanted trees die, the applicant will be required to replace them with trees that are 48 -inch box size at a minimum. 25. MITIGATION MEASURE 4.3 -2, PROTECTION OF NESTING SPECIAL - STATUS AND MIGRATORY BIRDS: hi order to avoid impacts to special - status and migratory bird species during project implementation, the measures outlined below shall be implemented. With the incorporation of the following measures, significant impacts on these species would be avoided: a. The removal of trees and shrubs shall be minimized to the extent feasible. b. If tree removal, pruning, grubbing and demolition activities are necessary, such activities shall be conducted outside of the breeding season (i.e., between September I and January 31), to avoid impacts to nesting birds. 7 c. If tree removal, pruning, grubbing and demolition activities are scheduled to commence during the bird breeding season (i.e., between February 1 and August 31), a preconstruction survey shall be conducted by a qualified biologist no more than two weeks prior to the initiation of work. The preconstruction survey shall include the project footprint and up to a 300 -foot buffer, access and sight -lines permitting. If no active nests of migratory birds are found, work may proceed without restriction and no fiuther measures are necessary. If work is delayed more than two weeks, the preconstruction survey shall be repeated, if determined necessary by the project biologist. d. If active- nests (i.e. nests with eggs or young birds present, or hosting an actively breeding adult pair) of special - status or migratory birds are detected, the project biologist shall designate non - disturbance buffers at a distance sufficient to minimize disturbance based on the nest location, topography, cover, species, and the type /duration of potential disturbance. No work shall occur within the non - disturbance buffers until the young have fledged, as determined by a qualified biologist. The appropriate buffer size shall be determined in cooperation with the CDFW and/or the USFWS. If, despite the establishment of a non - disturbance buffer it is determined that project activities are resulting in nest disturbance, work shall cease immediately and the CDFW and the USFWS shall be contacted for further guidance. e. If project activities must occur within the non - disturbance buffer, a qualified biologist shall monitor the nest(s) to document that no take of the nest (i.e., nest failure) will result. If it is determined that project activities are resulting in nest disturbance, work shall cease immediately and the CDFW and the USFWS shall be contacted for further guidance. 26. MITIGATION MEASURE 4.3 -3, PROTECTION OF ROOSTING BATS: In order to avoid impacts to special - status bat species during project implementation, the measures outlined below shall be implemented. With the incorporation of the following measures, significant impacts on these species would be avoided. a. Prior to the removal or significant pruning of trees and the demolition of 90 Albright Way, a qualified bat biologist shall assess them for the potential to support roosting bats. Suitable bat roosting sites include trees with snags, rotten stumps, and decadent trees with broken limbs, exfoliating bark, cavities, and structures with cracks, joint seams and other openings to interior spaces. If there is no evidence of occupation by bats, work may proceed without further action. b. If suitable roosting habitat is present, the bat biologist shall recommend appropriate measures to prevent take of bats. Such measures may include exclusion and humane eviction (see "o" below) of bats roosting within structures during seasonal periods of peak activity (e.g., February 15 - April 15, and August 15 — October 30), partial dismantling of structures to induce abandonment, or other appropriate measures. c. If bat roosts are identified on the site, the following measures shall be implemented: • If non - breeding/migratory bats are identified on the site within a tree or building that is proposed for removal, then bats shall be passively excluded from the tree or building. This is generally accomplished by opening up the roost area to allow airflow through the cavity /crevice, or installing one -way doors. The bat biologist shall confum that the bats have been excluded from the tree or building before it can be removed. If a maternity roost of a special - status bat species is detected, an appropriate non - disturbance buffer zone shall be established around the roost tree or building site, in consultation with the CDFW. Maternity roost sites may be demolished only when it has been determined by a qualified but biologist that the nursery site is not occupied. 9 Demolition of maternity roost sites may not be performed during seasonal periods of peak activity (e.g., February 15 - April 15, and August 15 - October 30). No additional mitigation for the loss of roosting bat habitat is required. 27. MITIGATION MEASURE 4.3 -6, CREEK PROTECTION: The following measures from the Town's adopted "Guidelines and Standards for Land Use Near Streams" would ensure that site construction and operation would not result in indirect adverse effects on the riparian and aquatic habitats or Los Gatos Creek: Measures to be hnplemented During Project Construction a. Project construction activities shall be restricted to daylight hours; nighttime work shall not be permitted. b. Use of elevated flood lights shall not be permitted; any exterior lighting shall be directed inward and shall not cause the illumination of the adjacent riparian habitat. c. Dust control must be practiced during demolition and grading. d. The Town of Los Gatos routinely requires implementation of protective measures for all projects adjacent to stream courses. For all work adjacent to stream channels, best management practices (BMPs) shall be implemented to prevent bank erosion, sedimentation, release of contaminants, and accidental incursion by construction equipment below the tops of bank. Such measures may include installation of silt fencing, hay bales, straw wattles or other protective devices to prevent the downslope migration of silt or sediment from the construction site. Measures to be Implemented During Project Operation e. Post - construction BMPs incorporated into the project's drainage plan shall comply with Provision C.3.c of the Municipal Regional Stormwater Permit (see Impact 4.5 -5 in Section 4.3, Hydrology and Water Quality, for more discussion) to ensure that no 10 significant adverse effects on water quality of Los Gatos Creek or the adjacent riparian habitat would result. f Exterior lighting_ shall be directed inward and shall not cause the illumination of the adjacent riparian habitat. g. Restrictions shall be in place to prevent the placement of pet food containers by employees outdoors in areas accessible to wildlife. h. Free - roaming domestic pets (e.g., cats, off -leash dogs) of employees shall not be ,permitted. i. All exterior trash receptacles shall be designed and maintained to exclude wildlife. j. All storm water treatment facilities must be in accordance with local and regional water quality standards to ensure there is no release of contaminants into the aquatic environment. 28. MITIGATION MEASURE 4.4 -3a, FILL REMOVAL: In accordance with the recommendations of the project geotechnical report, the project sponsor shall require the removal of existing fill materials within proposed building excavations to a lateral distance of at least 5 feet beyond the building footprint or to a lateral distance equal to the fill depth below the perimeter footing, whichever is greater. Reuse of the fill materials shall only be allowed if they meet the requirements for engineered fill specified in the geotechnical report for the project. Materials such as debris, wood, and trash that do not meet the requirements shall be screened out of the fill materials and removed from the site. Fill materials shall be placed in lifts and compacted in accordance with the compaction requirements specified in the geotechnical report. While it is preferable to replace all existing fills with engineered fills, those fill materials extending into planned pavement and flat work areas (e.g. pedestrian concrete and pavers) I may be left in place at the project sponsor's option. However, the project sponsor must determine that the fills are of low risk for future differential settlement and ensure that the upper 12- to 18- inches of fill below the subgrade is re- worked and compacted in accordance with the compaction requirements specified in the geotechnical report. If there are updates or revisions to the project geotechnical report, the above mitigation requirements shall be revised to match the updated recommendations as necessary. 29. MITIGATION MEASURE 4.4 -313, ABANDONMENT OF EXISTING UTILITIES: In accordance with the recommendations of the project geotechnical report, the project sponsor shall ensure that existing utilities are completely removed fiom all building areas. A utility may only be abandoned in place if it would not pose an unacceptable risk, and if approved by the geotechnical engineer. If abandoned in place, the utility must be completely backfilled with grout or sand - cement slurry and the ends outside of the building area must be capped with concrete. Trench fills must also be removed and replaced with engineered fill with the trench side slopes flattened to at least 1:1. If there are updates or revisions to the project geotechnical report, the above mitigation requirements shall be revised to match the updated recommendations as necessary. 30. MITIGATION MEASURE 4.4 -3C, EXCAVATION SAFETY: In accordance with the recommendations of the project geotechnical report, the project sponsor shall ensure that the below grade excavations within the upper five feet below the building subgrade are sloped at 3:1 (vertical:horizontal) and that those deeper than five feet below the building subgrade as well as those excavations in pavement and flatwork areas are sloped at a maximum inclination of 1.5:1. Alternatively, temporary shoring may be used to support the excavations. The design of the shoring shall be left to the construction contractor's judgment, but shall comply with the standards set forth in the geotechnical report for the project. A California- 12 licensed civil or structural engineer must design and be in charge of the temporary shoring design. The shoring shall support adjacent improvements such as utilities, pavements, and buildings. A pre - condition survey shall be conducted including photographs and installation of monitoring points for existing site improvements. All sensitive improvements shall be located and monitored for horizontal and vertical deflections and distress cracking based on the pre - construction survey. For multi -level excavations, the installation of inclinometers at critical areas may be required for more detailed deflection monitoring. The monitoring frequency shall be established and agreed to by the project team prior to start of shoring construction. If there are updates or revisions to the project geotechnical report, the above mitigation requirements shall be revised to match the updated recommendations as necessary. 31. MITIGATION MEASURE 4.4 -3D, IMPLEMENT RECOMMENDATIONS OF GEOTECHNICAL REPORT: The project sponsor shall implement all of the recommendations of the project geotechnical report, and any associated updates or revisions, related to review of plans and specifications for proposed buildings; demolition observation and testing; construction observation and testing; site demolition, clearing, and preparation; subgrade preparation; subgrade stabilization; material for fill; compaction requirements; trench backfill; site drainage; foundations; concrete slabs and pedestrian pavements; vehicular pavements; and retaining walls. 32. MITIGATION MEASURE 4.7 -1, ADMINISTRATIVE CONTROLS: Prior to Grading Permit issuance, the project applicant shall demonstrate to the satisfaction of the Town of Los Gatos Public Works Department that the project complies with the following: a. Pursuant to the Town of Los Gatos Municipal Code Section 16.20.035, construction activities (including operation of haul and delivery tucks) shall occur between the hours 13 of 8:00 a.m. and 8:00 p.m. on weekdays and 9:00 a.m. and 7:00 p.m. on weekends and holidays. Additionally, pursuant to Municipal Code Section 16.20.035(2) the Contractor shall demonstrate, to the satisfaction of the Town of Los Gatos Public Works Department, that construction noise shall not exceed 85 dBA outside of the property line. This shall be accomplished through the use of properly maintained mufflers and other state - required noise attenuation devices. b. Property occupants located adjacent to the project boundary shall be sent a notice, at least 15 days prior to commencement of construction of each phase, regarding the construction schedule of the proposed project. A sign, legible at a distance of 50 feet shall also be posted at the project construction site. All notices and signs shall be reviewed and approved by the Town of Los Gatos Public Works Department prior to mailing or posting and shall indicate the dates and duration of construction activities, as well as provide a contact name for the contractor's Noise Disturbance Coordinator and a telephone number where residents can contact that person about the construction process and register complaints. c. The Contractor shall provide, to the satisfaction of the Town of Los Gatos Public Works Department, a qualified "Noise Disturbance Coordinator." The Disturbance Coordinator shall be responsible for responding to any local complaints about construction noise. When a complaint is received, the Disturbance Coordinator shall notify the Town within 24 -hours of the complaint and determine the cause of the noise complaint (e.g., starting too early, bad muffler, etc.) and shall implement reasonable measures to resolve the complaint, as deemed acceptable by the Public Works Department. d. Construction haul routes shall be designed to avoid noise sensitive uses (e.g., residences, convalescent homes, etc.) to the extent feasible and shall be restricted to collector streets 14 in the project vicinity (i.e. Winchester Boulevard and Lark Avenue). e. During construction, stationary construction equipment shall be placed such that emitted noise is directed away from sensitive noise receivers. 33. MITIGATION MEASURES 4.7 -2, VIBRATION CONTROLS: To prevent cosmetic damage to existing adjacent structures, the project contractor shall avoid use of large, track- mounted vibratory compactors within 15 feet of adjacent structures, and shall not use any equipment that generates vibration levels that exceed 0.5 in/see PPV, the cosmetic damage threshold for transient-vibration, when measured at the closest residential structures. 34. MITIGATION MEASURE 4.8 -1a, BAAQMD BASIC AND ADDITIONAL CONSTRUCTION MITIGATION MEASURES: Prior to issuance of any Grading or Demolition Permit, the Town Engineer and the Chief Building Official shall confirm that the Grading Plan, Building Plans, and specifications stipulate that the following basic and enhanced construction mitigation measures shall be implemented as required by BAAQMD Guidelines while project phases are under construction: • Water all active construction areas to maintain 12% soil moisture. • All grading shall be suspended when winds exceed 20 miles per hour. • All haul trucks transporting soil, sand, or other loose material off -site shall be covered. • Pave, apply water three times daily, or apply (non - toxic) soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites. Hydroseed or apply non -toxic soil stabilizers to inactive construction areas (previously graded areas inactive for ten days or more). Enclose, cover, water twice daily or apply non -toxic soil binders to exposed stockpiles (dint, sand, etc.). 15 • All visible mud or dirt track -out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. Install sandbags or other erosion control measures to prevent silt runoff to public roadways. • Wind breaks and perimeter sand bags shall be used to minimize erosion. • The amount of simultaneously disturbed surface shall be minimized as much as possible. • Site access points from public roadways shall be paved or treated to prevent track -out. • Replace vegetation in disturbed areas as quickly as possible. • All vehicle speeds on unpaved roads shall be limited to 15 mph. • All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. • Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to two rninutes. Clear signage shall be provided for construction workers at all access points. • All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. Post a publicly visible sign with the telephone number and person to contact at the Town regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD's phone number shall also be visible to ensure compliance with applicable regulations. 35. MITIGATION MEASURE 4.8 -1B, BAAQMD ARCHITECTURAL COATINGS: Prior to issuance of any Building Permit, the Chief Building Official shall confirm that the Building Plans and specifications include the following BAAQMD additional construction mitigation measures (during the application of architectural coatings in Years 3 and 4): 16 Use low volatile organic compounds (VOC) (i.e., reactive organic gases [ROG]) coatings beyond the BAAQMD requirements (i.e., Regulation 8, Rule 3: Architectural Coatings). • VOC content of architectural coatings shall not exceed 150 grams VOC per liter of coating. 36. MITIGATION MEASURE 4.8 -1C, HAUL TRUCK VMT LIMITS: The following limitations shall be adhered to during soil hauling activities (during mass and fine grading) for construction Years 1 and 2 only in order to ensure NOX emissions would be reduced to less - than - significant levels: Phase 1 (Year 1): Trucks hauling soil during Phase 1, shall not exceed a vehicle miles traveled (VMT) per day during mass grading of 1,653 miles. Phase 2 (Year 2): Trucks hauling soil during Phase 2 shall not travel more than 1,943 VMT. VMT during fine grading shall not exceed 545 miles (NOX mitigation is not necessary in Year 3). Phase 3 (Years 4 and 5): No mitigation is necessary. Per BAAQMD policy, these travel distance limits are daily averages for a 7 -day week. VMT's shall be logged weekly and supplied to the Town Engineer and the Chief Building Official on a monthly basis. These limitations shall be stipulated in construction bids, plans, and specifications. 37. MITIGATION MEASURE 4.9 -1, GHG REDUCTION MEASURES: Prior to the issuance of building permits, the applicant shall demonstrate the incorporation of a combination (one or more) of sustainable project design features that would meet the EIR significance threshold of 4.6 MT CO2e /sp /year. The applicant's current proposal is to implement the GHG mitigation measures identified in Table 4.9 -2 of this EIR, which would achieve the 17 reductions necessary to achieve the 4.6 MT CO2e /sp /year threshold. Those measures shall be carried out, except that, at the applicant's election and subject to approval by the Community Development Director, the applicant may substitute alternative measures of equivalent effectiveness to one or more of the measures identified in Table 4.9 -2. In the event that the BAAQMD has assigned percent reductions for such alternative measures, such reductions shall be considered by Town Staff in determining whether such measures holy are equivalent in their effectiveness to those identified in Table 4.9 -2. The following menu of measures provides examples of potential alternatives to the measures already accounted for in Table 4.9 -2: Include solar photovoltaic or other technology to generate electricity on -site to reduce consumption from the electrical grid. • Implement an employee telecommuting program. • hmplement an on -site carpool matching program for employees. • 100% Increase in Diversity of Land Uses (provide on -site employee amenities). • Increase Energy Efficiency Beyond Title 24. • Work with the Bay Area Air Quality Management District ( BAAQMD) to implement acceptable off -site mitigation. This would involve an agreement with the BAAQMD and payment of fees or the purchase of carbon credits. The BAAQMD would commit to reducing the type and amount of emissions identified in the agreement. 38. MITIGATION MEASURE 4.10 -2, HAZARDOUS BUILDING MATERIALS SURVEYS AND ABATEMENT: Prior to demolition of each building, the project applicant shall incorporate into contract specifications the requirement that the contractor(s) have a hazardous building materials survey completed by a Registered Environmental Assessor or a registered engineer. This survey shall be completed prior to any demolition activities M associated with the project. If any friable asbestos - containing materials or lead- containing materials are identified, adequate abatement practices, such as containment and/or removal, shall be implemented in accordance with applicable laws prior to demolition. Specifically, asbestos abatement shall be conducted in accordance with Section 19827.5 of the California Health and Safety Code, as implemented by the BAAQMD, and 8 CCR Section 1529 and Sections 341.6 through 341.14, as implemented by Cal/OSHA. Lead -based paint abatement shall be conducted in accordance with Cal/OSHA's Lead in Construction Standard. Any PCB - containing equipment, fluorescent light tubes containing mercury vapors, and fluorescent -light ballasts containing DEHP shall also be removed and legally disposed of in accordance with applicable laws including 22 CCR Section 66261.24 for PCBs, 22 CCR Section 66273.8 for fluorescent lamp tubes, and 22 CCR Division 4.5, Chapter 11 for DEHP. 39. MITIGATION MEASURE 4.10 -3A, UPDATE ENVIRONMENTAL DATABASE REVIEW: The project applicant shall retain a qualified professional to update the environmental database review performed as part of the Phase 1 Environmental Site Assessment no more than three months prior to the start of any construction activities that would involve disturbance of greater than 50 cubic yards of soil. The qualified professional shall prepare a report summarizing the results of the environmental database review that assesses the potential for any identified chemical release sites to affect soil quality at the proposed project site and identifies appropriate soil analysis to evaluate the potential for soil contamination at the proposed project site, if needed. In response, the project applicant shall implement the recommended soil analyses, if any. 40. MITIGATION MEASURE 4.10 -313, CONTINGENCY PLAN: The project applicant shall require the construction contractor(s) to have a contingency plan for sampling and analysis of potential hazardous materials and for coordination with the Santa Clara County Department 19 of Environmental Health.in accordance with the Voluntary Cleanup Program in the event that previously unidentified hazardous materials are encountered during construction. If previously unidentified soil contamination is identified, per the contingency plan, the contractor(s) shall be required to modify their health and safety plan to include the new data, conduct sampling to assess the chemicals present, and identify appropriate disposal methods. Evidence of potential contamination includes soil discoloration, suspicious odors, the presence of underground storage tanks, or the presence of buried building materials. 41. MITIGATION MEASURE 4.11 -2A, ARCHAEOLOGICAL MONITOR: A qualified archaeologist shall be retained to monitor the site clearing and grading operations in those areas where buildings will be removed and/or new construction will occur. The archaeologist shall be present on -site to observe site clearing at a representative sample of building removal areas until he /she is satisfied that there is no longer a potential for finding buried resources. In the event that any potentially significant archaeological resources (i.e., potential historical resources or unique archaeological resources) are discovered, the project archaeologist shall stop work inside a zone designated by him/her where additional archaeological resources could be found. A plan for the evaluation of the resource shall be submitted to the Community Development Director for approval. Evaluation normally takes the forth of limited hand excavation and analysis of materials and information removed to determine if the resource is eligible for inclusion on the California Register of Historic Resources (CRHR). 42. MITIGATION MEASURE 4.11 -213, IDENTIFICATION OF ELIGIBLE RESOURCES: If an eligible resource (i.e., an historical resource or a unique archaeological resource) is identified, a plan for mitigation of impacts to the resource shall be submitted to the Community Development Department for approval before any additional construction related W1 earthmoving can occur inside the zone designated as archaeologically sensitive. Whether the proposed plan is feasible shall be determined by the Community Development Department after consideration of the viability of avoidance in light of project design and logistics. In lieu of avoidance, mitigation could include additional hand excavation to record and remove for analysis significant archaeological materials, combined with additional archaeological monitoring of soils inside the archaeologically sensitive zone. 43. MITIGATION MEASURE 4.11 -2C, DISCOVERY OF HUMAN REMAINS: Required monitoring will also serve to identify and reduce damage to human burials and associated grave goods. In the event that human remains are discovered, it shall be the responsibility of the project archaeologist to contact the County Coroner's Office and the Native American Heritage Commission (NAHC). The NAHC is responsible for naming a Most Likely Descendant (MLD) who shall represent tribal interests in regards to human remains and associated grave goods. The MLD shall make recommendations to the Community Development Director regarding the method for exposure and removal of human burials and associated grave goods, and shall advise the Community Development Director regarding the place and method of reburial of these materials. 44. MITIGATION MEASURE 4.11 -3, HALT CONSTRUCTION AND EVALUATE RESOURCE: Prior to the commencement of construction activities, the project applicant shall provide for a qualified paleontologist to provide construction personnel with training on procedures to be followed in the event that a fossil site or fossil occurrence is encountered during construction. The training shall include instructions on identification techniques and how to further avoid disturbing the fossils until a paleontological specialist can assess the site. An informational package shall be provided for construction personnel not present at the meeting. 21 In the event that a paleontological resource (fossilized invertebrate, vertebrate, plan or micro - fossil) is found during construction, excavation within 50 feet of the find shall be temporarily halted or diverted until the discovery is evaluated. Upon discovery, the Community Development Director shall be notified immediately and a qualified paleontologist shall be retained to document and assess the discovery in accordance with Society of Vertebrate Paleontology's 2010 Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources, and determine procedures to be followed before construction is allowed to resume at the location of the find. If the Community Development Director determines that avoidance is not feasible, the paleontologist will prepare an excavation plan for mitigating the project's impact on this resource, including preparation, identification, cataloging, and curation of any salvaged specimens. 45. COMMUNITY BENEFIT: Community Benefit is required as offered by the applicant in Exhibit 9 of Attachment 4 and Attachment 9 of the Town Council Staff Report for their meeting on May 20, 2013. These Community Benefit offerings are above and beyond what can be required of the applicant by other current Town Policy and include: • $1 per constructed square foot of newly constructed office /R &D buildings at the time of Certificate and Occupancy; and • Dirt from the site as might be timely available for improvements to the Los Gatos Creek Trail. 46. KEEP CLEAR: Applicant shall provide "Keep Clear" or other appropriate roadway markings and signage at the intersection of Charter Oaks Drive and Lark Avenue as soon as possible following a traffic safety study. 47. SIGNS: There will be no fi-eeway visible signage. 22 Building Division 48. PERMITS REQUIRED: A separate building permit shall be required for the demolition(s) of existing buildings and each new office /commercial building and the parking garage structure. Separate permits are required for electrical, mechanical, and plumbing work as necessary 49. CONDITIONS OF APPROVAL: The Conditions of Approval must be blue -lined in full on the second sheet of the construction plans. A Compliance Memorandum shall be prepared and submitted with the building permit application detailing how the Conditions of Approval will be addressed. 50. SIZE OF PLANS: Four sets of construction plans, size 30" x 42" maximum. 51. STREET NAMES, BUILDING & SUITE NUMBERS: Submit requests for new street names and/or building addresses /suite numbers to the Building Division prior to submitting for the building permit application process. 52. SOILS REPORT: A soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations, shall be submitted with the building permit application. This report shall be prepared by a licensed civil engineer specializing in soils mechanics. 53. DEMOLITION REQUIREMENTS: Obtain Building Department Demolition Applications and Bay Area Air Quality Management District Applications from the Building Department Service Counter. Once the Demolition Forms have been completed, all signatures obtained, and written verification from PG &E that all utilities have been disconnected, return the completed Forms to the Building Department Service Counter with the Air District's J# Certificate(s), PG &E verification, and three (3) sets of Site Plans showing all existing structures, existing utility service lines such as water, sewer, and PG &E. No demolition work shall be done without first obtaining a Permit fiom the Town. 23 54. SHORING: Shoring plans and calculations will be required for all excavations which exceed four (4) feet in depth or which remove lateral support from any existing building, adjacent property or the public right -of -way. Shoring plans and calculations shall be prepared by a California licensed engineer and shall conform to Cal/OSHA regulations. 55. FOUNDATION INSPECTIONS: A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project building inspector at foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and that the building pad elevations and on -site retaining wall locations and elevations have been prepared according to the approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. Building pad elevation b. Finish floor elevation c. Foundation corner locations d. Retaining Walls 56. TITLE 24 ENERGY COMPLIANCE: All required California Title 24 Energy Compliance Forms must be blue -lined (sticky- backed) onto a sheet of the plans. 57. BACKWATER VALVE: The scope of this project may require the installation of a sanitary sewer backwater valve per Town Ordinance 6.50.025. Please provide information on the plans if a backwater valve is required and the location of the installation. The Town of Los Gatos Ordinance and West Valley Sanitation District (WVSD) requires backwater valves on drainage piping serving fixtures that have flood level rims less than 12- inches above the elevation of the next upstream manhole. 58. FIRE ZONE: This project will require Class A Roof Assemblies. 59. SPECIAL INSPECTIONS: When a special inspection is required by CBC Section 1704, the 24 architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permit. The Town Special Inspection form must be completely filled -out, signed by all requested parties, and be blue- lined on the construction plans. Special Inspection forms are available from the Building Division Service Counter or online at www.losgatosea.gov /building 60. NONPOINT SOURCE POLLUTION STANDARDS SHEET: The Town standard Santa Clara County Valley Nonpoint Source Pollution Control Program Sheet (or Clean Bay Sheet 24x36) shall be part of the plan submittal as the second or third page. The specification sheet is available at the Building Division Service Counter for a fee of $2 or at San Jose Blue Print for a fee. 61. NPDES -C.3 DATA FORMS: Copies of the NPDES C.3 Data Forms (updated based on the final construction drawings) must be blue -lined in fall onto the Plans. In the event that this data differs significantly from any Planning approvals, the Town may require recertification of the project's storm water treatment facilities prior to release of the Building Permit. 62. GREEN BUILDING STANDARDS: This project must, at a minimum, be in compliance with the Nonresidential Mandatory Measures of the 2010 California Green Building Standards Code and all subsequent Amendments. 63. SITE ACCESSIBILITY: At least one accessible route within the boundary of the site shall be provided fi-om public transportation stops, accessible parking and accessible passenger loading zones and public streets or sidewalks to the accessible building entrance that they serve. The accessible route shall, to the maximum extent feasible, coincide with the route for the general public. At least one accessible route shall connect all accessible buildings, facilities, elements and spaces that are on the same site. If access is provided for pedestrians from a pedestrian tunnel or elevated walkway, entrances to the buildings from each tunnel or 25 walkway must be accessible. 64. ACCESSIBLE PARKING: The parking lots, as well as the parking structure, where parking is provided for the public as clients, guests or employees, shall provide handicap accessible parking. Accessible parking spaces serving a particular building shall be located on the shortest accessible route of travel fiom adjacent parking to an accessible enhance. In buildings with multiple accessible entrances with adjacent parking, accessible parking spaces shall be dispersed and located closest to the accessible entrances. 65. APPROVALS REQUIRED: The project requires the following departments and agencies approval before issuing a building permit: a. Community Development — Planning Division:. Joel Paulson (408) 354 -6879 b. Engineering /Parks & Public Works Department: Maziar Bozorginia (408) 395 -3460 c. Santa Clara County Fire Department: (408) 378 -4010 d. West Valley Sanitation District: (408) 378 -2407 e. Bay Area Air Quality Management District: (415) 771 -6000 Local School District: The Town will forward the paperwork to the appropriate school district(s) for processing. A copy of the paid receipt is required prior to permit issuance. TO THE SATISFACTION OF THE PARKS AND PUBLIC WORKS DIRECTOR: Engineering Division 66. GENERAL: All public improvements shall be made according to the latest adopted Town Standard Drawings and the Town Standard Specifications. All work shall conform to the applicable Town ordinances. The adjacent public right -of -way shall be kept clear of all job related dirt and debris at the end of the day. Dirt and debris shall not be washed into storm drainage facilities. The storing of goods and materials on the sidewalk and /or the street will 26 not be allowed unless a special permit is issued. The developer's representative in charge shall be at the job site during all working hours. Failure to maintain the public right -of -way according to this condition may result in the Town performing the required maintenance at the developer's expense. 67. GRADING PERMIT: A grading permit is required for site grading and drainage. The grading permit application (with grading plans) shall be made to the Engineering Division of the Parks & Public Works Department located at 41 Miles Avenue. The grading plans shall include final grading, drainage, retaining wall location, driveway, utilities and interim erosion control. Grading plans shall list earthwork quantities and a table of existing and proposed impervious areas. Unless specifically allowed by the Parks and Public Works Director, the grading permit will be issued concurrently with the building permit. The grading permit is for work outside the building footprint(s). A separate building permit, issued by the Building Department at 110 E. Main Street is needed for grading within the building footprint. 68. GRADING PERMIT PHASING: Phased grading permits may be allowed if approved by the Town Attorney and the Parks and Public Works Director. Phasing may relate to development phases or to multiple grading permits within a development phase, such as early release of a grading permit prior to release of the building permit, or for utility relocation. Bonding of early grading improvements may be required. 69. PILE DRIVING: No pile driving shall be allowed during any phase of construction. 70. TENTATIVE MAP: A tentative map is required, either one tentative map for the proposed project or more than one tentative map, depending on phasing, prior to submittal for one or more final or parcel maps. Phased subdivision maps shall be permitted. 71. SUBDIVISION MAP: A final or parcel map shall be recorded. Two copies of the final / parcel map shall be submitted to the Engineering Division of the Parks & Public Works 27 Department for review and approval. Submittal shall include closure calculations, title reports and appropriate fee. The map shall be recorded before any building permits are issued. Tentative Map planning applications shall be approved for each development phase before a parcel or final map for that phase is recorded. 72. RIGHT OF WAY VACATION: The Albright Way and Albright Court right of ways shall be vacated prior to or concurrently with the first subdivision map. Street vacation or issuance of an encroachment permit shall occur prior to issuance of permits allowing private work to . commence in street right of way areas. 73. PUBLIC EASEMENT ABANDONMENT: The initial public easements to be abandoned shall occur prior to or simultaneously with the street vacation or issuance of an encroachment permit. Subsequent public easement abandonments may be approved by the Director of Parks , and Public Works. 74. ENCROACHMENT PERMIT: All work in the public right -of -way will require a Construction Encroachment Permit. All work over $5,000 will require construction security. 75. DEDICATIONS: The following shall be dedicated on each subdivision map. The dedications shall be recorded before any permits are issued. a. Winchester Boulevard. Right of way as needed to accommodate required frontage and site entry improvements. b. Public Service Easements (PSE), as required. c. Ingress - egress, storm drainage and sanitary sewer easements, as required. d. Emergency Access Easement. Extending from the northerly terminus of Charter Oaks, through the project site, to Winchester Blvd. sufficient to meet the Fire Department's requirements. No private vehicle access will be permitted between Charter Oaks to the project site utilizing this Easement. NJ 76. PAD CERTIFICATION: A letter fiom a licensed land surveyor shall be provided for each building stating that the building foundation was constructed in accordance with the approved plans shall be provided subsequent to foundation construction and prior to construction on the structure. The pad certification shall address both vertical and horizontal foundation placement. 77. DESIGN CHANGES: The Applicant's registered Engineer shall notify the Town Engineer, in writing, at least 72 hours in advance of all differences between the proposed work and the design indicated on the plans. Any proposed changes shall be subject to the approval of the Town before altered work is started. Any approved changes shall be incorporated into the final "as- built" drawings. 78. AS -BUILT PLANS: After completion of the construction of all work, the original plans shall have all changes (change orders and field changes) clearly marked. The "as- built" plans shall again be signed and "wet- stamped" by the civil engineer who prepared the plans, attesting to the changes. The original "as- built" plans shall be review and approved the Engineering Inspector. A Mylar and AutoCAD disk of the approved "as- built" plans shall be provided to the Town before the Faithful Performance Security or Occupancy Permit is released. The AutoCAD file shall include only the following information and shall conform to the layer naming convention: a) Building Outline, Layer: BLDG - OUTLINE; b) Driveway, Layer: DRIVEWAY; c) Retaining Wall, Layer: RETAINING WALL; d) Swimming Pool, Layer: SWIMMING -POOL; e) Tennis Court, Layer: TENNIS- COURT; f) Property Line, Layer: PROPERTY -LINE; g) Contours, Layer: NEWCONTOUR. All as -built digital files must be on the same coordinate basis as the Town's survey control network and shall be submitted in AutoCAD version 2000 or higher. 79. FINISHED FLOOR ELEVATIONS: Finished floor elevations for all new inhabitable buildings shall be higher than the 100 -year water surface elevations identified on Flood Insurance Rate Maps current at the time of building permit issuance. 80. PLAN CHECK FEES: Plan check fees shall be deposited with the Town prior to plan review at the Engineering Division of the Parks and Public Works Department. 81. INSPECTION FEES: Inspection fees shall be deposited with the Town prior to issuance of any Permit or recordation of the Final Map. 82. PUBLIC WORKS INSPECTIONS: The developer or his representative shall notify the Engineering Inspector at least twenty -four (24) hours before starting any work pertaining to on -site drainage facilities, grading or paving, and all work in the Town's right -of -way. Failure to do so will result in rejection of work that went on without inspection. 83. THIRD PARTY INSPECTOR FEES: The applicant shall pay for the inspection of public street lighting and traffic signal related work. Inspections shall be performed by the Town's street lighting and traffic signal contractor. An initial deposit of $5,000 shall be made to the Town prior to issuance of an encroachment or public improvement permit. Inspection will be on a cost recovery basis and additional inspection fees may be required. 84. SOILS ENGINEER CONSTRUCTION OBSERVATION: During construction, all excavations and grading shall be inspected by the applicant's soils engineer prior to placement of concrete and/or backfill so they can verify that the actual conditions are as anticipated in the design -level geotechnical report, and recommend appropriate changes in the recommendations contained in the repot, if necessary. The results of the construction observation and testing should be documented in an "as- built" letter /report prepared by the applicants' soils engineer and submitted to the Town before final release of any occupancy permit is granted. 85. WATER DESIGN: Water plans prepared by SJWC must be reviewed and approved prior to 30 issuance of any permit for each development phase, subject to the discretion of the Town Engineer. 86. STORMWATER MANAGEMENT PLAN: A storm water management plan shall be included with each phased grading permit application for all Group 1 and Group 2 projects as defined in the amended provisions C.3 of the amended Santa Clara County NPDES Permit. The plan shall delineate source control measures and BMP's together with the sizing calculations. The plan shall be certified by a professional pre - qualified by the Town. In the event that storm water measures proposed for the A &S approval differ significantly from those certified on the Building/Grading- Permit, the Town may require a modification of the A &S approval prior to release of the Building Permit. The applicant may elect to have the A &S submittal certified to avoid this possibility. 87. AGREEMENT FOR STORMWATER BEST MANAGEMENT PRACTICES INSPECTION AND MAINTENANCE OBLIGATIONS: The property owner or Owner's Association, as appropriate, shall enter into an agreement with the Town for maintenance of the stormwater filtration devices required to be installed on this project by Town's Stormwater Discharge Permit and all current amendments or modifications. The agreement will specify that certain routine maintenance, including catch basin cleaning and pavement sweeping, shall be performed by the property owner or owner's association, as applicable, and will specify device maintenance reporting requirements. The agreement will also specify routine inspection requirements, permits and payment of fees. The agreement shall be recorded prior to release of any occupancy permits. 88. SITE DRAINAGE: All storm drain inlets (public or private) shall be stenciled/signed with appropriate "NO DUMPING - Flows to Bay" NPDES required language. 89. NPDES 1: On -site drainage systems for all projects shall conform to the requirements of the 31 Municipal Regional NPDES Permit that is current at the time of A &S approval for each development phase. Each development phase must provide, at a minimum, sufficient improvements to treat all development within that phase. Deferral of treatment to future phases will not be allowed. 90. NPDES 2: Prior to issuance of a building permit for each new building, landscape plans shall be submitted to Community Development for review and approval to insure that beneficial landscaping has been incorporated into the design to minimize inigation runoff and use of pesticides and fertilizers. 91. WEST VALLEY SANITATION DISTRICT: All sewer connection and treatment plant capacity fees for a project phase shall be paid either immediately prior to the recordation of any subdivision map for that phase, or immediately prior to the issuance of a sewer connection permit, which ever event occurs first. Written confirmation of payment of these fees shall be provided prior to recordation of each map or issuance of a building permit. 92. SANITARY SEWER LATERAL: Sanitary sewer laterals are televised by West Valley Sanitation District and approved by the Town of Los Gatos before they are used or reused. Install a sanitary sewer lateral clean-out at the property line. 93. SANITARY SEWER BACKWATER VALVE: Drainage piping serving fixtures which have flood level rims less than twelve (12) inches (304.8 mm) above the elevation of the next upstream manhole and/or flushing inlet cover at the public or private sewer system serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve. Fixtures above such elevation shall not discharge through the backwater valve, unless first approved by the Administrative (Sec. 6.50.025). The Town shall not incur any liability or responsibility for damage resulting from a sewer overflow where the property owner or other person has failed to install a backwater valve, as defined section 32 103(e) of the Uniform Plumbing Code adopted by section 6.50.010 of the Town Code and maintain such device in a functional operating condition. Evidence of West Valley Sanitation District's decision on whether a backwater device is needed shall be provided prior to issuance of a building permit. 94. TRASH ENCLOSURES: Trash enclosures shall be covered and provided with a drain connected to the sanitary sewer system. No trash enclosure shall be placed between a building and a residential area. 95. GREASE TRAPS: Meet all requirements of the Santa Clara County Health Department and West Valley Sanitation District for the interception, separation or pretreatment of effluent. 96. UTILITIES: All new utilities shall be placed underground. 97. ABOVE GROUND UTILITIES: The applicant shall submit a 75- percent progress print to the Town for review of above ground utilities including backflow prevention devices, fine department connections, gas and water meters, off - street valve boxes, hydrants, site lighting, electrical/communication/cable boxes, transformers, and mail boxes. Above ground utilities shall be reviewed and approved by the Community Development Director prior to issuance of any permit for each development phase. 98. UTILITY RELOCATION AND PHASING: Utility and circulation relocation and phasing plans shall be included in the grading permit application package. 99. PHOTOMETRICS: Site lighting photometrics shall be provided with each Architecture and Site application. 100. UTILITY COMPANY REVIEW: Letters from the electric, telephone, cable, and hash companies indicating that the proposed improvements and easements are acceptable shall be provided prior to recordation of each subdivision map. 101. JOINT TRENCH PLANS: Joint trench plans shall be reviewed and approved by the Town 33 prior to recordation of each map. The joint trench plans shall include street and/or site lighting and associated photometrics. A letter shall be provided by PG &E stating that public street light billing will be by Rule LS2A, and that private lights shall be metered with billing to the owner. Pole numbers, assigned by PG &E, shall be clearly delineated on the plans. 102. TRENCHING: Trenching within public streets will be allowed subject to the following requirements: a. The Town standard "T" trench detail shall be used. b. A Town approved colored controlled density backfill shall be used. c. The total asphalt thickness shall be a minimum of 3- inches or shall match the existing _ thickness, whichever is greater. The final lift shall be 1.5- inches of half inch medium asphalt. The initial lift(s) shall be of three quarter inch medium asphalt. d. The Contractor shall schedule a pre - paving meeting with the Town Engineering Construction Inspector the day the paving is to take place. e. A slurry seal topping may be required by the construction inspector depending his assessment of the quality of the trench paving. If required, the slurry seal shall extend the full width of the street and shall extend 5 -feet beyond the longitudinal limits of trenching. Slurry seal materials shall be approved by the Town Engineering Construction Inspector prior to placement. Black sand may be required in the slurry mix. All existing striping and pavement markings shall be replaced upon completion of slurry seal operations. 103. TRAFFIC IMPACT MITIGATION FEE: The developer shall pay a fee proportional to the project's share of transportation improvement needed to serve cumulative development within the Town of Los Gatos. The fee amount will be based upon the Town Council resolution in effect at the time the building permit application is made. The fee shall be paid before the building permit is issued. The traffic impact mitigation fee for this project, using the current ga fee schedule and addition of 235,000 square -feet of Office Park (ITE Code 750) is $149,280. The final fee shall be calculated from the final plans using the rate schedule in effect at the time of the building permit application, using a trip generation rate based on use. 104. TRAFFIC IMPACT COMMUNITY BENEFIT: The developer is required to provide Community Benefit based on the Town Traffic Impact Policy. 105. LARK/UNIVERSITY TRAFFIC SIGNAL: Prior to issuance of a building permit or recordation of any map, the developer shall pay $184,089.52 to reimburse the Town for their fair share contribution towards the construction of a traffic signal at the intersection of University Avenue and Lark Avenue. The contribution is based on 46- percent of the total construction and design cost of $397,550.63. 106. PARKING. Any proposed parking restrictions on public streets must be approved by the LGPD. 107. TRAFFIC SIGNAL: A new intersection aligned with the existing Courtside driveway on Winchester Boulevard, and conversion of the existing Albright Way intersection to right -turn in and out shall be provided with the Phase 1 development. A full traffic signal, signal interconnection and timing shall be provided prior to issuance of the first certificate of occupancy. 108. TRAFFIC SIGNAL TIMING AND SYNCHRONIZATION: The applicant shall provide a proposal from a licensed traffic engineer containing a scope of work for developing a method of interconnection, coordination, and timing of the traffic signals along Winchester from the new project signal to Winchester/Wimbledon to Lark/Winchester and on to Lark/University. New conduit is required in locations where street widening is proposed. The proposal and method of signal coordination shall be reviewed and approved by Town Engineer. Signal coordination shall be in place prior to occupancy of Phase 1 building, and re -timed again 35 once each building has reached a significant level of occupancy. A bond for the signal coordination up to two times subsequent to the initial work performed prior. to occupancy shall be posted with the Town prior to issuance of each certificate of occupancy. 109. TRAFFIC CIRCULATION STUDIES: As part of each grading permit application, the developer shall submit design -level circulation plans to address onsite circulation and project entry points from Winchester Boulevard at each development phase. The plans will identify the configuration of on -site circulation facilities and project entry points from Winchester Boulevard as needed to support each development phase. 110. TRAFFIC IMPROVEMENTS: The following traffic improvements shall be- constructed prior to issuance of the fast certificate of occupancy: a. New Project Entry. The applicant shall construct a new four -way signalized intersection to align with the existing Courtside driveway approximately 200 -feet south of Albright Way. The design shall include, at a minimum, an additional right turn lane entering the project .site, additional Class II bike lane on east side of Winchester Boulevard along entire project frontage, and two left -turn lanes exiting the project site. The southbound left turn pock shall be formed using a raised median. The raised median shall extend north to physically restrict southbound left and U -turns at Albright Way. The northbound left turn pocket to the Courtside Club shall be extended to 175 -feet (7 car queue) as recommended in the traffic impact analysis. Handicap ramps, pedestrian crossings, signing, striping and parking shall be provided in general conformance with the approved PD plan set. . b. Albright Way at Winchester Blvd. Construct a landscaped island ( "pork chop ") to restrict vehicular movement to right -in right -out only with tarn restriction signage. c. Frontage Improvements. Paint pole and install LED light fixtures for all existing street 36 lights at the project fiontage. d. Class H Bike Lanes. Class II bike lanes shall be provided in both the north and south bound directions on Winchester Boulevard between Wimbledon Drive and the rail crossing. Median islands shall be modified as needed to accommodate the bike lanes. e. Dedicated Right Turn Lanes. Winchester Boulevard shall be widened to provide dedicated right turn lanes at the south entry and new signalized entry. Additional widening may also be required to provide a right turn lane at Albright Way if determined to be required by the Director of Parks and Public Works. f. Striping. The developer shall restripe southbound Winchester Boulevard between the Courtside entrance and Lark Avenue to provide a dedicated southbound left-turn lane to eastbound Lark Avenue. 111. FRONTAGE "ROVEMENTS: Applicant shall be required to improve the project's public fiontage to current Town Standards. These improvements may include but not limited to curb, gutter, sidewalk, driveway approaches, curb ramps; traffic signal, street lighting (upgrade and/or repaint) etc. 112. BUS PAD: Prior to issuance of the first certificate of occupancy, the developer shall provide a bus pad on northbound Winchester Boulevard north of Albright Way. The pad shall meet the following VTA specifications: a. Handicap access ramps and sidewalk from Albright Way to the bus pad; b. 10' x 55' concrete bus pad constructed to VTA specifications; c. Minimum 8' x 40'concrete sidewalk adjacent to the bus stop area; d. Solar bus stop light mounted on VTA bus stop pole with ADA compliant activation button; e. Trees and landscaping should be placed outside the bus stop area to accommodate 37 passenger /pedestrian movement and provide clearance for vehicles. 113. PUBLIC IMPROVEMENTS: Plans for public improvements shall be prepared by a California registered civil engineer, reviewed and approved by the Town, and guaranteed by contract, Faithful Performance Security and Labor & Materials Security before the issuance of a building permit or the recordation of a subdivision map for each development phase. The improvements must be substantially completed prior to issuance of the first certificate of occupancy, fully complete and accepted by the Town prior to issuance of the final Certificate of Occupancy for each development phase. 114. RESTORATION OF PUBLIC IMPROVEMENTS: The developer shall repair or replace all existing improvements not designated for removal that are damaged or removed because of developer's operations. Improvements such as, but not limited to: curbs, gutters, sidewalks, driveways, signs, pavements, raised pavement markers, thermoplastic pavement markings, etc. shall be repaired and replaced to a condition equal to or better than the original condition. A slurry seal shall be provided across the full lane width in areas of trenching, lane widening, median modification or construction, and where striping has been ground off. Existing improvement to be repaired or replaced shall be at the direction of the Engineering Construction Inspector, and shall comply with all Title 24 Disabled Access provisions. Developer shall request a walk- through with the Engineering Construction Inspector before the start of construction to verify existing conditions. 115. PUBLIC AND PRIVATE IMPROVEMENT SECURITY: The applicant shall supply suitable securities for all public improvements, and private circulation and drainage infrastructure improvements that are a part of the development in a form acceptable to the Town in the amount of 100% (performance) and 100% (labor and material) prior to issuance of any permit for each development phase. Applicant shall provide two (2) copies of documents verifying 3$ the cost of the applicable improvements to the satisfaction of the Engineering Division of the Parks and Public Works Department. 116. RETAINING WALLS: A building permit, issued by the Building Department at 110 E. Main Street, may be required for site retaining walls. Walls are not reviewed or approved by the Engineering Division of Parks and Public Works during the grading permit plan review process. 117. SOILS REPORT: One copy of the soils report shall be submitted with each grading permit application. The soils report shall include specific criteria and standards governing site grading, drainage, pavement design, retaining wall design and erosion control. The reports shall be signed and "wet stamped" by the engineer or geologist, in conformance with Section 6735 of the California Business and Professions Code. Each report shall be peer reviewed by Town Consultants prior to submittal for permits. 118. SOIL EXPORT: The total soil export volume (sum of all development phases) fi-om the site shall not exceed 22,200 cubic yards. The contractor's project engineer shall send daily trucking reports to the Engineering inspector during the export operation of each development phase. Project impacts were evaluated based on the following earthwork breakdown: Phase 1) 33,000 CY cut to fill, 8,700 CY export; Phase 2) 4,500 CY cut to fill, 10,000 CY export; and Phase 3) 3,000 CY cut to fill, 3,500 CY export. 119. HAULING OF SOIL: Hauling of soil on or off -site shall not occur during the morning or evening peak periods (between 7:00 a.m. and 9:00 a.m. and between 4:00 p.m. and 6:00 p.m.). No more than 10 trucks per hour will be allowed. Prior to the issuance of a building permit, the developer shall work with the Town Building and Engineering Department Engineering Inspectors to devise a traffic control plan to ensure safe and efficient traffic flow 39 under periods when soil is hauled on or off the project site. This may include, but is not limited to provisions for the developer /owner to place construction notification signs noting the dates and time of construction and hauling activities, or providing additional traffic control. Coordination with other significant projects in the area may also be required. Cover all trucks hauling soil, sand, and other loose debris or require all trucks to maintain at least two feet of freeboard. 120. SOILS REVIEW: Prior to issuance of each grading permit, the applicant's soils engineer shall review the final grading and drainage plans to ensure that designs for foundations, retaining walls, site grading, and site drainage are in accordance with their recommendations and the peer review comments. The applicant's soils engineer's approval shall then be conveyed to the Town either by letter or by signing the plans. 121. EROSION CONTROL: Interim and final erosion control plans shall be prepared and submitted to the Engineering Division of the Parks & Public Works Department. A Notice of Intent (NOI) and Storm Water Pollution Prevention Plan ( SWPPP) shall be submitted to the San Francisco Bay Regional Water Quality Control Board for projects disturbing more than one acre. A maximum of two weeks is allowed between clearing of an area and stabilizing/building on an area if grading is allowed during the rainy season. Interim erosion control measures, to be carried out during construction and before installation of the final landscaping shall be included. Interim erosion control method shall include, but are not limited to: silt fences, fiber rolls (with locations and details), erosion control blankets, Town standard seeding specification, filter berms, check dams, retention basins, etc. Provide erosion control measures as needed to protect downstream water quality during winter months. The grading, drainage, erosion control plans and SWPPP shall be in compliance with .E applicable measures contained in the amended provisions C.3 and C.14 of the most current Santa Clara County NPDES MRP Permit. 122. SURVEYING CONTROLS: Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer qualified to practice land surveying, for the following items: a. Retaining wall - -top of wall elevations and locations b. Toe and top of cut and fill slopes 123. PRECONSTRUCTION PAVEMENT SURVEY: Prior to issuance of a Grading Permit, the project Applicant shall complete a pavement condition survey documenting the extent of existing pavement defects using a 35 -mm or digital video camera. The survey shall extend from the Highway 17 freeway ramps on Lark Avenue along Lark and Winchester to the Campbell City limits. In addition, a pavement deflection analysis conforming to the same limits as the photographic survey shall be performed to determine pavement strength. The results shall be documented in a report and submitted to the Town for review. 124. POSTCONSTRUCTION PAVEMENT SURVEY: The project Applicant shall complete a post construction pavement condition survey and pavement deflection analysis to determine whether road damage occurred as a result of project construction and whether there were changes in pavement strength. Rehabilitation improvements required to restore the pavement to pre - construction condition and strength shall be determined using State of California procedures for deflection analysis. The results shall be documented in a report and submitted to the Town for review and approval. The Applicant shall be responsible for completing any required road repairs prior to release of a certificate of occupancy. 125. TREE REMOVAL: Copies of all necessary tree removal permits shall be provided prior to issuance of any grading permit. 126. DEMOLITION: Any existing structures that would straddle a future property line shall be demolished prior to recordation of the final or parcel map for the applicable phase. 127. DUST CONTROL: Blowing dust shall be reduced by timing construction activities so that paving and building construction begin as soon as possible after completion of grading, and by landscaping disturbed soils as soon as possible. Further, water trucks shall be present and in use at the construction site. All portions of the site subject to blowing dust shall be watered as often as deemed necessary by the Town, or a minimum of three times daily, or apply (non- toxic) soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites in order to insure proper control of blowing dust for the duration of the project. Watering on public streets shall not occur. Streets will be cleaned by street sweepers or by hand as often as deemed necessary by the Town Engineer, or at least once a day. Watering associated with on -site construction activity shall take place between the hours of 8 a.m. and 5 p.m. and shall include at least one late - afternoon watering to minimise the effects of blowing dust. All public streets soiled or littered due to this construction activity shall be cleaned and swept on a daily basis during the workweek to the satisfaction of the Town. Demolition or earthwork activities shall be halted when wind speeds (instantaneous gusts) exceed 20 MPH. All trucks hauling soil, sand, or other loose debris shall be covered. 128. DUST CONTROL, (SITES > 4 ACRES): The following measures should be implemented at construction sites greater than four acres in area: a. Hydroseed or apply (non- toxic) soil stabilizers to inactive construction areas (previously graded areas inactive for ten days or more). b. Enclose, cover, water twice daily or apply (non- toxic) soil binders to exposed stockpiles (dirt, sand, etc.) 9% c. Limit traffic speeds on unpaved roads to 15 mph. d. Install sandbags or other erosion control measures to prevent silt runoff to public roadways. e.. Replant vegetation in disturbed areas as quickly as possible. 129. SILT AND MUD IN PUBLIC RIGHT -OF -WAY: It is the responsibility of contractor and property owner to make sure that all dirt tracked into the public right -of -way is cleaned up on a daily basis. Mud, silt, concrete and other construction debris SHALL NOT be washed into the Town's storm drains. 130. SIDEWALK CLOSURE: Any proposed blockage or partial closure of the sidewalk requires an encroachment permit. Special provisions such as limitations on works hours, protective enclosures, or other means to facilitate public access in a safe manner may be required. 131. SIDEWALK REPAIR: The developer shall repair and replace to existing Town standards any sidewalk damaged now or during construction of this project. Sidewalk repair shall match existing color, texture and design, and shall be constructed per Town Standard Details. The limits of sidewalk repair will be determined by the Engineering Construction Inspector during the construction phase of the project. 132. CURB AND GUTTER: The developer shall repair and replace to existing Town standards any curb and gutter damaged now or during construction of this project. New curb and gutter shall be constructed per Town Standard Details. The limits of curb and gutter repair will be determined by the Engineering Construction Inspector during the construction phase of the prod ect. 133. PRIVATE EASEMENTS: Agreements detailing rights, limitations, and responsibilities of involved parties shall accompany each private easement. The easements and associated agreements shall be recorded simultaneously with each subdivision map. 43 134. PRIVATE STREETS: All streets within the development shall be private. 135. CONSTRUCTION NOISE. 1: Between the hours of 8:00 a.m. to 8:00 p.m., weekdays; and 9:00 a.m. to 7:00 p.m., weekends and holidays, construction, alteration or repair activities shall be allowed. No individual piece of equipment shall produce a noise level exceeding eighty-five (85) dBA at twenty-five (25) feet. If the device is located within a structure on the property, the measurement shall be made at distances as close to twenty-five (25) feet from the device as possible. The noise level at any point outside of the property plane shall not exceed eighty-five (85) dBA. 136. CONSTRUCTION NOISE 2: The Director Of Parks and Public Works may allow earlier start times than specified by Town code if it determined that the work will not cause undue nuisance to adjacent residential neighborhoods. In the event that noise complaints are received, the Town code construction hours will be implemented. 137. PRECONSTRUCTION MEETING: Prior to issuance of any permit or the commencement of any site work, the general contractor shall: a. Along with the project applicant, attend a pre - construction meeting with the Town Engineer to discuss the project conditions of approval, working hours, site maintenance and other construction matters; b. Acknowledge in writing that they have read and understand the project conditions of approval, and will make certain that all project sub - contractors have read and understand them prior to commencing work and that a copy of the project conditions of approval will be posted on site at all times during construction. 138. CONSTRUCTION MANAGEMENT PLAN: The Applicant shall submit a construction management plan that shall incorporate at a minimum the Earth Movement Plan, Traffic Control Plan, Project Schedule, site security fencing, employee parking, construction staging .. area, construction trailer, and proposed outhouse locations. 139. GOOD HOUSEKEEPING: Good housekeeping practices shall be observed at all times during the course of construction. Superintendence of construction shall be diligently performed by a person or persons authorized to do so at all times during working hours. The storing of goods and /or materials on the sidewalk and/or the street will not be allowed unless a special permit is issued by the Engineering Division. The adjacent public right -of -way shall be kept clear of all job related dirt and debris at the end of the day. Dirt and debris shall not be washed into storm drainage facilities. The storing of goods and materials on the sidewalk and/or the street will not be allowed unless a special permit is issued. The developer's representative in charge shall be at the job site during all working hours. Failure to maintain the public right -of -way according to this condition may result in the Town performing the required maintenance at the developer's expense. 140. TRAFFIC CONTROL PLAN: The project sponsor will be required to work with the Engineering Division of the Parks and Public Works Department to develop a traffic control plan for incorporation into the construction bid documents (specifications), and this plan will include, but not be limited to, the following measures: a. Construction activities shall be strategically timed and coordinated to minimize traffic disruption for schools, residents, businesses, special events, and other projects in the area. The schools located on the haul route shall be contacted to help with the coordination of the trucking operation to minimize traffic disruption. b.', Flag persons shall be placed at locations necessary to control one -way traffic flow. All flag persons shall have the capability of communicating with each other to coordinate the operation. c. Prior to construction, advance notification of all affected residents and emergency 45 services shall be made regarding one -way operation, specifying dates and hours of operation. 141. CONSTRUCTION STREET PARKING: No vehicle having a manufacturer's rated gross vehicle weight exceeding ten thousand (10,000) pounds shall be allowed to park on the portion of a street which abuts property in a residential zone without prior approval from the Town Engineer (§ 15.40.070). 142. COVERED TRUCKS: All trucks transporting materials to and from the site shall be covered. 143. CC &R's: A copy of the CC &R's shall be submitted for review and approval by the Town Attorney and Planning Division prior to map recordation. 144. FENCING 1: A fence shall be provided along the project frontage to the rail right of way as shown in the A &S plan set. The fence shall be complete prior to issuance of the first certificate of occupancy. 145. FENCING 2: A 6 -foot masonry fence shall be provided between commercial and residential zones as required by Town Code. 146. ALTERNATIVE TRANSIT: The project shall encourage alternative transportation modes (carpooling and bicycling) by providing reserved parking for carpools /vanpools, showers /changing areas for employees, and bicycle parking. 147. BICYCLE PARKING: Bicycle parking shall be provided at a ratio of one bike space to twenty vehicle parking spaces. Three quarters (75 %) of the bike spaces shall be Cl I and the remaining quarter (25 %) shall be Cl II spaces as defined by VTA. The spaces shall be provided by phase in accordance with the vehicle spaces required for that phase. 148. SCVWD APPROVAL: The following Santa Clara Valley Water District approvals shall be obtained prior to issuance of building permits: a. Any work east of the project's east boundary requires an encroachment permit from the .p District. b. Any proposed trail access points must be open to the general public and not be exclusive to site occupants. New trail connections and trail amenities require District permits. The District discourages the proliferation of "midblo&' access points. c. Planting of replacement trees on SCV WD property to mitigate on site tree removals is not permitted. TO THE SATISFACTION OF THE SANTA CLARA COUNTY FIRE DEPARTMENT: 149. Review of this development proposal is limited to acceptability of site access and water supply as they pertain to fire department operations,. and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive fiom, the Building Department all applicable construction permits. 150. FIRE DEPARTMENT ACCESS MINIMUM CLEAR WIDTH: The minimum clear width of fire department access roads shall be 20 feet. Aerial fire access roads: Buildings or portions of buildings or facilities exceeding 30 feet in height above the lowest level of fire department vehicle access shall be provided with approved fire apparatus access roads capable of accommodating fire department aerial apparatus. Overhead utility and power lines shall not be located within the aerial fire apparatus access roadway. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet in the immediate vicinity of any building or portion of building more than 30 feet in height. Proximity to building: At least one of the required access routes meeting these conditions shall be located within a minimum of 15 feet and a maximum of 30 feet from the building and shall be 47 positioned parallel to one entire side of the building, as approved by the fire code official. CFC Sec. 503 See Pages C =1, C -2.1 and C -2.2. 151. ACCESS AND LOADING FACILITIES: Buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road (including bridges and culverts) with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds or as otherwise determined by the fire code official. Minimum clear height: Vertical clearance over required vehicular access roads and driveways shall be 13 feet 6 inches. Grade: Maximum grade shall -rot exceed 15 %. Turn Radius (circulating): The minimum outside turning radius is 42 feet for required access roadways. Greater radius up to 60 feet may be required where the fire department determines that ladder truck access is required. Circulating refers to travel along a roadway without dead ends. Turning Radius (Cul -de- sacs): The minimum outside turning radius is 36 feet. Use of cul -de -sacs is not acceptable where it is determined by the fire department that ladder truck access is required, unless greater turning radius is provided. CFC Sec. 503 See pages C -1, C -2.1 and C -2.2. 152. EMERGENCY RESPONDER RADIO COVERAGE: Buildings and structures that cannot support the required level of radio coverage shall be equipped with a radiating cable system, a distributed antenna system with FCC certified signal boosters or other system approved by the fire code official in order to achieve the required adequate radio coverage. CFCJ103.1.1. 153. FIRE SPRINKLERS WHERE REQUIRED: An approved automatic fire sprinkler system shall be provide throughout all new buildings and structures. Where the provisions of this code require that a building or portion thereof be equipped throughout with an approved fine sprinkler system in accordance with this section, the sprinklers shall be installed throughout in accordance with NFPA 13 except as provided in Section 903.3.1.1.1 and local standards. W. Note: The new owner(s), occupant(s) and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C -16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. CFC Sections 903.2.1 through 903.2.18 as adopted and amended by LGTC. 154. POTABLE WATER: Potable water supplies shall be protected fi-om contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water -based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by hat purveyor as having been met by the applicant(s).. 2007 CFC Sec. 903.3.5 and Health and Safety Code 13114.7. 155. HOSE VALVES /STANDPIPES REQUIRED: Buildings shall be equipped with standpipes designed per NFPA Std. #14, as amended in Chapter 47, and be equipped with 2 -1/2" hose valves, at location designated by the fire department. Hose valves /standpipes shall be installed as per the 2010 CFC Sec. 905, or where emergency access has been deemed minimal, shall be equipped standpipes designed per NFPA Std. #14, as amended in Chapter 47, and be equipped with 2 -1/2" hose valves, located within the stair enclosure(s). Note .. specifically, within parking structure(s) @ stairwells and on podium within courtyard area. 2010 CFC Sec. 905. 156. PUBLIC FIRE HYDRANT(S) REQUIRED. Provide public fine hydrant(s) at location(s) to be determined jointly by the Fire Department and the San Jose Water Company. Fire hydrants shall be provided along required fire apparatus access roads and adjacent public streets at location(s) to be determined by the fie department. Maximum hydrant spacing shall be 500 feet, with a minimum single. hydrant flow of 1500 GPM at 20 psi, residual pressure. Prior to design, the project civil engineer shall meet with the fire department water supply officer to jointly spot the required fine hydrant locations. 2010 CFC Sec. 507, Appendix B and C and Tables B106 and C105.1. 157. FIRE LANE MARKING REQUIRED: Provide marking for all roadways within the project. Markings shall be per fire department specifications. Installations shall conform to Local Government Standards and Fire Department Standard Detail and Specifications A -6. 2010 CFC Sec. 503.3. 158. TIMING OF REQUIRED WATER SUPPLY INSTALLATIONS. Installations of required fire service(s) and fire hydrant(s) shall be tested and accepted by the Fire Department, prior to the start of framing or delivery of bulk combustible materials. Building permit issuance may be withheld until required installations are completed, tested, and accepted. 2010 CFC Sec. 501. 159. TIMING OF REQUIRED ROADWAY INSTALLATIONS. Required access roads, up through fast lift of asphalt, shall be installed and accepted by the Fire Department prior to the start of combustible construction. During construction, emergency access roads shall be maintained clear and unimpeded. Note. that building permit issuance may be withheld until 50 installations are completed. Temporary access roads may be approved on a case by case basis. 2010 CFC Sec. 501. 160. PREMISES IDENTIFICATION: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with thew background. CFC Sec. 505. 161. NEW COMMERCIAL BUILDING: All new commercial buildings shall comply with standard specification SI -7 for construction site safety. 162. FIRE HYDRANT LOCATION IDENTIFIER: Prior to project final inspection, the general contractor shall ensure that -an approved ( "Blue Dot") fire - hydrant location identifier has been laced in the roadway, as directed by the fire department, 163. TRAFFIC SIGNAL PREMPTION: Both new and existing traffic signals on Winchester Boulevard and Lark Avenue must be equipped with signal preemption control devices. Contact this office to determine which intersections must be so equipped. 51 SECTION VI This Ordinance was introduced at a regular meeting of the Town Council of the Town of Los Gatos on June 3, 2013, and adopted by the following vote as an ordinance of the Town of Los Gatos at a meeting of the Town Council of the Town of Los Gatos on June 17, 2013 and becomes effective 30 days after it is adopted. COUNCIL MEMBERS: AYES: Marcia Jensen, Steven Leonardis, Diane McNutt, Joe Pirzynski, and Mayor Barbara Spector NAYS: ABSENT: ABSTAIN: CALIFORNIA ATTEST: L ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA GATOS 52 PL J /I r / j I O 90 - 160 ALBRIGHT-WAYAND 14600 WINCHESTER BOULEVARD. TOWN OF LOS GATOS Application No. PDA 2 -001 " A.P.N. # 424 -31 -053, 054, 063, 424 -32 -038, 045, 049, 054, 059, 060, 063 Change of zoning map amending the Town Zoning Ordinance. ® Zone Change From: CM:PD To: CM:PD Forwarded by Planning Commission (" Date: Approved by Town Cou ci Dat June 17, 2 13 l'Oa Clerk Administrato M.__ or ril 24, 2013 : 2216 EXHIBIT A Mmwg1k 0 LG BUSINESS PARK LLC • JOHNR.SHENK • PORM4 ARCHITECTURE • STUDIO FIVE LANDSCAPE • BKFCIVIL ENGINEERS ALBRIGHT OFFICE PARK ARCHITECTURE & SITE APPROVAL WINCHESTER BOULEVARD, LOS GATOS, CA MMAM A -01 July 12, 2012 January 10, 2013 June 11. 2013 Vicinity Map SHEETINDEX A -01 Cover A -02 Sheet Index & Vicinity Map A -03 Land Use Exhibit A -04 Conceptual Site Plan A -05 Conceptual Building Perspective & Materials A -06.1 Conceptual Exterior Elevations - 4 Story Buildings A -06.2 Conceptual Exterior Elevations - 3 Story Buildings A -06.3 Conceptual Building Section- 4 Story Buildings A -06.4 Conceptual Building Section- 3 Story Buildings A -07 Conceptual Exterior Elevations - Garage A -08 Conceptual Signage A -09 Conceptual Phasing Plan C -01 Existing Conditions C -02 Conceptual Grading Plan C -03 Conceptual Utility Plan C -04 Conceptual Stormwater Quality Exhibit C -05 Conceptual Parcel Map L -01 Conceptual Landscape Plan L -02 Conceptual Tree Disposition Plan, Sheet 1 L -03 Conceptual Tree Disposition Plan, Sheet 2 L -04 Conceptual Tree Disposition Plan, Sheet 3 Permitted Uses: Offices, including corporate, administrative, business, and professional offices, but excluding medical and dental offices. Light manufacturing, light assembly, research and development, wholesaling, warehousing, and other light industrial uses (including indoor storage of materials and products). Office- serving uses designed to primarily serve those employed at the site or visiting the site for business purposes, such as: recreational facilities; conference and training facilities, restaurants, cafeterias and other eating establishments; health and wellness facilities; and ancillary uses such as on -site banking, ATMs, private post offices, personal services (such as dry cleaning pick up) and similar support uses. Conditional Uses (CUP Required): No conditionally permitted uses are allowed. ---------- - - - - -- .� Nom - 7IL^.CT N0. 5130 \ (307 M 21-241 i J TOO.— VoF 4� o�< �NVg w a,ER M: v. md.N Q00 � v WOd g Z. p0Q Development Standards: Maximum building area is 485,000 square feet in up to four (4) buildings. There may be one (1) parking garage. Parking to have minimum 3.3 stalls per 1,000 sf of office space /research and development space. Setbacks to comply with Zoning Code section 29.70.235 and Guideline II.B.1 of the Guidelines & Standards for Land Use Near Streams dated August 2005 and revised July 2006. The maximum height of the buildings 2 and 3 as shown on sheet A -04 can be up to 65' -0' (sixty five feet zero inches) and buildings 1 and 4 as shown on sheet A -04 can be up to 50' -0" (fifty feet zero inches) above the finish floor, including all towers, spires, elevator and mechanical penthouses, cupolas, wireless telecommunication antennas, similar structures and necessary mechanical appurtenances which are not used for human activity or storage. The maximum height of the parking structure can be 35' -0" (thirty five feet zero inches), exclusive of tower elements, elevator overrun structures, and other similar architectural elements that will be reviewed using Section 29.10.090 of the Zoning Code. Renewable energy facilities, such as wind or solar, can be built on the garage; these facilities can not be taller than the maximum height of the garage (35'). Lot Coverage. Maximum lot coverage for both buildings and parking structures at full buildout to comply with Zoning Code section 29.70.245. The provisions of sections 29.40.015 through 29.40.070 of the Zoning Code do not apply because no residential uses are allowed. Article V of the Zoning Code applies, with the exception that Section 29.50.035 does not apply to the proposed protective fencing at the existing railroad right of way on Winchester at the property line. All references to Zoning Code are to the zoning code in effect as the effective date of the ordinance adopting this PD Overlay zone. Trash Eodosure .72Aright in - right out) 79T30 4 50' fta?YSall LIA 'i y. !ED be right in - right Wear 3�,E`� 65f�ttt91�. t . FLOOR AREA BY OCCUPANCY: A Occupancy: Office/ Research Development CHARTER OAKS Total Building Area: 485,000 square feet The conceptual plan shown on this sheet is one of numerous possible configurations and is shown to illustrate four buildings, 65 and 50 feet tall, and parked at 3.3 stalls /1,000 square feet. The actual site plan is to be determined through the Architecture & Site Appravat process pursuant to Zoning Code section 29.20.150, in conformance with the development standards on Sheet A -03. Position of Buildings Relative to Code and Fire Protection Requirements: The project will comply with Fire Department requirements. Should portions of a building be further than a 150 feet hose reach, approved fire hydrants will be located as directed by the Fire Department. 11 aaaPaeatI -- -- -- _ 000 . o -o o 0 0 ~� 65' feet tall Open Area IL W M. —1 I, J emergency vehicle m parking to existing 1 50 rifest tall N Existing rail line & proposed fence at property line Note: New curb location matches existing curb location for existing tree preservation Trash Enclosure, typ. to 00 } Q 2 2 Grade Level Truck Area Trash Enclosure, typ. PROJECT NORTH 0 50' 100' 200' 9 1 A- Note: See site plan for conceptual orientation and sheets A-06.1,6.2 and A -07 for conceptual elevations. This conceptual rendering illustrates one possible 65 foot building design. Actual building design is to be determined through the Architecture & Site Approval process pursuant to Zoning Code section 29.20.150. in conformance with the development standards on Sheet A -03. LG BUSINESS PARK LLC • JOHNR. SHENK • FORM< ARCHITECTURE • STUDIO FIVE LANDSCAPE. • BKFCIVIL ENGINEERS ALBRIGHT OFFICE PARK PD OVERLAY ZONING WINCHESTER BOULEVARD, LOS GATOS. CA Conceptual Building Perspective & Materials A -05 July 12, 2012 January 10, 2013 Junell.2013 C n C C Q C ;z ;5 r1 I l CC C O OQ FRONT/ BACK ELEVATION Scale: 1/16 " =1 -0" (Scaled for printing at Full size 24 "x36 ") Ltfi; Is f,14 0 (. 1L ID, " s: 6 I. 6. For a 65 foot building the highest elevation SIDE ELEVATION above finish floor height is 65' -0" Scale: 1/16' =1-0' G_ FRONT/ BACK ELEVATION Scale: 1/16 " =1 -0' NOTE: These elevations illustrate one possible 65 foot building design. Actual building design is to be determined through the Architecture & Site Approval process pursuant to Zoning Code section 29.20.150, in conformance with the development standards on Sheet A-03. CC C C B A SIDE ELEVATION Scale: 1/16 " =1 -0' 0' 0I (D !D '�? I(� �1 f1 71 12) 17 15 16 OF CC i FRONT/ BACK ELEVATION Scale: 1/16 " =1 -0" (Scaled for printing at Full size 24 "x36 ") 16 15 11 1] 4 N 10 O OI For a 50' tall building the highest elevation ((above finish floor height is 50' -0" 1 I O O O 1 I I SIDE ELEVATION Scale: 1/16' =1-0 "Q i FRONT/ BACK ELEVATION Scale: 1/16" =1 -0" NOTE: These elevations illustrate one possible 50 foot building design. Actual building design is to be determined through the Architecture & Site Approval process pursuant to Zoning Code section 29.20.150, in conformance with the development standards on Sheet A -03. SIDE ELEVATION d4 LLfBrL0.6r FliGi L.YL PT FD"M Scale: 1/16 " =1 -0" - 64' 00 0 0 00 r 1. 42-0' I. .O� The tallest element can be 65' above first floor elevation. Within that upper limit. ceiling and floor to floor heights may be ajdusted. 00 0 0 00 The tallest element can be 50' above first floor elevation. Within that upper limit. ceiling and floor to floor heights may be ajdusted. These elevations illustrate one possible parking garage design. Actual parking garage design is to be determined through the Architecture & Site Approval process pursuant to Zoning Code section 29.20.150, in conformance with the development standards on Sheet A -03. Cnl ITLA WEST N N N Concrete Finish to Match Office Bu 55 -0 r= o cac oAVr� o' -o- tss -o' w o cave ?AhL vusL F hAilIX1 Sig eac Free Standing Building Identification Sign Monument Sign at new signs Sign area= 50 s.f. each side. Pursuant to Zoning Code Section 29.10.135(d), signage will conform to the following standards: Building mounted signs shown on this sheet are permitted but not required. Signage size to conform to Zoning Code Section 29.10.135(c). Such signs may be placed below 45 feet shown on the elevations on this sheet. No building mounted signs may be visible from SR 85. Monument signs shown on this sheet are to be located at the new signalized intersection on Winchester Boulevard. See sheet A -04 for the specific locations. Signage size and conceptual design will be as shown on this sheet. Freestanding signs shown on this sheet are permitted but not required. They may be located within 60 feet of the buildings' perimeter as shown on this sheet. They may serve way finding and identification purposes. Signage size and conceptual design will be as shown on this sheet. Back Elevation (May alternate with front on different Buildings) Front Elevation (May alternate with back on different Buildings) Side Elevation 1ffitr3iYYl� ®YI!�! � _ .f limit for Building Mounted Signage d on wall at building front and ind/ or sides. Design for these will be submitted separately ,mit. o WW Monument signs at new signalized intersection. a Freestanding building identification sign zones. Building mounted sign zones. r� - -- - Potential Phase 1 Phasing: WINCHESTER BOULEVARD —•� uer or Boa CHARTER OAKS DRIVE Future buildings may be constructed in phases. All or any portion of the existing development is permitted to remain in place and continue in officetresearch and development use, such that at any time the property may be improved partially with all or some of the existing buildings and partially with new development, which new development may include any of the uses authorized on the land use exhibit. Note: The phasing plan shown on this sheet represent an example plan of possible phasing configuration. ffl� S CpEBK �p5 GASO -_ - -- -- -- WINCHESTER BOULEVARD -,1, I' BLD I BinG "ate' t� _ (� 00 1 G rt pGAR ACA Potential Phase 2 Potential Phase 3 CHARTER OAKS DRIVE \ S OWEeK LOS WINCHESTER BOULEVARD cF" CWEEK GNS OS `OS m u w N _IDR�% IBIIR4 5� 1 �1 n� ua2r 1 1 p71-4 t> tat 3 -OS1 .ID ei Ae P� m (6 ME. WINCHESTER BOULEVARD N]6]5 '"T - MIIIUIEN! lIE 1 ,xoezv 1z. -s ='ws ®IIM /la a A Sn u °is' e w tavlm,. v u. Mw tz�]z -ox � ; 6 P111L8 fK n. PMC1 1 -/. - Yw� - Pura n� a°M.aB r M A ' M P1PC t> 7 �\ M — .so u I3M:.lf- 1, -05J E \ tas u x x: tz. -v -as f 1N Ac _ PMY8 PoI WACT N0. 5M T6 mW ]0) N i, -z. tt sA \ ALBRIGHT WAY v ` t APti ]iif -]i' Win. P pE O °I �a 1 .Mai 5 -, PNiC81M0 r \ \ 411 lf�J3 -tMt • e t�61 7J Rs\E_6—aPi/ PIIK9_ 1ND .art p �q rR�V S z V p\'\ CPE / C\'plp GpjpS (��y ) / �9n SpNj p SOS co Q } Zo Q ON °° 3 i U� U° O� pz w � m �- N4 r N WINCHESTER BOULEVARD LL II > C { RKPfR1Y IIE y .,..y 1�� y v✓ y. vial �✓ r m s_ 77— ;1 4 tr BLDOp " r Cl9 040 — > cc ! FF 288. 1 i BLDG. 5p BLDG. 2 p �� a - = ��% ,l FF 2 FF 281.00 BLD n 1!J'I ice: FF 279.50 = LL _ - -`4 ��_ •.. � y ` ` �, � / •nom •� � •Z IMPERVIOUS SURFACE !✓!io[f!p `� �- gd - i ' EXISTING IMPERVIOUS AREA a *662.417 SF (315.2 AC) (X Xx) CQsTW, 01VAINN 65M n BOTTOM OF STAW I ATOx •\ ate.® ,.\ .\ {.` i PROPOSED IMPERVIOUS AREA " *585,420 SF (313.4 AC) 1y EWIOm 90n W wAU EUNAnW Tp.n MISED GRADE QXw1a0N f i PROPOSED LANG USE nncnn now LIRE EuvAnox DEVELOPMENT AREA - 938,282 SF (21.54 AC) Pxm. TOP M PAw1wT EIEVATmT PUBLIC STREET a 0 SF TCX n TOP OF CURB OLUVAnoN � j•• PRIVATE STREET AND DRIVEWAYS = *363,510 SF (*8.3 AC) 1S000n[ TOP OF STAIR EIFVATCN LAND COVERED BY BUILDINGS T nI TOP °P WALL EIEVADCM a y ' _ -✓' i i ®.�'_ _. y y / INCLUDING PARKING STRUCTURES - 1221,710 SF (*5.1 AC) OPEN SPACE / (LANDSCAPEMARDSCAPE) . *353,062 5F ( *8.1 AC) \ i '• /// GGJ EARTHWORK SUMMARY .t G CUT/FIU- VOLUME " I .SOD Cr GRAPNIG OS GPj 05 IMPORT VOLUME = 0 Cr - �...�, CHARTER" .A EXPORT VOLUME = 22,200 Cy OAKS DRIVE The conceptual plan shown Bus us sheet is one em of numus possible configurations. �' Note 'FF means'Finished Floor WINCHESTER BOULEVARD U) OD r a 3 x c� x W a s OS GP'�O L The conceptual plan shown on this sheet is one of numerous possible configurations. —. — 4TA i m A~ A' AC 1p 611, A-1 fWli [• - -.�� n A. l A -w OAT AC zwa v WINCHESTER BOULEVARD xms: I OM AC - t w.mn rD awi iAw N[r. r oa OM K I(i n i f.ru �wua ..rG 4`_ Ac �. ` l •` 6 0.11 M �\ OD '•°R..� M.oi�..oaws q pw1Y. YF 6.r 4LVr 5 w >6 C DRdr w»bE.wt °6.e1 D. C09a� V M 10lCOi .[MF t! IK rA �$CfY.Ei .(I.91®d YrFq�CYIWI wnwm� RDw °: � ww� l®�RP /.i PaOiMZ aao. aoc maa .' 1 � m®c srz �xO wwK ,uiWU� � eBIORETENTION AREA DETAIL p �e OM SS ! NOM i • • �• a A� A-1 �l ONL C I n v LOI At \ `7 p aJl K -✓ jI x J LU AC V( ( W it °m u' AC ® a o" AC fIYO i IM A. ie A -w '"w AKK A. b xms: I OM AC - t w.mn rD awi iAw N[r. r oa OM K I(i n i f.ru �wua ..rG 4`_ Ac �. ` l •` 6 0.11 M �\ OD '•°R..� M.oi�..oaws q pw1Y. YF 6.r 4LVr 5 w >6 C DRdr w»bE.wt °6.e1 D. C09a� V M 10lCOi .[MF t! IK rA �$CfY.Ei .(I.91®d YrFq�CYIWI wnwm� RDw °: � ww� l®�RP /.i PaOiMZ aao. aoc maa .' 1 � m®c srz �xO wwK ,uiWU� � eBIORETENTION AREA DETAIL p �e OM SS ! NOM i • • �• a A� A-1 �l ONL C I n v LOI At \ `7 p aJl K -✓ jI x J LU AC V( ( W s 4 i Ay V w}Mi �• A. E l i � OiY AC B W AC! . -w B / OS GPO L CHAR G1„M= SC,1 OAKS DRIVE >.EGM r -k N9e9�vw, °n ®.�emmwn�v96 tmsu.eb.09.fem COL °s°Olw�. 4i \� Q RtlY 4lII R1Y. 11 °m u' ® a _ - Am Am $— - s 4 i Ay V w}Mi �• A. E l i � OiY AC B W AC! . -w B / OS GPO L CHAR G1„M= SC,1 OAKS DRIVE >.EGM r -k N9e9�vw, °n ®.�emmwn�v96 tmsu.eb.09.fem COL °s°Olw�. 4i \� Q RtlY 4lII R1Y. 11 PARCEL B 6 ACRES � f PARCEL 4 �� t (COMMON AREA) 1 PARCEL 3 _ 0.92 ACRES 1 1 _ 0.92 ACRES (BLDG 4) (BLDG. 3) PARCEL B 6.03 ACRES B (COMMON AREA) i'.M 1 o s2 +arts P.M 2 493 AMS PM L ] so IL]SS ____ HflY P.m Uw PM + a92 IdQS N.,nxtt I.c PN LA ioWAOWS PMM 9 1,03 AOLLS PM c 1.n ACRES 14rx 21.N AtlEv 101e •. AE IYNF. NNIi 6 WTY1M M•. z wxcom �eonsae +i r9r WINCHESTER BOULEVARD PARCEL A 110.06 ACRES (COMMON AREA) l PARCEL 2 [, 0.92 ACRES lL� (BLDG. 2) fL PARCEL C 1 •, t77 ACRES (PARKING GARAGE) PARCEL A 10.06 ACRES JA(COMMON AREA) cNP�s o���E 0 P� PARCEL 1 0.92 ACRES (B ALD IG 1) G The concephial plan sho9m on Nis sheet is one of numerous possible configurations. U) CD N a 2 (7 2 w F a U) f a.l S 1 The conceptual plan shown on this sheet is one of numerous possible configurations and is shown to illustrate four buildings, 65 and 50 foot tall, and parked at 3.3 stalls /1,000 square feet. The actual site plan is to be determined through the Architecture & Site Approval process pursuant to Zoning Code section 29.20.150, in conformance with the development standards on Sheet A-03. 1 �oapsoo�aa� - �saa�ess- sai�a w•: 1{ 91� X -• zese aa_5 • [t i TREE PROTECTION NOTES 1. 1REF FW4 VAIM APM RU ECI E IE(milS MA1 xnlh N TR$ AS F R6r11 a imas K« ITWIdFS Mo w <r As A E9el a RATM EMt " W MCM MMI EM 1«6 M AIN. 11 T6 061µQ, 9R1NES /MMO<6 MIS < H AKA « H MX ATB. 9 ) QXApAp T ETW M IFEmCNAr e4iKK/MS Y91 H11H TO MTECr Ig196, M'S AM!N`Ah 5 MW H AAT M w . Y w'-01 SINNING a Ca:SiMYI91 W.1fRV5 R HE6 <1M+ M £1511Q lU6 VF' AK. Mn . PHHxt A8 CP ACMN r,fi W AS IDMUMI/YMSRtAY 1RMfK. W "AM a YI.RRAI. ICOSII. M- a E(R)OWAT . H P[p TTM e1N1 M 1RfE rzI.YY9I£ AE. M fAWfO tAV.BO M M[ Char 9i W, H uMH MSE BAMdCMLs 9 IRnAn n q aln i N CiVN a M 9RONG I4EXi. EYCar M « ¢£a ' Wo N M Aa1gE➢ K. V H P TV M M6 10 BE RMIEcmn a AlEV A E Httxp M Qa LK a Mir "Us 9 H Pw1Sf0 ra [a151RVCIXN 1uiEbMS NO a9rt PNLa1G 1 noot annelc (r XEE£SSARI) WATER Mp aw m1RE1XN a NR XTIA<IG/QI% Q4 w <n . A T QF IN. 91Q Mlr RWrs GISAIEN Mµ p( Nd II "I M dIl1E1ER H OAWfYA � M YA91 I E %W<IG W AQ IED QItIxG MD sF/AW. a [IDO2D RNIS 5MMY H ACL1lIR@iD VI[Oi M 9RTRMSHN a A OlIL56 N✓BMSi N W@ MW1 CC$RVATRI H1a.O M Y< ai «T4 1H111x -rq/( (N11gFS -4 PRUNBIG ` MWM+a M MIMt CMYYS510 M1LC RdP�M a aAOgL 6 MEC(YdUm M9 4gUG H wIN1ED Nta 10 CP6MICIXM afNA1M6 9AN i«MO Bl NOKE Ml HCESLAY NISTMMiI OfIRM2 wl IiS911 M ITLMICIO a PoIENTM iQ11MB @(ANNE KAIC['WhAI' QRCf MO NwR( IM q<i4giENl 9111N1E ra IEMiIR MO NWN6 CMITL 5. EF WZA11M A PFIXAAY a RRRItA1Xx 6r 1[M6 a a1P RWr 59l NECMN 51Sf1}XgfLM <N1 KRIGiKftS M Sx0.T' LIlp 9i. ra TOY " 10 H A .x <Y Cafit«ICML 90 QX 'II 4 4 N SQNAR QHR RWI aEi<Yxl, aE W 9N M5 AS w ®10 WNSGPKTttI MO /a O1MdWRM MT [NCWRAQ MEiA, ALLMAIE Y( NPA[HN MD caNO6AA: rUP xx (XQ19MI< I a XA iEFDMG RWi NLIS xannol a ru EEMIMIExG wcdAV S ECmFNaT PXnM to M wnAlQt a mann)cm: AcI «lr 6 MAig A $RflE & OtMAHM FAOFW 6 HW<[ M M Au T (DaU W sF M) M < H ICQYPfl9[0 AT W< THE ro i(K EFtt X1rEWN5 qIM- M EFIEO a ..W rMgMh ar[W vn wY.rlpx K ro H MRm Al a ABOUT M un uE x ui A«pnir 9 .Fl(11tr ro 9F0.r MPgoaAmr mm10s) GMEQ6 a «Arta roR EAa Rrcx x nMM<,... nA. RwcAnx cH H ww!om er HMS a A sm Em1t ]oM¢x w PEI6atTQ «.aE. <sN 1�c'souxx' a RRYUHF TOYS RATA 6 ro H RW Ar r0« A[i9.PL Ag9W RIMOfr/MRNC. MIGMG M X�.T «asluX: TO PENETRATE M m to Moor ants ). WICR <Xp<IG <rx wao a<+s (w«x< oalx i' -«Aww oam s) «n<r M[ LM<PN9:rs (W la igvf / w<I:IEM) u Qsmi <asiuE Ev.R<AlnoX rE« sca. RroTn Aw EMCd«AQ HHNnngs xoors Mo VE<ES P aa91C Y6 lr]fACMx. 6 BKPECTa [TY<ACIa 91ML CBIAM coor a orc AwaNSr Pa'Al Mo H rAw.w AW ca«aE1 to Au HWrt[ItNs R«aYG w9'EC1 Br M 92 Mt ' MS HQYF/IIO oU1MG tlxsMM1IMN An.M PARWI1AEr 15 ms AE wAcm Br Rbip<ry/a aaA. «af TM AT APoMOw.AY W (A) IM &I VMS < H 98i1 T r0 AMSS MO ~W M Err(CIISQICSS a M M 1H9nVA`M H Mdl TO ROWS HCaROOAtt Ea ANY AtVi U (« TWAT O TREE PROTECTION NOTES 1. 1REF FW4 VAIM APM RU ECI E IE(milS MA1 xnlh N TR$ AS F R6r11 a imas K« ITWIdFS Mo w <r As A E9el a RATM EMt " W MCM MMI EM 1«6 M AIN. 11 T6 061µQ, 9R1NES /MMO<6 MIS < H AKA « H MX ATB. 9 ) QXApAp T ETW M IFEmCNAr e4iKK/MS Y91 H11H TO MTECr Ig196, M'S AM!N`Ah 5 MW H AAT M w . Y w'-01 SINNING a Ca:SiMYI91 W.1fRV5 R HE6 <1M+ M £1511Q lU6 VF' AK. Mn . PHHxt A8 CP ACMN r,fi W AS IDMUMI/YMSRtAY 1RMfK. W "AM a YI.RRAI. ICOSII. M- a E(R)OWAT . H P[p TTM e1N1 M 1RfE rzI.YY9I£ AE. M fAWfO tAV.BO M M[ Char 9i W, H uMH MSE BAMdCMLs 9 IRnAn n q aln i N CiVN a M 9RONG I4EXi. EYCar M « ¢£a ' Wo N M Aa1gE➢ K. V H P TV M M6 10 BE RMIEcmn a AlEV A E Httxp M Qa LK a Mir "Us 9 H Pw1Sf0 ra [a151RVCIXN 1uiEbMS NO a9rt PNLa1G 1 noot annelc (r XEE£SSARI) WATER Mp aw m1RE1XN a NR XTIA<IG/QI% Q4 w <n . A T QF IN. 91Q Mlr RWrs GISAIEN Mµ p( Nd II "I M dIl1E1ER H OAWfYA � M YA91 I E %W<IG W AQ IED QItIxG MD sF/AW. a [IDO2D RNIS 5MMY H ACL1lIR@iD VI[Oi M 9RTRMSHN a A OlIL56 N✓BMSi N W@ MW1 CC$RVATRI H1a.O M Y< ai «T4 1H111x -rq/( (N11gFS -4 PRUNBIG ` MWM+a M MIMt CMYYS510 M1LC RdP�M a aAOgL 6 MEC(YdUm M9 4gUG H wIN1ED Nta 10 CP6MICIXM afNA1M6 9AN i«MO Bl NOKE Ml HCESLAY NISTMMiI OfIRM2 wl IiS911 M ITLMICIO a PoIENTM iQ11MB @(ANNE KAIC['WhAI' QRCf MO NwR( IM q<i4giENl 9111N1E ra IEMiIR MO NWN6 CMITL 5. EF WZA11M A PFIXAAY a RRRItA1Xx 6r 1[M6 a a1P RWr 59l NECMN 51Sf1}XgfLM <N1 KRIGiKftS M Sx0.T' LIlp 9i. ra TOY " 10 H A .x <Y Cafit«ICML 90 QX 'II 4 4 N SQNAR QHR RWI aEi<Yxl, aE W 9N M5 AS w ®10 WNSGPKTttI MO /a O1MdWRM MT [NCWRAQ MEiA, ALLMAIE Y( NPA[HN MD caNO6AA: rUP xx (XQ19MI< I a XA iEFDMG RWi NLIS xannol a ru EEMIMIExG wcdAV S ECmFNaT PXnM to M wnAlQt a mann)cm: AcI «lr 6 MAig A $RflE & OtMAHM FAOFW 6 HW<[ M M Au T (DaU W sF M) M < H ICQYPfl9[0 AT W< THE ro i(K EFtt X1rEWN5 qIM- M EFIEO a ..W rMgMh ar[W vn wY.rlpx K ro H MRm Al a ABOUT M un uE x ui A«pnir 9 .Fl(11tr ro 9F0.r MPgoaAmr mm10s) GMEQ6 a «Arta roR EAa Rrcx x nMM<,... nA. RwcAnx cH H ww!om er HMS a A sm Em1t ]oM¢x w PEI6atTQ «.aE. <sN 1�c'souxx' a RRYUHF TOYS RATA 6 ro H RW Ar r0« A[i9.PL Ag9W RIMOfr/MRNC. MIGMG M X�.T «asluX: TO PENETRATE M m to Moor ants ). WICR <Xp<IG <rx wao a<+s (w«x< oalx i' -«Aww oam s) «n<r M[ LM<PN9:rs (W la igvf / w<I:IEM) u Qsmi <asiuE Ev.R<AlnoX rE« sca. RroTn Aw EMCd«AQ HHNnngs xoors Mo VE<ES P aa91C Y6 lr]fACMx. 6 BKPECTa [TY<ACIa 91ML CBIAM coor a orc AwaNSr Pa'Al Mo H rAw.w AW ca«aE1 to Au HWrt[ItNs R«aYG w9'EC1 Br M 92 Mt ' MS HQYF/IIO oU1MG tlxsMM1IMN An.M PARWI1AEr 15 ms AE wAcm Br Rbip<ry/a aaA. «af TM AT APoMOw.AY W (A) IM &I VMS < H 98i1 T r0 AMSS MO ~W M Err(CIISQICSS a M M 1H9nVA`M H Mdl TO ROWS HCaROOAtt Ea ANY AtVi U (« TWAT G cX Ff'._ \ WTCl�ME9FE44ETLB W1CIlIE8H81Fki�IIf �X \ � WTLNHE 9EE 91EETL �/ WTM1E 5H$IEEfLp � XX +w° X�m �A X. \ X° X Xw X X Xm mx X yam. � Y � . 456 -3 2E 5P / .... ,5 U 1 65� /260/